About this file
This is a Request for Bids (RFB) and Scope of Work issued by Kennett Township, Chester County, Pennsylvania, for the removal and disposal of woody debris yard waste. The project involves clearing accumulated woody debris from a public drop-off facility located at 557 Bayard Road, Kennett Square, PA. Materials to be removed include tree branches, tree trunks (generally less than 18 inches in diameter), Christmas trees, leaves, and grass clippings, with an estimated volume of approximately 20,000 cubic yards. The pile measures approximately 330 feet long by 125 feet wide by 12 feet high, though bidders are required to obtain their own measurements for accurate quantity estimates. The yard waste facility closed to public drop-off on Friday, September 25, 2026, at 4:00 PM. An optional pre-bid meeting will be held on Wednesday, October 21, 2026, at 9:00 AM at the facility. Bidders may visit the site at any time between dawn and dusk to evaluate conditions and materials. The notification of bid award is anticipated on or about November 6, 2026, with a 45-calendar-day completion deadline from the award date. All work is subject to state-mandated prevailing wage requirements. Bids must be submitted via the PennBID Program, and a 10% bid bond is required.
This is a lump sum contract with all costs including labor, supervision, equipment, materials, fuel, lubricants, mobilization/demobilization, overhead, and insurance to be included in the bid price. Two interim payments are permitted: 50% of the lump sum when 50% of the pile has been removed (as determined by the Director of Public Works), and final payment upon complete removal and demobilization. A penalty of $200 per day applies for work extending beyond the 45-day completion window, to be deducted from final payment. The successful bidder must carry Commercial General Liability insurance with a combined single limit of $500,000 per occurrence and $1,000,000 general aggregate, automobile liability insurance of $500,000 combined single limits, and statutory worker's compensation and employer's liability insurance, with Kennett Township named as additional insured. Certified payroll documentation must be submitted prior to payment to verify prevailing wage compliance. The township reserves the right to award to the lowest responsible bidder or reject all bids. Burning or incinerating materials is not permitted due to proximity to residential areas, though grinding onsite or offsite is acceptable and anticipated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE-BID
2026 REQUEST FOR BIDS TO
REMOVE AND DISPOSE WOODY
DEBRIS YARD WASTE
KENNETT TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
Project Description
This is a re-bid of a previously solicited project. All bids were rejected in the effort to comply with state-mandated prevailing wage requirements.
We have diligently attempted to highlight the changes to this document, subsequent to the original bid, by using red text. But bidders are responsible for reading, understanding and complying with the entire document.
Kennett Township provides a woody debris yard waste drop off facility for its residents.
Contents primarily consist of woody debris such as:
- Tree branches
- Tree trunks, generally less than 18” diameter o Tree trucks with a diameter of greater than 18” may be set aside by the contractor.
- Christmas trees
- Leaves
- Grass clippings
The public works department generally removes non-compliant materials, but no assurance is provided that non-compliant materials may be encountered within the pile.
Non-compliant materials include:
- Tree stumps
- Lumber
- Fence posts/rails
- Tires
- Furniture
- Mattresses
If the contractor encounters non-compliant materials, the materials may be set aside for disposal by the Township.
The yard waste facility is located adjacent to the Public Works facility located at 557 Bayard Road, Kennett Square, PA
For informational purposes only, the yard waste pile is approximately 330 ft. long x 125
ft. wide x 12 ft. high. The contractor is specifically directed to obtain his own measurements of the pile to establish a quantity on which to base his bid.
An aerial image, dated July 2026, of the pile/facility is provided in Attachment A.
Materials have continued to be dropped off (the pile has continued to grow) subsequent to the aerial photo.
The Yard Waste Dropoff area was closed to the public on Friday, September 25, 2026 at 4:00 pm. No additional drop-off of material has been accepted since the closure.
Pre-Bid Meeting An optional Pre-Bid Meeting will be held on Wednesday, October 21, 2026, at 9:00 AM at the Yard Waste Facility located at 557 Bayard Road, Kennett Square, PA.
Bid Requirements
1. A 10% Bid Bond shall be submitted with the bid.
2. No other bonds are required for this project.
3. It is anticipated, but not required, that the contractor will grind the materials onsite and truck the grindings away.
4. Allowable work hours are from 7:00 am to 7:00 pm, Monday through Saturday.
5. The bid price shall include all labor, supervision, equipment, material, fuel, lubricants, mobilization/demobilization, overhead and insurance costs.
6. The contractor shall remove the contents of the pile within 45 calendar days of the
Notification of Bid Award.
a. After 45 days a penalty of $200/day will be assessed and deducted from the payment due the contractor.
b. The Notification of Bid Award is anticipated to be issued on or about
November 6, 2026.
7. The successful bidder shall comply with the established, state-mandated, prevailing wage rates. A copy of the prevailing wage rates are attached as Attachment B.
8. Bidders may visit the yard waste facility at any time between dawn and dusk to review the site conditions, determine the quantity of the yard waste materials and evaluate the general composition of the yard waste material for use in preparing their bid.
9. The bidders are solely responsible for measuring the amount of stockpiled yard waste to use in determining their Lump Sum Bid.
10. The bidders shall account for additional materials to be added to the pile until the closure date listed above.
11. All work shall comply with all Federal, State, County, and Local laws, regulations, and ordinances.
12. Bids shall be submitted via the PennBID Program.
13. The Township shall award the project to the lowest responsible bidder.
14. The Township reserves the right to waive minor informalities of the bids/quotes if the resultant work is in the best interest of the Township and its residents.
15. The Township reserves the right to reject all bids.
16. Due to proximity of neighbors and size of the pile, burning/incinerating the material is not an acceptable process to reduce volume of pile contents prior to disposal. (We may consider technology/equipment that could incinerate the contents in a state approved manner on future projects)
17. Required documents to be submitted with your bid:
a. Non-Collusion Affidavit
b. Public Works Employment Verification Form
c. Prevailing Wage Compliance Form
Insurance Requirements
1. The successful bidder shall carry insurance to indemnify Kennett Township against any claim for loss, damage or injury to property or persons arising out of the performance of the bidder and/or his employees covered by the proposal and the use, misuse or failure of any equipment used by the bidder and/or his employees or agents and shall provide certificates of insurance to the Township prior to starting work.
2. Kennett Township shall be named an additional insured.
3. The successful bidder shall provide proof of the following insurance requirements:
a. Commercial General Liability (“CGL”) insurance on an occurrence basis covering claims of bodily injury and property damage resulting from the Independent Contractor’s performance of the work under this Agreement.
CGL insurance shall initially have a combined single limit of not less than Five Hundred Thousand Dollars ($500,000) for each Occurrence and a One Million Dollars ($1,000,000) minimum General Aggregate.
Products/Completed Operations shall have a $1,000,000 Aggregate.
b. Automobile liability insurance covering bodily injury and property damage of not less than Five Hundred Thousand Dollars ($500,000) combined single limits
c. Statutory Worker’s Compensation and Employer’s Liability insurance
Payment
1. This is a lump sum project.
2. The lump sum price bid for this project shall include all costs to complete the work including mobilization/demobilization, equipment, labor, supervision, fuel, lubricants, materials, and all overhead costs.
3. One interim payment for 50% of the lump sum bid price may be invoiced by the contractor when 50% of the pile, as determined by the Director of Public Works, has been removed from the site.
4. Final payment may be invoiced when all materials have been removed from the site and the contractor has demobilized all equipment. Any penalty assessments due to exceeding the allowable timeframe will be deducted from the final payment.
5. All invoices must be submitted to finance@kennett.pa.us and ted.otteni@kennett.pa.us, along with a W9. Payment by credit card is the fastest option, followed by ACH. A check is possible but will take longer to receive.
Note, all ACH and check payments must be approved at a public meeting of the Board of Supervisors. The invoice and W9 must be submitted at least one week in advance of the meeting date.
mailto:finance@kennett.pa.us
6. A copy of certified payrolls for the weeks worked must be submitted prior to the Township issuing payment to ensure compliance with the state-mandate prevailing wage requirements.
Questions about this proposal shall be submitted through the PennBID program.
The point of contact for this project is:
Ted Otteni Director of Public Works 610-388-1300 Ext: 112 ted.otteni@kennett.pa.us
All bids shall be submitted via the PennBID Platform. Any hard-copy or hand-delivered bids will not be considered and will be discarded.
mailto:610-388-1300%20Ext:%20112
Attachment A Location and Aerial Map totteni Text Box Kennett Township Public Works Facility 557 Bayard Road Kennett Square, PA totteni Callout Rosedale Road totteni Callout E. Hillendale Road totteni Polygon totteni Polygon totteni Callout Yard Waste Dropoff Area totteni Text Box Image is from ChescoViews dated July 2026
Attachment B Prevailing Wage Rates
Project Name: Remove & Dispose Woody Debris Yard Waste - Kennett Township
General Description: Remove and dispose of approximately 20,000 CY of accumulated woody debris from the public works facility.
Project Locality Kennett Township
Awarding Agency: Kennett Township
Contract Award Date: 11/6/2026
Serial Number: 26-08974
Project Classification: Highway
Determination Date: 10/9/2026
Assigned Field Office: Philadelphia
Field Office Phone Number: (215)560-1858
Toll Free Phone Number:
Project County: Chester County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 10/9/2026 Page 1 of 7
Project: 26-08974 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 5/1/2025 $60.84 $48.71 $109.55
Asbestos & Insulation Workers 5/1/2026 $64.51 $50.26 $114.77
Boilermakers 3/1/2018 $45.89 $33.73 $79.62
Bricklayer 5/1/2025 $50.00 $32.57 $82.57
Bricklayer 5/1/2026 $51.15 $34.92 $86.07
Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $55.83 $30.39 $86.22
Carpenter - Chief of Party (Surveying & Layout) 5/1/2027 $58.03 $30.74 $88.77
Carpenter - Chief of Party (Surveying & Layout) 5/1/2028 $60.29 $31.09 $91.38
Carpenter - Chief of Party (Surveying & Layout) 5/1/2029 $62.63 $31.44 $94.07
Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $48.55 $30.39 $78.94
Carpenter - Instrument Person (Surveying & Layout) 5/1/2027 $50.46 $30.74 $81.20
Carpenter - Instrument Person (Surveying & Layout) 5/1/2028 $52.43 $31.09 $83.52
Carpenter - Instrument Person (Surveying & Layout) 5/1/2029 $54.46 $31.44 $85.90
Carpenter - Instrument Person (Surveying & Layout) 5/1/2030 $56.55 $31.79 $88.34
Carpenter - Rodman (Surveying & Layout) 5/1/2026 $24.28 $21.99 $46.27
Carpenter - Rodman (Surveying & Layout) 5/1/2027 $25.23 $22.34 $47.57
Carpenter - Rodman (Surveying & Layout) 5/1/2028 $26.22 $22.69 $48.91
Carpenter - Rodman (Surveying & Layout) 5/1/2029 $27.23 $23.04 $50.27
Carpenter - Rodman (Surveying & Layout) 5/1/2030 $28.28 $23.39 $51.67
Carpenters 5/1/2026 $48.55 $30.39 $78.94
Carpenters 5/1/2027 $50.46 $30.74 $81.20
Carpenters 5/1/2028 $52.43 $31.09 $83.52
Carpenters 5/1/2029 $54.46 $31.44 $85.90
Carpenters 5/1/2030 $56.55 $31.79 $88.34
Cement Finishers & Plasterers 5/1/2022 $38.57 $32.39 $70.96
Cement Masons 5/1/2024 $46.70 $32.46 $79.16
Cement Masons 5/1/2025 $48.70 $32.46 $81.16
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Drywall Finisher 5/1/2025 $40.14 $32.35 $72.49
Drywall Finisher 5/1/2026 $41.10 $32.99 $74.09
Electricians 6/1/2026 $55.25 $41.28 $96.53
Electricians 5/31/2027 $57.33 $42.80 $100.13
Electricians 5/29/2028 $59.49 $44.14 $103.63
Electricians 5/28/2029 $61.64 $45.49 $107.13
Elevator Constructor 1/1/2025 $71.85 $45.77 $117.62
Elevator Constructor 1/1/2026 $74.86 $46.86 $121.72
Floor Coverer 5/1/2025 $51.67 $31.69 $83.36
Floor Coverer 5/1/2026 $52.84 $32.86 $85.70
Glazier 5/1/2025 $49.96 $38.34 $88.30
Glazier 5/1/2026 $51.30 $39.37 $90.67
Interior Finish 5/1/2023 $34.60 $25.80 $60.40
Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/9/2026 Page 2 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Iron Workers (Riggers) 7/1/2025 $44.77 $36.27 $81.04
Iron Workers (Riggers) 7/1/2026 $48.84 $36.52 $85.36
Iron Workers (Rodman/Reinforcing) 7/1/2024 $47.70 $34.77 $82.47
Iron Workers (Rodman/Reinforcing) 7/1/2025 $47.80 $36.65 $84.45
Iron Workers (Rodman/Reinforcing) 7/1/2026 $52.39 $36.90 $89.29
Laborers (Class 01 - See notes) 5/1/2025 $37.25 $26.10 $63.35
Laborers (Class 02 - See notes) 5/1/2025 $41.00 $27.70 $68.70
Laborers (Class 03 - See notes) 5/1/2025 $37.67 $26.28 $63.95
Laborers (Class 04 - See notes) 5/1/2025 $37.67 $26.28 $63.95
Laborers (Class 05 - See notes) 5/1/2025 $37.25 $26.10 $63.35
Landscape Laborer 5/1/2025 $32.15 $24.30 $56.45
Marble Finisher 5/1/2025 $41.17 $30.75 $71.92
Marble Finisher 5/1/2026 $42.07 $31.85 $73.92
Marble Mason 5/1/2023 $47.20 $31.95 $79.15
Marble Setter 5/1/2026 $51.50 $33.80 $85.30
Mason Tender, Cement 5/1/2023 $35.02 $25.98 $61.00
Millwright 5/1/2025 $57.39 $35.81 $93.20
Millwright 5/1/2026 $60.20 $35.81 $96.01
Operators (Building, Class 01 - See Notes) 5/1/2025 $54.52 $34.49 $89.01
Operators (Building, Class 01 - See Notes) 5/1/2026 $55.67 $35.34 $91.01
Operators (Building, Class 01A - See Notes) 5/1/2025 $57.52 $35.38 $92.90
Operators (Building, Class 01A - See Notes) 5/1/2026 $58.68 $36.22 $94.90
Operators (Building, Class 02 - See Notes) 5/1/2025 $54.27 $34.42 $88.69
Operators (Building, Class 02 - See Notes) 5/1/2026 $55.43 $35.26 $90.69
Operators (Building, Class 02A - See Notes) 5/1/2025 $57.29 $35.29 $92.58
Operators (Building, Class 02A - See Notes) 5/1/2026 $58.44 $36.14 $94.58
Operators (Building, Class 03 - See Notes) 5/1/2025 $50.18 $33.22 $83.40
Operators (Building, Class 03 - See Notes) 5/1/2026 $51.34 $34.06 $85.40
Operators (Building, Class 04 - See Notes) 5/1/2025 $49.88 $33.13 $83.01
Operators (Building, Class 04 - See Notes) 5/1/2026 $51.04 $33.97 $85.01
Operators (Building, Class 05 - See Notes) 5/1/2025 $48.16 $32.62 $80.78
Operators (Building, Class 05 - See Notes) 5/1/2026 $49.32 $33.46 $82.78
Operators (Building, Class 06 - See Notes) 5/1/2025 $47.17 $32.33 $79.50
Operators (Building, Class 06 - See Notes) 5/1/2026 $48.34 $33.16 $81.50
Operators (Building, Class 07A- See Notes) 5/1/2025 $66.26 $39.55 $105.81
Operators (Building, Class 07A- See Notes) 5/1/2026 $67.73 $40.48 $108.21
Operators (Building, Class 07B- See Notes) 5/1/2025 $65.97 $39.46 $105.43
Operators (Building, Class 07B- See Notes) 5/1/2026 $67.44 $40.39 $107.83
Painters Class 1 (see notes) 5/1/2025 $44.38 $34.55 $78.93
Painters Class 1 (see notes) 5/1/2026 $45.71 $35.22 $80.93
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 4 (see notes) 5/1/2025 $46.47 $34.55 $81.02
Painters Class 4 (see notes) 5/1/2026 $48.45 $35.22 $83.67
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/9/2026 Page 3 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Plasterers 5/1/2024 $39.88 $33.08 $72.96 plumber 5/1/2025 $70.53 $39.46 $109.99 plumber 5/1/2026 $73.73 $40.36 $114.09
Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15
Pointers, Caulkers, Cleaners 5/1/2026 $53.35 $32.30 $85.65
Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80
Roofers (Composition) 5/1/2026 $47.53 $35.22 $82.75
Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55
Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55
Sheet Metal Workers 5/1/2025 $62.62 $52.17 $114.79
Sheet Metal Workers 5/1/2026 $65.06 $54.48 $119.54
Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89
Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39
Sprinklerfitters 1/1/2023 $62.23 $31.99 $94.22
Sprinklerfitters 5/1/2025 $70.37 $34.85 $105.22
Steamfitters 5/1/2024 $70.32 $43.09 $113.41
Steamfitters 5/1/2025 $72.52 $44.89 $117.41
Stone Masons 5/1/2025 $50.00 $32.80 $82.80
Stone Masons 5/1/2026 $51.50 $33.80 $85.30
Terrazzo Finisher 5/1/2025 $45.61 $29.41 $75.02
Terrazzo Finisher 5/1/2026 $47.78 $29.61 $77.39
Terrazzo Grinder 5/1/2025 $45.88 $29.41 $75.29
Terrazzo Grinder 5/1/2026 $47.78 $29.61 $77.39
Terrazzo Mechanics 5/1/2025 $52.21 $31.26 $83.47
Terrazzo Mechanics 5/1/2026 $53.36 $32.61 $85.97
Tile Finisher 5/1/2025 $41.17 $30.75 $71.92
Tile Finisher 5/1/2026 $42.07 $31.85 $73.92
Tile Setter 5/1/2025 $52.21 $31.26 $83.47
Tile Setter 5/1/2026 $53.36 $32.61 $85.97
Truckdriver class 1(see notes) 5/1/2024 $36.79 $22.54 $59.33
Truckdriver class 1(see notes) 5/1/2026 $38.57 $23.87 $62.44
Truckdriver class 2 (see notes) 5/1/2024 $36.89 $22.54 $59.43
Truckdriver class 2 (see notes) 5/1/2026 $38.67 $23.87 $62.54
Truckdriver class 3 (see notes) 5/1/2026 $38.92 $23.87 $62.79
Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/9/2026 Page 4 of 7
Project: 26-08974 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Bricklayer 5/1/2025 $50.00 $32.57 $82.57
Bricklayer 5/1/2026 $51.15 $34.92 $86.07
Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $65.96 $30.09 $96.05
Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $67.52 $30.44 $97.96
Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $58.39 $29.06 $87.45
Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $60.09 $29.06 $89.15
Carpenter - Rodman (Surveying & Layout) 5/1/2025 $45.88 $23.19 $69.07
Carpenter - Rodman (Surveying & Layout) 5/1/2026 $46.97 $23.54 $70.51
Carpenter 5/1/2025 $57.36 $30.09 $87.45
Carpenter 5/1/2026 $58.71 $30.44 $89.15
Cement Masons 5/1/2023 $43.20 $32.91 $76.11
Cement Masons 5/1/2025 $46.55 $32.66 $79.21
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/Pile Driver Diver 5/1/2026 $61.88 $45.47 $107.35
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Electric Lineman 6/3/2024 $62.07 $33.96 $96.03
Electric Lineman 6/2/2025 $65.10 $34.45 $99.55
Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21
Iron Workers (Riggers) 7/1/2023 $42.53 $34.14 $76.67
Iron Workers (Rodman/Reinforcing) 7/1/2023 $45.70 $34.77 $80.47
Laborers (Class 01 - See notes) 5/1/2025 $40.20 $27.80 $68.00
Laborers (Class 01 - See notes) 5/1/2026 $41.65 $27.90 $69.55
Laborers (Class 02 - See notes) 5/1/2025 $40.40 $27.80 $68.20
Laborers (Class 02 - See notes) 5/1/2026 $41.85 $27.90 $69.75
Laborers (Class 03 - See notes) 5/1/2025 $40.40 $27.80 $68.20
Laborers (Class 03 - See notes) 5/1/2026 $41.85 $27.90 $69.75
Laborers (Class 04 - See notes) 5/1/2025 $35.00 $27.80 $62.80
Laborers (Class 04 - See notes) 5/1/2026 $36.45 $27.90 $64.35
Laborers (Class 05 - See notes) 5/1/2025 $41.05 $27.80 $68.85
Laborers (Class 05 - See notes) 5/1/2026 $42.50 $27.90 $70.40
Laborers (Class 06 - See notes) 5/1/2025 $41.10 $27.80 $68.90
Laborers (Class 06 - See notes) 5/1/2026 $42.55 $27.90 $70.45
Laborers (Class 07 - See notes) 5/1/2025 $40.95 $27.80 $68.75
Laborers (Class 07 - See notes) 5/1/2026 $42.40 $27.90 $70.30
Laborers (Class 08 - See notes) 5/1/2025 $40.70 $27.80 $68.50
Laborers (Class 08 - See notes) 5/1/2026 $42.15 $27.90 $70.05
Laborers (Class 09 - See notes) 5/1/2025 $40.55 $27.80 $68.35
Laborers (Class 09 - See notes) 5/1/2026 $42.00 $27.90 $69.90
Laborers (Class 10- See notes) 5/1/2025 $40.70 $27.80 $68.50
Laborers (Class 10- See notes) 5/1/2026 $42.15 $27.90 $70.05
Laborers (Class 11 -See Notes) 5/1/2025 $40.60 $27.80 $68.40
Laborers (Class 11 -See Notes) 5/1/2026 $42.05 $27.90 $69.95
Laborers (Class 12 -See Notes) 5/1/2025 $42.30 $27.80 $70.10
Laborers (Class 12 -See Notes) 5/1/2026 $42.85 $27.90 $70.75
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/9/2026 Page 5 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Laborers (Class 13 -See Notes) 5/1/2025 $44.33 $27.80 $72.13
Laborers (Class 13 -See Notes) 5/1/2026 $45.78 $27.90 $73.68
Laborers (Class 14 -See Notes) 5/1/2025 $40.90 $27.80 $68.70
Laborers (Class 14 -See Notes) 5/1/2026 $41.90 $27.90 $69.80
Laborers Utility (PGW ONLY) (Flagperson) 5/1/2025 $34.07 $19.73 $53.80
Laborers Utility (PGW ONLY) (Flagperson) 5/1/2026 $35.52 $19.83 $55.35
Laborers Utility (PGW ONLY) 5/1/2024 $39.70 $19.63 $59.33
Laborers Utility (PGW ONLY) 5/1/2025 $41.10 $19.73 $60.83
Laborers Utility (PGW ONLY) 5/1/2026 $42.55 $19.83 $62.38
Landscape Laborer 5/1/2024 $30.28 $24.05 $54.33
Landscape Laborer 5/1/2025 $31.73 $24.15 $55.88
Millwright 5/1/2025 $57.39 $35.81 $93.20
Millwright 5/1/2026 $60.20 $35.81 $96.01
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2025 $54.52 $34.49 $89.01
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2026 $55.67 $35.34 $91.01
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2025 $57.52 $35.38 $92.90
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2026 $58.68 $36.22 $94.90
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2025 $54.27 $34.42 $88.69
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2026 $55.43 $35.26 $90.69
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2025 $57.29 $35.29 $92.58
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2026 $58.44 $36.14 $94.58
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2025 $50.18 $33.22 $83.40
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2026 $51.34 $34.06 $85.40
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2025 $49.88 $33.13 $83.01
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2026 $51.04 $33.97 $85.01
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2025 $48.16 $32.62 $80.78
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2026 $49.32 $33.46 $82.78
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2025 $47.17 $32.33 $79.50
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2026 $48.34 $33.16 $81.50
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2025 $66.26 $39.55 $105.81
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2026 $67.73 $40.48 $108.21
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2025 $65.97 $39.46 $105.43
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/9/2026 Page 6 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2026 $67.44 $40.39 $107.83
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 2 (see notes) 2/1/2025 $50.85 $33.91 $84.76
Painters Class 2 (see notes) 2/1/2026 $51.61 $35.00 $86.61
Painters Class 3 (see notes) 2/1/2025 $61.81 $33.95 $95.76
Painters Class 3 (see notes) 2/1/2026 $62.57 $35.04 $97.61
Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $68.89 $44.73 $113.62
Steamfitters 5/1/2018 $56.37 $34.39 $90.76
Truckdriver class 1(see notes) 5/1/2024 $36.64 $22.54 $59.18
Truckdriver class 1(see notes) 5/1/2026 $38.42 $23.87 $62.29
Truckdriver class 2 (see notes) 5/1/2024 $36.74 $22.54 $59.28
Truckdriver class 2 (see notes) 5/1/2026 $38.52 $23.87 $62.39
Truckdriver class 3 (see notes) 5/1/2026 $38.77 $23.87 $62.64
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/9/2026 Page 7 of 7
| Attachment A |
| Location and Aerial Map |
Attachment B Prevailing Wage Rates