This solicitation requests quotes for an asbestos and lead abatement project at Edwards Air Force Base in California. Quotes are due by June 7, 2022 at 3:00pm ET and shall be submitted via email. The scope of work includes removing approximately 3,945 square feet of asbestos flooring and carpeting and 103 linear feet of lead-based paint from handrails. It also requires installing approximately 4,200 square feet of new carpeting, 227 square feet of VCT flooring, and 565 linear feet of new baseboard. The work must be performed in stairwells and rooms 124 through 127 of building 2580. An optional site visit is available on May 24, 2022 at 9:00am at the specified location on the base. The solicitation is being conducted by the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9. Wage Determination CA20220020.pdf | ||
| 697DCK-22-R-00273.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDW TRACON Asbestos and Lead Abatement i
STATEMENT OF WORK (SOW)
FY20 JCN: 19003501 and 19003502 Facility ID: EDW BLDG
Location: Edwards Air Force Base, CA Author (s): Jose Salmeron, Hannah Carlson
Date Prepared: 24AUG2020
WSA Technical Operations Engineering Services
777 Aviation Blvd., El Segundo, CA ii
Table of Contents
1.0 SUMMARY AND SCOPE OF WORK
1.1 REGULATORY COMPLIANCE
1.2 PROJECT CONDITION
1.3 WORK BY FAA
1.4 HOURS OF WORK
1.5 SCHEDULE OVERRRUNS
1.6 PRE-CONSTRUCTION MEETING
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTING & COATING
ATTACHMENT I
APPENDIX I
1.0 SUMMARY
A) Applicable provisions of Division 1 - General Requirements, Drawings, and other provisions and requirements of the Contract Documents apply to work of this Section. This specification is being included as part of the bid package to be followed for the removal of asbestos and lead that would be disturbed during the course of the project.
B) This Section includes the removal, control and disposal of friable and non-friable asbestos containing materials (ACM), and delaminating lead-based paint (LBP) coatings from existing building components, or the complete removal and replacement of existing building component containing LBP at Edwards Air Force Base located in Kern County, CA. The work includes, but is not limited to: the construction of temporary enclosures to isolate the work area, including providing tunnels for moving equipment and FAA personnel means of egress, the establishment of negative-air pressure within the isolated work area, the removal of ACM and LBP from the isolated work area, and the legal disposal of the removed ACM and LBP from FAA property.
1. Observe all existing conditions prior to submitting a bid. The Contractor is expected to have considered, and included in their bid, all aspects and liability of the existing conditions and their impact, particularly to cost and health and safety of workers and occupants, and proper function and operation of the facility. Additionally, the Contractor shall be aware of other work being performed. Failure to visit the site shall in no way relieve the Contractor from the necessity of furnishing materials or performing any work that may be required to complete the work in accordance with the Contract Documents without additional cost to the FAA. Additional site visits required by the Contractor, shall be scheduled with the FAA.
2. The quantities and locations of ACM and LBP and the extent of work indicated are only best estimates which are limited by the physical constraints imposed by occupancy of the facility. Accordingly, minor variations (plus or minus 10 percent) in quantities of ACM and LBP within the limits of containment for each abatement area are considered as having no impact on contract sum and contract performance period. Locations of ACM and LBP different than indicated on drawings but within the limits of containment are considered as having no impact on contract sum and contract performance period. Where additional asbestos and lead abatement work is required beyond the above variations, the contract sum and contract performance period will be adjusted under provisions of Division One of the Specifications.
C) ACM and LBP Locations - In general, the following asbestos and lead containing materials shall be encountered in the following areas:
Stairwell Room 124 – Wellness Room Room 125 – Break Room Room 126 – Supply Room Room 127 – Equipment Room
The contractor shall furnish all labor, materials, services, trained personnel, insurance and equipment as needed to complete the removal of ACM and LBP as indicated in the project-specific task order requirements.
The contractor shall follow all federal, state and local ordinances, regulations and requirements pertaining to ACM and LBP removal, storage, transportation and disposal. The scope of work for the EDW BLD Asbestos and Lead Abatement project at Edwards Air Force Base located in Kern County, CA includes, but is not limited to:
• Remove approximately 3,945 SF of asbestos tile and carpeting from the floors in the stairwell, rooms
124, 125, 126, and 127 of building 2580.
• Install approximately 4,200 SF of carpet in the hallway, stairwell (stairs and landings), Rooms 124, 126, and 127.
• Install approximately 227 SF of VCT in Room 125 – Breakroom and 66 LF of base.
• Remove and install approximately 565 LF of base in the hallway, stairwell, Room 124, 126, and 127.
Install Armstrong cove base or product of equal specifications to match existing.
• Remove the raised floor in Room 127 – Equipment Room where re-host equipment was installed.
• Strip lead-based paint from approximately 103 LF of handrails in the stairwell. Include stair stringers, risers, handrail supports, and ladder on the landing (an additional approximately 55 SF).
• Install a non-skid surface on two levels of stairs.
• Contractor to field verify all measurements and dimensions.
SCOPE OF WORK REQUIRED BY ROOM
• Wellness Room (Room 124) o Establish a negative pressure enclosure. Emergency egress route impact concerns will require consideration during work in this area.
o Remove and dispose of any and all layers of flooring and floor base containing asbestos.
o Clean and decontaminate floors and other non-porous surfaces.
o Install approximately 503 SF of carpet and approximately 101 LF of base, including around columns.
Contractor to field verify.
o All work under this contract shall comply with requirements of the Carpet and Rug Institute (CRI), the Textile Colorists & Chemists (AATCC), ASTM, EPA, and state and local regulations.
o Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
• Breakroom (Room 125) require consideration during work in this area.
o Remove and dispose of any and all layers of flooring and floor base containing asbestos.
o Clean and decontaminate floors and other non-porous surfaces.
o Install approximately 227 SF of new tile and approximately 66 LF of tile base throughout.
Contractor to field verify.
• Supply Room (Room 126) require consideration during work in this area.
o Remove and dispose of any and all layers of flooring and floor base containing asbestos.
o Clean and decontaminate floors and other non-porous surfaces.
o Install approximately 250 SF of new carpet and approximately 76 LF of base.
Contractor to field verify.
o All work under this contract shall comply with requirements of the Carpet and Rug
Institute (CRI), the Textile Colorists & Chemists (AATCC), ASTM, EPA, and state and local regulations.
• Equipment Room (Room 127) require consideration during work in this area.
o Remove and dispose of any and all layers of flooring and floor base containing asbestos.
o Remove the 150 SF raised platform in preparation for new re-host equipment to be installed. Coordination of installation schedules is required.
o Clean and decontaminate floors and other non-porous surfaces.
o Install approximately 2,300 SF of new carpet and approximately 203 LF of base.
Contractor to field verify.
• Hallway o Install approximately 350 SF of new carpet and approximately 100 LF of base where tile containing asbestos has already been removed.
Contractor to field verify.
o All work under this contract shall comply with requirements of the Carpet and Rug Institute (CRI), the Textile Colorists & Chemists (AATCC), ASTM, EPA, and state and local regulations.
• Stairwell require consideration during work in this area.
o Remove and dispose of tile, carpet, and floor base containing asbestos on the stairs and three landings.
o Strip and re-paint approximately hand rails, ladder, stair stringers, and stair supports containing lead (approximately 103 LF of hand rails).
o Clean and decontaminate floors, railings, stair stringers, and other non-porous surfaces.
o Contractor must prepare the rail for new cover/paint/coat per manufacturer’s recommendations.
o Paint must be Rust Bullet Industrial low VOC metal coating or similar (ie. Similar VOC, wear resistance, warranty, etc.)
Documentation must be provided.
o Install approximately 195 SF of new carpet on three landings, approximately 70 SF of carpet on the stairs, and approximately 85 LF of base.
Contractor to field verify.
o Install non-skid surface/stair tread on two levels of stairs.
o All material used must be low VOC (including but not limited to: paint stripper, thinner, etc.)
o All work under this contract shall comply with requirements of the Carpet and Rug
Institute (CRI), the Textile Colorists & Chemists (AATCC), ASTM, EPA, and state and local regulations.
D) ACM and LBP Quantities to be abated are based upon Asbestos Survey Inventory dated
03/11/2019.
1.1 REGULATORY COMPLIANCE
All project activities, including pre-cleaning, set-up, LBP removal, final clean-up, air monitoring, transportation, and waste disposal shall be in accordance with this specification and current federal and state regulations, including local laws, ordinances, rules, regulations, orders and codes (all to be referred to as "applicable law"). The contractor shall be responsible for the proper handling, storage and disposal of all waste generated from this project, including any material classified by the Environmental Protection Agency (EPA) as Resource Conservation and Recovery Act (RCRA) or Toxic Substances Control Act (TSCA) regulated waste. In cases where regulations and/or contract documents are conflicting, or discrepancies occur, the more stringent requirement shall be followed and enforced.
1.2 PROJECT CONDITIONS
The EDW TRACON facility is in operation 24-hours per day, 7-days per week facility which is essential to the safe operation of Air Traffic, however it is only staffed during normal business hours Monday through Friday. The Contractor will be responsible for the continuous protection of this facility and its employees and shall immediately notify the COR in the event of a breach of this protection. They must also coordinate construction and abatement activities with the COR in order to prevent any disruption of this critical operation.
A) Disruption of operations for any amount of time could jeopardize the safety of the flying public and may result is criminal prosecution.
B) The FAA shall occupy the facility during construction activities. The Contractor shall cooperate fully with the COR during construction operations to minimize conflicts and to facilitate FAA usage. The Contractor shall perform the work so as not to interfere with FAA operations. The Contractor shall provide FAA personnel access to equipment remaining in service. The Contractor shall construct containments to allow travel routes for FAA personnel and to allow moving of necessary equipment.
C) The work shall be limited to specific areas of the building and site. Unlimited Contractor access is specifically not permitted. Arrangements for use of the buildings and site will be restricted to those areas specifically allowed by FAA. Other Contractors shall be working at the site prior to and after asbestos abatement. The contractor shall cooperate with other contractors and prevent work by others from jeopardizing the asbestos work. Construction planning meetings shall be held once a week to discuss other projects that could adversely impact the asbestos abatement project.
1.3 WORK BY FAA
A) The shut-down and re-start of mechanical equipment.
B) The shut-down of electrical circuits and equipment.
C) Storage for and moving of furniture (ie. desks, lockers, chairs, appliances, gym equipment, etc.)
in areas of this Contractor’s work.
1.4 HOURS OF WORK
A) The Contractor shall strictly adhere to work hours as specified in Division One. Deviations shall be pre-approved, in writing, by the COR 48 hours in advance.
B) Request to change work hours or overtime proposed by the Contractor shall require COR’s written approval prior to implementing changes. The COR’s rejection of request for change shall not result in changing contract sum or extending contract time.
1.5 SCHEDULE OVERRUNS
A) If the work is behind the agreed time of completion, the COR shall deduct extra costs, including expenses, for GCIH services due to the overrun, from the final payment to the Contractor, in addition to compensation for damages identified in other parts of the contract documents.
1.6 PRECONSTRUCTION MEETING
A) The FAA shall schedule a preconstruction meeting after the Notice to Proceed. The minimum agenda shall consist of the following:
1. Designation of responsible personnel and introduction of the GCIH.
2. Establishing chain of authority. (The direction will be from the FAA in continual consultation with the GCIH.)
3. Tentative abatement/construction schedule, as identified by the Contractor.
4. Critical work sequencing, scheduling.
5. Processing of field decisions and change orders.
6. Adequacy of distribution of Contract Documents.
7. Discuss procedures to be followed for Application for Payment.
8. Submittals: schedules, shop drawings, product data and samples, manufacturers certifications of products, manpower reports, major equipment deliveries and priorities, procedures for maintaining record documents, use of FAA facilities by contractor (access, parking, office area, storage area, and waste load-outs), safety and first aid procedures, security procedures and housekeeping procedures.
02 82 00 ASBESTOS REMEDIATION
PART 1 - GENERAL
1.1 REFERENCE STANDARDS
A. The current issues of the following documents in effect on the date of Invitation For Bids form a part of this specification and are applicable to the extent specified herein. Work shall conform to applicable federal, state and local governments regulations and to the requirements specified in these Contract Documents. Whenever inconsistencies occur between the referenced materials, the more stringent shall apply. The intent of these documents are to verify the Work is conducted at the highest level of safety.
B. American National Standards Institute (ANSI)
1. Z9.2: Fundamentals governing the design and operation of local exhaust systems.
2. Z87.1: Occupational and educational eye and face protection.
3. Z88.2: Respiratory protection.
C. American Society for Testing and Materials (ASTM)
1. C732: Aging effects of artificial weathering on latex sealants.
2. D522: Mandrel bend test of attached organic coatings.
3. D1331: Surface and interfacial tension of solutions of surface-active agents.
4. D2794: Resistance of organic coatings to the effects of rapid deformation (impact).
5. D4397: Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
6. E84: Surface burning characteristics of building materials.
7. E96: Water vapor transmission of materials.
8. E119: Fire tests of building construction and materials.
9. E736: Cohesion/adhesion of xprayed fire-resistive materials applied to structural members.
10. E1368: Visual inspection of asbestos abatement projects.
11. D2986: Evaluation of air assay media by the monodisperse DOP (Dioctyl Phthalate) smoke test.
D. Code of Federal Regulations (CFR)
1. 29 CFR
Part 1910 Occupational Safety and Health Regulations.
1910.20 Access to Employee Exposure and Medical Records
1910.132 Personal Protective Equipment.
1910.134 Respiratory Protection.
Subpart J General Environmental Controls
1910.141 Sanitation.
1910.145 Specifications for Accident Prevention Signs and Tags.
Subpart Z Toxic and Hazardous Substances
1910.1000 Air Contaminants.
1910.1001 Asbestos.
1910.1200 Hazard Communication.
2. Part 1926 Safety and Health Regulations for Construction.
Subpart D Occupational Health and Environmental Controls.
1926.1101 Asbestos.
Appendix F Work Practices and Engineering Controls for Major Asbestos Removal, Renovation, and Demolition Operations.
Appendix H Substance Technical Information for Asbestos.
Appendix I Medical Surveillance Guidelines for Asbestos.
3. 40 CFR
Part 61 National Emission Standards for Hazardous Air Pollutants.
Subpart A General Provisions.
Subpart M National Emission Standard for Asbestos.
Part 261 Identification and Listing of Hazardous Waste
Part 763 Asbestos-Containing Materials in Schools; Final Rule and Notice (10/30/87).
4. 49 CFR
Part 173 Shippers - General Requirements for Shipments and Packaging
E. National Institute for Occupational Safety and Health (NIOSH)
1. Method 7400 Fibers.
2. Method 7402 Asbestos Fibers
F. National Fire Protection Association (NFPA)
1. 70: National Electrical Code (NEC).
2. 701: Standard method of fire tests for flame-resistant textiles and films.
G. Compressed Gas Association (CGA)
1. G-7: Compressed air for human respirators and commodity specifications for air.
H. Underwriters Laboratories (UL)
1. 586: High-efficiency particulate air filter units.
I. Federal Aviation Administration (FAA)
1. Article 55: Agreement between DOT/FAA and the Professional Airways System
Specialists (PASS).
2. Order 1050.20: Airway facilities asbestos control.
3. Order 3900.19B Occupational Safety and Health Program, Chapter 15, Asbestos
1.2 DEFINITIONS
A. The following terms used in the text shall be defined as indicated:
1. ACRP: Abatement, Containment, and Removal Plan, submitted by the Contractor and subject to COR approval, clearly stating and scheduling the Work, identifying the Levels of Work required at each area, and identifying the safety, removal and disposal requirements for Work at each area. ACRP shall include signs, labels and related warning devices for identifying hazardous surfaces, areas and conditions to workers, occupants, and the general public.
2. Adequately Wet. A term as defined in 40 CFR 61, Subpart M and EPA 340/1-90-019 that means to sufficiently mix or penetrate with liquid to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material (ACM), then that material has not been adequately wetted. However, the absence of visible emissions is not sufficient evidence of being adequately wetted.
3. Amended Water. Water containing a wetting agent or surfactant with a maximum surface tension of 29 dynes per square centimeter when tested in accordance with ASTM D1331.
4. Asbestos Containing Material. Any material containing more than one percent asbestos.
For purposes of these specifications, ACM includes presumed asbestos-containing material (PACM) as defined by 29 CFR 1926.1101.
5. Asbestos Regulated Work Area. An area established to demarcate areas where Class I, II, and III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work accumulates; and a work area where the airborne concentration of asbestos fibers exceeds, or has a possibility to exceed, the permissible exposure limit.
6. Category I Non-friable ACM. Asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products containing more than 1 percent asbestos as determined using the method specified in appendix A, subpart F, 40 CFR 763, that cannot be crumbled pulverized or reduced to powder by hand pressure, when dry.
7. Category II Non-friable ACM. Any material, excluding Category I non-friable ACM, containing more than 1 percent asbestos as determined using the methods specified in appendix A, subpart F, 40 CFR 763, section 1, Polarized Light Microscopy that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
8. Certified Industrial Hygienist (CIH). An Industrial Hygienist certified in the comprehensive practice of industrial hygiene by the American Board of Industrial Hygiene.
9. Class I Asbestos Work. Activities involving the removal of thermal system insulation (TSI) and surfacing ACM.
10. Class II Asbestos Work. Activities involving the removal of ACM that is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, siding shingles, and construction mastic.
11. Class III Asbestos Work. Repair and maintenance operations where ACM, including TSI and surfacing ACM, is likely to be disturbed. Operations may include drilling, abrading, cutting a hole, cable pulling, crawling through tunnels or attics and spaces above the ceiling, where asbestos or asbestos-containing debris is actively disturbed. Removal of small amounts of ACM that would fit into a single 60x60 inch glove bag or disposal bag may be classified as a Class III job.
12. Class IV Asbestos Work. Maintenance and custodial construction activities during which employees contact but do not disturb ACM and activities to clean up dust, waste and debris resulting from Class I, II, and III activities. This may include dusting surfaces where ACM waste and debris and accompanying dust exists and cleaning up loose ACM debris from TSI or surfacing ACM following construction.
13. Competent Person. On all construction worksites the contractor shall designate a competent person having the qualifications and authority for ensuring worker safety and health as required by 29 CFR 1926.20 and for overseeing asbestos-related work as required by 29 CFR 1926.1101. The duties of the competent person include, but are not limited to, the following: establishing the negative pressure enclosure, ensuring its integrity, controlling entry into and exit from the enclosure, and ensuring workers wear required personal protective equipment and are trained in the use of hygiene facilities, work practices, and decontamination procedures specified in this specification and applicable regulations.
14. COR: Contracting Officer’s Representative
15. Friable ACM. A term as defined in 40 CFR 61, Subpart M and EPA 340/1-90-018 that means any material containing more than 1 percent asbestos as determined using the method specified in 40 CFR 763, Appendix A, Subpart F, Section 1, Polarized Light Microscopy, that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
16. Government’s Consulting Industrial Hygienist (GCIH). A trained and certified professional contracted as a third party to the FAA, to perform inspections and air monitoring.
17. High Efficiency Particulate Air (HEPA) filter. A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
18. Immediately: In this Section, the definition of this term shall be as indicated:
a. When the contractor is on-site, immediately refers actions required to take place within
15 minutes of being notified. When the contractor is off-site, immediately refers to actions required to take place within 2 hours of being notified.
19. Presumed Asbestos-Containing Material (PACM). Thermal system insulation and surfacing material found in buildings constructed no later than 1980.
20. Permissible Exposure Limit (PEL). OSHA PELs are worker exposure limits regulating the amount or concentration of a substance in air that shall not be exceeded. (1) An airborne concentration of asbestos of 0.1 fibers per cubic centimeter of air (f/cc) as an eight- (8) hour time weighted average (TWA). (2) An airborne concentration of asbestos of 1.0 f/cc as averaged over a sampling period of thirty (30) minutes (Excursion Limit).
21. Time-Weighted Average (TWA). The TWA is an 8-hour time weighted average concentration of airborne asbestos fibers (longer than 5 micrometers) per cubic centimeter of air that represents the employee's 8-hour workday as determined by Appendix A of 29
CFR 1926.1101.
1.3 SUBMITTALS
A) Contractor Identification: The Asbestos Abatement Contractor shall be licensed by the State of California for the purpose of removal, encapsulation, enclosure, demolition, and maintenance of structures of components covered by or composed of asbestos containing materials.
Company name and address (street and mailing if different).
2. Name of individual supplying information.
3. Name of parent company, if any.
4. Address of office responsible for this project.
5. Telephone number.
B) Insurance:
1. Insurance carrier and coverage.
2. Surety company.
3. Special coverage specifically regarding asbestos.
4. Contractor shall have at a minimum the following insurance amounts.
General Liability $1 million per occurrence
Contractual Liability $1 million per occurrence Automobile Liability $1 million per occurrence for bodily injury $50,000 per occurrence for property damage Property Damage Liability $1 million per occurrence Worker’s Compensation $1 million per occurrence Pollution Liability $1 million per occurrence
5. The policies evidencing required insurance shall be written on a comprehensive form of policy listing the FAA as the certificate holder and shall not contain pollution exclusions.
The policies shall also contain an endorsement to the effect that any cancellation or any material change adversely affecting the FAA’s interest shall not be effective for such period as the laws allow or until 30 days after the insurer or the Contractor gives written notice to the CO, whichever period is longer. Each policy shall include a provision that the FAA shall be notified at least 30 days in advance of the effective date of any reduction in coverage or cancellation.
C) Staff:
1. Number of full-time company employees.
2. Names of full-time field supervisory personnel, and years of asbestos removal experience.
3. Names of part-time field supervisory personnel, and years of asbestos removal experience.
4. Number of full-time laborers.
5. Number of part-time laborers.
6. Name of employees union, if any.
7. Usual ratio of supervisory to labor personnel used.
D) Experience:
1. Briefly describe company history.
2. Provide evidence verifying that the company has a minimum of three (3) years of successful abatement experience working in the State of California.
3. Provide a representative list (at least three projects) of successful asbestos abatement projects working in occupied environments, such as in hospitals or computer centers. List project name, date, size, duration, removal cost, references and telephone numbers for each project.
4. State average yearly dollar volume of asbestos removal work over the past two years.
E) Regulatory:
1. List and explain warnings or citations received from Federal, State or Local Regulatory Agencies related to asbestos abatement activities. Include project name, date and resolution.
2. List assessed penalties, liquidated damages or schedule overruns and resolutions which occurred. Include contract terminations.
3. List projects where removal activities were halted by the owner, architect or consultant.
State project name, date, reason for shut-down and resolutions.
4. List asbestos-related legal proceedings/claims in which the company (or employees scheduled to participate in this project) have participated or are currently involved. Include descriptions of role, issue and resolution to date.
F) Medical Requirements (29 CFR 1910.1001/1926.1101):
1. Provide a copy of the company's Medical Surveillance Program.
2. Provide documentation from a physician that employees or agents who may be exposed to airborne asbestos in excess of background levels have been provided with an opportunity to be medically monitored to determine whether they are physically capable of working while wearing the respirator required without suffering adverse health effects. In addition, the Contractor shall document that personnel have received medical monitoring as required in OSHA 29 CFR 1910.1001 (g) and 1926.1101. This documentation shall be submitted for each employee entering the regulated (removal) area.
G) Asbestos Training:
1. Provide a copy of the company's training program for supervisors and laborers. The program shall include, but is not limited to, how often training is conducted, who conducts the training, when it is conducted, what the duration of the program is and how documentation of training is accomplished.
2. The Contractor shall submit signed certificates for each employee stating that each employee has:
a. Received training in the proper handling of materials that contain asbestos.
b. Understands the health implications and risks involved (including the illnesses possible from exposure to airborne asbestos fibers).
c. Understands the use and limits of the respiratory equipment to be used.
d. Understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment.
e. Understands the project scope and has been given project specific training.
H) Respiratory Protection:
1. Provide a copy of the company's respiratory protection training program.
2. Provide a copy of a passing and current (within the last 12 months) fit test for the employees with the respirator that will be used for the abatement.
I) Health And Safety Program: Provide a copy of the company's health and safety program.
J) Project Personnel
1. Provide number of full-time laborers that will be assigned to this project.
2. Provide number of crews and shifts for this project.
K) Asbestos Abatement Plan: Submit a detailed plan and schedule of the work procedures to be used in the removal of asbestos containing materials to the COR at least thirty (30) days prior to the performing work under this contract. The abatement plan shall be completed and signed of by a CIH with at least 2 years of experience in asbestos and possessing a current project designer’s certificate and shall include:
1. A physical description of the work area;
2. A detailed work area layout plan showing the location of temporary scaffolding, decking, access ladders, stairways, and elevators (interior & exterior), as needed;
3. A layout of decontamination and bag-out chambers;
4. A detail of the "Z-flap" construction;
5. A description of the material to be removed and the approximate quantity;
6. A description of the methods to be used to remove the asbestos-containing material;
7. The wetting agent to be used, including manufacture’s product data;
8. A description of the lock down agent to be used at the end of the project, including manufacture’s product data;
9. Interface of trades involved in the construction and sequencing of asbestos-related work;
10. A schedule for turning off and sealing existing ventilation systems;
11. A description of work practices to be observed by employees;
12. A description of personal protective equipment and clothing to be worn by employees;
13. Personal hygiene procedures;
14. Labeling procedures;
15. A description of the local exhaust ventilation systems to be used and air change calculations;
16 A layout of the waste load out route.
17. A description of the method to be used to transport waste material, including the name, address, phone number, contact, EPA licenses, and certificates of insurance for the transporter;
18. Location of the EPA approved landfill;
19. An abatement schedule in time line format;
20. A description of all hazard sign text.
21. Emergency Planning and Procedures
L) Laboratories: Submit copies that the laboratory to be used by the Abatement Contractor for Personnel Samples on this contract is accredited by the American Industrial Hygiene Association (AIHA) for Phase Contrast Microscopy and has successful completion in the last four rounds in the American Industrial Hygiene Association (AIHA) Proficiency Analytical Testing (PAT) Program.
M) Miscellaneous: Submit copies of the Notification to the Bay Area Air Quality District, Asbestos Abatement Contractor's State License for Asbestos Removal, Hazardous Waste Manifest Form, and manufactures data on materials used at the site.
N) Submittal Notarization: Sign and date submittal, indicating name and title of person signing.
O) Title to Materials: Provide all required Federal, State and Local documentation regarding the transportation and disposal of ACM and asbestos contaminated materials at the earliest possible time.
P) Contractor’s Air Sampling Professional (CASP)
1. Provide the name, address, telephone number, and copies of the CIH’s current ABIH and
Asbestos Project Designer certifications and resume documenting at least two years of asbestos abatement experience.
2. Provide the names, addresses, telephone numbers, resumes and current certifications of additional IHs and IHTs who will be assisting the CIH in performing on-site tasks.
1.4 SYSTEM DESCRIPTION
A) The work consists of the containment and removal of asbestos containing materials. Asbestos is a material which can cause a serious health risk to humans. The work is governed by a body of local, state and federal rules, regulations and laws. The Contractor agrees by accepting the contract that their company is fully knowledgeable of this information and will bear full responsibility for the health and safety of workers, FAA's employees and invitees, and third parties, who come in contact with the work site.
B) The Contractor shall cooperate with the COR. This cooperation shall include allowing access to the work areas to allow for visual and air monitoring, collecting samples, providing requested data on personnel, equipment, scheduling and facilitating FAA's monitoring of the work.
C) The Contractor shall not allow anyone access to the site who is not authorized by FAA to enter the site of work.
D) The Contractor shall provide personal protective equipment for three (3) authorized persons including full protective clothing without charge. Protective clothing supplied by Contractor shall be identical to or of better quality than the Contractor provides for his/her own employees.
E) The Contractor is responsible for maintaining a log of all personnel who enter the work place.
A copy of logs shall be submitted to the COR on a weekly basis. Contractor shall have logs available for review by the COR.
G) The Contractor shall install warning labels in prominent locations adjacent to asbestos containing material identified in this specification to remain. The labels shall be installed before demolition or construction starts under this contract. The labels will remain in place, after completion of abatement work, as the property of the FAA. The labels shall be printed in large, bold letters on a contrasting background and conform to the requirements of 29 CFR
1926.1101 and contain the following information:
DANGER
CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST
CANCER AND LUNG DISEASE
HAZARD
1.5 NOTIFICATION
A) The Contractor is responsible for asbestos related notifications and permits, in accordance with Federal, State and local regulations, prior to and following abatement. Notify the COR 10 working days prior to the start of the asbestos removal operation.
1.6 PROJECT CLOSEOUT
A) Closeout Submittal: Upon completion of the work, the Contractor shall provide to the FAA, through the COR, a closeout submittal. The closeout submittal will consist of the following documents:
1. Written certification on final completion of the work that it complies with Contract
Documents.
2. Certification that items on punch list issued at substantial completion have been completed or corrected and that tools, construction equipment and surplus materials have been removed from the site.
3. Contractor daily logs for abatement work.
4. Contractor entry/exit logs for each containment.
5. Copy of asbestos Waste Manifests for the project.
6. Copies of asbestos worker and supervisory personnel certifications, fit test records, and physicians written opinion forms.
7. Copies of air monitoring results.
B) Application for Final Payment: In addition to the closeout submittal, the Contractor shall submit Application for Final Payment. FAA shall process final statement for payment in accordance with Conditions of the Contract.
PART 2 - PRODUCTS
2.1 MATERIALS AND EQUIPMENT
A) Materials and products shall comply with the requirements of 29 CFR 1910.134 and 29 CFR 1926.1101.
B) Polyethylene Sheeting: ASTM D2l03, 6 mils thick, flame-retardant. Sheeting shall meet flammability requirements of NFPA 701, and flame spread and smoke density requirements of
ASTM E84.
C) Duct Tape: Pressure-sensitive adhesive tape, 3 mils (min.) thick by 2 or 3 inches wide, water-proof.
D) High Efficiency Particulate Air (HEPA) Filtered Vacuum: Vacuum(s) shall be:
1. Capable of removing 99.97 percent of the asbestos particles (0.3 microns or greater in diameter) from the air.
2. Portable
3. Equipped with hoses of sufficient length to reach areas behind pipes, ducts and other obstacles.
E) HEPA Filtered Ventilation System: Portable ventilation system designed to exhaust and clean the air inside the enclosure prior to exhausting to the outside of the building. The system shall be capable of filtering particles of 0.3 micron in size with an efficiency of 99.97 percent. Units shall be equipped with the automatic restart feature. Units shall be tested and verified to meet HEPA standards, provide proof of successful testing to COR.
F) Wetting Agent: Provide water to which a surfactant has been added. Use a mixture of surfactant and water which results in wetting of the asbestos-containing material and in retardation of fiber release during disturbance of the material, equal to or greater than that provided by the use of one ounce of a surfactant consisting of 50 percent polyoxyethylene ester and 50 percent polyoxyethylene ether mixed with five gallons of water.
G) Encapsulant: Provide an encapsulant/sealant which will be compatible with the existing surfaces, and one which will act as a suitable substrate for future sprayed-on fireproofing.
Taint (or tint) the encapsulant with a contrasting color, to be approved by the COR, so as to identify coverage.
H) Airless Sprayer: Hand-pump type, pressure-can sprayer fabricated of either metal or plastic, equipped with a wand at the end of a hose capable of delivering a stream or spray of liquid under pressure.
I) Respirators: Personal protective breathing equipment shall be in accordance with 29 CFR 1910.134, 29 CFR 1910.1001 and 29 CFR 1926.1101.
J) Signs and Labels: Signs and labels shall be provided in accordance with 29 CFR 1910.145, 29 CFR 1910.1001, 29 CFR 1910.1200, 29 CFR 1926.1101 and 40 CFR 61 subpart M.
K) Disposal Bags: Leak-tight, 6 mil thick polyethylene bags with appropriate hazard warning, per EPA regulations 40 CFR 61.150 (a) (1) (v) or OSHA requirement 29 CFR 1910.1001 (g)(2)(ii), and 29 CFR 1926.1101.
L) Miscellaneous Materials: Provide tangible supplies (such as coveralls, duct tape, soap, shampoo, towels, etc.), for persons entering the removal area. This includes FAA personnel, the GCIH and other persons approved for entry.
M) Air Monitoring Equipment. The Contractor's CIH shall select and approve the personal air monitoring equipment to be provided and used by the contractor for evaluation of airborne asbestos fiber concentrations. The equipment shall include, but not be limited to:
1. Low-volume, battery powered, body-attachable, portable personal pumps with a power pack capable of sustaining the calibrated flow rate for a minimum of 10 hours.
2. Standard 25-millimeter diameter, 0.8 micron pore size filters and cassettes in accordance with 29 CFR 1926, for personal air sampling.
3. A flow calibrator capable of calibration to within plus or minus 2 percent of reading over a temperature range of minus 20 deg C (minus 4 deg F) to plus 60 deg C (140 deg F) and traceable to a National Institute of Standards and Technology (NIST) primary standard.
PART 3 - EXECUTION
3.1 EMERGENCY PLANNING AND PROCEDURES
A) Emergency planning shall be developed by the Contractor and agreed to by the COR prior to abatement initiation.
B) Emergency procedures shall be in written form and prominently posted in the clean change area and equipment room of the worker decontamination area. Everyone, prior to entering the work area, shall be required to read and sign these procedures to acknowledge receipt and understanding of work site layout, location of emergency exits and emergency procedures. The Contractor shall review and designate containment area emergency exits in adequate number and location to safely exit workers in the event of the need to do so. Consideration shall be given to the resultant contamination, but as a second priority to life safety. The Contractor shall be responsible for required decontamination.
C) Emergency planning shall include a notification packet to be approved by the COR and shall include written notification to police, fire and emergency medical personnel of planned abatement activities, work schedule, and layout of work area, particularly barriers that may affect response capabilities. COR shall be responsible for notification of police, fire and emergency medical departments.
D) Emergency planning shall include considerations of fire, explosion, toxic atmospheres, electrical hazards, slips, trips and falls, confined spaces and heat related injury. Written procedures shall be developed and employee training in procedures shall be provided.
E) Emergency planning shall include a Hazard Communication Program (HAZCOM). A written HAZCOM program shall be established and implemented according to 29 CFR 1926.59.
Copies of Material Data Sheets (MSDS) for chemicals brought on-site by the Contractor shall be attached to the written HAZCOM Program.
F) Employees shall be trained in evacuation procedures in the event of work place emergencies:
1. For non-life threatening situations, employees injured or otherwise incapacitated shall be decontaminated following normal procedures, with assistance from fellow workers if necessary, before exiting the work place to obtain proper medical treatment.
2. For life-threatening injury or illness, worker decontamination shall be secondary after measures stabilize the injured worker. Remove workers from the work place and secure proper medical treatment prior to decontamination.
G) Telephone numbers of emergency response personnel shall be prominently posted in the clean change area and equipment room, along with the location of the nearest telephone.
H) Upon coordination with the COR, the Contractor shall clearly mark the exit paths within the enclosure for emergency egress. The Contractor shall use a fluorescent paint or tape and apply the markings no more than 24" above the floor surface.
I) Inspection by the COR: During asbestos work, the work will be subject to on-site inspection by the COR, who may be assisted by the GCIH.
J) Work Stoppage: The COR will immediately issue a "stop work" order to the Contractor for any of the reasons listed below. No work will be allowed to resume until the conditions stabilize and upon approval from the COR. Standby time required to identify and resolve the problem will be at the expense of the Contractor and may include the costs incurred by the extended efforts of the FAA's Monitoring Contractor.
1. If asbestos air monitoring results indicate the presence of airborne fibers to be greater than
0.02 f/cc, above baseline, outside the containment.
2. If the pressure differential inside the containment drops below 0.02 inches of water or above 0.05 inches of water as established in Section 2080.3.5 (B).
3. If excessive water accumulations appear or if water leakage is detected in areas adjacent to the removal area.
4. If the work is found to violate specified requirements.
5. If conditions arise that may adversely impact or disrupt flying operations or working conditions at the facility.
3.2 GENERAL DESCRIPTION OF WORK
A) Comply with the requirements of these Specifications and ANSI Z9.2, 29 CFR 1910.145, 29 CFR 1926.1101 and 40 CFR 61 and 763. The most stringent of codes shall apply. The following will be considered as the typical sequence to the asbestos abatement work. Refer to the following sections for specific procedures for the asbestos removal project.
1. Establishing Baseline TWA. Area monitoring, sufficient to establish a reference or baseline time-weighted average (TWA) for each abatement area, shall be accomplished by the FAA at least 24 hours prior to the start of any construction activity.
2. Preparing the Work Area. Prepare the work area in accordance with Section 2080.3.7 of these specifications. In addition, be able to withstand the project design pressure differentials of Section 2080.3.5 (B).
3. Establish a worker decontamination system and a waste and equipment decontamination system in accordance with Section 2080.3.6 of these Specifications.
4. Upon approval from the COR, initiate removal activities, cleaning and waste load-out.
5. Perform final cleaning, pass inspection from COR and initiate clearance testing.
6. Upon passing final clearance testing, restore work area to original conditions.
B) Environmental Monitoring: Environmental monitoring for airborne fiber concentrations and pressure differential, and third party inspections shall be accomplished by the GCIH, who shall be under a separate contract with the FAA. This individual shall respond directly to the COR.
C) Wet Removal: All ACM shall be removed using an amended water wet removal method as recommended by the EPA and OSHA. The Contractor shall provide for the continual prevention of excessive water accumulation throughout the duration of the project.
D) Housekeeping: Essential parts of asbestos dust control are housekeeping and clean-up procedures. Maintain surfaces of the asbestos control area free of accumulations of asbestos fibers. Give meticulous attention to restricting the spread of dust and debris. Keep waste from being distributed over the general area. Do not blow down the space with compressed air. The COR and/or GCIH will inspect the removal area daily for residual asbestos material on the floors and decks, and for the accumulation of dust. The Contractor will be required to re-clean all areas noted having visible emissions by the inspection.
E) Asbestos Abatement Superintendent: The Contractor shall designate a qualified employee as superintendent. The superintendent shall meet the requirements of a competent person/supervisor in accordance with 29 CFR 1926 and possess at least 3 years asbestos experience. The competent person shall perform the following:
1. Oversee all Contractor personnel performing any asbestos related work, including:
a. Licensed carpenters
b. Licensed electricians
c. Licensed mechanical workers
2. Oversee construction of all enclosures, including the worker decontamination chamber and the waste load-out chamber.
3. Control entry to and exit from the removal area.
4. Supervise all employee exposure monitoring required by OSHA.
5. Verify the proper use of protective clothing and equipment.
6. Verify that all occupants of the removal area are properly trained and certified.
7. Verify the proper use of hygiene facilities and decontamination procedures.
8. Verify that all engineering controls are functioning per design.
9. Note: The Contractor shall furnish and maintain two-way radios for communication. The superintendent shall use these radios to maintain constant contact with the COR. An adequacy test of all radios shall be conducted to verify clear, static-free communications throughout the building. The purpose is to maintain tighter project control and to be able to immediately pass on information relating to air monitoring results and pressure differential readings.
F) Disposal Supervisor: The Contractor shall designate a qualified individual to oversee the following "clean-up", "housekeeping" and disposal tasks in accordance with these Specifications, specifically:
1. Continuous floor and horizontal surface clean-up.
2. Continuous clean-up of ACM debris.
3. Continuous collection and disposal of water build-up. No puddling or ponding water shall be tolerated.
4. Regular inspection of disposal procedures to verify conformance with this specification as well as all Federal, State and Local Laws.
5. This individual shall have no other duties and shall be responsible for the daily removal of ACM from the regulated area.
3.3 PERSONAL PROTECTIVE EQUIPMENT
A) Personal Protective Equipment (PPE): The Contractor shall provide PPE for workers, FAA representatives, GCIH and authorized visitors and shall include, at a minimum, full body and head coverings (i.e. Tyvek coveralls) as well as full face PAPR. Respiratory protection shall comply with 29 CFR 1910.134 and 29 CFR 1926.1101.
3.4 TEMPORARY FACILITIES AND UTILITIES
A) Field Office: The Contractor shall furnish the contractor's own temporary office space. The office shall be made available for use by FAA representatives, GCIH or authorized visitors.
B) Temporary Electric: The Contractor shall provide and maintain a specified secondary electrical power center for asbestos removal operations throughout the abatement period. The Contractor shall provide:
1. Main distribution panel with a capacity of 110-120 volts, 60 amperes, single phase and 60 hertz.
2. Circuit protection for each circuit.
3. Ground fault interruption protection for all circuits.
4. Grounded, UL listed extension cords from power centers to the point of operation.
C) Temporary Lighting: The Contractor shall provide temporary lighting for construction needs, safe working conditions, public safety and security lighting. Lamps shall be covered with safety guards or deeply recessed in reflector and lamps shall not be suspended by their electric cords unless cord and fixture is designed for that purpose.
D) Temporary Water: The Contractor shall provide and maintain temporary water service connection throughout the abatement period. The Contractor shall install valves at tie-in locations that shall be turned off and locked-out and tagged out when the contractor is not present on-site.
E) Monitor Temporary Utilities: The Contractor shall be responsible for all damage to the work and the facility caused by a defect in such utilities.
F) Existing Systems: The Contractor may make written arrangements with the FAA to modify, supplement and extend an existing system to meet temporary requirements for the project, subject to approval by the COR. If existing systems are modified, supplemented and/or extended, the Contractor shall not overload the system or interfere with FAA's normal use of the system. The Contractor is advised that: The Loss of an Operation System for Any Amount of Time Will Jeopardize the Safety of the Flying Public.
G) Removal of Temporary Systems: The Contractor shall repair all damage caused by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .