This is a Job Specification document for ship maintenance work on the USS SAN DIEGO (LPD-22). The work involves the removal and installation of a refrigerant suction pipe for the No. 4 Air Conditioning Plant located in Auxiliary Machinery Room No. 2.
The scope of work includes removing the existing 8-inch IPS refrigerant suction pipe (which has a pin hole defect) from the compressor suction system, delivering it to SRF Production Shop S56 for repair under separate job order 38DXA51413-H01, and subsequently reinstalling the repaired pipe. Installation requirements include cleaning and preparing all surfaces, reusing existing fasteners, installing new gaskets, and witnessing an operating pressure test to verify joint tightness with zero allowable leakage. The work references Air Conditioning Plant technical drawings S9514-D5-MMA-010 Rev 17 and parts list 476-84001-000 Rev M. The document specifies that Ship's Force will handle refrigerant recovery, evacuation, dehydration, charging, and system adjustment. Government-furnished materials include gaskets, bolts, screws, insulation sheets, glass cloth, and adhesives identified in the material list. The preparing activity is SASEBO, with an anticipated award date of 11/03/2026 and production completion date of 01/31/2027. The SRF Production Shop point of contact is Mr. Tanaka at extension 252-8192.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - N6264926Q0577.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
LPD-22 USS SAN DIEGO
JON: 38DXA51413 A01
TITLE:
Refrigerant Suction Pipe for No.4 A/C Plant; remove and install
JOB SPECIFICATION
Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:
/I I 03/u,~/, I J-- I J-/ I U) >---h POP Start Date: POP End Date: SASEBO II /.?-3/:u>~ /JI lz.1 lw~?
PREPARED BY: CODE DATE
S.TERASHITA P TE 6/22/2026
APPROVED BY:
CODE
S.MURAKAMI S225
CONCURRED BY: -~';J:- CODE
T.TAKAMASU S234
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JSN(S}: EA0S-1971 CASREP#
5/F CONTACT: LAGAR MM2 / CARRILLO MMC CWP # CCNS#
Approved by S300/S900 l>::::7 ~ Date: \9 'A\)(:,'½':'.(_!) Avl: 7A1
C- \.v-_. Lo~ '-{.
LWC:
Work Completed
S/Force: Rate: Date:
SHIPSUPT: Date: SRF CONTROL NO.:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE DATE:
1/4
1301407566 r-------------- --- - -
Shi /HULL NO. Shi /HULL NAME
JON:
ICN:
38DXA51413
Rev: Key Op:
LPD-22 USS SAN DIEGO
TITLE:
Refrigerant Suction Pipe for No.4 A/C Plant; remove and install
1. SCOPE:
1.1 Title : Refrigerant Suction Pipe for No.4 A/C Plant ; remove and install
1.2 Location of Work :
1.2.1 Auxiliary Machinery Room No . 2 (7-80-0-E), Upper Level
1.3 Identification :
A01
1.3.1 Quantity (One EA), 8 Inch IPS Refrigerant Suction Pipe for No . 4 A/C Plant Located in 1.2.1, including 1-1/8 Inch OD Branched Pipe , each Flange End , See ENCLOSURE (A)
2. REFERENCES:
2 .1 Standard Items ( FY27)
2 . 2 S9514-D5-MMA-010 Rev 17 , Air Conditioning Plant, HFC-134a , 200-Ton Capacity
2 . 3 476-84001-000 Rev M, R-134a Air Conditioning 200 Ton Water Cooling System Parts List and Notes
3 . REQUIREMENTS :
3 .1 Remove existing refrigerant suction pipe listed in 1.3.1 for repair by SRF Production Shop, using 2. 2 and 2 . 3 for guidance. ( See 4. 2.)
3 . 2 Deliver existing refrigerant suction pipe removed in 3.1 to SRF Production Shop S56 . (See 4.3 and 4 . 4 . )
3 . 3 Pick up repaired refrigerant suction pipe from SRF Production Shop S56 .
3 . 4 Install repaired refrigerant suction pipe , using 2 . 2 and 2 . 3 for guidance .
3.4.1 Remove high spots , burrs , abrasions , nicks , corrosion and foreign matter from exposed flanges and mating surface .
3.4.2 Clean each existing fastener for reuse.
3.4 . 3 Install each new gasket , using 2 . 2 and 2 . 3 for guidance .
(V) (G) "OPERATING PRESSURE TEST"
3.4.4 Witness an operating pressure test to be conducted by Ship ' s Force to verify tightness of each mechanical joint affected by this work
2/4
Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
JON:
LPD-22 USS SAN DIEGO 38DXA51413
TITLE:
Refrigerant Suction Pipe for No.4 A/C Plant; remove and install item, until the specified criteria is verified . Allowable leakage : None.
- Sl30
3.4.5 Accomplish the requirements of 009-011 of 2.1.
A01
3.5 Accomplish the requirements of 009- 032 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas .
4 . NOTES:
4.1 Initial Condition - Compressor suction pipe has pin hole .
4 . 2 Refrigerant recovery , evacuation and dehydration , refrigerant charge , and system adjustment will be accomplished by Ship ' s Force .
4 . 3 SRF Production Shop will repair damaged pipe delivered by contractor to be accomplished by job order number : 38DXA5 1 413-H01.
4.4 POC of SRF Production Shop is below .
Mr . Tanaka (S56/S26 , F/8) ---- Ext . 252-8192
5 . GOVERNMENT FURN I SHED MATERIAL :
5 . 1 SRF will provide fo l lowing material.
MATERIAL LIST
M QTY
ITEM PC REF I STOCK HAZ DOC REQD/ PARA
NO. NO. NO. C DESCRIPTION NUMBER MAT NO. UNIT NO.
001 M GASKET FOR 1-1/8"00 RELIEF 9B 5330 013717649 N 6168B060 2/EA 3.4
VALVE
002 M GASKET, 11 OD x 8-5/8 ID x 1/8 9B 5330 014848579 N 6168B061 2/EA 3.4
THK (INORGANIC FIBER
W/NEOPRENE BINDER) (ASTM F-
104 F712400A9B4E34K5M9)
003 C BOLT, HEX HD, 5/16-18UNC X 1- 9B 5305 002259081 N 6168B062 1/HD 3.4
1/4"L ZINC-PLO STL GR 5
004 C SCREW, 3/4"-10UNC-2A, 2-3/4" 9B 5307 SAPTE0169 N 4/PG 3.4
LONG, MEDIUM-STRENGTH
GRADE 5 STEEL, ZINC-PLATED,
SAE J-429 GR 5, 5EA/PG
005 C GAKET SHEET, GARLOCK BLUE- 9B 5330 SAPTE0170 N 2/SH 3.4
GARD 3300 SHEET, 1/8''THK X 60
IN X 60 IN
006 M INSULATION, SHEET, 3/4"THK X 9B 5640 SA9607854 N 5/SH 3.4
3FT W X 4FT L, K-FLEX ECO, NON
HALOGEN RUBBER FOAM
007 M GLASS CLOTH, 5 FT W X 50 YD, 9B 8305 001487363 N 6169B001 1/RO 3.4
MIL-C-20079H TY.I CL.3, L/W
008 M ADHESIVE, WHITE, MIL-DTL- 9B 8040 002738708 y 6169EX10 2/GL 3.4
33160 CL.1 GR.A 1GUUI
009 M ADHESIVE, NEOPRENE, MIL-A- 9B 8040 005508835 y 6169EX09 2/GL 3.4
24179A TY.II , CL.1 , 520, R-373, 1
GUUI
3/4
Ship/HULL NO. Ship/HULL NAME I ICN: Rev: Key Op:
LPD-22 USS SAN DIEGO JON: I 38DXA51413 A01 !
TITLE:
Refrigerant Suction Pipe for No.4 A/C Plant; remove and install
RUPTURE DISK
COMPRESSOR
MOTOR
~~r
OIL PUMP
I
I
:t. ------, t -- i I
I I
A/C Plant Arrangement
ENCLOSURE (A) 1 / 1
Refrigerant Suction Pipe listed in 1 3. 1
4/4