This statement of work and related federal contract opportunity describe requirements for a roof replacement project at a Federal Aviation Administration facility in San Pedro, California. The statement of work requires removal of an existing fiberglass dome and construction of a new non-combustible roof structure at the Quality Levels Assessment Emergency Operations Facility building. Key requirements include demolition of the dome, installation of new structural steel beams and decking, installation of standing seam metal roofing and gutters, and electrical and lighting work. Interested parties must respond to screening information request number 697DCK-21-R-00129 by May 3, 2021 with technical and cost proposals. The project is set aside for small businesses and is estimated to cost between $250,000 to $500,000, with a 120 calendar day period of performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION

ENGINEERING SERVICES

STAT EMENT OF WORK

F O R

QLA E OF R A D O M E R E M O V A L

And Roof Construction

QLA SAN PEDRO

RANCHO PALOS VERDES

CALIFORNIA

17 JUNE 2020

Statement of Work QLA EOF Roof Construction Cont’d.

PROJECT LOCATION AND POINT OF CONTACTS

Project Description

Commissioned circa 1960, the QLA OEF Building is a robust steel structure supporting the Emergency Operations Facility located atop the Palos Verdes Peninsula Mountain.

The building assets include several offices for the staff and technicians and a large Emergency Operations facility. While originally commissioned with a Surveillance Radar protected by a fiberglass “radome” the radar functions and equipment have been replaced with a newer system now in operation at the same site. The EOF radome now serves as protection of three antenna support towers; however, the dome has outlasted its effective service life and must be demolished carefully before natural causes destroy the dome and building contents.

The existing composite deck is designed and constructed to accommodate the extremely heavy loading conditions of the radar equipment. As such, the as-is structural capacity of said deck will easily accommodate the removal of the radome and construction of a new non-combustible roof structure.

The following Scope of Work (SOW) describes the requirements necessary to remove said dome and construct a new non-combustible roof structure with antenna’ and support platform necessary to provide protection and continued safe operations of the facility and the NAS for many years henceforth.

PROJECT LOCATION:

3860 Crest Road Rancho Palos Verdes

CA 90275

SITE MANAGER SSC:

Jasper Spence

562.596.4623 Office

310.420.6856 Cell

Jasper.spence@faa.gov

FAA ENGINEER:

David J. de Langis FAA AWP Regional Office 777 Aviation Blvd. Suite 150 El Segundo, CA 90245

424.405.7546 Office

310.956.6030 Cell

david.de.langis@faa.gov

SITE CONTACT:

Jose Albarez

310.377.2504 Office

714.392.2236 Cell

Jose.albarez@faa.gov

Cont’d.

1.0 SPECIFIC SCOPE OF WORK:

1.1 General Description:

Bidders/Vendors shall furnish all technology, labor, equipment, tools, services and materials necessary to construct the new roof structure including removal of the fiberglass dome. All new construction shall comply with all applicable codes including but not limited to the ASCE/SEI 7-16 Standards for Minimum Design Loads and Associated Criteria.

The scope of work shall be that which is described herein and as graphically depicted in the Design-Build construction drawings, Sheet(s) S001 QLA Radome Demolition Plan, one page dated 22 April 2020 and S002 QLA Roof Construction Plan, one page dated 22 April, 2020 attached hereto and made a part hereof by this reference. Scope of work shall include but not necessarily be limited to the following:

1.2 Selective Demolition Sheet S001:

• Remove the existing fiberglass dome.

• Remove all catwalk and support structures being careful to save the existing cantilever beams for connection of the new fascia beams.

• Remove steel dome-ring if and where necessary to permit the installation of any and all new structural steel roof beams and related framing members.

1.3 Temporary Protection and Site Clean Up:

• Where roof is demolished, provide weather protection at all times to prevent rainwater damage in the event of sudden storm.

• Provide daily labor for interior and exterior clean up and protection of work site.

• Daily Work Scope shall be the protected each day in the event of sudden storm and high winds.

1.4 Carpentry and metal Framing - Sheet S002:

• Provide temporary protection in the event of rain at all deck penetrations.

• Provide barricades and/or guard railings at deck perimeter and any deck openings such as existing access doors, stair openings, etc.

• Provide light gage cripple wall framing as illustrated to support Verco Roof Deck metal.

1.5 Structural Steel and misc. metals - Sheet S002:

• Provide all structural steel beams, columns, fascia and related steel elements for the fabrication and installation of new roof structure.

• Provide shop drawings for same.

• Provide hip support beams, transverse beams, columns, anchor base plates, etc.

• Provide roof access stair extension through roof scuttle.

• Remove any existing access doors/covers through the existing concrete deck where and if necessary to install new roof steel structure.

• Provide perforated metal eave closure as illustrated.

• Provide Verco Roof Deck materials installed over light gage metal framing.

Cont’d.

1.6 Roofing and sheet metal:

• Standing-seam metal roof material shall be 16” x 22g PVDF Galvalume by Metal Sales Mfg., or equal, color to match W71 or W38 or W35.

• Roof underlayment shall be WR Grace Water Shield “HT” self-adhesive roof underlayment or equal.

• Provide TPO roof membrane over Verco Roof Deck metal at antenna service platform.

• Install rain gutters and down spouts using pre-finished 24 gage galvanized aluminum materials with color to match metal roof.

• Clad roof scuttle walls with 22 gage galvanized aluminum sheet metal.

• Provide spring loaded roof access door with fail-safe operation preventing lockout.

• Provide sheet metal cap and cladding at antenna mount locations

• Provide any necessary flashings, counter flashings and metal trim etc., to prevent water and wind intrusion through vertical and horizontal transitions and assemblies of dissimilar materials and surfaces.

1.7 Exterior finishes:

• Prime and Paint entire building exterior and exposed surfaces using Dunn Edwards materials suitable for application over the existing metal cladding.

• Paint all exposed metal appurtenances such as antenna towers, roof scuttle cladding .

• The color of the paint must be coordinated and approved by the FAA.

• Paint the three antenna towers using FAA AOA orange and white safety marking paint.

1.8 Electrical:

• Furnish and install two new LED exterior light fixtures, Lithonia or equal, mounted to the underside of roof eave. Install new dedicated lighting circuit with photometric cell switch.

• Install dedicated NEMA 3R GFCI power outlet at antenna platform.

• Install new waterproof LED light fixture mounted to one antenna tower leg for convenience lighting at antenna platform. Control new light by switch located at base of roof stairs.

• Provide LED stair lighting fixture in stair well controlled by new light by switch located at base of roof stairs.

• Provide three new LED obstruction lights at top of each antenna tower.

1.9 Final Clean-up:

• Upon completion of all work, provide site clean-up and disposal of all construction debris.

Wash entire exterior of building using pressure washer. Wash all windows inside and out.

2.0 REQUIREMENTS:

• The contractor shall verify in the field all dimension conditions, and comply with all local construction safety codes including compliance with CBC, IBC & NEC requirements. In addition, electrical work shall comply with requirement of the FAA Electrical Specifications Standard FAA 19f, and C-1217e.

• Contractor shall confine all operations, activities, storage of materials, and on-site-parking within the designated areas as indicated at the pre-bid walk through.

Cont’d.

3.0 SUBMITTAL WITH BIDS PACKAGE:

• Proposed project schedule.

4.0 EXECUTION OF WORK:

• The Contractor shall assume full responsibility for the protection and safekeeping of products stored on the site. The Contractor, Contractors employees, and Subcontractors shall maintain the jobsite in a neat and orderly condition at all times, including the daily removal of rubbish, waste and tools, equipment, and materials not required for the work in progress. All persons on site shall maintain safe working conditions and provide adequate protection safeguards for all workers and equipment.

5.0 DELIVERIES OR PERFORMANCE:

• The Contractor shall be required to (a) Commence work under this contract within fifteen (15) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than thirty (30) Calendar days after receipt of notice to proceed. The time stated for completion shall include final cleanup of the premises.

6.0 SECURITY REQUIREMENTS:

• The QLA EOF is a secure facility and thus, the Contractor shall comply with all security and safety requirements and regulations of the FAA while working in secure area.

• All work shall be performed in a way not to disturb the normal operation of the facility.

• The contractor shall ensure project dust, fumes, and vapors are minimized.

• The contractor is not allowed to enter any area, which is outside of the scope of this project.

• The contractor shall perform work at times that minimize risk that may interfere with Air

Traffic Operations.

• If requested by the RE, the Contractor shall provide to the RE, at least seven (7) days prior to

Pre-Construction Meeting, a list of contractor's personnel who will require access to the project site. The list shall be kept current during project work.

7.0 GOVERNMENT FURNISHED MATERIALS

• RF antennas and antenna support towers shall be reused.

8.0 JOB WALK

• A pre-bid job walk shall be scheduled for interested contractors to inspect the job site and familiarize themselves with the surrounding area and environmental conditions. The date and hour for the job walk is TBD.

Cont’d.

9.0 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK:

• The Contractor shall be required to commence work on the NTP date.

• The work shall be prosecuted diligently and completed no later than (90) working days from

NTP date.

• Contractor working hours, shall be no less than five (5) days a week (Monday through Friday) eight (8) hours a day.

• The exact daily start and end time shall be determined future preconstruction meeting. Any deviation from this schedule shall be prearranged and approved by the RE. Approval by the RE for overtime work shall not be construed as an agreement for payment of overtime work.

Holiday work will not be approved.

10.0 PROTECTION OF EXISTING UTILITIES AND PROPERTY:

• Any damage to existing utilities, vegetation, structures, fencing, gates, etc. caused by the Contractor in the performance of this work shall be immediately repaired by the Contractor with quality material and best methods at no cost to the Government. Contractor shall dedicate all effort (manpower and equipment working 24 hours a day, including weekends and holidays) to restore a damage utility back to normal, as approved by the RE.

11.0 AVAILABILITY OF UTILITIES:

• Water, electricity, and sanitary facilities are available for the Contractor’s use. Public telephone service is not available.

12.0 SUBMITTALS:

• TBD.

13.0 ATTACHMENTS

S001 QLA Radome Demolition Plan S002 QLA Roof Construction Plan

*** END OF DOCUMENT ***

4.0 EXECUTION OF WORK:
The Contractor shall assume full responsibility for the protection and safekeeping of products stored on the site. The Contractor, Contractors employees, and Subcontractors shall maintain the jobsite in a neat and orderly condition at all times, in...
5.0 DELIVERIES OR PERFORMANCE:
The Contractor shall be required to (a) Commence work under this contract within fifteen (15) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for u...
6.0 SECURITY REQUIREMENTS:
7.0 GOVERNMENT FURNISHED MATERIALS
8.0 JOB WALK
A pre-bid job walk shall be scheduled for interested contractors to inspect the job site and familiarize themselves with the surrounding area and environmental conditions. The date and hour for the job walk is TBD.