| File | Type | Posted |
|---|---|---|
| Attachment_Model_OT_Agreement- Final.pdf | ||
| Attachment 10 - Technical Data Products and Certification Packages.xlsx | XLSX spreadsheet | |
| SpeedDealer Solicitation Final.pdf | ||
| SpeedDealer Request for Information_RADHAZ Information (002).pdf2.pdf | ||
| SpeedDealer Solicitation Questions and Answers.pdf | ||
| SpeedDealer Draft Demonstration Scenarios.pdf | ||
| Attachment 4 - Technical Data Products and Certification Packages.pdf | ||
| Attachment 3 - SpeedDealer Draft SOW.pdf | ||
| SpeedDealer Solicitation- FinalDraft.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D I G I T A L D I R E C T O R A T E
Three-Dimensional Expeditionary Long-Range Radar (3DELRR)
Acquisition Strategy Update Industry Day
Col Michael D. Harm Program Manager, 3DELRR
04 February 2020
FALSE IMPRESSION: THIS BRIEFING/INFORMATION IS FOR INFORMATION ONLY. NO U.S. GOVERNMENT COMMITMENT TO SELL, LEASE, CO-
DEVELOP OR CO-PRODUCE DEFENSE ARTICLES IS IMPLIED OR INTENDED.
CONTROL STATEMENT: THIS IS A GOVERNMENT-TO-GOVERNMENT RELEASE AND DOES NOT IMPLY ANY AUTHORITY FOR ANY HAFB CONTRACTOR PERSONNEL TO PROVIDE THE SUBJECT MATERIALS TO THE GOVERNMENT OF NORWAY AND AUSTRALIA. ANY
CONTRACTOR CONTACT WITH THESE GOVERNMENTS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH ANY AND
ALL ITAR REQUIREMENTS.
"U.S. GOVERNMENT INFORMATION IS FURNISHED TO THE GOVERNMENT OF NORWAY AND AUSTRALIA UPON
THE CONDITION THAT IT WILL NOT BE RELEASED TO ANOTHER NATION WITHOUT
SPECIFIC AUTHORITY OF THE DEPARTMENT OF THE AIR FORCE OF THE UNITED STATES,
THAT IT WILL BE USED FOR MILITARY PURPOSES ONLY, THAT INDIVIDUAL OR
CORPORATE RIGHTS ORIGINATING IN THE INFORMATION, WHETHER PATENTED OR NOT,
WILL BE RESPECTED, THAT THE RECIPIENT WILL REPORT PROMPTLY TO THE UNITED
STATES ANY KNOWN OR SUSPECTED COMPROMISE, AND THAT THE INFORMATION WILL BE
PROVIDED SUBSTANTIALLY THE SAME DEGREE OF SECURITY AFFORDED IT BY THE
DEPARTMENT OF DEFENSE OF THE UNITED STATES. ALSO, REGARDLESS OF ANY OTHER
MARKINGS ON THE DOCUMENT, IT WILL NOT BE DOWNGRADED OR DECLASSIFIED
WITHOUT WRITTEN APPROVAL OF THE ORIGINATING U.S. AGENCY.“
DESTRUCTION NOTICE: DESTROY BY ANY METHOD THAT WILL PREVENT
DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF DOCUMENT.
The following AFLMC/WFNFM Case # applies: XXXXXXXXXXX
FOREIGN DISCLOSURE OFFICE STATEMENTS
Time 4 February 2020 (MITRE S-Building) Briefer
08:05 Disclaimer Kevin Kelleher, Agreements Officer
08:15 Opening Remarks; Purpose Col Michael Harm, Program Manager
08:30 Control and Reporting Center Overview Lt Col Anthony “Ted” Kuczynski
ACC/A3CG
09:00 Acquisition Strategy Overview Lt Col Matthew Judge, Deputy Program Manager
10:00 BREAK
10:15 SpeedDealer Agreement Overview Kevin Kelleher, Agreements Officer
10:30 SpeedDealer Proposal & Technical Activities
Charlene Caefer, Chief Engineer
10:45 SpeedDealer Demonstration Capt Zachary Benson, Test Lead
11:15 Follow-on Production Overview Maj Warren Anderson, Operations Lead
11:45 Questions?
12:00 Adjourn
Agenda
• The Government does not intend to award a contract on the basis of the information received at this event
• This is for informational purposes only. The contents of any future solicitation take precedence over anything provided during this briefing and one-on-one sessions
• Relevant questions and answers from this session will be posted to beta.sam.gov and are considered public record
• Costs incurred as a result of this meeting are considered bid and proposal costs and will not be reimbursed by the Government
Disclaimer
• The TPS-75 needs replacement as it has reached its expected end of life
• The Government believes we have an opportunity to accelerate needed capability to the field due to market research
Opening Remarks
• Give Industry an overview of the changes in the 3DELRR acquisition strategy and the Government’s intent to procure production-ready radar systems
• Solicit input from Industry representatives
Purpose
Offerors Expected to Demonstrate Production-Ready Radar Systems in FY20
(MITRE S-Building) Briefer
08:05 Disclaimer Kevin Kelleher, Agreements Officer
08:15 Opening Remarks; Purpose Col Michael Harm, Program Manager
08:30 Control and Reporting Center Overview Lt Col Anthony “Ted” Kuczynski
ACC/A3CG
09:00 Acquisition Strategy Overview Lt Col Matthew Judge, Deputy Program Manager
10:00 BREAK
10:15 SpeedDealer Agreement Overview Kevin Kelleher, Agreements Officer
10:30 SpeedDealer Proposal & Technical Activities
Charlene Caefer, Chief Engineer
10:45 SpeedDealer Demonstration Capt Zachary Benson, Test Lead
11:15 Follow-on Production Overview Maj Warren Anderson, Operations Lead
11:45 Questions?
12:00 Adjourn
(MITRE S-Building) Briefer
08:05 Disclaimer Kevin Kelleher, Agreements Officer
08:15 Opening Remarks; Purpose Col Michael Harm, Program Manager
08:30 Control and Reporting Center Overview Lt Col Anthony “Ted” Kuczynski
ACC/A3CG
09:00 Acquisition Strategy Overview Lt Col Matthew Judge, Deputy Program Manager
10:00 BREAK
10:15 SpeedDealer Agreement Overview Kevin Kelleher, Agreements Officer
10:30 SpeedDealer Proposal & Technical Activities
Charlene Caefer, Chief Engineer
10:45 SpeedDealer Demonstration Capt Zachary Benson, Test Lead
11:15 Follow-on Production Overview Maj Warren Anderson, Operations Lead
3DELRR Mid-Tier Acquisition Strategy
• Rapid Prototyping effort to demonstrate production-ready radar systems
• Award zero to three Prototype Other Transaction Agreements (OTAs)
• Complete demonstrations Summer 2020
• Award follow-on RDT&E and Production contract to include Operational Test-like event
• Transition to Rapid Fielding effort
• Procure up to 35 systems between FY21-FY26 (phasing is funding dependent)
Results in Required Assets Available for Initial Operational Capability in FY24
FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27
MTA
Approval Demos
RDT&E
Follow-On Production (29)
RAA RAA
RAPID PROTOTYPING RAPID FIELDING
Program Milestones Prototype OTA Activity Follow-On Contract Activities Earliest Start DateInitial Production (6)
OT
Follow-on Decision
Summary of Acquisition Strategy & Contract Vehicles
FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27
MTA
Approval Follow-on Decision
Demos
RDT&E
Follow-On Production (29)
RAA RAA
RAPID PROTOTYPING RAPID FIELDING
Program Milestones Prototype OTA Activity Follow-On Contract Activities Earliest Start DateInitial Production (6)
OT
Mid-Tier Acquisition (MTA) Strategy
Rapid Prototyping
Rapid Fielding
Contract Vehicle Prototype OTA
DEMO
Contract Vehicle (TBD: OTA or FAR)
RDT&E
(Integration)/
OT
Initial Production (6)
Follow-On Production (29)
Funding 3600 3600 3080 3080
Rapid Prototyping – SpeedDealer Demo
• Contract Vehicle: Prototype Other Transaction Authority
• Funding: 3600 RDT&E
• Purpose: Contractor demo of capabilities to assess current overall system performance WRT CDD Excerpts, producibility, sustainability
• Zero to three competitively awarded Prototype OTAs of $500K
• Initiation: Signed ADM (27 Dec 2019)
• Completion: Successful completion of OTA
• Program Milestones
• Industry Day • Solicitation Release • Agreement Award • Integration & Production Award
February March April May June July August September
RFP Release Program Milestones Prototype OTA Activity
Capabilities Demonstration Window
Proposal prep
Prototype OTA Award
Govt.
Review
Design Review Window
• Contract Vehicle: Production OTA or FAR-based
• Funding: 3600 RDT&E & 3080 Procurement
• Purpose:
• RDT&E for integration, training, T.O.s, etc. development effort
• Initial Production for up to 6 units
• Initiation: Integration & Production Award (2QFY21)
• Completion: Required Assets Available (RAA) (1QFY24) or transition to
Rapid Fielding
• Program Milestones
• RDT&E Effort Complete
• Operational Test Complete
Rapid Prototyping – RDT&E & Initial Production
FY20 FY21 FY22 FY23 FY24
MTA
Approval
RDT&E
Initial Production (6)
RAA
OT
• RAA for IOC
• Follow-On Production Decision
Demo
Follow-on Decision
Rapid Fielding
FOR OFFICIAL USE ONLY
• Contract Vehicle: Production OTA or FAR-based
• Funding: 3080 Procurement
• Purpose: Build up to 29 Full-Rate Production Units
• Initiation: Follow-On Production Decision (1QFY22)
• Completion: RAA for FOC (4QFY27)
• Program Milestones
• RAA for FOC
FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27
MTA
Approval
Follow-on Production (29)
RAA
Follow-On Award
RDT&E
Initial Production (6)
OT
Follow-On Decision
Demo
BREAK
(MITRE S-Building) Briefer
08:05 Disclaimer Kevin Kelleher, Agreements Officer
08:15 Opening Remarks; Purpose Col Michael Harm, Program Manager
08:30 Control and Reporting Center Overview Lt Col Anthony “Ted” Kuczynski
ACC/A3CG
09:00 Acquisition Strategy Overview Lt Col Matthew Judge, Deputy Program Manager
10:00 BREAK
10:15 SpeedDealer Agreement Overview Kevin Kelleher, Agreements Officer
10:30 SpeedDealer Proposal & Technical Activities
Charlene Caefer, Chief Engineer
10:45 SpeedDealer Demonstration Capt Zachary Benson, Test Lead
11:15 Follow-on Production Overview Maj Warren Anderson, Operations Lead
SpeedDealer Overview
• SpeedDealer Phase will make use of Prototype Other
Transaction Agreements (OTAs)
• Government plans to award zero to three Prototype OTAs
• Following charts will discuss
• SpeedDealer Selection Criteria
• SpeedDealer Proposal
• SpeedDealer Activities (Statement Of Work)
• Follow-on Production decision
• To be eligible for award the following conditions must be met
• The demonstration must be able to be completed within the period stated within the solicitation (currently planned to end on 30 Sep 20)
• In accordance with 10 U.S. Code § 2371b, the Offeror’s proposal must satisfy at least one of the following conditions to be considered for a 3DELRR OTA award:
• (A) There is at least one non-traditional defense contractor or nonprofit research institution participating to a significant extent in the prototype project; or
• (B) All significant participants in the transaction other than the Federal Government are small businesses (including small businesses participating in a program described under Section 9 of the Small Business Act (15 U.S.C. 638)) or non-traditional defense contractors; or
• (C) At least one third of the total cost of the prototype project is to be paid out of funds provided by sources other than the Federal Government
SpeedDealer OTA Award Eligibility
• Offeror’s overall proposal will be assessed from a holistic point of view using technical/risk rating scale
• Benefit defined as an aspect of an Offeror’s proposal that meets or exceeds desired capabilities or expectations
• Shortcoming defined as an aspect of an Offeror’s proposal that does not meet desired capabilities or expectations
SpeedDealer Selection Criteria:
(1 of 2)
SpeedDealer Selection Criteria:
(2 of 2)
TECHNICAL/RISK RATINGS
Adjectival Rating
Description
Good The Offeror’s proposal has benefits that far outweigh any shortcomings.
The risk of unsuccessful Agreement performance is very low.
Acceptable The Offerors proposal has benefits that outweigh any shortcomings.
The risk of unsuccessful Agreement performance is low.
Marginal The Offeror’s proposal has benefits that offset the shortcomings.
The risk of unsuccessful Agreement performance is medium.
Unacceptable The Offeror’s proposal has one or more shortcomings that are not offset by benefits.
The risk of unsuccessful Agreement performance is high.
• In accordance with 10 U.S. Code § 2371b(f)(1), after successful completion, a follow-on production contract or transaction may be initiated with the Offeror for a quantity of up to 35 3DELRRs
• This decision is at the sole discretion of the Government, and successful completion does not guarantee that a production contract or agreement will be awarded.
• Any Prototype OTA shall contain a provision that sets forth the conditions under which that agreement must be successfully completed
• The Government currently intends to define successful completion as:
• Technical Data and Certification Packages submitted as required
• Radar System Technical Review completed
• Offeror successfully operates system during demonstration and submits data to
Government
SpeedDealer OTA Completion
(MITRE S-Building) Briefer
08:05 Disclaimer Kevin Kelleher, Agreements Officer
08:15 Opening Remarks; Purpose Col Michael Harm, Program Manager
08:30 Control and Reporting Center Overview Lt Col Anthony “Ted” Kuczynski
ACC/A3CG
09:00 Acquisition Strategy Overview Lt Col Matthew Judge, Deputy Program Manager
10:00 BREAK
10:15 SpeedDealer Agreement Overview Kevin Kelleher, Agreements Officer
10:30 SpeedDealer Proposal & Technical Activities
Charlene Caefer, Chief Engineer
10:45 SpeedDealer Demonstration Capt Zachary Benson, Test Lead
11:15 Follow-on Production Overview Maj Warren Anderson, Operations Lead
SpeedDealer Proposals:
Content (1 of 6)
• Three focus areas
• Performance
• Producibility and Maturity
• Maintainability and Sustainability
• Performance
• Demonstration radar system functional description (system and subsystem)
• Size, weight, and power (SWaP), MTBCF, MTBF, MTTR
• Growth potential
• Software architecture description (CSCI level)
• Detection processing, tracking algorithm, electronic protection techniques
• Measured/predicted radar system performance WRT CDD Excerpts
• Detection range
• Surveillance volume
• Scan period
• Generator power/configuration
• Performance with Electronic Attack
• Accuracy (el, az, range)
• Resolution (el, az, range)
• Operational Availability
• Mobility (how system is moved on battlefield)
• Transportability (how system is moved to battlefield)
• Set-up / tear-down timelines 23
Content (2 of 6)
• Producibility and Maturity
• Manufacturing Readiness Level of demonstration radar system
• Manufacturing process description to include build timeline
• Approach to supply chain risk management
• Capacity of manufacturing facilities, current/planned use, and how many systems previously built
• Capacity to manufacture the radar, spare parts, and repair incoming parts from the field
• List of available technical data products and certification packages
Content (3 of 6)
• Technical Data Products
• Contractor Test Data Products
• Government Test Data Products
• Reliability Growth Data Products
• Environmental Assessment (AF Form 813 or equivalent)
• Safety Release (AFMAN 63-119 or equivalent)
• Certification Packages
• Air Traffic Control Radar Beacon System (ATCRBS), Identification Friend or Foe (IFF), Mark XII/Mark
XIIA, Systems (AIMS) Certification Package (box / platform)
• Authorization To Operate (ATO) Certification Package
• Spectrum Certification Package
• Transportation Certification Package
• Modeling and Simulation Verification and Validation Package
• Other Products / Packages
• Additional information the Offeror can provide to substantiate the maturity of their demonstration radar
Content (4 of 6)
• Maintainability and Sustainability
• Maintenance and sustainment approach for hardware, software, and firmware to include obsolescence program and approaches to software and cybersecurity updates
• Approach/maturity of technical orders
• Format (S1000D, SGML)
• Common tools / viewers
• How long fielded
• Level of detail for Organizational level TOs (e.g., Theory, Troubleshooting)
• Identify any required support equipment and/or special test equipment
Content (5 of 6)
• Maintainability/Sustainability (cont.)
• Approach/maturity of training packages
• Types of training available (e.g., Operator, Maintainer)
• Method of training available (e.g., hands-on, computer-based)
• How long is initial training? How many students at one time?
• How many classes taught (classroom, delivery site)?
• Sparing concept at Organizational level and Depot level
• Level of repair analysis to determine repair location (Organizational / Depot)
• Initial spare analysis
• How conducted?
• Results (components and how many)
• War readiness spare kit contents
• Spare supply support (Contractor, Government, combination)
Content (6 of 6)
(MITRE S-Building) Briefer
08:05 Disclaimer Kevin Kelleher, Agreements Officer
08:15 Opening Remarks; Purpose Col Michael Harm, Program Manager
08:30 Control and Reporting Center Overview Lt Col Anthony “Ted” Kuczynski
ACC/A3CG
09:00 Acquisition Strategy Overview Lt Col Matthew Judge, Deputy Program Manager
10:00 BREAK
10:15 SpeedDealer Agreement Overview Kevin Kelleher, Agreements Officer
10:30 SpeedDealer Proposal & Technical Activities
Charlene Caefer, Chief Engineer
10:45 SpeedDealer Demonstration Capt Zachary Benson, Test Lead
11:15 Follow-on Production Overview Maj Warren Anderson, Operations Lead
SpeedDealer Activities
• Three main tasks
• Technical Data Products and Certification Packages
• Radar System Technical Review
• Radar System Demonstration
SpeedDealer Activities:
Technical Data Products and Certification Packages
• Deliver existing Technical Data Products and Certification Packages no later than 10 calendar days after agreement award
• Used to assess maturity of system in selecting follow-on awardee
• Used to scope Research Development Test & Evaluation effort for follow-on contract
• Used to scope Operational Test & Evaluation effort for follow-on contract
Radar System Technical Review (1 of 2)
• Conduct Radar System Technical Review
• Tailored combination of Critical Design Review, System Verification Review, and Production Readiness Review
• Provides understanding of the technical design, performance, manufacturing readiness, and cost of the radar system
• Used to assess performance, manufacturability, maturity, and cost of system in selecting follow-on awardee
• Expectation is no later than 90 calendar days after agreement award and prior to demonstration
• Expectation is for a five-day review
• Exact dates will be negotiated at the time of agreement award
• Conference calls for planning activities, est. bi-weekly until review
Radar System Technical Review (2 of 2)
• Conduct Radar System Technical Review (cont.)
• Deliver completed technical review self-assessment spreadsheet
• Red / green compliance to CDD Excerpt requirements with pointer to Technical Data Product / Certification Package substantiating assessment
• Deliver open technology development self-assessment
• CDD Excerpts Attachment 3 – 3DELRR Open Technology Development
• Modular open systems architecture attributes of functional modularity, layered design/architecture, data accessibility, net-centricity, platform and vendor independence, and scalability
• Run Government provided scenarios through hardware-in-the-loop stimulator and modeling and simulation tools and deliver data
• Unclassified scenario based on Benchmark 96 Target Tracking Problem
• Classified scenario based on maximum target load
• Deliver an estimated unit cost for the procurement of thirty-five (35) production radar systems
Radar System Demonstration (1 of 2)
• Support Radar System Demonstration
• Live-fly system performance demonstration designed by the
Government
• Will include calibrated targets, operationally relevant surrogate targets, with and without Electronic Attack
• Conducted at Contractor far field range and/or Government range
• The Government will conduct all events and analyze data against truth data
• Contractor will operate and maintain system during demonstration
• Military Operators and Maintainers will observe the live-fly system performance demonstration and any maintenance performed
• Contractor is responsible for recording all radar performance data and delivering it to the Government for analysis daily
• Government requires early delivery of radar data samples in agreed format and software to read for dry runs prior to start of demonstration
• Previously completed testing will be used to construct tailored demonstration
Radar System Demonstration (2 of 2)
• Support Radar System Demonstration (cont.)
• Conduct maintainability/testability demonstration of Government selected items using Technical Orders
• Military Maintainers will observe the maintenance demonstration
• Actions are limited to Organizational level maintenance
• Actions will be composed of a Government selected list of remove/replace actions periodic inspections/maintenance and/or time change items actions
• Observation of performance monitoring and fault isolation will be included
• All maintenance observation, and recorded data shall be used for
Government reliability, availability, and maintainability (RAM) analysis.
• Conference calls for planning activities, est. bi-weekly until date of demonstration
(MITRE S-Building) Briefer
08:05 Disclaimer Kevin Kelleher, Agreements Officer
08:15 Opening Remarks; Purpose Col Michael Harm, Program Manager
08:30 Control and Reporting Center Overview Lt Col Anthony “Ted” Kuczynski
ACC/A3CG
09:00 Acquisition Strategy Overview Lt Col Matthew Judge, Deputy Program Manager
10:00 BREAK
10:15 SpeedDealer Agreement Overview Kevin Kelleher, Agreements Officer
10:30 SpeedDealer Proposal & Technical Activities
Charlene Caefer, Chief Engineer
10:45 SpeedDealer Demonstration Capt Zachary Benson, Test Lead
11:15 Follow-on Production Overview Maj Warren Anderson, Operations Lead
• Government intends to negotiate a follow-on RDT&E and Production contract based on information from the SpeedDealer Phase
• RDT&E effort
• Negotiate up to 35 units
• Option for up to 6 initial units
• Options for up to 29 units based on Streamlined OT&E results
• Activities to include but not limited to:
• C2 Integration
• Technical Orders in US Air Force accepted formats
• Training materials/activities
• Limited RDT&E for system shortcomings
• Streamlined OT&E with capital asset
Scope of Follow-on Contract
Follow-on Contract Decision
• Government best value decision based on but not limited to
• Performance (current capabilities and growth potential)
• Producibility and Maturity
• Maintainability and Sustainability
• Data Rights
• Affordability
• Procurement costs
• Operations and Sustainment costs
Above not listed in order of importance
Questions?
Refer any questions or communications to:
Closing Remarks
Kevin W. Kelleher Agreements Officer AFLCMC.3DELRR.org@us.af.mil mailto:AFLCMC.3DELRR.org@us.af.mil
| Three-Dimensional Expeditionary �Long-Range Radar (3DELRR) |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| BREAK |
| Slide Number 15 |
| SpeedDealer Overview |
| Slide Number 17 |
| SpeedDealer Selection Criteria: �(1 of 2) |
| SpeedDealer Selection Criteria:�(2 of 2) |
| Slide Number 20 |
| Slide Number 21 |
| SpeedDealer Proposals:�Content (1 of 6) |
| SpeedDealer Proposals:�Content (2 of 6) |
| SpeedDealer Proposals:�Content (3 of 6) |
| SpeedDealer Proposals:�Content (4 of 6) |
| SpeedDealer Proposals:�Content (5 of 6) |
| SpeedDealer Proposals:�Content (6 of 6) |
| Slide Number 28 |
| SpeedDealer Activities |
| SpeedDealer Activities:�Technical Data Products and Certification Packages |
| SpeedDealer Activities:�Radar System Technical Review (1 of 2) |
| SpeedDealer Activities:�Radar System Technical Review (2 of 2) |
| SpeedDealer Activities:�Radar System Demonstration (1 of 2) |
| SpeedDealer Activities:�Radar System Demonstration (2 of 2) |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
File details come from the government source that posted it. Updated .