USMEPCOM
J-6/MEIT
Network Cabling Guide
Version 0.12
July 26, 2017
Confidential & Proprietary
Table of Contents
1 RESOURCES
1.1 DOCUMENT CONTROL
1.2 REFERENCES
1.3 TABLE OF FIGURES
2 CABLE INSTALLATION GUIDE
2.1 MANDATORY GUIDELINES
2.2 RECOMMENDED GUIDELINES
2.3 GENERAL PRACTICES
2.4 MEPCOM SPECIFIC EQUIPMENT-RELATED CABLING REQUIREMENTS
2.5 MIRS/COMM OR TELECOMMUNICATION CLOSET/ROOM
2.6 FLOOR MOUNT RACKS/CABINETS
2.7 WALL MOUNT RACKS
2.8 WALL MOUNT CABINETS
2.9 PATCH PANELS
2.10 CABLE MANAGEMENT
2.11 CABLE
2.12 CEILING INSTALLATIONS AND CABLE PATHWAYS
2.13 SEPARATION FROM SOURCES OF EMI
2.14 WORK AREA OUTLETS (WAO)
2.15 FIBER OPTIC CABLE
2.16 WIRELESS DROPS
2.17 GROUNDING
2.18 FIRE STOPPING
2.19 VERTICAL AND HORIZONTAL CORES/SLEEVES
2.20 FILL RATIOS FOR NEW AND EXISTING PENETRATIONS
2.21 POWER INSTALLATION
2.22 HVAC INSTALLATION
2.23 LABELING STANDARDS
2.24 FACEPLATE LABELS
2.25 PATCH PANEL PORT LABELS
2.26 COPPER CABLE LABELS
2.27 FIBER OPTIC COMPONENT LABELS
2.28 FIRE STOP LABEL
2.29 GROUND WIRE LABEL
3 RACK MANAGEMENT
3.1 MAIN DISTRIBUTION FRAME (MDF)
3.2 BEST PRACTICES
4 REFERENCES
4.1 CROSS-REFERENCE OF TOPIC TO REFERENCE
4.2 STANDARD OPTICAL FIBER JACKET COLOR IDENTIFICATIONS
5 ABBREVIATIONS
6 TERMS
1 Resources
1.1 Document Control
Version Date Author Comments
0.1 7/7/2011 Milton Heath Initial Creation
0.4 9/20/2011 Peter Hanson Incorporation of MEPCOM standards
0.5 10/24/2011 Peter Hanson Added Rack Management
0.9 11/21/2011 Peter Hanson Incorporate feedback from NSB
0.10 4/8/2013 Mike Golick Changed reference from SEA to MIRS/COMM and CMR to TR Changed power requirements for MIRS room
0.12 7/31/2017 Mike Golick Corrections to equipment types and connection requirements.
Added cable color coding requirements.
1.2 References
Document Title Document Name
UFC-3-580-01 DoD Unified Facilities Criteria Telecommunications Building Cabling Systems Planning and Design
ANSI/NFPA 70 National Electric Code Oct 2002
National Electrical Code
ANSI/TIA/EIA 568-C.0 Generic Telecommunications Cabling for Customer Premises
ANSI/TIA/EIA 568-C.1 Commercial Building Telecommunications Cabling Standard
ANSI/TIA/EIA 568-C.2 Commercial Building Telecommunications Cabling Standard Part 2: Balanced Twisted- Pair Cabling Components
ANSI/NECA/BICSI 568-2006 Standard for Installing Commercial Building Telecommunications Cabling
ANSI/TIA/EIA-569-B Commercial Building Standards for Telecommunications Pathways and Spaces
ANSI/TIA/EIA-606-A Administration Standard for Telecommunications Infrastructure
ANSI/TIA/EIA-607 Grounding and Bonding Requirements for Telecommunications in Commercial Buildings
TIA/EIA 526-7
1.3 Table of Figures
Figure 2-1 Distances from Sources of EMI Figure 2-2 Face Plate Sample Figure 2-3 Patch Panel Sample Figure 2-4 Cable Label Sample Figure 2-5 Ground Wire Label Figure 3-1 MEPS MDF, Single Switch Figure 3-2 MEPS MDF, Multiple-Switch Figure 3-3 List of Network Hardware Figure 3-4 Cable Ties Figure 3-5 Example MDF rack, with issues Figure 3-6 Example MDF Rack, well organized Figure 4-1 Standard Optical Fiber Jacket Color Identifications
2 Cable Installation Guide
2.1 Mandatory Guidelines
Items that utilize the phrases “Must,” “Shall,” or “Will” are mandatory requirements and must be followed. No deviation is permitted without prior approval from the government project manager.
Telecommunications design must be performed and stamped by a Registered Communications Distribution Designer (RCDD) for all projects. (Reference UFC-3-580-01 Chapter 2)
2.2 Recommended Guidelines
Items that utilize the phrases “Could,” “Should,” or “May” are preferred or recommended guidelines and may be deviated from at the discretion of the Installation Team Leader when conditions or circumstances prevent implementation of these recommendations.
These guidelines apply to the installation of all new and reused/existing equipment that is involved in any upgrade activity. “If you use it, consider it your responsibility to ensure it meets standards.” All installations will be IAW Telecommunication Industry Association (TIA) and Electronic Industry Alliance (EIA) standards.
2.3 General Practices
• All ceiling tiles that are removed will be reinstalled.
• Broken ceiling tiles will be replaced if damaged by installers.
• All activities will take into account worker safety and the safety of the staff.
• Work areas will be kept clean and free of debris.
• Equipment racks should be installed in a secure/lockable area. When the space/room is not secure/lockable, then an enclosed, lockable floor mount cabinet or wall mount cabinet will be used.
• A rack-mountable fan will be installed in all enclosed cabinets.
2.4 MEPCOM Specific Equipment-Related Cabling Requirements
2.4.1 General Switch Configuration
On the Cisco 45xx switch, blade slots 3 and 4 will be used for the supervisor modules. Supervisor blade ports are not to be used as access ports. Connection to the router shall me made as follows:
• Blade 2 port 1 will connect to the RSN (USAHRC) Router as the Primary Uplink to the RSN.
This cable shall be color coded blue and labeled “Primary Uplink”.
• Blade 2 port 2 will connect to the Cisco IPS 5515.
2.4.2 CAT-ASVAB Network Requirements
Cabling for the CAT-ASVAB machines from the patch panel to a specific range of ports on the Cisco 45xx switch, as defined below. It shall be color-coded yellow and labeled “CAT-ASVAB” in addition to the standard label.
• On the Cisco 45xx switch in the MDF or other IDF used to serve the WinCAT terminals, WinCAT ports will begin on the last blade of the switch.
• If additional ports are required for WinCAT, they will continue on the next blade up (the next highest populated blade that is not a supervisor blade) with port 1, continuing in sequence as high as necessary.
• The range of ports dedicated for WinCAT shall be contiguous and reserved only for WinCAT usage.
2.4.3 Color coding for premise wiring and patch cables
• Color coding for premise wiring and patch cables is defined below:
• CAT-ASVAB : Premise Wiring – Yellow, Patch Cables - Yellow
• Servers: Premise Wiring - Blue, Patch Cables - Blue
• Data runs to user stations: Premise Wiring – Gray, Patch Cables - Gray
• Telephone runs to user stations: Premise Wiring – Gray, Patch Cables White
2.4.4 Multiple Network Switch Requirements
In cases when there are multiple Cisco Network data switches on site (Chicago, Houston, and Los Angeles, for example) each switch shall be inter-connected via a ceramic, multimode 62.5-micron fiber optic cable using LC to LC end connectors, and labeled at each end by the Installing Contractor. Switch to Switch connections will be as follows:
• Blade 5 port 8 on the main switch will be used as the downstream link to the second switch, to blade 5 port 8.
• Blade 5 port 7 on the second switch will be used as the downstream link to the third switch, to blade 5 port 7.
See also Figure 3-2 MEPS MDF, Multiple-Switch.
2.4.5 Specific Port Usage Configurations
Connection of other network devices, ports shall be configured as follows:
• On the Cisco 45xx switch in the MDF, use the last blade ports 1-12.
• Blade 9 ports 1-12 shall be reserved only for network devices.
• Networked UPS units may be connected to general use ports.
2.5 MIRS/COMM or Telecommunication Closet/Room
• The Telecommunications Room (TR) must conform to UFC-3-580-01 section 2-5.
o The TR must be environmentally controlled (heating and air conditioning).
o The TR must be secured. UFC-3-580-01 sections 2-5.3, 2-5.4 o 220 Volt 70 Amp circuit must be installed with a service disconnect in the MIRS/COMM room.
o Dedicated 20 Amp electrical outlets (8 - 10 outlets) to be installed in the MIRS/COMM room, with 1 duplex dedicated outlet on each rack post. UFC-3-580-01 section 2-5.15
• Telephone backboards and patch panels must be installed to accommodate telephone lines. UFC- 3-580-01 section 2-5.6
• 100 pair telephone cable must be extended from demarcation to MIRS/COMM room and terminated on a 110 block mounted on the backer board.
• All copper termination patch panels must be Cat-6, 48 Port Universal RJ45/110 Patch Panel with cables punched in accordance with EIA/TIA 568-B standards. UFC-3-580-01 sections 2-4.2.2, 2- 5.9
• The data racks will be a Global Standard Pack; Std Rack 19"W x 7'H Black, UL Listed, and require a cable management scheme (See Section 2.10) with identifying labels on each data cable from the patch panel to the data switch.
• All racks/cabinets will be properly installed and labeled.
• Penetrations, sleeves and cores will be properly fire stopped and labeled.
• All racks/cabinets shall be properly bonded and grounded.
• All cables will be properly installed, labeled and dressed.
• All cable will be routed in an organized fashion using vertical and horizontal cable management devices.
• All fiber and Light Interface Units (LIUs) shall be properly installed and labeled.
• All patch panels will be properly installed and labeled.
2.6 Floor Mount Racks/Cabinets
• New floor mount racks/cabinets will be mounted/bolted securely to the floor using a minimum of four fasteners appropriate for the existing sub floor.
• If floor is carpeted, carpet will be cut away to allow racks/cabinets to be mounted directly to the sub floor.
• There should be a clearance of 36” from the wall to the back of floor mounted racks/cabinets, as well as on at least one side of the racks/cabinets.
• Floor mount racks/cabinets should have, if the layout requires it, a ladder tray secured from rack/cabinets to wall with end caps and cable spillway.
• Rack mounted ground bars (RGBs) should be mounted at top of floor mounted racks/Cabinets and should be mounted on the back.
• LIUs should be mounted under the rack mounted ground bar.
• All racks/cabinets will be grounded.
• Multiple racks/Cabinets will have an independent #6 AWG ground wire from rack/cabinet RGB to TGB.
• Racks will be “bonded” from rack/cabinet to ladder tray.
• All floor mount racks/cabinets will be labeled in sequence from left to right.
• Enclosed equipment racks will have enough clearance to open front and rear panel for access to panels and equipment.
2.7 Wall Mount Racks
• Telephone backboards and patch panels must be installed to accommodate telephone lines. UFC- 3-580-01 section 2-5.6
• New wall mount racks will be mounted on fire rated ¾” plywood (or plywood painted with fire retardant paint) with bolts and anchors or toggle bolts at a minimum of 4 points. No lag bolts will be used.
• Wall mount racks will have enough clearance to open front panel for access to panels and equipment and not interfere with the ingress/egress to the room or closet.
• Rack mounted ground bars should be mounted at top of wall mount racks and should be mounted on the back.
• LIUs should be mounted under the rack mounted ground bar.
• All wall mount racks will be grounded.
• Multiple racks will have an independent (home run) #6 AWG ground wire from rack to TGB.
• All wall mount racks will be labeled in sequence from left to right.
2.8 Wall Mount Cabinets
• New wall mount cabinets will be mounted on fire rated ¾” plywood (or plywood painted with fire retardant paint) with a minimum of 6 bolts and anchors or toggle bolts. No lag bolts will be used.
• All wall mount cabinets will be reinforced by at least one bolt or toggle bolt at each hinge to insure stability for load capacity.
• Wall mount cabinets will have enough clearance to open front and rear door for access to panels and equipment.
• Cabinet mounted ground bars will be mounted at top of wall mount cabinets and should be mounted on the back.
• LIUs should be mounted under the cabinet mounted ground bar.
• All cabinets will be grounded.
• Multiple cabinets will have an independent (home run) #6 AWG ground wire from rack RGB to
TGB.
• A non-metallic grommet or bushing will be inserted into the cable access point at the top, bottom or side of cabinet to prevent damage to the cabling.
• All wall mount cabinets will be labeled in sequence from left to right.
2.9 Patch Panels
• Patch panels will be rated for Cat-6.
• Cables should be punched down on patch panels in ascending order by room number, wall plate number, and port number.
• Patch panels will be labeled properly under ports in front. See Figure 2-3 Patch Panel Sample.
• Multiple patch panels will be labeled on the left front in order from top to bottom, Panel “A”, “B”, “C”, or “1”, “2”, “3”.
• Patch panels will be securely attached to the rack/cabinet using a minimum of 4 screws per panel.
2.10 Cable Management
• Each rack (new and existing, as appropriate) that will support patch panels with station cables, will be equipped with horizontal and vertical wire management panels in order to keep all mounted hardware free of obstructions and provide organized and clear access to the individual devices.
• All cable management devices installed in existing or new racks will be fastened down with appropriate screws at all four corners.
• All patch cables should use Velcro-type ties for cable management purposes.
• The correct length of cables will be used when connecting the devices in the rack or between the racks and equipment. Take into consideration the additional length of cable used through the cable management devices.
• Cables will not be bent beyond the radius specified by the manufacturer and should not be bent beyond the Commercial Building Telecommunications Cabling Standard (TIA/EIA-568-C.2 Chap 5.3.6) for UTP and fiber optic media.
2.11 Cable
• All horizontal copper cable runs must be Cat-6, 4 Pairs, 24 gauge, solid, unshielded twisted pair standard and adhere in accordance with EIA/TIA 568-B standards. UFC-3-580-01 sections 2-4.1
• If local building code requires plenum cabling, then Cat-6 Plenum-Rated 550MHz Solid cables must be used in accordance with EIA/TIA 568-B standards.
• All wiring from the telco demarcation to the telecommunication equipment patch panels shall be Cat-6 Cable, 4 Pairs, 24 Gauge, Solid, Unshielded Twisted Pair standard and adhere in accordance with EIA/TIA 568-B standards. UFC-3-580-01 sections 2-4.2.2
• Cat-6 Cable will not exceed 295’ (90) meters including a 10-foot (3 meters) maintenance loop at the communications room termination point and 12”-18” at the user outlet termination points.
• Cable terminations on back of patch panel will have no more than 1/2” of untwisted wire between cable insulation and termination.
• Cat-6 cable will always be terminated to a Cat-6 patch panel.
• All cable will be labeled and visible on back of patch panels. See Figure 2-4 Cable Label Sample and Figure 2-3 Patch Panel Sample.
• A 10’ service loop at the MIRS/COMM end is required and should be provided in a “snake” fashion above ceiling where possible.
• D- Rings may be used if necessary to secure cable vertically in MIRS/COMMs (D-rings are not authorized for use in horizontal cable suspension).
• Cables will not be stretched for any reason.
• The correct length of cables will be used when connecting the devices in the rack or between the racks and equipment.
• Cables will not bend beyond the radius specified by the manufacturer and should not bend beyond the Commercial Building Telecommunications Cabling Standard (TIA/EIA-568-C.2 Chap 5.3.6) for UTP and fiber optic media.
• Cables should be protected from EMI-emitting devices, such as fluorescent lights.
• Keep cables away from walkways.
• All cables will be routed in an organized fashion by using the horizontal and vertical cable management devices.
• Any cable damaged in any way during the installation process will be replaced.
• All patch cables from the wall jacks to user’s computers shall be Cat-6 cable, 4 Pairs, 24 Gauge, Stranded, Unshielded Twisted Pair standard and adhere in accordance EIA/TIA 568-B standards.
UFC-3-580-01 section 2-4.1.1.2
• All wiring and station outlets are to be tested using the latest commercial standards, and a report with the test results provided to USMEPCOM.
2.12 Ceiling Installations and Cable Pathways
• Cable pathways will be as close to true hard ceiling as possible or where the cable pathway can be reached safely.
• Cable supports will be spaced every 3’ to 5’ on center.
• All Velcro will be plenum rated.
• Velcro should be utilized to dress cables in main pathways and across “J” hooks or supports.
• Velcro will be spaced every 16” to 24” in main cable pathway.
• Velcro used to bundle cables will be applied loosely to allow the Velcro to slide around the cable bundle. The Velcro will not be cinched so tightly as to deform the cable sheath.
• All exposed cable in the MIRS/COMM and computer room will be bound with restraints such as Velcro across the ladder rack and into the ceiling or floor.
• Cable pathway will have no more than a 6” drop between supports.
• Cable supports should be mounted on red iron when possible.
• Priority order to use when mounting cable supports is; red iron or beams, then wall. If red iron or beams are too high or are non- existent, then newly installed all thread wire not supporting the ceiling grid may be use as a last resort. This newly installed wire will be identified with an “ERICO type” grid wire securing clip.
• There will be a clearance of at least 5” between ceiling tiles and cable supports.
• “J” hooks on vendor-installed grid wire may support cable as specified by “J” hook size.
• “J” hooks will not be attached to grid wires that support electrical equipment or lights.
• Cables should not run diagonally. A “main trunk line” down corridors and hallways will be installed with cables going into work areas branched off main trunk line at right angles.
• A single service loop above work area outlet (WAO) in ceiling should be 12”-18” at user end.
• Cable will be installed a minimum of 5” to 24” away from all lights, speakers, fire alarms, sprinklers, water pipes and AC ducts. See Figure 2-1Figure 2-1 Distances from Sources of EMI.
• Building red iron (structural steel), roof support, or other building structures will only be used with appropriate supporting hook or clamp designed to support the weight of cables.
• In-wall installations shall be used as the primary means for installing cables. Surface mounted raceway may only be used when circumstances prohibit in-wall installation.
2.13 Separation from Sources of EMI
Figure 2-1 Distances from Sources of EMI
CONDITION <2 KVA 2 TO 5 KVA >5 KVA
Unshielded power lines or electrical equipment in proximity to open or nonmetal pathways
5 in (127 mm)
12 in (305 mm)
24 in (610 mm)
Unshielded power lines or electrical equipment in proximity to a grounded metal pathway
2.5 in (64 mm)
6 in (152 mm)
12 in (305 mm)
Power lines enclosed in a grounded metal conduit (or equivalent shielding) in proximity to a grounded metal pathway
N/A
3 in (76 mm)
6 in (152 mm)
2.14 Work Area Outlets (WAO)
• All wall jacks are to be Cat-6 certified with quad-face connections. See Figure 2-3 Patch Panel Sample for faceplate labeling standards.
• Wall jacks must be labeled to correspond with labeling on the patch panel.
• Cables will be labeled at user end in the wall in the same fashion as the face plate. See Figure 2-4 Cable Label Sample.
• Cat-6 terminations will have no more than 1/2” of untwisted wire between cable insulation and termination.
• In-wall (flush mount) installations shall be used as the primary means for installing cables and faceplates.
• Where surface raceway is present, all couplings, corner fittings and ceiling boots will be installed.
• All surface-mount work area outlets and raceway will be fastened to the wall surface with an appropriate mechanical fastener. Using adhesive on the back of the raceway is not acceptable.
• Where modular furniture is present, WAOs may be installed at least 18” from ceiling to the top of modular furniture.
2.15 Fiber Optic Cable
• All new fiber will be ceramic, multimode 62.5-micron fiber optic cable using LC to LC end connectors
• All new fiber optic cable will be installed in plenum-rated inner-duct unless armored Jacketed Cable is used.
• Armored fiber will be properly grounded at both ends.
• Plenum Velcro should be used to secure inner-duct to supports and in MIRS/COMM.
• All new fiber optic cable will have a separate path and penetration than the copper cable pathway.
• LIUs will be installed in the MIRS/COMM with no less than a 20’ service loop.
• LIUs will be labeled with both source and destination MIRS/COMM numbers and ports terminated on front top left corner of cover.
• Fiber patch cords connecting newly installed electronics will be labeled with MIRS/COMM number, port number source and destination identification. See Section 2.28 - Fiber Optic Component Labels
2.16 Fiber will be terminated to color code. See Standard Optical Fiber Jacket Color Identifications
• A fiber optic breakout kit is required for all loose tube fiber optics.
2.17 Wireless Drops
Wireless drops will be installed based on locations provided by the plan.
• Cables will be labeled at the wireless outlet in the same fashion as the WAO face plate.
• Cat-6 terminations will have no more than 1/2” of untwisted wire between cable insulation and termination.
For wireless drop locations terminating in a jack:
• Outlet boxes will be mounted above ceiling tiles unless otherwise directed.
• Outlet box will be of metallic construction 4” x 4” with a reducer ring. The cable(s) will enter the outlet box through a strain relief box connector with neoprene bushing providing strain relief on the cable.
• Wireless drops will utilize dual or quad stainless steel face plates.
• Wireless drops will have an 18’’ maintenance loop at the user end.
• All surface-mount wireless outlets will be fastened to the wall surface with an appropriate mechanical fastener. The use of glue adhesive on the back of surface-mount wireless outlets will not be acceptable.
• The patch cable from the wireless outlet to the wireless AP device will be properly supported so as not to lay on the ceiling or other ceiling systems.
• If enclosures are utilized, they will be supported by at least two “speed link” type supports secured to the true ceiling. Supports will be connected in a “crosswise” manner to secure each side of the enclosure.
• Wireless devices will be patched into the “A” port of the face plate.
For wireless drops that are not terminated in a jack:
• Cable will be terminated in a standard RJ-45 plug
• The wireless drop will have a 6’ maintenance loop at the user end.
2.18 Grounding
• Each MIRS/COMM that will require new cable or equipment will be grounded.
• If not already available, a pre-drilled copper, ¼” thick by 2” wide buss bar (telecommunications ground bar) will be installed.
• Minimum wire size will be #6 AWG insulated copper.
• Ground wire must be labeled at point of termination with non-metallic labels. See Figure 2-5 Ground Wire Label.
• Ground wire should be green. If black wire is used it must be marked with green tape.
• The TGB should be bonded to vertical “bare metal” steel frame or horizontal steel if welded to vertical steel.
• Do not bond to water pipe.
• Anti-oxidant does not have to be applied to “clean” or “bare metal” indoors ground connections.
• The local civil engineering or facilities group should provide appropriate grounding points in all MIRS/COMMs as well as in the for the grounding of equipment racks. The installation team will affix a non-metallic label to each ground cable as instructed in ANSI/TIA/EIA J-STD 607 2002.
• If the building currently has no TBB, or the Telecommunications Bonding and Ground infrastructure is sub-code, then the cabling and infrastructure installation team shall identify this to the government project manager at the earliest possible timeframe, and shall receive direction from the government project manager concerning actions required during installation.
• All new and existing equipment racks or cabinets will be bonded and grounded if affected by upgrade activities.
2.19 Fire Stopping
• All penetrations will be fire stopped with a 2-hour rating and will follow manufacturer’s recommended directions in accordance with TIA/EIA-569-B Annex A and all applicable local codes.
• All 2” and 4” sleeves will be fire stopped with mineral wool, fire caulk or fire putty (Fire Stop System material.)
• All 1” sleeves will be fire stopped with fire caulk or putty.
• All sleeves will be fire stopped on the outside, at the base of the penetrations.
• Cable trays will be fire stopped with 2 to 4 hour rated pillows at all wall penetrations.
• All penetrations (sleeves or cable trays) will have a fire stop label installed on each side of wall with installer and company name, manufacturer, fire rating and date. See Section 2.29, page 22 Fire Stop Label.
• All conduits, sleeves and penetrations will be fire stopped in both directions and will be labeled on both surfaces IAW TIA/EIA-606A.
• Cable will not fill more than 50% of sleeve, cable tray, or raceways; 50% will be left void to allow fire stop expansion and unplanned additions.
• All cabling and inner-duct in new penetrations will be centered in the sleeve prior to the installation of Fire Stop System material.
2.20 Vertical and Horizontal Cores/Sleeves
• The installation team will not drill vertical core holes unless directed to do so by the government project manager.
• The installation team will install sleeves in core holes if not already present.
• All vertical cores/sleeves will be 4” (0.10160 meters) in diameter. Sleeves will protrude a minimum of 1” (0.0254 meters) above the finished floor (AFF).
• Cores must be installed a minimum of 1” (0.0254 meters) and a maximum of 6” (0.1524 meters) away from the wall.
• Cores should be positioned to avoid blocking access to backboard space.
• All vertical core/sleeves will be capped with appropriate metal caps or fire stopped in accordance with EIA/TIA569 B Annex A. All areas where vertical cores/sleeves are to be installed will require x-ray negative to insure area to be cored or sleeved is free of obstructions such as electrical conduit, plumbing pipes, etc…
• On all wall and floor penetrations, the conduit or sleeve will protrude a minimum of 1”.
o Normally, it should not exceed 3”, however when circumstances warrant, the length can protrude up to 6”.
• All horizontal and vertical through penetrations will have a metal sleeve with a bushing at each end.
• Horizontal and vertical “through” penetrations that are cut from EMT will have both a connector and a bushing at each end.
• All penetrations through metal studs will have a non-metallic bushing or grommet to protect the cable from sharp edges.
• All conduit and sleeves shall be reamed, bushed and securely fastened to the building.
• No cabling shall be installed in penetrations that are used for any purpose other than telecommunications cabling.
• No existing penetration shall be reused unless it meets all conditions set by EIA/TIA 569- B Annex A.
2.21 Fill Ratios for New and Existing Penetrations
(See TIA/EIA 569-B Chap 8.9.4,)
• Installations shall not, at any time, exceed the maximum fill ratio for penetrations as designated in the applicable fire stop systems U.L. rating table for the specific type penetration.
• Utilize the following list to determine allowable fill ratios in all new and existing sleeves.
o If the below fill ratios are exceeded by the planned installation of UTP cabling, than a new penetration or pathway will be installed.
o If the below figures exceed the allowable fill ratio as determined by the manufacturer’s U.L. rating table for the specific type penetration, than the ratios established by the U.L.
Approved fire stop system table for that specific type penetration must be utilized.
• Preferred fill ratios: These figures are derived from Cat-6 (.295” O.D.) Cabling and a 40% fill load.
.75” Diameter Sleeve or EMT: 2 Cables Maximum 1” Diameter Sleeve or EMT: 4 Cables Maximum 2” Diameter Sleeve or EMT: 18 Cables Maximum 4” Diameter Sleeve or EMT: 73 Cables Maximum
• Existing and new cable trays and ladder way shall be filled no more than a maximum of 50%
(See TIA/EIA 569-B Chap 8)
Preferred fill ratios: These figures are derived from Cat-6 (.295” O.D.) Cabling.
12” Cable Tray: 562 Cables Maximum 24” Cable Tray: 1224 Cables Maximum 36” Cable Tray: 1686 Cables Maximum
2.22 Power installation
• All new power identified for new equipment will be 20 Amp dedicated power, minimum.
• MIRS/COMM room will receive a 70 Amp Circuit Breaker with disconnect, with a blanked out receptacle for the purpose of hard-wire installation of an APC battery back–up and protection system.
• MIRS/COMM room will contain 8 to 10 20 amp duplex outlets, with 1 duplex dedicated outlet mounted on the base of each rack post.
• All dedicated power outlets will be labeled to show their circuit panel location.
2.23 HVAC installation
• Temperature and humidity in each MIRS/COMM and shall be controlled to provide continuous operating ranges of 18 °C (65 °F) to 24 °C (75 °F) with 30% to 55% relative humidity.
• Humidification and dehumidification equipment may be required depending upon local environmental conditions.
2.24 Labeling Standards
• All Cat-6 cabling shall be labeled at each end by Installing Contractor . UFC-3-580-01 section 2- 8 and Figure 2-4 Cable Label Sample
• Cable labels should be visible (not buried) at patch panel end and should be 12”-18” back from the user end to allow several re-terminations.
• All wall jacks must be labeled to correspond with labeling on the patch panel. UFC-3-580-01 sections 2-8.1, 2-8.3, and Figure 2-2 Face Plate Sample.
• All phone lines and patch panels must be labeled at each end to identify locations from the user work location to the patch panel. UFC-3-580-01 sections 2-8.1, 2-8.3. 2-8.4
• In the absence of existing industry-standard labeling, the site-labeling standards described in this document will be used.
o In order to standardize the labeling process in a room that contains one or more outlets, the first outlet shall be the outlet immediately to the left from the point of entry into the room (looking into the room from the entry point). Marking and installation will continue in a clockwise manner to the next outlet in the room until all outlets are marked. In a room that contains more than one entry point, the first outlet will be marked based upon the entry that is the leftmost from drawing north.
• All Labeling will be machine produced; no handwritten labels are permitted to remain on the cabling.
• All Cable Labels shall be of the style that is applied along the length of the cable, and wrapped with a clear protective covering.
• When there is an option to use either numbers or letters, use the method that is most consistent with existing labeling schemes.
• Identifying labels will be used on each data cable from the patch panel to the data switch.
UFC-3-580-01 sections 2-8.1, 2-8.4
• All patch panels must have labels designating the wall plate and port. See Figure 2-3 Patch Panel Sample.
2.25 Faceplate Labels
• Faceplate top:
o Format: Room number-Drop number/Jack letters o Example: (RM 346-1A/B).
• Faceplate bottom:
o Format: MIRS/COMM number-Rack number-Patch panel letter-Port numbers.
o Example: (MIRS/COMM 2080-16-R1-C-3/4) (Note that this example MIRS/COMM has a hyphenated room number: 2080-16)
• Jacks used for dedicated Voice lines shall be labeled with “V”. Data jacks may be labeled “D”.
• See Figure 2-2 Face Plate Sample
Room number where wall plate located, i.e. 4L123 Short for “Room”
Wall Plate in room, usually numbered sequentially Wall Plate Ports: A-B on dual, A-D on quad
Top Label
Bottom Label
Short for “Satellite Equipment Area” Room number of the SEA
Rack/Cabinet ID in the SEA; i.e. R1, R2, C1 Patch Panel ID: number or letter, i.e. Patch Panel C
Patch Panel Ports: Range where the cables are actually terminated on the patch panel in the destination SEA. In this example, 1 through 4
RM 4L123-1A/D
SEA 4L145-R1-C-1/4
SEA 4L145-R1-C-1/4
A B
C D
RM 4L123-1A/D
V
Figure 2-2 Face Plate Sample
2.26 Patch Panel Port Labels
• Labeling on patch panel is just room number and port number in that room.
• The label will include a designation for whether it is a data line or dedicated voice line with a corresponding “-D” or “-V”. VoIP lines will not be considered to be dedicated voice lines.
• Example, see Figure 2-3 Patch Panel Sample.
o 4L123 is the room number where the far end of the cable is terminated.
o “1A-D” = port A on wall plate number 1, Data jack o “2B-D” = port B on wall plate number 2, Data jack o “1D-V” = port D on wall plate number 1, Voice jack.
4L123 1A-D
4L123 1B-D
4L123 1C-D
4L123 1D-V
4L123 2A-D
4L123 2B-D
1 2 3 4 5 6
Patch Panel Label
4L123 – Actual room number Wall plate number 1, Port A, Data
4L123-1A-D
Figure 2-3 Patch Panel Sample
2.27 Copper Cable Labels
• Cable labels need to be attached to each end of the cable and need to contain MIRS/COMM and room location.
• Cable at both ends: MIRS/COMM number-Rack number-Patch panel letter-Port number.
Format: Room number-Drop number and Jack letter Example: (MIRS/COMM 2080-16-R1-C-1 RM 346-1A)
• See Figure 2-4 Cable Label Sample.
Room number Short for “Room”
Wall Plate number and port number.
“1A” = port A on wall plate 1
Cable Label
Short for “Satellite Equipment Area” Room number of the SEA
Rack/Cabinet ID in the SEA; i.e. R1, C1 Patch Panel ID: number or letter, i.e. Panel C
Patch Panel Port where the cable is terminated
RM 4L123-1ASEA 4L145-R1-C-1
Figure 2-4 Cable Label Sample
2.28 Fiber Optic Component Labels
• Fiber optic cable at both ends:
o Format: Termination room-Rack number-LIU ID-Port number -- Termination room-
Rack number-LIU ID-Port number o Example: (TR 110-2-R1-A-8 -- MIRS/COMM 210-24-R1-A-2)
• Fiber optic jumper from LIU to Switch GBIC port at both ends:
o Format: LIU ID-Port numbers--switch ID-GBIC Port number o Example: (LIU A-3/4 – SW4-49)
• Fiber optic distribution box:
o Format: Number strands and type, termination rooms o Example: (24 MM, 110-2 -- MIRS/COMM 210-24)
• Fiber optic inner duct (within 12” of each end, at each side of firewall, wherever inner duct changes direction):
o Format: Number strands and type, termination rooms o Example: (24 MM, 110-2 -- MIRS/COMM 210-24)
2.29 Fire Stop Label
The fire stop label will display the following information:
o Unique identifier of the format:
floor-location-number(hour rating) for example: 1-105-2(4) o Type and manufacturer of firestopping installed o Date of installation o Name of installer o Service record showing any modifications
2.30 Ground Wire Label
Figure 2-5 Ground Wire Label
3 Rack Management
3.1 Main Distribution Frame (MDF)
The MDF is the cable rack that interconnects the telecommunication wiring between the private or public lines coming into the building with the internal network. In the MEPS, the incoming connections include telephone lines and the connection to the Recruiter Service Network (RSN). The MDF coordinates and connects these lines to the internal hardware.
For the network connections, the RSN connection enters the building in the demarc location, and is connected to the RSN Router (Cisco 2821, to be upgraded to Cisco 3845). This router is connected to the Cisco 45xx switch, for distribution throughout the building.
The network topology at a MEPS is a star configuration. In general, each workstation and server is connected to the network by a cable that runs back directly to the 45xx switch in the MDF. In a few locations, there is an Intermediate Distribution Frame (IDF) that serves a portion of the building. In this case, a single uplink line connects the MDF switch to a second switch in a different location of the building. This second switch is then connected to workstations in a star topology.
Patch panels are used to add a layer of abstraction between the switch and the horizontal cable runs to the workstations. Each workstation cable run terminates at the back of a patch panel in the rack. Patch cables then connect the front of the patch panel to a port on the switch.
It is important to keep the wiring of the patch cables neat and organized. Ideally, patch cables should run from the switch port to the nearest side of the rack, bundled carefully with Velcro to keep them organized but not kinked. In this way, half the cables would transit the left side of the rack, and half to the right. Then the patch cables should run vertically to the designated patch panel. Then the cables should again run horizontally to the corresponding patch panel.
Patch cables should not be excessively long. They should traverse the distance necessary with a minimum of slack.
Cable management systems on the sides of the rack aid in managing the vertical cable runs.
Cable lengths can be kept to a minimum and the vertical runs kept less cluttered by locating the switch near the center of the rack, and locating 4 patch panels above the switch, and 3 patch panels below. However, since the 65xx switches are heavy, keeping them at the bottom of the rack is also acceptable.
A minimum of cable clutter will aid in managing the MDF during future modifications, aid in increasing airflow to the heat-generating components and enable port and cable labels to be more easily read.
3.1.1 MEPS MDF, Single Switch
Cisco 45xx
UPS: APC 2200 RM
UPS: APC 2200 RM
Cisco 3845 RSN R
POTS and Fax lines patch panel
CONSOLE
AUX
HWIC 3
N M E
PVDM 3
DO NOT REMOVE DURING NETWORK OPERATION
HWIC 2 HWIC 1 HWIC 0AIM 0AIM 1PVDM 0PVDM 1PVDM 2
CF
SPD
SPD
GigE 0/0 SFP
LINK
LINK
GigE 0/1
N M E
N M E
N M E
S / N
CLEI
PEP
Single-Switch MEPS
TO BE hardware including:
- Cisco 6509 switch
- VoIP phone system
- Cisco IPS 4240
- Infinistream update
Cisco IPS 4240 CONSOLEUSB
100Mbps
10/100 ETHERNET 0
ACT LINK 100Mbps ACT LINK
10/100 ETHERNET 1
0-
0V
.5 /0
.7 5a
ID
S
/6
H z
On the Cisco 6509 switch, blade 5/9 will connect to the RSN Router as the Primary UPLINK to the RSN
On the Cisco 6509 switch, blade 6/9 will connect to the RSN Router as the Secondary UPLINK to the RSN
Larger MEPS may require multiple Cisco 3925 units
Catalyst 4510R
FAN
STATUS
10FLEX-SLOT
6000ACV
POE ENABLEDOUTPUT FAIL
FAN OK
INPUT 1
OK
INPUT 2
OK
O I
O I
SWITCHES SHOULD BE IN THE OFF ‘O’ POSITION TO INSTALL /
REMOVE POWER SUPPLIES. FASTENERS MUST BE FULLY ENGAGED
PRIOR TO OPERATING POWER SUPPLY100-240V~ 12A
220-240V~ 16A 50/60 Hz
100-120V~ 12A/200-240V~ 16A (For Japan)
100-240V~ 12A 220-240V~ 16A 50/60 Hz
100-120V~ 12A/200-240V~ 16A (For Japan)
+V IN GND FB
6000ACV
POE ENABLEDOUTPUT FAIL
FAN OK
INPUT 1
OK
INPUT 2
OK
O I
O I
SWITCHES SHOULD BE IN THE OFF ‘O’ POSITION TO INSTALL /
REMOVE POWER SUPPLIES. FASTENERS MUST BE FULLY ENGAGED
PRIOR TO OPERATING POWER SUPPLY100-240V~ 12A
220-240V~ 16A 50/60 Hz
100-120V~ 12A/200-240V~ 16A (For Japan)
100-240V~ 12A 220-240V~ 16A 50/60 Hz
100-120V~ 12A/200-240V~ 16A (For Japan)
+V IN GND FB
STATUS
ACTIVE
SUP
RESET
1% 100%
UTILIZATION
WS-X45-SUP7-E
USB
1G/10GUPLINKS (SFP/SFP+)
10/100/1000
MGT
SECURE DIGITAL
LINK
1-2 ACTIVE 3-4 ACTIVE
1G
STATUS
ACTIVE
SUP
RESET
1% 100%
UTILIZATION
WS-X45-SUP7-E
USB
1G/10GUPLINKS (SFP/SFP+)
10/100/1000
MGT
SECURE DIGITAL
LINK
1-2 ACTIVE 3-4 ACTIVE
1G
WS-X4748-RJ45V+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-RJ45V+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-RJ45V+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-RJ45V+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-RJ45V+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-RJ45V+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-RJ45V+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4612-SFP+E
“+E”
SERIES
STATUS
1 2 3 4 5 6 7 8 9 10 11 12
1G 10G
Figure 3-1 MEPS MDF, Single Switch
This is the target configuration for a MEPS MDF. This configuration shows a typical layout of the racks containing the network hardware and patch panels.
Refer to Section 2.4, “MEPCOM Specific Equipment-Related Cabling Requirements” for more configuration constraints.
3.1.2 MEPS MDF, Multiple Switch
FAN
STATUS
Power Supply 1 Power Supply 2
Catalyst 6500 SERIES
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
WS-SUP32-10GE-P3B
CATALYST 6500 SUPERVISOR ENGINE 32
SYSTEM
STATUS
ACTIVE
PWR
MGMT
EJECT
DISK 0CONSOLE
PORT 2PORT 1
LINK 1
LINK 2
RESET
TX RX TX RX
LINK
USB 2.0
PORT 3
WS-SUP32-10GE-P3B
CATALYST 6500 SUPERVISOR ENGINE 32
SYSTEM
STATUS
ACTIVE
PWR
MGMT
EJECT
DISK 0CONSOLE
PORT 2PORT 1
LINK 1
LINK 2
RESET
TX RX TX RX
LINK
USB 2.0
PORT 3
Cisco 45xx
APC 2200 RM
APC 2200 RM
Cisco 3845 RSN Router
POTS and Fax lines patch panel
CONSOLE
AUX
HWIC 3
N M E
PVDM 3
DO NOT REMOVE DURING NETWORK OPERATION
HWIC 2 HWIC 1 HWIC 0AIM 0AIM 1PVDM 0PVDM 1PVDM 2
CF
SPD
SPD
GigE 0/0 SFP
LINK
LINK
GigE 0/1
N M E
N M E
N M E
S / N
CLEI
PEP
Cisco 3925 SRST Router (Larger MEPS may require multiple
Cisco 3925 units)
CF 1
CF 0 ISM
EHWIC 0EHWIC 2EHWIC 3
EN EN
CONSOLE
AUX
PVDM1 PVDM0 L
L
PVDM2
L
USB
G E
S
S
S
E N
S
E N
S
GE0/1
GE0/2
4 3
SPE
2 1
CTRLR T1/E/1 0
VWIC2-
1MFT-T1/E1
SEE
MANUAL
BEFORE
INSTALLATION
AL
LP
CD
CTRLR T1/E/1 0
VWIC2-
1MFT-T1/E1
SEE
MANUAL
BEFORE
INSTALLATION
AL
LP
CD
0123 IN USE
VIC2-
4FXO
0123 IN USE
VIC2-
4FXO
Two-Switch MEPS
TO BE hardware:
- Cisco 6509 switch
- VoIP phone system
- Cisco IPS 4240
- Infinistream update
Cisco Systems, Inc.
RUNIN
STALL
SWITCH MUST BE IN OFF "O" POSITION TO INSTALL/
REMOVE POWER SUPPLY. FASTENER MUST BE FULLY
ENAGED PRIOR TO OPERATING POWER SUPPLY.
100-240 V ~ 16A 60/50 Hz
INPUT
OK
FAN
OK
OUTPUT
FAIL
1 2
INPUT 1
100-240 V ~ 16A 60/50 Hz
INPUT 2
Cisco Systems, Inc.
RUNIN
STALL
SWITCH MUST BE IN OFF "O" POSITION TO INSTALL/
REMOVE POWER SUPPLY. FASTENER MUST BE FULLY
ENAGED PRIOR TO OPERATING POWER SUPPLY.
100-240 V ~ 16A 60/50 Hz
INPUT
OK
FAN
OK
OUTPUT
FAIL
1 2
INPUT 1
100-240 V ~ 16A 60/50 Hz
INPUT 2
LogLogic LX510
NetScout Infinistream 6906A
Cisco IPS 4240
CONSOLEUSB
100Mbps
10/100 ETHERNET 0
ACT LINK 100Mbps ACT LINK
10/100 ETHERNET 1
0-
0V
.5 /0
.7 5a
ID
S
/6
H z
On the Cisco 6509 switch, blade 5/9 will connect to the RSN Router as the Primary UPLINK to the RSN
On the Cisco 6509 switch, blade 6/9 will connect to the RSN Router as the Secondary UPLINK to the RSN
FAN
STATUS
Power Supply 1 Power Supply 2
Catalyst 6500 SERIES
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
STATUS
PHONE
WS-X6148-RJ-45V 47
37 38 39 40 41 42 43 44 45 46 4847363533 3431 3229 3027 2825 26242321 2219 2017 1815 1613 1412119 107 85 63 41 2
WS-SUP32-10GE-P3B
CATALYST 6500 SUPERVISOR ENGINE 32
SYSTEM
STATUS
ACTIVE
PWR
MGMT
EJECT
DISK 0CONSOLE
PORT 2PORT 1
LINK 1
LINK 2
RESET
TX RX TX RX
LINK
USB 2.0
PORT 3
WS-SUP32-10GE-P3B
CATALYST 6500 SUPERVISOR ENGINE 32
SYSTEM
STATUS
ACTIVE
PWR
MGMT
EJECT
DISK 0CONSOLE
PORT 2PORT 1
LINK 1
LINK 2
RESET
TX RX TX RX
LINK
USB 2.0
PORT 3
Cisco 45xx
APC 2200 RM
APC 2200 RM
Cisco Systems, Inc.
RUNIN
STALL
SWITCH MUST BE IN OFF "O" POSITION TO INSTALL/
REMOVE POWER SUPPLY. FASTENER MUST BE FULLY
ENAGED PRIOR TO OPERATING POWER SUPPLY.
100-240 V ~ 16A 60/50 Hz
INPUT
OK
FAN
OK
OUTPUT
FAIL
1 2
INPUT 1
100-240 V ~ 16A 60/50 Hz
INPUT 2
Cisco Systems, Inc.
RUNIN
STALL
SWITCH MUST BE IN OFF "O" POSITION TO INSTALL/
REMOVE POWER SUPPLY. FASTENER MUST BE FULLY
ENAGED PRIOR TO OPERATING POWER SUPPLY.
100-240 V ~ 16A 60/50 Hz
INPUT
OK
FAN
OK
OUTPUT
FAIL
1 2
INPUT 1
100-240 V ~ 16A 60/50 Hz
INPUT 2
Main MIRS/COMM Room Secondary MIRS/ COMM Room
“MEPS with 2 and/or 3 6509 Switches” Some MEPS could have 2 or 3 6509 Switches.
1: Port 5/8 on switch#1 is the down stream link to the second switch#2 Port 5/8.
2: Port 5/7 on switch#2 is the down stream link to the third switch Port 5/7.
Figure 3-2 MEPS MDF, Multiple-Switch
This is the target configuration for a MEPS MDF where the facility requires more than one distribution point. This is the case for MEPS with multiple floors or where the facility is too spread out to support Ethernet cable runs from only the main MDF. This configuration shows a typical layout of the racks containing the network hardware and patch panels.
Refer to Section 2.4, “MEPCOM Specific Equipment-Related Cabling Requirements” for more configuration constraints.
3.1.3 MEPS MDF Equipment
The table in Figure 3-3 contains a list of equipment deployed to the MEPS as part of the MDF, and network infrastructure.
Hardware Purpose Cisco 45xx LAN Switch Cisco IPS 5515 Intrusion Prevention and detection
Cisco 3925 Router RSN Router
APC 2200 RM (x2) UPS units for network hardware Patch Panels Termination of Ethernet cabling to wall jacks Patch Cables Connection of patch panel and other hardware to switch Phone Patch Panel Connects building Phone cabling to PBX or dedicated lines, where applicable. This patch panel may be mounted on the wall instead.
Figure 3-3 List of Network Hardware
3.2 Best Practices
3.2.1 General Rack Management Best Practices
• Color coding o By subsystem o By connection type: Workstation, switch, server, internet
• Avoid bending cables too far. They should not be bent to the point of creasing the sheathing.
• Label all cables and components
• Organize cables to separate data from power as much as possible.
• Keep data and power cables from obstructing the flow of air within the cabinet.
• Data cables should run up and overhead, power should be run down to the floor.
• Use Velcro instead of cable ties.
Figure 3-4 Cable Ties
The crimping of cable insulation as shown in Figure 3-4 should be avoided..
3.2.2 MEPS MDF, Examples
Figure 3-5 below shows a typical MDF rack. However, there are a number of issues with this rack.
• Patch cables are unnecessarily long
• Some patch cables are not adequately organized (especially the yellow ones)
• Patch cables are bound with plastic zip ties, crimping the cable sheathing.
• Unused equipment is still located in the racks
• A number of cables are dangling loosely
• There appear to be unused cables dangling from the rack
• Ideally, vertical cable management systems would be implemented on the sides of the rack to aid with cable organization.
Figure 3-5 Example MDF rack, with issues
Figure 3-6 below shows a well-organized MDF rack.
• Cables are well organized and neat
• Adequate space is available to access the rear of the rack
• Vertical cable management systems are used
Figure 3-6 Example MDF Rack, well organized
4 References
4.1 Cross-reference of Topic to Reference
Topic Reference
Electrical ANSI/NFPA 70 National Electric Code Oct 2002
Bonding and Grounding ANSI/TIA/EIA 607
Testing of Fiber Optic Cabling TIA/EIA 526-14-A, TIA/EIA 568-C Annex E
TIA/EIA 526-7
General Cabling Practices TIA/EIA 568-C.0/C.1/C.2
BICSI Telecommunications Cabling Manual
UTP Cable Length TIA/EIA 568-C.1 Chap 8.3
UTP Cable Terminations TIA/EIA 568-C.0 Chap 5.3.3
Testing of UTP Cat-6 Cabling TIA/EIA 568-C.2 Annex C
Existing Pathways TIA/EIA-569-B 7.10.4 / 7.11.4/ Chap 8
New Pathways TIA/EIA 569-B 7.10.4 / 7.11.4/ Chap 8
New Vertical Penetration TIA/EIA 569-B Chap 8.8.2.7
Floor Penetrations TIA/EIA 569-B Chap 8.8.2.7
Wall penetrations TIA/EIA 569- B Chap 8.8.2.7
Fill Ratios for Penetrations TIA/EIA 569-B Chap 8.9.4 / 8.11.3.1
Rack Clearance TIA/EIA 569- B Chap 7.10.5.1.4
Fire Stopping TIA/EIA-606A 6.1.3 / 6.2.5
TIA/EIA 569-B Annex A
EMI Separation Table TIA/EIA 569-B Chap 8.3 / 568 C.0 Chap 5.3.6
Ladder Tray, Cable Tray TIA/EIA 569-B Chap 8.6
False (Drop) Ceilings TIA/EIA 569-B Chap 5.5.1.6 / 6.2.5.1.6 / 6.3.5.1.8 / 7.11.5.1.7
Telecommunications Poles TIA/EIA 569- B Chap 8.9.9
Surface Mount Raceway TIA/EIA 569-B Chap 8.11
Labeling TIA/EIA 606-A
J-Hooks TIA/EIA 569- B Chap 8.7