This document package contains a Job Specification and associated Test Procedure for repair work on the USS NEW ORLEANS (LPD-18) flight deck safety net frame, with an Anticipated Award Date of 09/13/2026 and Production Completion Date of 12/11/2026. The work is being performed at SASEBO, with a Period of Performance from 10/22/2026 to 01/30/2027. The primary task involves repairing a bullet hole in AFT safety net #16 (Test Net ID: A6) located at Flight Deck Frame 203 through plug welding the existing hole and grinding the buildup area flush, followed by installation of new 3/16-inch diameter CRES 316 wire rope and swaging sleeves, and completion of a load test. Government-furnished materials include 10 swaging sleeves and 100 feet of wire rope (CRES 316, 7x19 construction with 2,900 lbs breaking strength).
The Test Procedure (TP File No. 61221-2-100_26245) establishes comprehensive requirements for certifying the structural integrity of the repaired safety net frame through a static load test of 1,000 to 1,050 pounds applied for 10 minutes to the net assembly in its horizontal position. Pre-test inspection requirements include detailed acceptance criteria for pendant turnbuckles, wire rope, quick-release hooks, frame pads, attachment hardware, CRES pipe/tubing, lashing rope, wire rope netting, grid spacing (89±10 mm), net clips, latch mechanisms, holdback staples, ground straps, and frame alignment. The test acceptance criteria require no visible damage, permanent deformation, wire rope strand breakage, weld cracks, or evidence of failure following load application. Test completion requires signatures from the LWC (Lead Work Center) and S246 (Test Code) upon satisfactory completion of all inspection and load test requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264926Q0566.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. ShiD/HULL NAME ICN: Rev: Key Op:
LPD-18 USS NEW ORLEANS
JON: 38KF361201 A01
TITLE:
Safety Net Frame at Flight Deck; repair
JOB SPECIFICATION
Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:
or I, 3 /:;.o:>b ( ~/ I I...{ /-2-u~ POP Start Date: POP End Date: SASEBO to /:;. 2-- !'2- u_d ~ l I ?O I~()), 7
PREPARED BY: CODE DATE
Y. HAMABE H HA 7/13/2026
APPROVED BY:
CODE
S. MURAKAMI S225
CONCURRED BY:
/21?/tJ
CODE
S. MOROOKA S231
ASSIST PLANNER'S NAME: I • CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JSN(S): V101-1798 CASREP#
S/F CONTACT: SEMBACH ABH2 / LAWRENCE ABFC CWP# CCNS#
Approved by S300/S900v/,#Jj~ Date: 2..1 JVL...--2-O2& Avl: 7J1
LT. M. MOLINA/ Project Officer
LWC:
Work Completed
S/Force: Rate: Date:
Ship Supt: Date: SRF CONTROL NO.:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
1/r
1301397621
Ship/HULL NO. Ship/HULL NAME ICN:
LPD-18 USS NEW ORLEANS
JON: 38KF361201
TITLE:
Safety Net Frame at Flight Deck; repair
1. SCOPE:
1.1 Title: Safety Net Frame at Flight Deck; repair
1.2 Location of Work:
1.2.1 Flight Deck, Frame 203
1. 3 Identification:
Rev: Key Op:
A01
1.3.1 Quantity (One AY), Flight Deck Safety Net Assembly (Test Net ID: A6 of Figure 1-1 of 2.5), Located in 1.2.1
1.3.1.1 Quantity (One EA), Bullet Hole to be Plug Welded
2. REFERENCES:
2 .1 Standard Items ( FY27)
2.2 612-7320831 Rev E, Helicopter Safety Nets Arrangement & Details
2.3 612-8802781 Rev A, SHIPALT LPD17-95214D MOD to Flight Deck Safety Nets
2.4 804-8436624, Safety Nets, Deck Edge, CRES 316 Frame, CRES 316 Net
2.5 T.P File No.: 61221-2-100 26245, Flight Deck Safety Net - Load Test (Enclosed)
3 . REQUIREMENTS:
3.1 Remove each existing lashing rope and main net assembly of flight deck safety net assembly listed in 1.3.1, using 2.2 through 2.4 for guidance.
3.1.1 Plug weld each exiting hole listed in 1.3.1.1 and grind down each build up area to surface flush.
3.1.1.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column D, Lines One through 7 for welding.
3.2 Upon completion of the repair work, install each existing main net assembly of flight deck safety net assembly listed in 1.3.1 with new 3/16 inch diameter 7 by 19 wire standard core CRES wire rope and CRES swaging sleeve.
(V) (G) "LOAD TEST"
3.3 Accomplish the requirements of 2.5 for load test of each flight deck safety net assembly listed in 1.3.1. -S246
Ship/HULL NO. Ship/HULL NAME
JON:
ICN: Rev: Key Op:
LPD-18 USS NEW ORLEANS 38KF361201 A01
TITLE:
Safety Net Frame at Flight Deck; repair
3.4 Accomplish the requirements of 009-032 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.
4. NOTES:
4.1 Initial Condition - During normal operations on the flight deck 1- 138-0-W it was discovered that AFT safety net#16 has a bullet hole in the top frame from ace gun shoot.
4.2 SRF Tool Room will issue test weight and dynamometer when required.
5. GOVERNMENT FURNISHED MATERIAL (GFM)
5.1 Government Furnished Material as follows.
MATERIAL LIST
MATERIAL LIST
QTY
ITEM PC REF STOCK HAZ DOC REQD/ PARA
NO. NO. NO. M/C DESCRIPTION NUMBER MAT NO. UNIT NO.
001 M SWAGING, SLEEVE WIRE, 3/16", 9B 4030 012097478 N 10/EA 3.2
CRES
002 M WIRE ROPE, 3/16"DIA, CRES 316, 9B 4010 SA2100227 N 100/FT 3.2
RR-W-410H 7X19 TY-VI, CLASS 3,
P/N; 3/16 7 X 19, BREAKING; 2,900
LBS REQUEST CERTIFICATION
CUI
SHIP/HULL NO.: USS NEW ORLEANS / LPD-18 ICN: Rev: Key Op:
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Page 1 of 16
SHIP REPAIR FACILITY - JAPAN REGIONAL MAINTENANCE CENTER -
DET SASEBO TEST PROCEDURE ·, 1/
TITLE: JCN:
V101-1798
FLIGHT DECK SAFETY NET - LOAD TEST CWP:
NIA
TEST PROCEDURE PREPARATION
PRINT NAME & SIGNATURE PHONE CODE DATE
PREPARED BY MATSUMOTO.NA ~i~~~~~~~~OYA.16306080
N. MATSUMOTO OY A.1630608089 ~!1., 2026.01.02 os,2s,43 +os·oo· 252-8053 S246F 02-Jul-2026
REVIEWED BY IIDA.SHUNICHl.1 Digitallysignedby
S. IIDA 274619127
IIDA.SHUNICHl.1274619127 252-8045 S246A 02-Jul-2026 Date: 2026.07.02 08:33:15 +os·oo·
APPROVED FOR ISSUE YOSHIKAWA.SRI ~i~~1
1~::~~~ANT 12826914
B. YOSHIKAWA AN.T.1282691449 ~!1., 2026.010211:48:44+09•00·
252-8050 S246CTE 02-Jul-2026
PROCEDURE COMPLETED
PRINT NAME & SIGNATURE ORGANIZATION BADGE/RANK DATE
LWC
S246
SRF-JRMC
DET SASEBO
CERTIFICATION REVIEW AND APPROVAL OF TEST RESULTS
PRINT NAME & SIGNATURE PHONE CODE DATE
REVIEWER (Test Certified Complete and Test Results Satisfactory)
S. IIDA
252-8045 S246A
TEST CODE (Test Results Reviewed and Approved)
B. YOSHIKAWA
252-8050 S246CTE
COMMENTS:
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Page 2 of 16
TEST PROCEDURE GENERAL NOTES
1. TEST SEQUENCE: Unless otherwise specified in the test document, this test procedure (TP) shall be completed in provided order.
2. VERIFICATION: The person designated to sign for an action verifies, based on personal observation, objective evidence, or watch stander reports and certifies by signature that the action has been performed in accordance with the specified requirements.
3. USE ORIGINAL DOCUMENTS: All data attached to the Master TP shall have original pen and ink entries on the data sheets (unless otherwise specified in the test procedure).
4. USE DARK INK: All signature and data shall be in dark, water insoluble ink.
5. CORRECTIONS: When an error was made, it shall be corrected by drawing a single line through the error, recording the correct entry, initialing, dating and printing the name of the person making the correction in accordance with JOINT FLEET MAINTENANCE MANUAL (JFMM), COMUSFL TFORCOMINST 4790.3, VOLUME
V, QUALITY MAINTENANCE.
6. LATEST APPLICABLE REVISION: Use the latest applicable revision of plans, instructions, technical manuals, and other reference material cited in this test procedure.
7. INSTRUMENT CALIBRATION: All measuring equipment shall be in current calibration as required by
NAVSHIPREPFACINST 4734.1.
8. OPERATION OF COMPONENTS: Only authorized personnel shall operate ship's permanently installed equipment.
The cognizant Shop shall control and operate their temporary test equipment. Ship's Force shall operate temporary systems and equipment formally turned over to the ship.
9. SAFETY INSTRUCTION: The Test Director is responsible for the safe conduct of this test. The safety precautions of NAVSHIPREPFAC M-5100.8 shall be observed at all times.
10. TEST STOPPAGE: The Test Director shall stop the test once a problem has been found in the system or equipment being tested. S246 Testing Standard Operating Procedure (SOP) shall be used to determine course of action prior to resuming the test procedure.
11. ENERGIZED EQUIPMENT: NSTM 300, para 300-2.4 shall be followed when working on energized equipment.
12. DATA COLLECTION: The test documents may require collection of additional data for which there is no acceptance criteria, provided the data sheet identifies that data is for information only.
13. SUPPLEMENTATION: When supplementation is made, annotate the supplemental information on the page with 'See Remarks' followed by a sequential numbering system corresponding in the Remarks section.
14. USE ASTERISK(*): When supplementation, correction and/or signature is made but there is not enough space, annotate using an asterisk(*) followed by sequential number adjacent to the portion then clarify on the same page using the same annotation.
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Paae 3 of 16
FLIGHT DECK SAFETY NET - LOAD TEST
1. PURPOSE
1-1 The purpose of this test is to certify the structural strength of repaired deck edge safety net frame by accomplishing the specified load test. See Table 1-1 & Figure 1-1 for the test items, location and their ID.
Table 1-1: Test Item Location
Flight Deck AFT Fr.203
CAlWALK
(HNGED)
~R (ACS TO LWR Pl.A TF)
B
Test Net ID
A6
17$ r
I B I
Test Load & Duration
1,000- 1,050 LBS test load for 10 minutes
B
CAlWALK
(HNGED)
lAOOER (ACS TD CA lWALK)
~R (ACS TO LWR PlATF)
Figure 1-1: Location & ID of Safety Net
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Paoe
2. REFERENCES
2-1 NAVSEA DRAWING
2-1.1 612-7320831; HELICOPTER SAFETY NETS ARRANGEMENT & DETAILS
2-1.2 612-8802781; SHIPALT LPD17-95214D MOD TO FLIGHT DECK SAFETY NETS
2-1.3 804-8436624; SAFETY NETS, DECK EDGE, CRES 316 FRAME, CRES 316 NET
2-1.4 612-21-001 LPD18; FLIGHT DECK SAFETY NET LATCHES; REPLACE
2-2 GSO-GENERAL SPECIFICATION FOR OVERHAUL OF SURFACE SHIPS: S9AA0-AB-GOS-010
2-2.1 SEC 092; SHIPBOARD TESTS
2-2.2 SEC 612; HULL FITTINGS LIFERAILS, STANCHIONS, LIFELINES AND SAFETY NETS
2-3 PMS-PLANNED MAINTENANCE SYSTEM
2-3.1 MIP 6122/004; Safety Nets (Deck Edge)
(1) MRC 9FST; Inspect Deck Edge CRES Safety Net Assembly
(2) MRC 3WH4; Inspect Deck Edge CRES Safety Net Assembly Frame Alignment.
(3) MRC A5K5; Load Test Deck Edge CRES Safety Net Assembly.
(4) MRC 1AG0; Load Test Deck Edge CRES Safety Net Assembly and Load Test Filler Nets
2-4 JFMM-JOINT FLEET MAINTENANCE MANUAL
2-5 NAVSHIPREPFAC M-5100.8: SAFETY AND HEALTH PROGRAM MANUAL
3. TEST AND SUPPORT EQUIPMENT/MATERIAL
3-1 Load indicating device (e.g., Dynamometer)
3-2 Necessary Rigging Gear
3-3 Caliper/tape measure/ruler
3-4 Scaffolding
3-5 8-foot wooden post (For frame alignment)
3-6 Test Weights
3-7 Stopwatch
3-8 Support hoisting device (e.g. crane, forklift)
3-9 Warning signs, ropes and/or barricades to ensure area affected by load testing is secured
CUI
o/tr
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Paae 5 of 16
4. GENERAL PRECAUTIONS
4-1 Only those personnel actively engaged in performing or witnessing this test shall be permitted in the testing area. All specified safety regulations shall be strictly observed.
4-2 To prevent injury or death, ensure that proper test equipment is used during testing.
4-3 The warning signs shall be posted prior to starting the test.
4-4 Safeguarding of personnel and equipment shall be adhered to at all times.
4-5 Comply with Navy Safety and Occupational Health (SOH) manual, OPNAVINST 5100.23 as well as any additional guidance from other applicable policy.
4-6 Comply with ship's regulations when working at or over the side. Wear non-inflatable life preserver, safety harness, and safety lanyard secured to a suitable structure.
4-7 For hinged safety nets, rig temporary lifelines and lashing, as required, prior to lowering safety net frames to the down (horizontal) position.
4-8 Wire rope pendant thimble(s) found to have cracks or found to have portions of material broken off are a potential FOO hazard.
4-9 Latch mechanism is designed to secure safety net frame in the up (vertical) position. In this position, frame is acting as a restraint system (liferail) to prevent personnel from falling overboard or to a deck below. An improper working latch mechanism or benVdamaged frame holdback staple may lead to personnel injury should frame drop when contacted or leaned on by personnel.
5. SHIPBOARD TEST
5-1 PRETEST BRIEFING Conduct a pre-test briefing (e.g., safety precaution, station assignments, testing steps) with all involved test personnel.
5-2 TMDE Record all Test, Measuring & Diagnostic Equipment (TMDE) type, range, serial number and calibration due date. Record the data in TEST DATA SHEET.
5-3 PRE-TEST INSPECTION Inspect Flight Deck Safety Net assembly as follows and record result (SAT/UNSAT) in the TEST DATA SHEET. When any defects are found as UNSAT, record the defective items (e.g., netting) & its condition (damaged) in the blank space below the results of the TEST DATA SHEET. Inspection described herein may be performed in any convenient sequence.
5-3.1 PENDANT TURNBUCKLES (Figure 5-1 & Figure 5-2)
(1) Inspect turnbuckle body.
Acceptance atterta: There shall be no excessive rust or deformation.
(2) Inspect turnbuckle end-fittings and threads.
Acceptance aiterta: There shall be no excessive rust, deformation or bent
(3) Inspect cotter pins.
Acceptance atterta: Turnbuckles shall have cotter pins on both end-fittings. Cotter pins shall be properly curled over.
CUI 3/; r
SHIP/HULL NO. : USS NEW ORLEANS / LPD-18 ICN: Rev: Key Op:
5-3.2
5-3.3
T.P FILE NO.: 61221-2-100_26245
TURNBUCKLE
SHAC+<LE
WIRE ROPE\
JON:
38KF361201
f $WAGE SLEEVE
/ / au17 RELEASE HOOK
I THIMBl.E J
00 A01 Paae 6 of 16
_f
CRES316
COTTER PIN
CURL OVER
Figure 5-1 : Pendant Assembly
PENDANT END-FITTING, SHACKLE (Figure 5-1)
Figure 5-2: Cotter Pin Curled Over
(1) Inspect end-fitting thimbles.
Acceptance criteria: There shall be no excessive rust, cracks, missing material due to cracking, bending, or any other sign of physical deformation.
(2) Inspect swage sleeves.
Acceptance criteria: There shall be no visible cracks and excessive rust
(3) Inspect anchor shackles.
Acceptance criteria: No damage, deformation or excessive rust Nut of shackles shall be secured in place by CRES 316 cotter pin.
(4) Inspect cotter pins on safety shackles.
Acceptance criteria: Cotter pins shall be properly curled over.
PENDANT WIRE ROPE (Figure 5-1 & Figure 5-3)
(1) Inspect pendant wire rope
Acceptance criteria: None is allowed for followings.
✓ Excessive rust, corrosion or pitting on wire rope.
✓ Six (6) or more broken wires in one rope lay-length.
✓ Three (3) or more broken wires in one strand lay-length.
✓ One broken wire within one rope lay-length of any end-fitting.
✓ Kinking , crushing, bird caging or any other physical damage resulting in distortion of rope structure.
~~} ONE ROPE LAY
STRAND LAY LENGTH ROPE LAY LENGTH
Figure 5-3: Nomenclature of Wire Rope
SHIP/HULL NO.: USS NEW ORLEANS / LPD-18
T.P FILE NO.: 61221-2-100 _26245
5-3.4 QUICK RELEASE HOOKS (Figure 5-4)
(1) Inspect quick release hook body.
CUI
JON:
ICN: Rev: Key Op:
38KF361201 00 A01
Acceptance criteria: No sjgns of deformaUon, excessjve corrosjon and wear.
(2) Inspect quick release hook pull lever.
Acceptance criteria: Pull lever shall be fadng upward when jn the hodzontal posHjon.
(3) Check operation of quick release hook.
(i) Open release hook by pulling up on pull lever.
Paae 7 of 16
Acceptance criteria: Retajnjng spdng shall hold pull lever firmly jn the seated ( down) posmon, unW s/jght pull force js app]jed After pull lever js released, the jnternal coj/ sprjng shall apply a s/jght pre-load force on the pull lever. Pull lever should not rotate freely
(ii) Inspect pull lever retaining spring and coil spring.
Acceptance criteria: Spdngs are not broken or mjssjng.
(iii) Inspect release hook.
Acceptance criteria: Hook shall djsengage and rotate freely, releasjng pendant assembly.
(iv) Close release hook around pendant assembly and rotate pull lever into seated position.
Acceptance criteria: A posjUve snap (ho/djng acUon) should be felt
RELEASE HOOK
PULL LEVER
SEATED (DOWN)
POSITION
RETAINING SPRING
FAR SIDE
HOOK EYE
Figure 5-4: Quick Release Hook
5-3.5
JON:
T.P FILE NO. : 61221-2-100 _26245 38KF361201 00 A01 Page 8 of 16
HULL, DECK PADS & ATTACHMENT HARDWARE (Figure 5-5)
(1) Inspect frame pendant pad and frame hinge pads installed on ship's hull and/or deck.
Acceptance criteria: There shall be no damage, deformation and excessive corrosion.
(2) Inspect weld(s).
Acceptance criteria: There shall be no visible cracks or discontinuities through paint system.
(3) Inspect hinge pins and pendant attachment pins.
Acceptance criteria: There shall be no damage, distortion or corrosion. Ensure CRES 316 cotter pins and flat washers are installed Where nut and bolt type hinge pins are installed and pins are drilled for cotter pins, ensure CRES 316 cotter pins are installed in addition to nuts.
PENDANT
ASSEMBLY
PENDANT PLATE~ ~o,c=~ • ~i -
LATCH ASSEMBLY \
HINGE PAO
Figure 5-5: Hinged Net Frame (TYP)
CUI
SAFETY NET IN
LIFERAIL POSITION
- • PENDANT PAD
WHEELSTOP 8
GUTTER
SIDE SHELL OR
TRANSOM
FILLER BAR
5-3.6
5-3.7
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Paae 9 of 16
FRAME ASSEMBLY (Figure 5-6)
(1) Inspect pipe/tubing throughout length of CRES safety net frame. If pipe/tube is noticeably worn , measure outer diameter of pipe/tubing using a vernier caliper at 3 different locations on frame. To determine original nominal diameter of pipe/tubing, take measurements in three to five different areas. Select areas which appear unworn.
Acceptance criteria: There shall be no excessive corrosion, wear and physical damage such as perforations, dents, or bends. Outside diameter of pipe/tubing shall not be less than 1/16 inch {0.0625"} of original diameter for CRES pipe/tubing.
(2) Inspect gaps (open space) between adjacent frames, and between frames and ship's structure.
Acceptance criteria: With exception of safety net frames along curved deck edges, the gaps shall not exceed 5 inches when frames are in the up {vertical) or down {horizontal) position.
(3) Inspect weld(s).
Acceptance criteria: There shall be no visible cracks or discontinuities through paint system.
LASHING ROPE
NET CLIP
NU ASSY SHALL Bl 11CH1 AGAINST FRAIi[ (TYP)
GAf' SHOWN BCTWEEN MARGlN ROPE ANO FRAME
FOR CLARITY ONLY
Figure 5-6: Wire Rope Net Construction - Main Net (TYP)
LASHING ROPE (Figure 5-6)
(1) Inspect for tightness of lashing rope.
Acceptance criteria: Acceptance criteria: Net assembly shall be tight against frame.
(2) Inspect for wire of lashing rope.
Acceptance criteria: There shall be no evidence of damage, permanent deformation, wire breakage, or other failure.
(3) Inspect for unsecured ends.
Acceptance criteria: Ends of wire or lashing rope shall be properly secured with swage fittings to join rope ends.
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Paae 10 of 16
5-3.8
5-3.9
NET & HARDWARE (Figure 5-3 & Figure 5-6)
(1) Inspect wire rope netting.
Acceptance criteria: None is allowed for followings.
✓ Excessive rust, corrosion , or pitting.
✓ Six (6) or more broken wires in one rope lay length.
✓ Three (3) or more broken wires in one strand lay length.
✓ One (1) broken wire within one rope lay length of any end-fitting.
✓ Kinking, crushing , bird caging or any other physical damage resulting in distortion of rope structure.
(2) Inspect net clip.
Acceptance criteria: Wire rope intersections are securely fastened with net {star} clips and do not have a loose fit or are crimped excessively which may part or damage wire rope. There shall be no corrosion, pitting or any other physical damage.
(3) Inspect netting grid spacing.
Acceptance criteria: The grid spacing shall be 89( +/- 1 OJ mm by 89{ + / -1 OJ mm.
(4) Inspect for wire rope ends.
Acceptance criteria: Wire rope ends securely fastened with swage fittings.
LATCH MECHANISM & HOLDBACK STAPLES
(1) Inspect safety net latch mechanism.
Accepta.nce criteria: There shall be no damage, deformation, excessive corrosion, excessive paint or other condition that may prevent its movement or operation.
(2) Inspect toggle pin .
Acceptance criteria: The toggle pin is installed and tethered to latch mechanism with either CRES 316 wire rope lanyard or jacketed aramid fiber lanyard
(3) Inspect wire rope lanyard.
Accepta.nce criteria: There shall be no kinking or broken wires.
(4) Inspect rubber bumper.
Acceptance criteria: There shall be no deterioration or missing fasteners. The frame contacts bumper when frame is secured in the up position.
(5) Inspect frame holdback staple.
Acceptance criteria: There shall be no damage or deformation.
(6) Check operation of latch mechanism by rotating frame from the down (horizontal) position to the up (vertical) position.
Accepta.nce criteria: The following must be met
✓ Latch paw automatically engages and captures the holdback staple mounted on the frame.
✓ Staple and latch paw are in straight line with each other.
✓ Latch mechanism and holdback staples shall hold frame securely in up position while shaking top of frame in an inboard/outboard direction.
SHIP/HULL NO. : USS NEW ORLEANS / LPD-18 ICN: Rev: Key Op:
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Paae 11 of 16
5-3.10 GROUND STRAPS
(1) Inspect ground strap assembly.
Acceptance criteria: There shall be no missing hardware, corrosion, broken wires, or signs of deterioration.
The bolted connections are not loose.
(2) Inspect weld connection.
Acceptance criteria: There shall be no visible cracks or discontinuities through the paint system.
5-3.11 FRAME ALIGNMENT
(1) Lower safety net frame(s) to the down (horizontal) position. Conduct visual inspection using 8 foot wooden post extended from the flight deck out to flight deck frames. Use wooden post to visually determine the height of the outboard tube/pipe frames. Check horizontal alignment.
(2) If there is any misalignment, raise frame to the up (vertical) position and secure. Remove cotter pins from end-fittings and adjust turnbuckle as required to correct alignment.
(3) Lower frame to down (horizontal) position. Check alignment. Repeat step (2) as needed until alignment is satisfactory.
Acceptance criteria: Outboard tube/pipe of all frames should be in same plane with each other. Maximum height of outboard tube/pipe of all frames is level with flight deck or top of wheel stop.
Minimum height of outboard tube/pipe of all frames is 3 inches below flight deck or top of wheel stop.
(4) When alignment is satisfactory, raise frame to the up (vertical) position . Reinstall cotter pins.
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Paae 12
WARNING
ENSURE THAT ALL UNAUTHORIZED PERSONNEL REMAIN CLEAR OF THE TEST AREAS DURING
DURATION OF THE TEST.
WARNING
INSPECTION SHALL BE CONDUCTED ONLY AFTER TEST LOADS HAVE BEEN RELIEVED.
CAUTION
of 16
TEST WEIGHTS, RIGGING, AND/OR OTHER DEVICES USED TO PRODUCE TEST LOADS SHALL HAVE NO
SHARP EDGES OR CORNERS THAT MIGHT TEAR OR CUT SAFETY NETTING.
CAUTION
TEST LOADS SHALL BE APPLIED SLOWLY TO PREVENT IMPACT LOADING.
5-4 LOAD TEST Conduct load test as follows and record data and result in the TEST DATA SHEET.
5-4.1 Lower safety net assembly to its lowered or horizontal position.
5-4.2 Apply a static test load of 1,000 to 1,050 pounds centered in the safety net. The area covered by the test load shall not be less than one (1) square foot and shall not exceed the inner perimeter of the frame. Test load shall not contact the net frames. Ensure test load remains centered in net. Do not allow test load to roll or shift down toward ship's hull.
5-4.3 Hold the test load in place for a period of ten (10) minutes.
5-4.4 After 10 minutes, slowly remove the test load.
5-4.5 Inspect the tested item and its support structure.
Acceptance criteria: There shall be no damage, permanent deformaUon, wire rope strand breakage, cracking of welds or other evidence of failure to the frame net, pendants, associated hardware and attachment points.
5-5 Return equipment to readiness condition , as required.
5-6 LWC and S246 shall sign the TEST DATA SHEET when all tests are completed .
6. TEST COMPLETION
6-1 Sign the test procedure coversheet to confirm that the test procedure has been fulfilled and completed and return it to S246 for review and approval.
SHIP/HULL NO.: USS NEW ORLEANS/ LPD-18 ICN: Rev: Key Op:
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Paqe 13 of 16
7. REMARKS
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Page 14 of 16
TEST DATA SHEET
5-2 TEST, MEASURING & DIAGNOSTIC EQUIPMENT (TMDE)
EQUIPMENT TYPE I RANGE I SERIAL NO. I CAL. DUE DATE
5-3 PRE-TEST INSPECTION
NETID STEP & ACCEPTANCE CRITERIA RESULT
5-3.1 (1) TURNBUCKLE BODY 0 SAT/ 0 UNSAT
• There shall be no excessive rust or deformation.
5-3.1 (2) TURNBUCKLE END-FITTINGS AND THREADS
0 SAT/ 0 UNSAT
• There shall be no excessive rust, deformation or bent
5-3.1 (3) TURNBUCKLE END-FITTING COTTER PINS
• Turnbuckles shall have cotter pins on both end-fittings. Cotter pins shall be properly curled 0 SAT/ 0 UNSAT over.
5-3.2 (1) PENDANT END-FITTING THIMBLES
• There shall be no excessive rust, cracks, missing material due to cracking, bending, or any 0 SAT/ 0 UNSAT other sign of physical deformation.
5-3.2 (2) PENDANT SWAGE SLEEVES D SAT/ D UNSAT
• There shall be no visible cracks and excessive rust
5-3.2 (3) PENDANT ANCHOR SHACKLE
• No damage, deformation or excessive rust Nut of shackles shall be secured in place by 0 SAT/ 0 UNSAT
CRES 316 cotter pin.
5-3.2 (4) PENDANT SHACKLE COTTER PINS 0 SAT/ 0 UNSAT
• Cotter pins shall be properly curled over.
A6 5-3.3 (1) PENDANT WIRE ROPE
• None is allowed for followings.
✓ Excessive rust, corrosion or pitting on wire rope.
✓ Six (6) or more broken wires in one rope Jay-length. 0 SAT/ D UNSAT
✓ Three (3) or more broken wires in one strand Jay-length.
✓ One broken wire within one rope Jay-length of any end-fitting.
✓ Kinking, crushing, bird caging or any other physical damage resulting in distortion of rope structure.
5-3.4 (1) QUICK RELEASE HOOK BODY D SAT/ 0 UNSAT
• No signs of deformation, excessive corrosion and wear.
5-3.4 (2) QUICK RELEASE HOOK PULL LEVER 0 SAT/ 0 UNSAT
• Pull lever shall be facing upward when in the horizontal position.
5-3.4 (3) OPERATION CHECK OF QUICK RELEASE HOOK
• Retaining spring shall hold pull lever firmly in the seated ( down) position, until slight pull force is applied. After pull lever is released, the internal coil spring shall apply a slight pre-load force on the pull lever. Pull lever should not rotate freely.
0 SAT/ 0 UNSAT • Springs are not broken or missing.
• Hook shall disengage and rotate freely, releasing pendant assembly.
• A positive snap (holding action) should be felt
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Page 15 of 16
TEST DATA SHEET
5-3 PRE-TEST INSPECTION
NETID STEP & ACCEPTANCE CRITERIA RESULT
5-3.5 (1) FRAME PENDANT PAD AND FRAME HINGE PADS
□ SAT/ □ UNSAT
• There shall be no damage, deformation and excessive corrosion.
5-3.5 (2) HULL, DECK PADS & ATTACHMENT HARDWARE WELD(S)
□ SAT/ □ UNSAT . There shall be no visible cracks or discontinuities through paint system .
5-3.5 (3) HINGE PINS & PENDANT ATTACHMENT PINS . There shall be no damage, distortion or corrosion. Ensure CRES 316 cotter pins and flat
□ SAT/ □ UNSAT
washers are installed. Where nut and bolt type hinge pins are installed and pins are drilled for cotter pins, ensure CRES 316 cotter pins are installed in addition to nuts.
5-3.6 (1) PIPE/TUBING THROUGHOUT LENGTH OF SAFETY NET FRAME
• There shall be no excessive corrosion, wear and physical damage such as perforations,
□ SAT/ □ UNSAT
dents, or bends. Outside diameter of pipe/tubing shall not be Jess than 1/ 16 inch (0.0625") of original diameter for CRES pipe/tubing.
5-3.6 (2) GAPS (OPEN SPACE) BETWEEN ADJACENT FRAMES, AND BETWEEN
FRAMES AND SHIP'S STRUCTURE
□ SAT/ □ UNSAT
• With exception of safety net frames along curved deck edges, the gaps shall not exceed 5 inches when frames are in the up (vertical) or down (horizontal) position.
5-3.6 (3) FRAME ASSEMBLY WELD(S)
• There shall be no visible cracks or discontinuities through paint system. □ SAT/ □ UNSAT
5-3.7 (1) TIGHTNESS OF LASHING ROPE
• Net assembly shall be tight against frame. □ SAT/ □ UNSAT
A6 5-3.7 (2) WIRE OF LASHING ROPE . There shall be no evidence of damage, permanent deformation, wire breakage, or other □ SAT/ □ UNSAT failure.
5-3.7 (3) LASHING UNSECURED ENDS
• Ends of wire or lashing rope shall be properly secured with swage fittings to join rope □ SAT/ □ UNSAT ends.
5-3.8 (1) WIRE ROPE NETTING
• None is allowed for followings.
✓ Excessive rust, corrosion or pitting on wire rope.
✓ Six (6) or more broken wires in one rope lay-length. □ SAT/ □ UNSAT
✓ Three (3) or more broken wires in one strand Jay-length.
✓ One broken wire within one rope Jay-length of any end-fitting.
✓ Kinking, crushing, bird caging or any other physical damage resulting in distortion of rope structure.
5-3.8 (2) NET CLIP
• Wire rope intersections are securely fastened with net (star) clips and are not crimped
□ SAT/ □ UNSAT
excessively which damage wire rope There shall be no corrosion, pitting or any other physical damage.
5-3.8 (3) NETTING GRID SPACING
• The grid spacing shall be 89(+/ -10) mm by89(+/- 10) mm . □ SAT/ □ UNSAT
5-3.8 (4) NET WIRE ROPE ENDS . Wire rope ends securely fastened with swage fittings . □ SAT/ □ UNSAT
JON:
T.P FILE NO.: 61221-2-100_26245 38KF361201 00 A01 Page 16 of 16
TEST DATA SHEET
5-3 PRE-TEST INSPECTION
NETID STEP & ACCEPTANCE CRITERIA RESULT
5-3.9 (1) SAFETY NET LATCH MECHANISM
• There shall be no damage, deformation, excessive corrosion, excessive paint or other 0 SAT/ □ UNSAT condition that may prevent its movement or operation.
5-3.9 (2) TOGGLE PIN
• The toggle pin is installed and tethered to latch mechanism with either CRES 316 wire rope □ SAT/ □ UNSAT lanyard or jacketed aramid fiber lanyard.
5-3.9 (3) LANYARD 0 SAT/ □ UNSAT . There shall be no kinking or broken wires .
5-3.9 (4) RUBBER BUMPER . There shall be no deterioration or missing fasteners. The frame contacts bumper when □ SAT/ □ UNSAT frame is secured in the up position.
5-3.9 (5) FRAME HOLDBACK STAPLE D SAT/ □ UNSAT . There shall be no damage or deformation .
5-3.9 (6) OPERATION CHECK OF LATCH MECHANISM
A6 • None is allowed for followings.
✓ Latch paw automatically engages and captures the hold back staple mounted on the frame. □ SAT/ □ UNSAT
✓ Staple and latch paw are in straight line with each other.
✓ Latch mechanism and ho/dback staples shall hold frame s ecurely in up position while shaking top of frame in an inboard/outboard direction.
5-3.10 (1) GROUND STRAP ASSEMBLY . There shall be no missing hardware, corrosion, broken wires, or signs of deterioration. The □ SAT/ □ UNSAT bolted connections are not loose.
5-3.10 (2) GROUND STRAP JOINT(S)
0 SAT/ □ UNSAT . There shall be no visible cracks or discontinuities through the paint system .
5-3.11 FRAME ALIGNMENT
• Outboard tube/pipe ofa/1 frames should be in same plane with each other. Maximum height of outboard tube/pipe ofa/1 frames is level with flight deck or top of wheel stop. □ SAT/ □ UNSAT Minimum height of outboard tube/pipe of all frames is 3 inches below flight deck or top of whee/stop.
5-4 LOAD TEST
ACCEPTANCE CRITERIA NETID
TEST LOAD DURATION
RESULT
(1,000-1,050 LBS) (10 minutes)
There shall be no damage, permanent deformation, wire rope strand breakage, cracking of joints or other evidence of failure to the frame net, pendants, A6 □ SAT/ □ UNSAT associated hardware and attachment points having the load applied.
LBS minutes
5-6 COMPLETION OF THE TEST
RESPONSIBILITY PRINT NAME/ SIGNATURE/ DATE