3a. Construction Specifications Bid Proposal Worksheet.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- DACA175250003700
About this file
The file is a Construction Specifications Bid Proposal Worksheet for a US Marine Corps Recruiting Station in Kendall, FL, issued by the Jacksonville District, U.S. Army Corps of Engineers. The solicitation seeks a commercial storefront/retail space between 1,219 and 1,605 gross rentable square feet, with specific geographic boundaries and requirements for five government vehicle parking spaces. The lease term is five years with government termination rights, and a full-service lease including utilities and janitorial services is preferred.
The comprehensive bid worksheet details specific construction and renovation specifications across multiple categories including HVAC/mechanical, plumbing, electrical, communications, safety equipment, architectural finishes, signage, security systems, and other infrastructure elements. Bidders must complete the entire worksheet, with each line item currently set at $1.00, and proposals must be submitted electronically to John Jensvold by 4:00 PM on May 7, 2025. The government will select a location based on evaluation factors, overall cost, and potential past performance, with a selection expected approximately 30 days after the proposal deadline. All contractors must be registered in the System for Award Management (SAM.gov) prior to contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Recruiting Facilities Program |
| Construction Specifications Bid Proposal Worksheet |
| Version: 2021-10-15 (REV 1) |
| IMPORTANT NOTES: |
| 1) All information supplied by the lessor/contractor on this bid proposal worksheet MUST include ALL appropriate requirements from the construction specifications Appendix provided by the USACE Representative. |
| 2) The entire bid proposal worksheet MUST be filled out in its entirety. Failure to fill out this bid proposal worksheet may result in the overall offer being rejected by USACE. |
| Bid Category | Quantity | $ - Each | Sub-Total | Comments |
| HVAC / Mechanical | 1 | $ 1.00 | $ 1.00 | |
| Plumbing: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Water Fountain | 1 | $ 1.00 | $ 1.00 | |
| Restroom (1) | 1 | $ 1.00 | $ 1.00 | |
| Restroom (2) | 1 | $ 1.00 | $ 1.00 | |
| Janitorial Closet | 1 | $ 1.00 | $ 1.00 | |
| Wet Pantry (if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Electrical: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Interior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage | 1 | $ 1.00 | $ 1.00 | |
| Emergency Lighting | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Communications: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Conduit | 1 | $ 1.00 | $ 1.00 | |
| CAT-6 Wiring | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Safety & Fire Equipment | 1 | $ 1.00 | $ 1.00 | |
| Architectural Finishes-Fixtures-Supplies: | ||||
| Ceilings | 1 | $ 1.00 | $ 1.00 | |
| Walls | 1 | $ 1.00 | $ 1.00 | |
| Soundproofing | 1 | $ 1.00 | $ 1.00 | |
| Paint: | ||||
| Common Area (Gov't Controlled) | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Porcelain Tile (wall / floor) | 1 | $ 1.00 | $ 1.00 | |
| Vinyl Composition Tile (VCT) | 1 | $ 1.00 | $ 1.00 | |
| Luxury Vinyl Tile (Air & Army Natl Guard) | 1 | $ 1.00 | $ 1.00 | |
| Carpet: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Base Cove (to include tiled areas) | 1 | $ 1.00 | $ 1.00 | |
| Fragment Retention Film | 1 | $ 1.00 | $ 1.00 | |
| Mini-Blinds | 1 | $ 1.00 | $ 1.00 | |
| Windows | 1 | $ 1.00 | $ 1.00 | |
| Doors | 1 | $ 1.00 | $ 1.00 | |
| Trim Work (chair rail, etc.) | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Fixed Panel Shade(s) | 1 | $ 1.00 | $ 1.00 | |
| Secondary Exit Door Security Hardware | 1 | $ 1.00 | $ 1.00 | |
| Restroom Fixtures | 1 | $ 1.00 | $ 1.00 | |
| Perforated Window Wrap(s): | ||||
| JRFC (Joint) Graphic | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Shelving | 1 | $ 1.00 | $ 1.00 | |
| Desk-Top(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Signage: | ||||
| Interior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Restroom(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Video Intercom Entry Control System | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Marquee / Pylon Signage | 1 | $ 1.00 | $ 1.00 | |
| Security Systems: | ||||
| Video Intercom Entry Control System: | ||||
| General/System (main parts/wiring/etc.) | 1 | $ 1.00 | $ 1.00 | |
| Door Station(s) | 1 | $ 1.00 | $ 1.00 | |
| Desk Stations (master + sub-masters) | 1 | $ 1.00 | $ 1.00 | |
| CCTV System: | ||||
| General/System (NVR /Wiring / Etc.) | 1 | $ 1.00 | $ 1.00 | |
| Cameras | 1 | $ 1.00 | $ 1.00 | |
| TV Monitor(s) - (office displays) | 1 | $ 1.00 | $ 1.00 | |
| Security Closet | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Permits Fees (all necessary, including low voltage if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Architectural / Design Costs | 1 | $ 1.00 | $ 1.00 | |
| Other Items (define): | ||||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| BID PROPOSAL - GRAND TOTAL | 1 | $ 1.00 | $ 116.00 |