This document is a Statement of Work (SOW) for San Jose temporary office space that outlines required modifications and installations divided into two project phases.

The pre-move-in phase (short-term, immediate) includes establishing perimeter door locks and cores with DSO locksmith coordination, installing ¾" plywood to deck above for the evidence room with temporary dead bolt and core/lock changeout, establishing Wi-Fi infrastructure including modem and repeaters for business use, and providing furniture for three private rooms and 20 agent stations. The 3-5 year short-term phase requires camera installation per the 2026 Security Package, at least one 2N-type AIPhone, card readers dependent on perimeter and secure interior doors, motion detectors based on layout, interior door hardware and locks, ¾" plywood perimeter/demising walls applied to the organization's side, additional split HVAC systems at 30,000 BTUs in the Telecommunications/Firebird room, alarm system connection to Denver MegaCenter, and evidence room subdivision into drug and non-drug storage areas with chain link fencing to deck. The document notes that current equipment including cameras, card readers, and AI phones are obsolete and cannot be reused. Additional specifications are referenced in the 2026 Security Package and Cabling Specifications documents.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scopes of Work for San Jose Temp Space

Short Term – Pre-Move-In – Defined as just to get staff in the office

1. Perimeter Doors - Locks / Cores (specify) (Page 13) – DSO can meet with locksmith.

2. Evidence Room – ¾” Plywood to deck above – all interior walls. Temporary dead bolt. Core and lock changeout.

3. Wi-Fi – Modem, repeaters, and WiFi for business – Specify

4. Furniture - (3) Private room set-ups (20) agent stations – or as many as space allows.

Short Term – 3-5 years

1. Cameras – Specify (see Security Package) (Pages 15 and 20)

2. AIPhones – At least one (Page 16) – 2N type

3. Cardreaders – Dependent on perimeter and secure interior doors – (Pages 14-15)

4. Motion Detectors – Dependent on layout (Pages 13-14)

5. Interior Doors – Hardware/locks/cores (Page 17)

6. Perimeter/Demising Walls – ¾” Plywood to deck – Applied to our side of the wall.

7. Firebird/LAN – In the Telecommunications/Firebird room: Add additional split systems @30,000 BTUs.

8. Alarm – Denver MegaCenter (Pages 5, 9-10)

9. Evidence – Subdivide room into drug and non-drug with chain link fencing going to deck.

*For Security, refer to the 2026 Security Package

* For Communications, refer to Cabling Specifications

**Current equipment – Cameras, card readers, AI Phones – all too old in to be reused in temp space.