38KF386504_00_A01.pdf
PDF 321 KB Posted
- Solicitation number
- N6264926Q0561
About this file
This is a Job Specification for scaffolding work on the USS NEW ORLEANS (LPD-18), a naval vessel. The document outlines work to be performed at the Sasebo facility with an anticipated award date of September 12, 2026, and a production completion date of January 30, 2027. The Period of Performance (POP) runs from October 22, 2026, to January 30, 2027.
The scope of work requires rigging and maintaining two separate scaffolding installations on the bridge face and forward exterior bulkhead of the vessel. Specifically, one scaffolding system is needed for preservation work on the Bridge Face at 03 and 04 Levels, and a second system is required for the Forward Exterior Bulkhead at 01 and 02 Levels. All scaffolding must conform to 29 CFR 1915 Subpart E safety requirements and include safety rails, access ladders, and walkable staging levels accessible to ship's force personnel. The contractor must install and maintain protective enclosures around the entire work area to prevent falling paint chips, materials, and tools, and must remove these enclosures upon completion of preservation work. All scaffolding must be inspected for safety prior to use and removed upon notification by the Ship Superintendent. Additionally, the contractor must accomplish cleaning and preservation of new and disturbed surfaces to match surrounding areas per Standard Item 009-032 (FY27). No government-furnished materials are required for this work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2.01 Solicitation - N6264926Q0561.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
LPD-18 USS NEW ORLEANS
JON: 38KF386504 A01
TITLE:
Scaffolding on Bridge Face for Ship's Force Use; rig
JOB SPECIFICATION
Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:
0 9 I I:> J 2-o>-6 I ":l---/ I Lf. /"l..o~l:, POP Start Date: POP End Date: SASEBO IO / 2--2- ( 20>-b 0 t / 70 /2.0;, 7
PREPARED BY: CODE DATE
T.SATO HST 7/03/2026
APPROVED BY: A,d-17 CODE
S.MURAKAMI S225
CONCURRED BY:
l CODE
S.MOROOKA I S231
ASSIST PLANNER'S NAME: - CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JSN{S): SERV-L295 CASREP#
S/F CONTACT: EMERSON K / EMO CWP# CCNS#
Approved by S300/S9od/1,41~ 44a a Date: 0~ Nt.. 2b2<., Avl: 7J1
LT. M. MOLINA/ Project Officer
LWC:
Work Completed
S/Force: Rate: Date:
Ship Supt: Date: SRF CONTROL NO.:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
1301393915
JON:
LPD-18 USS NEW ORLEANS 38KF386504
TITLE:
Scaffolding on Bridge Face for Ship's Force Use; rig
1. SCOPE:
1.1 Title : Scaffolding on Bridge Face for Ship ' s Force Use ; rig
1. 2 Location of Work :
A01
1 . 2 . 1 Bridge Face (Forward Exterior Bulkhead , 03 Level and 04 Level)
1 . 2 . 2 Forward Exterior Bulkhead , 01 Level and 02 Level
1 . 3 Identification :
1 . 3 . 1 Quantity (One) , Scaffolding for Preservation of Bridge Face , Located in 1 . 2 . 1
1 . 3 . 2 Quantity (One) , Scaffolding for Preservation of Exterior Bulkhead of Forward 01 Level and 02 Level , Located in 1 . 2.2
2. REFERENCES:
2 . 1 Standard Items (FY27)
3 . REQUIREMENTS :
3 . 1 Rig and maintain each scaffolding listed in 1 . 3 . 1 and 1 . 3 . 2 with each safety rail and access ladder conforming to the requirements of 29 CFR 1 915 Subpart E for ship ' s force use.
3.1.1 The scaffolding level must be installed so that personnel can walk around the staging level .
3.1 . 2 Install and maintain each enclosure around entire area to prevent falling down of each paint chip , material, and tool during preservation work. Upon completion of ship ' s force work , remove them .
(V) II SAFE TY II
3 .1. 3 Inspect each scaffolding condition to ensure safety prior to ship ' s force use .
3 . 1 . 4 Remove each scaffolding conforming to the requirements of 29 CFR 1915 Subpart E, when notified by SHIPSUPT .
3 . 2 Accomplish the requirements of 009-032 of 2 . 1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.
LPD-18 USS NEW ORLEANS
JON: 38KF386504 A01
TITLE:
Scaffolding on Bridge Face for Ship's Force Use; rig
4. NOTES:
4 . 1 Initial Condition - Ship ' s Force requires scaffolding for preservation work of bridge face and exterior bulkhead surface of FWD 01 and 02 level .
5 .l GOVERNMENT FURNISHED MATERIAL (GEM):
5.1 None .
File details come from the government source that posted it. Updated .