This document is a Cost Estimate Sheet for replacing No.1 and No.2 CHT Pump Units on the USS NUECES (Ship/HULL NO. APL-40). The detailed man-hour/trade cost estimate breaks down labor requirements across multiple trade categories including Ship Fitter, Welder, Machinist, Electrician, and others. The total man-hours estimated is 314, with a total labor cost of $15,700 and material costs of $16,440, bringing the total project estimate to $32,140.

Additional cost breakdown includes specific line items for CFM (Contract Furnished Material) costs: $1,540 for Mobile Crane, $14,000 for Marine Chemist, $300 for Paint, and $600 for miscellaneous items like fasteners and gaskets. The document includes an SRF (Ship Repair Facility) estimate with a contract number of 1301301606, and a final rounded total of $33,000 for the pump unit replacement project.

View the file

Other files

File Type Posted
38HZA59301_02_A03.pdf PDF
N6264926Q0010.pdf PDF
38HZA12303_00_A01.pdf PDF
38HZA12303_00_A01_GE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301301606

File details come from the government source that posted it. Updated .