STATEMENT OF WORK

PURCHASE REQUEST #NR-MAD000-23-00345

Waterproof Two Exterior Concrete Walls

1) Contractor shall dig a trench of approximately 60’ in length a minimum of 18” in width and a minimum of 18” below the ground surface exposing the building's foundation. Contractor shall remove all of the paint on the exterior wall on a surface of approximately 540 sf. at the west side, ground level of the AOML building. (PHOD AREA), and the wall on the 4th floor roof outside the UPS room (approx.

322 sf). SEE IMAGE 1 AND 2.

2) Contractor shall remove the paint so that the bare concrete is showing.

3) Contractor shall seal the top control joint (approximately 60’) with Dynamic 100 sealer or equivalent.

4) Contractor shall apply two coats of a water tight concrete sealer to both walls (approx. 862 sf). All sealants must be environmentally friendly and meet all Federal, State and local DEP, EPA requirements.

5 Contractor shall repaint the entire project area of both walls (approx. 862 sf) to match the existing paint.

6) Contractor shall fill the trench with a minimum of 1/2” blue stone or equivalent to help with drainage.

7 Contractor shall fill trench final 3” with dirt or replace the top layer with existing grass.

8) Contractor shall grade an approx. area of 25’ x 25’ (625 sf). Removing rock and debris. Area shall be graded to a smooth surface and be pitched away from the building. SEE IMAGE 3 AND 4.

9) All applications shall be completed in accordance with any and all applicable manufacturer’s instructions and/or recommendations.

10) Contractor shall furnish any and all warranty paperwork to AOML facility staff.

11) Contractor shall protect all equipment and merchandise in work locations. 16) Contractor shall maintain a clean and safe project area at all times and shall be responsible for the removal of all trash and debris from the project area upon completion. Contractor agrees that at no time will any AOML IT services will be utilized. All work must be approved by the Contracting Officer’s Representative.

SUBMITTALS: Submittals shall be approved before procurement, fabrication, or delivery of items to the job site. Partial submittals will not be acceptable and will be returned without review. Submittals shall include the manufacturer's name, trade name, catalog model or number, nameplate data, size, layout dimensions, capacity, project specification and paragraph reference, applicable Federal, Military, industry and technical society publication references, and other information necessary to establish contract compliance of each item the Contractor proposes to furnish. Failure to furnish required submittals can be cause for rejection of the material. Approval of submittals shall not relieve the contractor his obligation to comply with the contract specifications and drawings.

PERIOD OF PERFORMANCE: Complete by 09/30/2023

FEDERAL HOLIDAYS:

New Year’s Day Birthday of Martin Luther King, Jr.

Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

Image 1

Image 2

Image 3

Image 4

File details come from the government source that posted it. Updated .