3c P13174398 DWG.pdf
PDF 16 MB Posted
- Solicitation number
- 70Z0G124BSLIS0121
About this file
This document is a solicitation for the repair of the waterfront at USCG Station Montauk in Montauk, New York. The solicitation includes a base bid and two optional bid items for the replacement of the concrete floating dock for small boats, and repairs to the fixed timber pier, stone gabion bulkhead, and WPB floating pier. The estimated value of the project is between $1,000,000 and $5,000,000. The solicitation is a 100% set-aside for small businesses under NAICS code 237990 with a size standard of $45.0 million. The performance period is 285 calendar days from the notice to proceed, and the government reserves the right to exercise the optional bid items within 60 days of award. Bids are due by September 12, 2024 at 2:00 pm EST. The solicitation is issued under FAR Part 14 Sealed Bidding and all relevant documents can be accessed on SAM.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CG STA MONTAUK
MONTAUK, SUFFOLK COUNTY, NEW YORK
13174398 REPAIR WATERFRONT
CONCRETE FLOATING DOCK - SMALL BOAT, FIXED TIMBER PIER,
STONE GABION BULKHEAD, AND WPB FLOATING PIER
DRAWING INDEX
SHEET ID SHEET NO. DISCIPLINE SHEET TITLE
G-001 01 GENERAL COVER SHEET
G-002 02 GENERAL LEGEND & ABBREVIATIONS
G-003 03 GENERAL GENERAL NOTES
V-101 04 SURVEY OVERALL SITE PLAN
CD101 05 CIVIL DEMOLITION CONC FLOATING DOCK - SMALL BOAT DEMO PLAN
CD102 06 CIVIL DEMOLITION FIXED TIMBER PIER DEMO PLAN
CD103 07 CIVIL DEMOLITION STONE GABION BULKHEAD DEMO PLAN
CD104 08 CIVIL DEMOLITION OBI 1: WPB FLOATING PIER DEMO PLAN
C-101 09 CIVIL CONC FLOATING DOCK - SMALL BOAT REPLACEMENT PLAN
C-102 10 CIVIL FIXED TIMBER PIER REPAIR PLAN
C-103 11 CIVIL STONE GABION BULKHEAD REPAIR PLAN
C-104 12 CIVIL OBI 1: WPB FLOATING PIER REPAIR PLAN
C-501 13 CIVIL EROSION AND SEDIMENT CONTROL DETAILS
C-901 14 CIVIL SITE PHOTOGRAPHS - 1
C-902 15 CIVIL SITE PHOTOGRAPHS - 2
C-903 16 CIVIL SITE PHOTOGRAPHS - 3
S-501 17 STRUCTURAL FLOATING DOCK REPLACEMENT DETAILS
S-502 18 STRUCTURAL GABION REPAIR DETAILS
S-503 19 STRUCTURAL OBI 1: WPB FLOATING PIER REPAIR DETAILS - 1
S-504 20 STRUCTURAL OBI 1: WPB FLOATING PIER REPAIR DETAILS - 2
S-505 21 STRUCTURAL OBI 1: WPB FLOATING PIER REPAIR DETAILS - 3
S-506 22 STRUCTURAL OBI 2: WPB FLOATING PIER PILE REPAIR DETAILS
E-501 23 ELECTRICAL ELECTRICAL DETAILS
U.S. COAST GUARD
CIVIL ENGINEERING
CEU PROVIDENCE
VICINITY MAP
SCALE: NTS
LOCATION MAP
SCALE: NTS
STA MONTAUK
PROJECT DESCRIPTION:
THE PROJECT INCLUDES ONE (1) BASE BID ITEM (BBI) AND TWO (2) OPTIONAL
BID ITEMS (OBIS) AS SUMMARIZED BELOW. ANY WORK THAT IS NOT SPECIFIED
AS BEING PART OF AN OBI SHALL BE INCLUDED AS PART OF THE BASE BID
SCOPE.
1. THE BBI WORK INCLUDES THE FOLLOWING ITEMS AND INCIDENTAL
RELATED WORK:
BBI NO. 1:
RPUID 9939, CONCRETE FLOATING DOCK - SMALL BOAT: REPLACE THE
EXISTING FLOATING DOCK; REPLACE THE EXISTING GUIDE PILES; REMOVE
AND REINSTALL THE EXISTING SHORE TIE ON THE PROPOSED FLOATING
DOCK; REPLACE THE SHORE TIE ELECTRICAL LINES ON THE PROPOSED
FLOATING DOCK; REPAIR THE WORN GANGWAY FLANGES; AND REPLACE
GANGWAY ROLLERS, TRANSITION PLATE, ALUMINUM WEAR PLATE, AND
UHMW WEAR PADS AS SPECIFIED AND SHOWN IN THE CONTRACT
DOCUMENTS.
RPUID 66185, FIXED TIMBER PIER: REPLACE BROKEN SEWER LINE HANGER;
REPLACE MISSING SEWER LINE INSULATION; REMOVE ABANDONED
WATER AND COMPRESSED AIR LINES, CONNECTIONS, AND ENCLOSURE;
AND REPLACE MISSING ELECTRICAL JUNCTION BOX COVER PLATE AS
SPECIFIED AND SHOWN IN THE CONTRACT DOCUMENTS.
RPUID 9938, STONE GABION BULKHEAD: REPLACE CORRODED SECTIONS
OF GABION BASKET WIRE; REPLACE MISSING GABION STONE FILL; EXTEND
GABION BASKET BULKHEAD RETURN; AND RESTORE ERODED AREAS AS
SPECIFIED AND SHOWN IN THE CONTRACT DOCUMENTS.
2. THE OBI WORK INCLUDES THE FOLLOWING ITEMS AND INCIDENTAL
RELATED WORK:
OBI NO. 1:
RPUID 66186, WPB FLOATING PIER: TIGHTEN ALL THRU-RODS AND BOLTED
CONNECTIONS; REPLACE DAMAGED AND/OR SEIZED THRU-RODS;
REPLACE PILE GUIDE FRAMES, WEAR PADS, AND ASSOCIATED
THRU-RODS; INSTALL SUPPLEMENTAL BUOYANCY FLOATS TO RETURN
DOCK TO LEVEL; REPLACE PERIMETER TIMBER RUB STRIPS AND
D-FENDERS; REPLACE CLEATS AND ASSOCIATED HARDWARE; REPLACE
THE LIGHT POLE-TO-FLOATING DOCK BOLTED CONNECTION; REPLACE THE
UTILITY GANGWAY; REPLACE THE PERSONNEL GANGWAY HINGE; REPLACE
GANGWAY WEAR PADS; REPAIR CONCRETE DECK ABRASION/SPALLS; AND
REPLACE THE LOWER PILE CLUSTER DOLPHIN WRAP AS SPECIFIED AND
SHOWN IN THE CONTRACT DOCUMENTS.
OBI NO. 2:
RPUID 66186, WPB FLOATING PIER: RECOAT THE EXISTING GUIDE PILES;
AND INSTALL ALUMINUM ANODES ON THE GUIDE PILES AS SPECIFIED AND
SHOWN IN THE CONTRACT DOCUMENTS.
NOTES:
1. THE PROPERTY BOUNDARY DATA SHOWN WAS OBTAINED FROM THE SUFFOLK COUNTY, NEW
YORK GIS MAPPING (HTTPS://KOORDINATES.COM/PUBLISHER/SUFFOLK-COUNTY-NY/DATA/)
AND IS CONSIDERED APPROXIMATE.
ABUTTING PROPERTY DATA
BLOCK LOT PARCEL ADDRESS OWNER OWNER ADDRESS
1 400 2000 69 STAR ISLAND RD
MONTAUK, NY 11954
UNITED STATES
GOVERNMENT
69 STAR ISLAND RD
MONTAUK, NY 11954
2 400 1000 73 STAR ISLAND RD
MONTAUK, NY 11954
TOWN OF EAST
HAMPTON
159 PANTIGO RD
EAST HAMPTON, NY 11937
3 400 17000 58 STAR ISLAND RD
MONTAUK, NY 11954
32 STAR ISLAND
ASSOCIATES LLC
417 FIFTH AVE, FLOOR 4TH
NEW YORK, NY 10016
4 400 3000 59 STAR ISLAND RD
MONTAUK, NY 11954 MARLENA GERSHOWITZ 152 THE HELM
EAST ISLIP, NY 11730
5 400 4000 59 STAR ISLAND RD
MONTAUK, NY 11954 MARLENA GERSHOWITZ 152 THE HELM
EAST ISLIP, NY 11730
ABUTTING PROPERTIES MAP
SCALE: NTS
PROJECT
LOCATION
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
TECHNICAL DIRECTOR
AutoCAD SHX Text
BRANCH CHIEF
AutoCAD SHX Text
APPROVING OFFICER DATE
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text
ENGINEERING UNIT
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
PROVIDENCE
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text
SOUND
AutoCAD SHX Text
LONG ISLAND
AutoCAD SHX Text
PROVIDENCE
AutoCAD SHX Text
HARTFORD
AutoCAD SHX Text
HUDSON RIVER
AutoCAD SHX Text
LONG ISLAND
AutoCAD SHX Text
MASS.
AutoCAD SHX Text R.I.
AutoCAD SHX Text
CONN.
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
STATION
AutoCAD SHX Text
BLOCK
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text N.Y.
AutoCAD SHX Text
PA.
AutoCAD SHX Text N.J.
AutoCAD SHX Text
REPAIR WATERFRONT
AutoCAD SHX Text
CG STA MONTAUK
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
NY
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
CONCRETE FLOATING DOCK -SMALL BOAT
AutoCAD SHX Text G-001
AutoCAD SHX Text 13174398
AutoCAD SHX Text P13174398G-001
AutoCAD SHX Text
P13174398G-001.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text
MICHAEL P. CAROSOTTO, PE
AutoCAD SHX Text
MICHAEL P. CAROSOTTO, PE
AutoCAD SHX Text
DAVID C. DILL, PE
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
APR 2024
AutoCAD SHX Text
U.S. COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
LAKE MONTAUK
AutoCAD SHX Text
OYSTER POND
AutoCAD SHX Text
USCG STATION MONTAUK
AutoCAD SHX Text
MONTAUK PT.
AutoCAD SHX Text
WEST LAKE DRIVE
AutoCAD SHX Text
LONG ISLAND SOUND
AutoCAD SHX Text
ATLANTIC OCEAN
AutoCAD SHX Text
ATLANTIC OCEAN
ELEVATION
SECTION
DETAIL
CROSS-REFERENCE LEGEND
INDICATES REFERENCE QUADRANT SHEET LOCATION
SHEET WHERE SECTION/DETAIL/ELEVATION
IS TAKEN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE SECTION IS SHOWN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE DETAIL IS SHOWN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE ELEVATION IS SHOWN
X# X-#
X# X-#
X# X-#
X# X-#
VIEW TITLE SAMPLE
SCALE: AS NOTED
TRUE NORTH DIRECTION
REFERENCE DOCUMENTS:
1. THE FOLLOWING REFERENCE MATERIALS WERE USED TO INFORM THE DESIGNER OF
RECORD OF THE EXISTING SITE CONDITIONS AND ARE AVAILABLE TO THE
CONTRACTOR UPON REQUEST. REVIEW OF THIS MATERIAL IS NOT REQUIRED FOR
BIDDING PURPOSES.
A. 7 NOV 1980, AS BUILT DRAWINGS, CG PROJECT NO. 34074, DWG NO. 03-5888:
EROSION CONTROL, MONTAUK COAST GUARD STATION, MONTAUK, NEW
YORK; PREPARED BY U.S. COAST GUARD 3RD DISTRICT, GOVERNORS
ISLAND, N.Y.
B. 5 MAR 1986, DESIGN DRAWINGS, CG PROJECT NO. 35004, DWG NO. 03-6541:
MOORING FLOAT & PIER REDECKING, MONTAUK STATION, MONTAUK LONG
ISLAND, NEW YORK; PREPARED BY U.S. COAST GUARD 3RD DISTRICT,
GOVERNORS ISL., N.Y.
C. UNDATED, DESIGN DRAWINGS, CG PROJECT NO. 01-L5001: REPLACE
STATION/WPB PIER, CG STA MONTUAK, MONTAUK, NY; PREPARED BY U.S.
COAST GUARD FACILITIES DESIGN & CONST CENTER ATLANTIC, NORFOLK,
VA.
D. 1 NOV 2002, SHOP DRAWINGS, REV 2: CONCRETE FLOATING DOCK
ASSEMBLY, USCG STATION MONTAUK, MONTAUK, NY; PREPARED BY
BELLINGHAM MARINE, YORK, PA.
E. MAR 2021, WATERFRONT FACILITIES INSPECTION AND ASSESSMENT AT
UNITED STATES COAST GUARD STATION MONTAUK, MONTAUK, NEW YORK,
USCG PROJECT NO. 16844588; PREPARED BY CHILDS ENGINEERING
CORPORATION, BELLINGHAM, MA.
2. THE REFERENCE MATERIALS LISTED ABOVE ARE NOT INTENDED TO SHOW ALL
EXISTING CONDITIONS AND DETAILS FROM THE ORIGINAL CONSTRUCTION AND
SUBSEQUENT REPAIR OR IMPROVEMENT CONTRACTS BUT ARE INTENDED TO SHOW
BASIC ARRANGEMENT OF THE FACILITIES, GENERAL LOCATIONS OF REPAIRS, AND
OTHER IMPROVEMENTS.
ABBREVIATIONS
ABND ABANDONED
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
APPROX. APPROXIMATE
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
AWPA AMERICAN WOOD PRESERVES ASSOCIATION
AWS AMERICAN WELDING SOCIETY
BBI BASE BID ITEM
BMP BEST MANAGEMENT PRACTICES
BTM BOTTOM
BWTN BETWEEN
CA COMPRESSED AIR
CB CARRIAGE BOLT
CEU CIVIL ENGINEERING UNIT
CF CUBIC FOOT
CFD-SB CONCRETE FLOATING DOCK - SMALL BOAT
CL CENTER LINE
CLR CLEAR
COMM COMMUNICATIONS
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
CONT'D CONTINUED
COR CONTRACTING OFFICER REPRESENTATIVE
DIA/Ø DIAMETER
DIM DIMENSION
DW DOCK WASHER
DWG DRAWING
E EAST
EA EACH
EL ELECTRICAL
ELEV ELEVATION
EQ EQUAL
ES EACH SIDE
EX EXISTING
EXP EXPANSION
F&I FURNISH AND INSTALL
FH FLAT HEAD
FNDN FOUNDATION
FT FOOT/FEET
FTG FOOTING
FTP FIXED TIMBER PIER
FW FLAT WASHER
HDG HOT DIPPED GALVANIZED
HHN HEAVY HEX NUT
HLN HEX LOCK NUT
HORIZ HORIZONTAL
IBC INTERNATIONAL BUILDING CODE
I.D. INSIDE DIAMETER
IN INCH(ES)
KO CONTRACTING OFFICER
L LENGTH
LBS POUNDS
LF LINEAR FEET
LG LONG
LOD LIMITS OF DISTURBANCE
LW LOCK WASHER
MW MALLEABLE WASHER
MAX MAXIMUM
MHW MEAN HIGH WATER
MHHW MEAN HIGHER HIGH WATER
MIN MINIMUM
MLW MEAN LOW WATER
MLLW MEAN LOWER LOW WATER
MSL MEAN SEA LEVEL
MTL MEAN TIDE LEVEL
N NORTH
NAD83 NORTH AMERICAN DATUM OF 1983
NAVD88 NORTH AMERICAN VERTICAL DATUM OF 1988
NDS NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION
NE NORTH EAST
NIC NOT IN CONTRACT
NO. NUMBER
NTS NOT TO SCALE
NW NORTH WEST
NYSDEC NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
NYSDOS NEW YORK STATE DEPARTMENT OF STATE
NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION
OC ON CENTER
OBI OPTIONAL BID ITEM
OD OUTSIDE DIAMETER
P&M PROTECT AND MAINTAIN
PCF POUNDS PER CUBIC FOOT
PL PLATE
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PW POTABLE WATER
QTY QUANTITY
R&D REMOVE AND DISPOSE
R&R REMOVE AND REINSTALL
R&S REMOVE AND STOCKPILE
REF REFERENCE
REQ'D REQUIRED
RPUID REAL PROPERTY UNIQUE IDENTIFIER
E8 VERTICAL DATUM CONVERSION DIAGRAM
SCALE: NTS
MLLW
MLW
MTL
MSL
NAVD 88
MHW
MHHW
M
EA
N T
ID
AL
R
AN
G E
2.
EL. -0.17'
EL. 0.00'
EL. 1.07'
EL. 1.40'
EL. 2.07'
EL. 2.36'
EL. 1.04'
MLW
EL. -1.57'
EL. -1.40'
EL. -0.33'
EL. 0.00'
EL. 0.67'
EL. 0.96'
EL. -0.36'
NAVD 88
ABBREVIATIONS CONTINUED
S SOUTH
SE SOUTH EAST
SF SQUARE FEET
SID STATEN ISLAND DATUM
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
SGB STONE GABION BULKHEAD
SW SOUTH WEST
T&B TOP & BOTTOM
TYP TYPICAL
UHMW ULTRA HIGH MOLECULAR WEIGHT POLYETHELENE
U.S. UNITED STATES
USACE UNITED STATES ARMY CORPS OF ENGINEERS
USCG UNITED STATES COAST GUARD
UTIL UTILITIES
W WEST
WPB COAST GUARD PATROL BOAT
WPBFP WPB FLOATING PIER
W/ WITH
& AND
@ AT
' FEET/FOOT
" INCHES
< LESS THAN
> GREATER THAN OR EQUAL
% PERCENTAGE
± PLUS/MINUS
CIVIL LEGEND
PROPERTY LINE/EASEMENT
LOD
TURBIDITY BARRIER
ELECTRIC LINE
JUNCTION BOX
ELECTRICAL PANEL
OVERHEAD LIGHT AND POLE
APPROXIMATE SPOT ELEVATION
APPROXIMATE STATION
APPROXIMATE CONTOUR
X#
PLAN VIEW TITLE SAMPLE
SCALE: AS NOTED
INDICATES REFERENCE QUADRANT SHEET LOCATION
FEMA
100-YEAR
FLOOD
EL. 9.40' EL. 8.00'
O
NOTES:
1. THE ELEVATION DATA SHOWN ABOVE WAS OBTAINED FROM
THE U.S. DEPARTMENT OF COMMERCE, NATIONAL OCEANIC
AND ATMOSPHERIC ADMINISTRATION (NOAA), NATIONAL
OCEAN SERVICE, FROM :
STATION ID: 8510560
LOCATION: MONTAUK, NY
LATITUDE: 41° 2.9' N
LONGITUDE: 71° 57.6' W
INDICATES REFERENCE
QUADRANT SHEET LOCATION
INDICATES DIRECTION AND
DATE PHOTO WAS TAKEN
X# X-#
PHOTO TITLE SAMPLE
ORITENTATION, DATE
INDICATES PHOTO DESCRIPTION
INDICATES SHEET WHERE PHOTO
LOCATION IS DOCUMENTED
0+00 x 8.1
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
REPAIR WATERFRONT
AutoCAD SHX Text
CG STA MONTAUK
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
NY
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
LEGEND & ABBREVIATIONS
AutoCAD SHX Text
CONCRETE FLOATING DOCK -SMALL BOAT
AutoCAD SHX Text G-002
AutoCAD SHX Text 13174398
AutoCAD SHX Text P13174398G-002
AutoCAD SHX Text
P13174398G-002.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
APR 2024
AutoCAD SHX Text
US COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text E
AutoCAD SHX Text J
E
GENERAL NOTES:
1. THE SITE IS LOCATED IN MONTAUK, SUFFOLK COUNTY, NEW YORK.
2. THESE DRAWINGS ARE NOT INTENDED TO REPLACE THE SPECIFICATIONS. SEE SPECIFICATIONS
FOR ADDITIONAL REQUIREMENTS. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THESE
DRAWINGS AND SPECIFICATIONS.
3. UTILITY SIZES AND LOCATIONS, WHEN SHOWN ON THESE DRAWINGS, ARE CONSIDERED
APPROXIMATE. THE ACTUAL SIZE AND LOCATION OF UTILITIES MAY VARY FROM THOSE SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATIONS OF ALL UTILITIES, GRADES, AND DIMENSIONS PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL NOTIFY THE COR OF
ANY DISCREPANCIES, IN WRITING, PRIOR TO BEGINNING AFFECTED WORK. THE CONTRACTOR
SHALL MAKE PROVISIONS TO ENSURE UTILITY LINES ARE PROTECTED AND REMAIN IN CONTINUOUS
OPERATION, UNLESS OTHERWISE NOTED.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT DIG SAFELY NEW YORK AND THE
USCG COR A MINIMUM OF 72 HOURS BEFORE COMMENCING WITH ANY EXCAVATION RELATED
WORK, IN ORDER THAT ALL AFFECTED UTILITY COMPANIES ARE NOTIFIED.
5. EXISTING CONSTRUCTION, INCLUDING UTILITIES, DRAINAGE, AND OTHER MISCELLANEOUS WORK WHICH IS TO REMAIN, SHALL BE UNDISTURBED AND PROTECTED. HOWEVER, SOME UTILITIES MAY
REQUIRE TEMPORARY REMOVAL TO PERFORM THE WORK. REINSTALL TEMPORARILY REMOVED
UTILITIES OR REPLACE WITH NEW MATERIALS IN-KIND.
6. LIMITED WATER AND POWER ARE AVAILABLE ON SITE. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING CONNECTIONS AS NEEDED IN COORDINATION WITH THE COR.
7. RIGHT-OF-WAY LINES, LEASE LINES, AND EASEMENT LINES, WHEN SHOWN ON THESE DRAWINGS, ARE CONSIDERED APPROXIMATE AND WERE OBTAINED FROM HISTORIC RECORDS.
8. CONSTRUCTION LIMITS COINCIDE WITH PROPERTY LINE AND/OR LEASE LIMITS AS SHOWN ON THE
DRAWINGS.
9. THE USCG SHALL PROVIDE A STAGING AREA WITHIN THE PROPERTY FOR THE CONTRACTOR'S USE
AS SHOWN ON THE DRAWINGS OR AS AGREED TO BY THE KO DURING THE PRE-CONSTRUCTION
MEETING. THE CONTRACTOR SHALL STORE CONSTRUCTION MATERIALS WITHIN ITS DESIGNATED
STAGING AREA AND SHALL NOT STORE SUCH MATERIALS IN OTHER NON-AUTHORIZED AREAS.
10. THE FOLLOWING PERMITS ARE APPLICABLE TO THIS PROJECT:
10.1. USACE: AUTHORIZATION UNDER NATIONWIDE GENERAL PERMIT NUMBER 3 - MAINTENANCE AND
13 - BANK STABILIZATION, FILE NO. NAN-2023-00190-EMI.
10.2. NYSDEC: WATER QUALITY CERTIFICATION UNDER SECTION 401 CLEAN WATER ACT, PERMIT ID 2-4727-00751/00012.
10.3. NYSDOS: CONCURRENCE WITH CONSISTENCY DETERMINATION, PERMIT NO. F-2023-0178(DA).
THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR ADHERING TO THE CONDITIONS
PROVIDED WITHIN THESE DOCUMENTS, COPIES OF WHICH ARE PROVIDED IN THE SPECIFICATIONS.
11. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. SAFETY PROVISIONS SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND
LOCAL REGULATIONS. THESE REQUIREMENTS SHALL APPLY CONTINUOUSLY AND SHALL NOT BE
LIMITED TO NORMAL WORKING HOURS.
12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP ERECTION PROCEDURES AND SEQUENCING
TO INSURE THE PROTECTION OF EXISTING AND PROPOSED STRUCTURES AND THE SAFETY AND
PROTECTION OF STATION PERSONNEL, CONSTRUCTION PERSONNEL, AND THE PUBLIC, UNLESS
OTHERWISE DIRECTED BY THE COR. THIS INCLUDES THE ADDITION OF NECESSARY TEMPORARY
SUPPORTS (E.G., BRACING, SHORING, SHEETING, GUYS, TIEDOWNS, ETC.). SUCH TEMPORARY MATERIAL SHALL BE DESIGNED BY THE CONTRACTOR AND SHALL REMAIN THE PROPERTY OF THE
CONTRACTOR.
13. THE WORK SHALL BE CONDUCTED IN A MANNER THAT WILL MINIMIZE INTERRUPTIONS TO THE DAILY
OPERATIONS OF USCG STA MONTAUK. REFER TO THE CONSTRUCTION SEQUENCING NOTES FOR
ADDITIONAL REQUIREMENTS.
14. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE ORDERING ANY MATERIAL, COMMENCING ANY FABRICATION, OR PERFORMING ANY WORK.
THE CONTRACTOR SHALL NOTIFY THE USCG COR, IN WRITING, OF ANY CONDITIONS OR
DIMENSIONS WHICH VARY FROM THOSE SHOWN ON THE DRAWINGS AND INCORPORATE SUCH
VARIATIONS IN THE CONSTRUCTION AS APPROVED BY THE USCG.
15. WATER ELEVATIONS AT THE SITE ARE TIDAL AND WILL VARY.
16. THE PROPOSED WORK IS LOCATED WITHIN A FEMA ZONE VE FLOOD ZONE AND WILL BE INUNDATED DURING THE 100 YEAR FLOOD. THE 100 YEAR FLOOD ELEVATION IS ESTIMATED AT ABOUT EL. 8 FEET
(NAVD 88) AS SHOWN ON THE TOWN OF EAST HAMPTON FLOOD INSURANCE RATE MAP NUMBER
36103C0258H, PANEL 258 OF 1026, LAST REVISED SEPTEMBER 25, 2009.
17. ALL AREAS DISTURBED DURING DEMOLITION OR CONSTRUCTION SHALL BE RESTORED TO THEIR
ORIGINAL CONDITION BY THE CONTRACTOR, UNLESS OTHERWISE NOTED.
18. MATERIAL TO BE REMOVED SHALL BE LEGALLY DISPOSED OF OFFSITE BY THE CONTRACTOR DAILY
IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL LAWS.
19. THE CONTRACTOR SHALL OBTAIN, DAILY, A BURNING PERMIT FROM THE USCG FOR ALL WELDING
AND TORCH CUTTING.
20. THE CONTRACTOR SHALL PROVIDE ALL WORK AND MATERIALS NECESSARY FOR A COMPLETE
SYSTEM, WHETHER SHOWN OR NOT ON THE DRAWINGS. ALL WORK SHALL BE COORDINATED
BETWEEN GENERAL, CIVIL, DEMOLITION, STRUCTURAL, AND ELECTRICAL DRAWINGS.
21. THE CONTRACTOR IS RESPONSIBLE FOR ANY ADDITIONAL COST ASSOCIATED WITH THIRD PARTY
REINSPECTION OR RETEST WHEN PRIOR REJECTION MAKES REINSPECTION OR RETEST
NECESSARY.
22. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE COR FOR APPROVAL
PRIOR TO FABRICATION AND CONSTRUCTION. PROPOSED CONTRACTOR CHANGES SHOWN ON
SHOP DRAWINGS ONLY WILL NOT SATISFY THIS REQUIREMENT.
ENVIRONMENTAL PROTECTION PLAN:
1. IN ORDER TO PROTECT LAKE MONTAUK AND LONG ISLAND SOUND FROM HAZARDOUS MATERIALS
RELEASES DURING THE COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR TAKING PREVENTATIVE MEASURES TO AVOID ANY ENVIRONMENTAL IMPACTS.
THESE MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO:
1.1. ALL EQUIPMENT PROPOSED TO BE UTILIZED BY THE CONTRACTOR SHALL BE IN GOOD
WORKING CONDITION AND INSPECTED DAILY FOR LEAKS.
1.2. A SPILL KIT, ABSORBENT MATERIALS, AND CONTAINMENT BERM SHALL BE ON SITE AT ALL
TIMES DURING CONSTRUCTION OPERATIONS.
1.3. ALL FUEL TRANSFER OPERATIONS SHALL BE CONDUCTED IN AN EFFICIENT AND SAFE MANNER
IN ACCORDANCE WITH THE CONTRACTOR'S OPERATIONS MANUAL AND THE REQUIREMENTS
SPECIFIED. OIL ABSORBENT DIAPERS SHALL BE PLACED UNDER ALL EQUIPMENT DURING
FUELING OPERATIONS.
1.4. ALL HYDRAULIC EQUIPMENT OPERATING ON SITE SHALL HAVE VEGETABLE BASED, NON-TOXIC, NON-POLLUTING, AND BIO-DEGRADABLE HYDRAULIC FLUID.
1.5. ALL EQUIPMENT SHALL BE PROPERLY MAINTAINED AND RECORDED IN WEEKLY LOGS AS TO
REQUIREMENTS FOR AND ACTUAL MAINTENANCE COMPLETED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEANUP AND REMEDIATION OF HAZARDOUS
MATERIAL RELEASES.
DESIGN CRITERIA:
CONTRACT FLOATING DOCK - SMALL BOAT:
1. THE DESIGN OF THE REPLACEMENT FLOATING DOCK IS THE RESPONSIBILITY OF THE CONTRACTOR.
THE REQUIRED DESIGN CRITERIA ARE PROVIDED IN SECTION 35 51 13.00 20, CONCRETE FLOATING
PIER FOR SMALL CRAFT.
2. DESIGN VESSELS
GUIDE PILE SACRIFICIAL ANODES:
1. THE PROPOSED GUIDE PILE SACRIFICIAL ANODES WERE DESIGNED TO PROVIDE PROTECTION OVER
A 25-YEAR DESIGN LIFE IN COMBINATION WITH THE PROPOSED COATING SYSTEM.
REQUIRED DESIGN CODES:
1. 2020 BUILDING CODE OF NEW YORK STATE
2. INTERNATIONAL BUILDING CODE 2018 (IBC 2018)
3. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, AMERICAN SOCIETY OF CIVIL
ENGINEERS, ASCE 7-16
4. UNITED FACILITIES DESIGN, UFC 4-152-01 DESIGN: PIERS AND WHARVES
5. AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS
6. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, AMERICAN CONCRETE INSTITUTE, ACI 318-19
7. PCI RECOMMENDED PRACTICE FOR DESIGN, MANUFACTURE, AND INSTALLATION OF PRESTRESSED
ELEMENTS
8. AMERICAN INSTITUTE OF STEEL CONSTRUCTION, STEEL CONSTRUCTION MANUAL, AISC 15TH
EDITION
9. AMERICAN WELDING SOCIETY, AWS D1.1
10. NATIONAL DESIGN STANDARD (NDS) FOR WOOD CONSTRUCTION.
LAYOUT:
1. THE VERTICAL CONTROL DATUM FOR THIS PROJECT IS MLW.
2. THE CONTRACTOR SHALL ESTABLISH AND MAINTAIN ADEQUATE SURVEY CONTROL THROUGHOUT
CONSTRUCTION TO ESTABLISH AND MAINTAIN ALL LINES AND ELEVATIONS.
EXISTING CONDITIONS:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTION 02 41 00, DEMOLITION AND
DECONSTRUCTION.
METALS:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTION 05 50 15, CIVIL WORKS
FABRICATION.
FINISHES:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTION 09 97 13.26, COATING OF
STEEL WATERFRONT STRUCTURES.
ELECTRICAL:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTIONS 26 00 00.00 20, BASIC ELECTRICAL MATERIALS AND METHODS; 26 05 19.00 10, INSULATED WIRE AND CABLE; AND 26 27 29, MARINA ELECTRICAL WORK.
2. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTION 26 42 13.00 20, CATHODIC
PROTECTION BY GALVANIC ANODES.
EARTHWORK:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTIONS 31 00 00, EARTHWORK; 31 05
19, GEOTEXTILE; 31 36 00, WIRE MESH GABIONS; AND 31 62 16.16, STEEL PIPE PILES.
EXTERIOR IMPROVEMENTS:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTION 32 92 19, SEEDING.
WATERWAY MARINE CONSTRUCTION:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTION 35 51 13.00 20, CONCRETE
FLOATING PIER FOR SMALL CRAFT.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RETAINING A FLOATING DOCK MANUFACTURER FOR THE DESIGN AND FABRICATION OF THE FLOATING DOCKS. THE DESIGN SHALL BE STAMPED BY
A PROFESSIONAL ENGINEER REGISTERED IN THE UNITED STATES.
TEMPORARY ENVIRONMENTAL CONTROLS:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SECTION 01 57 19, TEMPORARY
ENVIRONMENTAL CONTROLS.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE AND MAINTAIN ENVIRONMENTAL CONTROLS AS REQUIRED BY FEDERAL, STATE, AND MUNICIPAL REGULATIONS AND PERMITS. ENVIRONMENTAL CONTROLS SHALL INCLUDE, BUT NOT BE LIMITED TO SEDIMENTATION, TURBIDITY, AND DUST.
3. THE PROJECT REQUIRES THE IMPLEMENTATION OF BEST MANAGEMENT PRACTICES (BMP) DURING
CONSTRUCTION WORK TO PREVENT/MINIMIZE ENVIRONMENTAL IMPACTS DURING THE
CONSTRUCTION ACTIVITY. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO:
A. NO DEBRIS SHALL BE ALLOWED TO ENTER THE WATER. THE CONTRACTOR SHALL PROVIDE A
TEMPORARY PLATFORM OR OTHER SUITABLE POSITIVE MEANS OF CAPTURING DEBRIS FROM
CONSTRUCTION AND DEMOLITION OPERATIONS. THESE FACILITIES SHALL BE IN PLACE AND
APPROVED BY THE COR BEFORE STARTING ANY DEMOLITION WORK.
5. THE CONTRACTOR SHALL PLACE CONSTRUCTION DEBRIS CONTROL DEVICES, BOOMS, TARPAULINS, FLOATS, STAGING AND OTHER DEVICES NECESSARY TO PREVENT CONSTRUCTION DEBRIS FROM
ENTERING THE WATER AND AIRBORNE MATERIALS FROM LEAVING THE IMMEDIATE VICINITY OF THE
SITE.
6. DEMOLITION DEBRIS FALLING INTO THE WATER SHALL BE PROMPTLY REMOVED BY THE
CONTRACTOR. UNDERWATER INSPECTIONS MAY BE CONDUCTED BY THE USCG TO VERIFY THAT
THE CONTRACTOR HAS REMOVED ALL DEMOLITION AND CONSTRUCTION DEBRIS FROM THE
MUDLINE.
CONSTRUCTION SEQUENCING:
1. STA MONTAUK IS AN ACTIVE USCG INSTALLATION AND WILL MAINTAIN CONTINUOUS OPERATION
THROUGHOUT THE COMPLETION OF THIS PROJECT. ACCORDINGLY, THE CONTRACTOR SHALL NOT
INTERFERE WITH STATION OPERATIONS OR IMPEDE UPLAND OR WATER BASED ACCESS. ACCESS
TO EMERGENCY RESPONSE VESSELS AND THE ABILITY TO GO UNDERWAY SHALL BE
CONTINUOUSLY MAINTAINED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING APPROVAL TO BEGIN EACH PHASE OF
WORK IN COORDINATION WITH THE KO AND STA NEW YORK COMMANDING OFFICER.
3. CONTRACTOR CONSTRAINTS TO SEQUENCING ARE AS FOLLOWS:
A. DESIGN, APPROVAL, FABRICATION, AND DELIVERY OF THE FLOATING DOCKS, GUIDE PILES, ELECTRICAL LINES, FIXED TIMBER PIER REPAIR ITEMS, GABION REPAIR ITEMS, TIMBER
RUBSTRIPS AND D-FENDERS, THRU-RODS, PILE GUIDE FRAMES, GUIDE PILE COATING REMOVAL
AND COATING SYSTEM, ALUMINUM ANODES, AND ALL REQUIRED ITEMS AND MATERIALS SHALL
BE COMPLETED BY THE CONTRACTOR PRIOR TO BEGINNING ANY WORK ON SITE IN ORDER TO
MINIMIZE THE AMOUNT OF TIME THAT THE UNIT IS IMPACTED.
B. FOR SCHEDULING PURPOSES, THE CONTRACTOR SHALL ASSUME THAT WORK WILL BE
PERFORMED AND COMPLETED ON ONE FLOATING DOCK AT A TIME (E.G., CONCRETE FLOATING
DOCK - SMALL BOAT, WPB FLOATING PIER) IN ORDER TO MINIMIZE IMPACTS TO STATION
OPERATIONS.
C. STA MONTAUK VESSELS DISPLACED BY THE PROPOSED WORK WILL TEMPORARILY MOOR AT
ADJACENT FLOATING DOCKS. THE CONTRACTOR SHALL MAINTAIN OPEN ACCESS FOR STA
MONTAUK VESSELS FROM ALL ACTIVE FLOATING DOCKS TO THE BOAT BASIN ENTRANCE AT ALL
TIMES IN ORDER TO PREVENT ANY IMPACT TO STATION OPERATIONS.
D. DURING THE CONCRETE FLOATING DOCK - SMALL BOAT REPLACEMENT WORK, THE
CONTRACTOR SHALL RELOCATE ITS SHORE TIE TO THE WPB FLOATING PIER SUCH THAT IT IS
ACCESSIBLE BY THE DISPLACED STA MONTAUK VESSELS.
E. AREAS OF THE FACILITY NOT UNDER CONSTRUCTION SHALL REMAIN IN OPERATION DURING
CONSTRUCTION. KEEP ALL CONSTRUCTION ACTIVITIES AND PERSONNEL CLEAR OF FACILITY
OPERATIONS.
DESIGN VESSEL SPECIFICATIONS
VESSEL
LENGTH
(FT)
BEAM
(FT)
DRAFT
(FT)
DISPLACEMENT
(LB)
45' RESPONSE
BOAT - MEDIUM 44.8 14.6 3.3 36,500
47' MOTOR
LIFEBOAT 47.9 14.0 4.5 40,000
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
REPAIR WATERFRONT
AutoCAD SHX Text
CG STA MONTAUK
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
NY
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
CONCRETE FLOATING DOCK -SMALL BOAT
AutoCAD SHX Text G-003
AutoCAD SHX Text 13174398
AutoCAD SHX Text P13174398G-003
AutoCAD SHX Text
P13174398G-003.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
APR 2024
AutoCAD SHX Text
US COAST GUARD
CIVIL ENGINEERING
CONC. PAD W/
FUEL
TANK
CONC. SIDEWALK
LAKE MONTAUK
WOOD JETTY
WOOD DOCK
FUEL TANK &
CONTAINMENT
BUILDING
TIDAL BENCHMARK 0448A
R O
O F O
VER
C O
N C
. SID
EW
ALK
ASPHALT PAVEMENT(LEACH FIELD BELOW)
UPH/GALLEY/MESS DECK
2 STORY
FRAME BUILDING
(DINING FACILITY)
FF EL=10.48
GABION WALL
R O
O F
O
VER
VOLLEY BALL
COURT
APPROX MHW
APPROX MLW
WOOD
SIGN
LIGHT POLE
CHAI
N LI
NK
FE
NCE
STA
R IS
LA
ND R
OAD
WOOD
SIGN
CHAIN LINK FENCE
ROOF OVER
GARAGE/BOAT
MAINTENANCE
2 STORY
FRAME BUILDING
& GARAGE
FF EL=10.53
N.O.S.
MARK
0448C
STORAGE
AREA
N.O.S.
MARK 6
C O
N C
CO
NC
. S
ID
EW
AL
K
FLAGPOLE
CONC. SIDEWALK
STATION BUILDING
2 STORY
FRAME BUILDING
(COAST GUARD STATION)
FF EL=13.72
ROOF OVER
CONC. PORCH
ALUMINUMBUILDING
GABIONWALL
C H
AIN
LIN
K FEN
C
E
N.O.S.
MARK
0448B
W O
O D
D O
C K
LIG
H
T
PO
LE
LIGHT POLE
BORING NO. 3
ED
GE
OF
PA
VE
MEN
T
ED
GE
OF
PA
VE
MEN
T
EDGE OF PAVEMENT
GANGW
AY
GANGW
AY
LEACH FIELD
CONCRETE FLOAT
CONCRETE FLOAT
TIMBER FLOAT
TIM
BER FLOAT
ASPHALT PAVEMENT
FU
EL STO
R
AG
E
FU
EL LIN
E
LIFT STA MH
SEPTICCVR
LAKE MONTAUK
FL
OOD
EB
B
STONE GABION
BULKHEAD (RPUID 9938)
A5 OVERALL SITE PLAN
SCALE: 1" = 30'
30' 60'0
CONCRETE FLOATING
DOCK - SMALL BOAT
(RPUID 9939)
WPB FLOATING PIER
(RPUID 66186)
TIMBER FLOATING DOCK
(RPUID 71004)
FIXED TIMBER PIER
(RPUID 66185)
TOWN PIERAPPROX BOAT BASIN LIMITS
E2 V-101
STA MONTAUK BOAT BASIN
NORTHEAST, 25 JUL 2018
WPB FLOATING PIER
CONCRETE FLOATING
FIXED TIMER PIER
C2 V-101
E2 V-101
C2 V-101
STA MONTAUK WATERFRONT
SOUTHEAST, 25 JUL 2018
DOCK - SMALL BOAT TIM
BER
FLO
ATIN
G
D O
C K
FI
XE
D
TI
M
ER
P
IE
R
STONE GABION BULKHEAD
USCG STA MONTAUK
E4
CD104
C-104
E4
CD101
C-101
E4
CD102
C-102
A2,D4,F4
CD103
C-103
CONTRACTOR'S STAGING AREA
(APPROX. 5,000 SF), SEE GENERAL NOTE 1.
GENERAL NOTES:
1. THE FINAL SIZE AND LOCATION OF THE CONTRACTOR'S
STAGING AREA TO BE PROVIDED BY THE KO FOLLOWING
AWARD. IF CONTRACTOR VESSELS ARE PROPOSED, KO
WILL ALSO PROVIDE ACCEPTABLE MOORING LOCATIONS
FOLLOWING AWARD.
2. AT THE END OF CONSTRUCTION, THE ENTIRE SITE MUST BE
COMPLETELY RESTORED TO ITS PRE-CONSTRUCTION
CONDITIONS INCLUDING, BUT NOT LIMITED TO COMPLETE
REMOVAL OF ALL SEDIMENT AND EROSION CONTROL
MATERIALS, AND FULL RESTORATION OF DISTURBED
AREAS (E.G., CONTRACTOR'S STAGING AREA, AREA BEHIND
STONE GABION BULKHEAD, ETC). CONTRACTOR SHALL
SEED ALL DISTURBED AREAS IN ACCORDANCE WITH
SECTION 32 92 19, SEEDING.
A9 S-501
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
REPAIR WATERFRONT
AutoCAD SHX Text
CG STA MONTAUK
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
NY
AutoCAD SHX Text
SURVEY
AutoCAD SHX Text
OVERALL SITE PLAN
AutoCAD SHX Text
CONCRETE FLOATING DOCK -SMALL BOAT
AutoCAD SHX Text V-101
AutoCAD SHX Text 13174398
AutoCAD SHX Text P13174398V-001
AutoCAD SHX Text
P13174398V-001.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
APR 2024
AutoCAD SHX Text
US COAST GUARD
E
EE
EE
EE
LAKE MONTAUK
E4 CONCRETE FLOATING DOCK - SMALL BOAT DEMO PLAN
SCALE: 1/8" = 1'
A4 CD101
CONCRETE FLOATING DOCK - SMALL BOAT DEMO ELEVATION
SCALE: 1/8" = 1'
MHW
EL. 2.07'MLW
EL. 0.00'
TOE OF GUIDE PILE
EL. -34.5'±
-30
-20
-10
1+00 1+25 1+50 1+75 2+000+75
EL
EV
AT
IO
N , F
EE
T
(M
LL
W
STATION
TOP OF GUIDE PILE
EL. 10.5'±
EXTRACT AND DISPOSE
GUIDE PILE (TYP. OF 4)
EX. 10'x58' ±
FLOATING DOCK
EX. 14"Ø CONCRETE FILLED
STEEL GUIDE PILE (TYP. OF 4)
A4
CD101
EBB
FLOOD
-40
EX. JUNCTION BOX
EX. SHORE TIE
EX. SHORE TIES (2 EA)
8' 16'0
8' 16'0
P&M AND TEMPORARILY SUPPORT
TIMBER FLOATING DOCK EL LINE
EX. FIXED TIMBER PIER
STEEL AND UHMW WEAR PADS
EX. UHMW WEAR PAD AND
STEEL TRANSITION RAMP
EX. ALUMINUM GANGWAY
EX. STEEL WEAR PAD
EX. TIMBER FLOATING DOCK
EX. FIXED
TIMBER PIER
EX. TIMBER
SUPPORT PILE (TYP.)
EX. RAILING (TYP.)
EX. TIMBER CAP
BEAM (TYP.)
EX. TIMBER
STRINGER (TYP.)
R&D CONCRETE FLOATING
DOCK - SMALL BOAT
47' MLB
47' MLB
EXTRACT AND DISPOSE
GUIDE PILE (TYP. OF 4)
R&S GANGWAY,
R&D ROLLERS
R&D ALUMINUM/UHMW
WEAR PADS
R&D TRANSITION
RAMP
R&D EL LINE FROM SHORE
TIE TO JUNCTION BOX
R&R SHORE TIES, SEE NOTE 2
EX. 10'x58' ±
FLOATING DOCK
R&D FLOATING DOCK
EX. TIMBER
SUPPORT PILE (TYP.)
EX. 14"Ø CONCRETE FILLED
STEEL GUIDE PILE (TYP. OF 4)
APPROX. EX.
MUDLINE,
EL. VARIES
EX. ALUMINUM
GANGWAY AND
TRANSITION RAMP
EX. (2) 4x12 TIMBER WALE (TYP. EA. SIDE) AND
(1) 2x12 TIMBER RUB STRIP (TYP. ENTIRE PERIMETER)
EX. 8'x8' CONCRETE
FLOAT MODULE (TYP.)
R&R SHORE
TIES, SEE
NOTE 2
R&D TRANSITION RAMP
R&D UHMW WEAR PAD
R&D ALUMINUM GANGWAY WEAR PAD
R&S GANGWAY
FLOATING DOCK DEMOLITION NOTES:
1. THE CONTRACTOR SHALL REMOVE, SALVAGE, AND SECURELY
STORE THE FOLLOWING DURING CONSTRUCTION:
1.1. GANGWAY
2. REMOVE AND TEMPORARILY INSTALL THE SHORE TIES ONTO
THE WPB FLOATING PIER AND SECURE TO DECK. THE STA
MONTAUK VESSELS DISPLACED DURING THE CONCRETE
FLOATING DOCK-SMALL BOAT REPLACEMENT WILL
TEMPORARILY MOOR AT THIS LOCATION AND UTILIZE THE
SHORE TIES. SHORE TIES TO BE INSTALLED PERMANENTLY
ONTO THE REPLACEMENT FLOATING DOCK FOLLOWING ITS
INSTALLATION, SEE C-101 FOR ADDITIONAL DETAILS.
R&D GANGWAY ROLLER
F1 C-901
F3 C-901
F5,F7,D3 C-901
F9,D5,D7 C-901
D1 C-901
R&D EL LINE FROM SHORE TIE TO
JUNCTION BOX
P&M AND TEMPORARILY SUPPORT
TIMBER FLOATING DOCK EL LINE
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
REPAIR WATERFRONT
AutoCAD SHX Text
CG STA MONTAUK
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
NY
AutoCAD SHX Text
CIVIL DEMOLITION
AutoCAD SHX Text
CONC FLOATING DOCK-SMALL BOAT DEMO PLAN
AutoCAD SHX Text
CONCRETE FLOATING DOCK -SMALL BOAT
AutoCAD SHX Text
CD101
AutoCAD SHX Text 13174398
AutoCAD SHX Text
P13174398CD101
AutoCAD SHX Text
P13174398CD101.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
APR 2024
AutoCAD SHX Text
US COAST GUARD
LAKE MONTAUK
FLOOD
EBB
D9
C-901
B1 C-901
B3 C-901
B7 C-901
LEGEND
LIGHT POLE
PILE BENT DESIGNATION
PILE ROW DESIGNATION
3/4"Ø POTABLE WATER CONNECTION
DATA COMMUNICATIONS CONNECTION
2 1/2"Ø SEWER CONNECTION
DIESEL FUEL CONNECTION
GASOLINE FUEL CONNECTION
COMPRESSED AIR CONNECTION
ELECTRICAL RECEPTACLES
200A/450V, 20A DUAL GANG
E4 FIXED TIMBER PIER DEMO PLAN
SCALE: 1/8" = 1'
8' 16'0
EX. FIXED
TIMBER PIER
EX. TIMBER
SUPPORT PILE (TYP.)
EX. RAILING (TYP.)
EX. TIMBER CAP
BEAM (TYP.)
EX. TIMBER
STRINGER (TYP.)
EX. STONE GABION
BULKHEAD
1 2 3 4 5 6 7 8 9 10 11 12
12A
13 14
15 16
B
A
C
8'-8"
GUARDRAIL (TYP)
2"x6" TIMBER
DECKING
12"Ø TIMBER PILE
(TYP)
4"x12" TIMBER SPLIT CAP 6"x12" TIMBER EDGE
STRINGER (TYP)
4"x8" TIMBER
CROSS BRACING
(TYP)
APPROXIMATE MUDLINE
(EL. VARIES)
4"x12" TIMBER STRINGER (TYP)
3"Ø PVC WATER
1 1/4"Ø FIBERGLASS
ELECTRIC
1 1/4"Ø GALV. STEEL
COMPRESSED AIR
3"Ø PVC ELECTRICAL
2"Ø FIBERGLASS DIESEL
2"Ø FIBERGLASS GAS
8"Ø INSULATED SEWER
1"Ø PVC ELECTRIC
3/4"Ø PVC ELECTRIC
2"Ø PVC ELECTRIC
2"Ø FIBERGLASS ELECTRIC
1"Ø FIBERGLASS ELECTRIC
1"Ø STEEL ELECTRIC
2 1/4"Ø PVC ELECTRIC
1 1/4"Ø FIBERGLASS ELECTRIC
A2
CD102
A2 CD102
TYPICAL FIXED TIMBER PIER SECTION
SCALE: NTS
R&D ABND PW LINE BACK TO SHORE,
R&D ABND PW CONN VALVE REMNANTS WITHIN ENCLOSURE,
R&D ENCLOSURE
STORAGE TRUNK
EMERGENCY SHUT OFF
R&D ABND CA LINE BACK TO SHORE,
R&D CA CONN VALVE AND STEEL SUPPORT
B5 C-901
EX. TIMBER
PLATFORM
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
REPAIR WATERFRONT
AutoCAD SHX Text
CG STA MONTAUK
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
NY
AutoCAD SHX Text
CIVIL DEMOLITION
AutoCAD SHX Text
FIXED TIMBER PIER DEMO PLAN
AutoCAD SHX Text
FIXED TIMBER PIER
AutoCAD SHX Text
CD102
AutoCAD SHX Text 13174398
AutoCAD SHX Text
P13174398CD102
AutoCAD SHX Text
P13174398CD102.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
APR 2024
AutoCAD SHX Text
US COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text
PW
AutoCAD SHX Text
SS
AutoCAD SHX Text
DFU
AutoCAD SHX Text
GFU
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text
DFU
AutoCAD SHX Text
DFU
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text
PW
AutoCAD SHX Text A
AutoCAD SHX Text
SS
AutoCAD SHX Text
PW
AutoCAD SHX Text
GFU
AutoCAD SHX Text C
AutoCAD SHX Text
MLLW EL. 0.0'
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ESO
ESO
M
AT
C H
LI
N
E A
F4 STONE GABION BULKHEAD DEMO PLAN
SCALE: 1/8" = 1'
8' 16'0
D4
STONE GABION BULHEAD DEMO PLAN
SCALE: 1/8" = 1'
8' 16'0
0+00
0+50
1+00 1+50 2+00
2+50 3+00 3+50 4+00
4+50
LOCATE DEFECTS
AND PREPARE
AREAS FOR REPAIR
LAKE MONTAUK
FLOOD
EBB
M
AT
C H
LI
N
E B
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E B
5+
5+
A7 TYPICAL GABION SECTION
SCALE: 1/2" = 1'
2' 4'0
TOP OF GABION
EL. 7'± TO 8'±
TOP OF GABION
EL. 5'± TO 8'±
STA 0+00 TO 3+40± STA 3+40± TO 5+66
EXISTING GRADE
(EL. VARIES)
3'x3'x12' GABION BASKET, EMBEDMENT DEPTH
VARIES
1'x3'x12' GABION BASKETEXISTING GRADE
(EL. VARIES)
EXISTING MUDLINE
(EL. VARIES)
EXISTING
MUDLINE
(EL. VARIES)
3'x3'x12' GABION BASKET, EMBEDMENT DEPTH
VARIES
LAKE MONTAUK
FLOOD
EBB
LAKE MONTAUK
FLOOD
EBB
B9 C-901
A1 C-901
1+17
A3 C-901
A5 C-901
A7 C-901
A9 C-901
F1 C-902
F3 C-902
F5 C-902
F7 C-902
F9 C-902
D1 C-902
D3 C-902 D5
C-902 D7 C-902 D9
C-902 B1
C-902
B3 C-902
B5 C-902 B7
C-902 B9 C-902
A1 C-902 A3
C-902 A5 C-902
A7,A9 C-902
F1 C-903
F3 C-903
5+05
5+20
5+42
F5 C-903
F7 C-903
F9 C-903
D1 C-903
A2 STONE GABION BULHEAD DEMO PLAN
SCALE: 1/8" = 1'
8' 16'0
STONE GABION
BULKHEAD
5+00
LOCATE DEFECTS
AND PREPARE
AREAS FOR REPAIR
STONE GABION
BULKHEAD
SHED
CONC. PAD
HAZMAT
LOCKER
CONC. S
IDEWALK
SEPTIC
COVER
LIFT STA
MH
FU
EL
L
IN
ES
STONE GABION
BULKHEAD
LOCATE DEFECTS
AND PREPARE
AREAS FOR REPAIR
x 5 .9 x 3 .0 x 8.1 x 8.1 x 1 .7 x 7.3 x 1 .4 x 1 .9 x 2 .1 x 1 .7 x 7.7 x 1 .9 x 2 .5 x 2 .2 x 2 .1 x 6.4 x 2 .0 x 5.2 x 2 .0 x 5.2 x 2 .1 x 5.4 x 1 .8 x 4 .06.0 x x 6 .9 x 7.6 x 7.8 x 7.2 x 7.7 x 7.7 x 7.4 x 1 .96.0 x
5.9 x
NOTE:
1. THE SPOT ELEVATIONS SHOWN WERE OBTAINED
BY CEU PROVIDENCE ON 19JAN2023 AND 6FEB2023
AND ARE CONSIDERED APPROXIMATE.
5+
STRIP AND STOCKPILE TOPSOIL,
EXCAVATE AND PREPARE AREA AS
REQ'D FOR GABION RETURN EXTENSION
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
REPAIR WATERFRONT
AutoCAD SHX Text
CG STA MONTAUK
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
NY
AutoCAD SHX Text
CIVIL DEMOLITION
AutoCAD SHX Text
STONE GABION BULKHEAD DEMO PLAN
AutoCAD SHX Text
STONE GABION BULKHEAD
AutoCAD SHX Text
CD103
AutoCAD SHX Text 13174398
AutoCAD SHX Text
P13174398CD103
AutoCAD SHX Text
P13174398CD103.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
APR 2024
AutoCAD SHX Text
US COAST GUARD
E4 OBI NO. 1: WPB FLOATING PIER DEMO PLAN
SCALE: 1/8" = 1'
A4 CD104
OBI NO. 1 WPB FLOATING PIER DEMO ELEVATION
SCALE: 1/8" = 1'
MHW
EL. 2.07'MLW
EL. 0.00'
TOE OF GUIDE PILE
EL. -35'± (TYP.)
-30
-20
-10
1+00 1+25 1+50 1+75 2+00
EL
EV
AT
IO
N , F
EE
T
(M
LW
STATION
TOP OF GUIDE PILE
EL. 10.5'± (TYP.)
EX. 14"Ø CONCRETE FILLED
STEEL GUIDE PILE (TYP. OF 8)
APPROX. EX.
MUDLINE,
EL. VARIES
EX. 10'x108' ±
FLOATING DOCK
OBI NO. 2: R&D PILE COATING
FROM MLW AND ABOVE (TYP. OF 8)
A4
CD104
EBB
FLOOD
-40
EX. SHORE TIE
8' 16'0
8' 16'0
EX. FIXED TIMBER PIER
EX. ALUMINUM UTILITY GANGWAY
R&D UHMW WEAR PADEX. TIMBER
SUPPORT PILE (TYP.)
EX. RAILING (TYP.)
EX. TIMBER CAP
BEAM (TYP.)
EX. TIMBER
STRINGER (TYP.)
R&D 2x12 PT TIMBER RUB STRIP AND
D-FENDER (TYP. ENTIRE PERIMETER)
R&D LIGHT POLE
ANCHORS (4 EA)
R&D EXTERNAL DOUBLE-PILE GUIDE
FRAME AND HARDWARE (1 EA)
R&D LOWER WIRE ROPE
PILE WRAP (1 EA)
EX. FIXED TIMBER PIER
EX. ALUMINUM PERSONNEL
GANGWAY AND TRANSITION RAMP 87' WPB
47' MLB
R&D EXTERNAL SINGLE-PILE GUIDE
FRAME AND HARDWARE (1 EA)
EX. 14"Ø CONCRETE
FILLED STEEL GUIDE
PILE (TYP. OF 8)
R&D GANGWAY
HINGE, SEE
R&D INTERNAL PILE GUIDE
FRAME AND HARDWARE (5 EA)
TIGHTEN ALL THRU-RODS,
R&D SEIZED THRU-RODS
(ASSUME 50 EA), R&D THRU-
RODS AT PILE GUIDES
EX. 34"Ø HDG THRU-RODS W/
HEX PIN LOCKNUT AND DOCK
WASHER, 12" O.C., (2) LEVELS
EX. (3) 4x12 TIMBER WALE (TYP. EA. SIDE) AND
(1) 2x12 TIMBER RUB STRIP W/ D-FENDER
(TYP. ENTIRE PERIMETER)
EX. 8'x10' CONCRETE FLOAT MODULE
W/ CORNER PILE NOTCH (TYP.)
EX. 8'x8' CONCRETE
FLOAT MODULE (TYP.)
R&D CLEATS AND BOLTS
(11 EA)
R&D SUPPLEMENTAL BUOYANCY
FLOAT REMNANTS (3 EA), SEE NOTE 1
EX. ALUMINUM PERSONNEL
GANGWAY AND TRANSITION RAMP
(UTILITY GANGWAY BEHIND)
OBI NO. 2: R&D PILE COATING FROM
MLW AND ABOVE (TYP. OF 8), SEE
R&D 2x12 PT TIMBER RUB
STRIP AND D-FENDER
(ENTIRE PERIMETER)
R&D LIGHT POLE
ANCHORS (4 EA)
R&D EXTERNAL DOUBLE-PILE GUIDE
FRAME AND HARDWARE (1 EA)
R&D LOWER WIRE ROPE
PILE WRAP (1 EA)
R&D INTERNAL PILE GUIDE
FRAME AND HARDWARE (5 EA)
TIGHTEN ALL THRU-RODS,
R&D SEIZED THRU-RODS
(ASSUME 50 EA),
R&D THRU-RODS AT PILE GUIDES
R&D SUPPLEMENTAL BUOYANCY
FLOAT REMNANTS (3 EA), SEE NOTE 1
R&D CLEATS AND
BOLTS (11 EA)
R&D EXTERNAL SINGLE-PILE GUIDE
FRAME AND HARDWARE (1 EA)
R&D UHMW WEAR PAD
EX. TIMBER
SUPPORT PILE
EX. 10'x108' ±
FLOATING DOCK
EX. 34"Ø HDG THRU-RODS W/
HEX PIN LOCKNUT AND DOCK
WASHER, 12" O.C., (2) LEVELS
EX. (3) 4x12 TIMBER WALE (TYP. EA. SIDE) AND
(1) 2x12 TIMBER RUB STRIP W/ D-FENDER (TYP.
ENTIRE PERIMETER)
EX. 8'x10' CONCRETE FLOAT MODULE
W/ CORNER PILE NOTCH (TYP.)
EX. 8'x8' CONCRETE
FLOAT MODULE (TYP.)
EX. TIMBER PILE
CLUSTER DOLPHIN
EX. TIMBER PILE
CLUSTER DOLPHIN
D3 C-903
D5 C-903
D7 C-903D9
C-903 B3
C-903
B5 C-903
B1 C-903
A7, B7 C-903
B9 C-903
A1,A3,A9 C-903
A5 C-903
R&D UTILITY GANGWAY,
TEMPORARILY SUPPORT UTILITIES
NOTES:
1. TWO OF THE THREE EXISTING SUPPLEMENTAL
BUOYANCY FLOAT FRAMES WERE OBSERVED
ON THE MUDLINE BELOW THE WPB FLOATING
PIER DURING A DIVE INSPECTION IN FEB 2023.
CONTRACTOR SHALL REMOVE AND DISPOSE
OF THESE FRAMES AND THE THIRD FRAME AND
BUOYANCY FLOAT WHICH HAS BEEN
TEMPORARILY TIED UP ADJACENT TO THE
FIXED TIMBER PIER.
COMMS CONNECTION
EX. FUEL PUMPS
A2
S-505
R&D GANGWAY
HINGE, SEE A2
S-505
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
REPAIR WATERFRONT
AutoCAD SHX Text
CG STA MONTAUK
AutoCAD SHX Text
MONTAUK
AutoCAD SHX Text
NY
AutoCAD SHX Text
CIVIL DEMOLITION
AutoCAD SHX Text
OBI 1: WPB FLOATING PIER DEMO PLAN
AutoCAD SHX Text
WPB FLOATING PIER
AutoCAD SHX Text
CD104
AutoCAD SHX Text 13174398
AutoCAD SHX Text
P13174398CD104
AutoCAD SHX Text
P13174398CD104.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
APR 2024
AutoCAD SHX Text
US COAST GUARD
E
EE
EEE
EE
E
LAKE MONTAUK
E4 CONCRETE FLOATING DOCK - SMALL BOAT REPLACEMENT PLAN
SCALE: 1/8" = 1'
A4 C-101
CONCRETE FLOATING DOCK - SMALL BOAT REPLACEMENT ELEVATION
SCALE: 1/8" = 1'
MHW
EL. 2.07'MLW
EL. 0.00'
-30
-20
-10
1+00 1+25 1+50 1+75 2+000+75
EL
EV
AT
IO
N , F
EE
T
(M
LL
W
STATION
A4
C-101 EBB
FLOOD
-40
E4 S-501
EX. JUNCTION BOX
REINSTALL EX.
SHORE TIES
8' 16'0
8' 16'0
EX. FIXED TIMBER PIER
EX. ALUMINUM GANGWAY
EX. TIMBER FLOATING DOCK
EX. FIXED
TIMBER PIER
47' MLB
47' MLB
PILE GUIDE
(TYP. OF 4), SEE
F&I REPLACEMENT GANGWAY
ROLLERS,
REINSTALL EX. GANGWAY
F&I 14" GANGWAY
ALUMINUM WEAR PLATE
F&I 14" ALUMINUM
TRANSITION RAMP
F&I 58" TRANSITION RAMP
POLYMER WEAR PAD
REINSTALL EX. SHORE TIES
APPROX. EX.
MUDLINE,
EL. VARIES
F&I ALUMINUM
TRANSITION RAMP
F&I TRANSITION
RAMP UHMW
WEAR PAD
F&I GANGWAY ALUMINUM WEAR PLATE
REINSTALL EX.
GANGWAY
F&I PERIMETER D-FENDER,
INCLUDE OUTER CORNERS
AND OUTBOARD PILE GUIDES
SHORE TIE EL PULL BOX
F&I SHORE TIE EL LINE
LANDWARD
EL PULL BOX
F&I GUIDE PILE
(TYP. OF 4), SEE A7
S-501
F&I SAFETY LADDER, SEE E1
S-501
A2 S-501
E4 S-501
F&I GUIDE PILE
(TYP. OF 4), SEE A7
S-501
F&I PILE GUIDE
(TYP. OF 4), SEE
A2 S-501
F&I SAFETY LADDER, SEE E1
S-501
F&I 9'± x 70'±
FLOATING DOCK, SEE
E4 S-501
F&I SHORE TIE EL LINE
FLOATING DOCK NOTES:
1. THE FLOATING DOCK MANUFACTURER SHALL COORDINATE PULL
BOXES, CONDUIT PENETRATIONS, SUPPORTS, AND ANCHOR BOLT
INSTALLATIONS WITH THE ELECTRICAL CONTRACTOR PRIOR TO
FABRICATION OF FLOATING DOCKS.
2. CONTRACTOR SHALL CONSULT WITH COR ON SITE FOR FINAL
PLACEMENT OF SALVAGED ITEMS AS LISTED ON SHEET CD101.
3. REFER TO SECTION 35 51 13.00 20, CONCRETE FLOATING PIER FOR
SMALL CRAFT FOR FLOATING DOCK AND GUIDE PILE DESIGN
CRITERIA, PERFORMANCE REQUIREMENTS, AND MATERIAL
SPECIFICATIONS FOR DOCKS AND AMENITIES.
4. THE GANGWAY ALUMINUM WEAR PLATE AND TRANSITION RAMP
SHALL BE FABRICATED FROM 6061-T6 ALUMINUM AND SHALL BE 14"
THICK (MIN).
5. THE GANGWAY ALUMINUM WEAR PLATE AND TRANSITION RAMP
UHMW WEAR PAD SHALL BE SIZED TO ACCOUNT FOR THE
GANGWAY POSITION ALONG THE FULL TIDAL RANGE. MATCH
EXISTING DIMENSIONS AT A MINIMUM. PROVIDE NON-SLIP SURFACE
PATTERN AND SECURE TO DECK WITH SS FASTENERS.
6. THE EXISTING SHORE TIES SHALL BE REINSTALLED ON THE NEW
FLOATING DOCKS AND SHALL BE SECURED TO THE DECK WITH
DRILLED AND GROUTED ANCHORS DESIGNED BY THE FLOATING
DOCK MANUFACTURER. EXISTING SHORE TIES ARE RUSSELLSTOLL
MAXGARD INTERLOCKED RECEPTACLE DBRS 1116-100.
7. F&I NEW SHORE TIE ELECTRICAL LINES IN ACCORDANCE WITH THE
FOLLOWING:
7.1. THE NEW ELECTRICAL LINE SHALL BE CONTINUOUS (I.E., NO
SPLICES). PROVIDE SUBMERSIBLE BUS CONNECTORS FOR ALL
POWER LINES AT THE LANDWARD PULL BOX IN THE FLOATING
DOCK.
7.2. EACH ELECTRICAL SHORE-TIE RECEPTACLE BRANCH CIRCUIT
SHALL BE REPLACED BACK TO THE THE SHORE TIE JUNCTION
BOX MOUNTED TO THE CAP BEAM BELOW THE TIMBER PIER
DECK AS SHOWN.
7.3. NEW ELECTRICAL LINES SHALL BE MARINE GRADE 2/C#1+G,
TYP…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .