3a. Construction_Specifications_Bid_Proposal_Worksheet.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- DACA175260000700
About this file
The file is a Construction Specifications Bid Proposal Worksheet for a U.S. Army Corps of Engineers (USACE) recruiting facilities project located in San German, Puerto Rico. The detailed worksheet itemizes numerous construction and renovation categories including HVAC/mechanical, plumbing, electrical, communications, safety equipment, architectural finishes, signage, security systems, and various branch-specific elements (Army, Navy, Marines, Air Force, etc.). Each line item is currently set at a placeholder price of $1.00, with a grand total bid proposal amount of $116.00.
The associated federal contract opportunity seeks a commercial storefront space between 1,000-1,675 gross rentable square feet within one mile of a specific address in San German, PR. The lease requires parking for three government vehicles, a five-year term with government termination rights, and is intended to be a full-service lease including utilities and janitorial services. Potential lessors must be registered in the System for Award Management (SAM.gov) and will need to provide a contractor's bid to complete the build-out according to the detailed construction specifications. The solicitation is being managed by the Jacksonville District of the U.S. Army Corps of Engineers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Recruiting Facilities Program |
| Construction Specifications Bid Proposal Worksheet |
| Version: 2021-10-15 (REV 1) |
| IMPORTANT NOTES: |
| 1) All information supplied by the lessor/contractor on this bid proposal worksheet MUST include ALL appropriate requirements from the construction specifications Appendix provided by the USACE Representative. |
| 2) The entire bid proposal worksheet MUST be filled out in its entirety. Failure to fill out this bid proposal worksheet may result in the overall offer being rejected by USACE. |
| Bid Category | Quantity | $ - Each | Sub-Total | Comments |
| HVAC / Mechanical | 1 | $ 1.00 | $ 1.00 | |
| Plumbing: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Water Fountain | 1 | $ 1.00 | $ 1.00 | |
| Restroom (1) | 1 | $ 1.00 | $ 1.00 | |
| Restroom (2) | 1 | $ 1.00 | $ 1.00 | |
| Janitorial Closet | 1 | $ 1.00 | $ 1.00 | |
| Wet Pantry (if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Electrical: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Interior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage | 1 | $ 1.00 | $ 1.00 | |
| Emergency Lighting | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Communications: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Conduit | 1 | $ 1.00 | $ 1.00 | |
| CAT-6 Wiring | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Safety & Fire Equipment | 1 | $ 1.00 | $ 1.00 | |
| Architectural Finishes-Fixtures-Supplies: | ||||
| Ceilings | 1 | $ 1.00 | $ 1.00 | |
| Walls | 1 | $ 1.00 | $ 1.00 | |
| Soundproofing | 1 | $ 1.00 | $ 1.00 | |
| Paint: | ||||
| Common Area (Gov't Controlled) | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Porcelain Tile (wall / floor) | 1 | $ 1.00 | $ 1.00 | |
| Vinyl Composition Tile (VCT) | 1 | $ 1.00 | $ 1.00 | |
| Luxury Vinyl Tile (Air & Army Natl Guard) | 1 | $ 1.00 | $ 1.00 | |
| Carpet: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Base Cove (to include tiled areas) | 1 | $ 1.00 | $ 1.00 | |
| Fragment Retention Film | 1 | $ 1.00 | $ 1.00 | |
| Mini-Blinds | 1 | $ 1.00 | $ 1.00 | |
| Windows | 1 | $ 1.00 | $ 1.00 | |
| Doors | 1 | $ 1.00 | $ 1.00 | |
| Trim Work (chair rail, etc.) | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Fixed Panel Shade(s) | 1 | $ 1.00 | $ 1.00 | |
| Secondary Exit Door Security Hardware | 1 | $ 1.00 | $ 1.00 | |
| Restroom Fixtures | 1 | $ 1.00 | $ 1.00 | |
| Perforated Window Wrap(s): | ||||
| JRFC (Joint) Graphic | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Shelving | 1 | $ 1.00 | $ 1.00 | |
| Desk-Top(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Signage: | ||||
| Interior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Restroom(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Video Intercom Entry Control System | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Marquee / Pylon Signage | 1 | $ 1.00 | $ 1.00 | |
| Security Systems: | ||||
| Video Intercom Entry Control System: | ||||
| General/System (main parts/wiring/etc.) | 1 | $ 1.00 | $ 1.00 | |
| Door Station(s) | 1 | $ 1.00 | $ 1.00 | |
| Desk Stations (master + sub-masters) | 1 | $ 1.00 | $ 1.00 | |
| CCTV System: | ||||
| General/System (NVR /Wiring / Etc.) | 1 | $ 1.00 | $ 1.00 | |
| Cameras | 1 | $ 1.00 | $ 1.00 | |
| TV Monitor(s) - (office displays) | 1 | $ 1.00 | $ 1.00 | |
| Security Closet | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Permits Fees (all necessary, including low voltage if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Architectural / Design Costs | 1 | $ 1.00 | $ 1.00 | |
| Other Items (define): | ||||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| BID PROPOSAL - GRAND TOTAL | 1 | $ 1.00 | $ 116.00 |
File details come from the government source that posted it. Updated .