This is a Job Specification document for naval ship maintenance work on the USS TRIPOLI (LHA-7). The specification details the replacement of chemical-resistant flooring in the Crash and Salvage Station (03-86-5-Q), a dry space compartment on the vessel.

The scope of work requires replacement of 320 square feet of chemical-resistant flooring (cosmetic polymeric) including underlayment/base coat and two drain rings, with the flooring specification conforming to MIL-PRF-32584, Type IV or V in red with black flake color. The work is located in SASEBO and includes removal of existing movable furniture and equipment, cleaning of surfaces to SSPC-SP-3 standards (with hand tool cleaning to SSPC-SP-2 in narrow areas where power tools cannot reach), installation of new slip-resistant self-adhesive tread, and removal and replacement of damaged fasteners for deck drain strainers. The required red color coat must match DEX-O-TEX Cardinal Red #940 or equivalent. The anticipated award date is 7/24/2026 with a production completion date of 10/2/2026. The Period of Performance runs from 8/17/2026 through 11/30/2026. Government-furnished materials include machine screws (10 each) and nonslip deck covering material (10 each). The work is prepared by T. SATO, approved by S. MURAKAMI, and concurred by S. MOROOKA.

View the file

Other files

File Type Posted
Solicitation - N6264926Q0457.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LHA -7 USS TRIPOLI

JON. 380JA66503 AOl

TITLE:

Chemical -Resistant Flooring in 03-86-5-Q; replace

JOB SPECIFICATION

Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:

SASEBOPOP Start Date: POP End Date:

PREPARED BY:

T.SATO

CODE

H_ST

DATE

10/24/2025

APPROVED BY:

S.MURAKAMI

CODE

S225

CONCURRED BY:

S.MOROOKA (77/ CODE

S231

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JSN(S): V102-0253 CASREP #

S/F CONTACT: SALAME ABHC / BRANCHDUCIOAM CWP # CCNS #

0. PERKINS

Approved by S3001S900 Date: Avi: 6A1

LWC:

Work Completed

S/Force: Rate: Date:

Ship Supt: Date: SRF CONTROL NO.:_________________________

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

Sakura.Yamaguchi.ja Typewritten Text

RR

Sakura.Yamaguchi.ja Typewritten Text 8/17/2026

Sakura.Yamaguchi.ja Typewritten Text 7/24/2026

Sakura.Yamaguchi.ja Typewritten Text 10/2/2026

Sakura.Yamaguchi.ja Typewritten Text 11/30/2026

Sakura.Yamaguchi.ja Typewritten Text 1301389876

ShIpIHULL NO.J ShIpIHULL NAME ICN: Rev: J Key Op:

LHA-7 USS TRIPOLI

j0 38DJA66503 I AOl

TITLE:

Chemical-Resistant Flooring in 03-86-5-Q; replace

1. SCOPE:

1.1 Title: Chemical-Resistant Flooring in 03-86-5-Q; replace

1.2 Location of Work:

1.2.1 Crash and Salvage Station (03-86-5-Q); Dry Space

1.3 Identification:

1.3.1 A Total of (320 SF) of Chemical-Resistant Flooring (Cosmetic Polymeric) Including UnderiLayment/Base Coat, and Drain Ring (2 EA) to be Replaced for Replacing Deck Covering Down to Bare Substrate, Located in 1.2.1

Specification: MIL-PRF-32584, Type IV or V Color: Red with Black Flake

2. REFERENCES:

2.1 Standard Items (FY26)

2.2 59086-VG-STM-010/CH-634/Rev 4/ACN 1/R5, Deck Coverings, General

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-26 of 2.1 including ATTACHMENT C for replacement of each new chemical-resistant flooring (cosmetic polymeric) system listed in 1.3.1.

3.1.1 Remove each existing movable furniture and equipment located in 1.2.1. Upon completion of the work, install them.

3.1.2 Remove each damaged existing fastener, tap each existing thread hole, and install each new fastener of deck drain strainer where missing or damaged.

3.1.3 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 6, Column A for each area.

3.1.3.1 Power tool clean each narrow area to SSPC-SP-3 where

power tool in 3.1.3 cannot reach.

3.1.3.2 Hand tool clean each narrow area to SSPC-SP-2 where

power tool in 3.1.3.1 cannot reach.

3.1.4 Install each new slip-resistant self-adhesive tread to match current location in accordance with 634-3.14 of 2.2.

3.2 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.

Sakura.Yamaguchi.ja

RR

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LHA-7 USS TRIPOLI JON. 38DJA66503 AOl

TITLE:

Chemical-Resistant Flooring in 03-86-5-Q; replace

4. NOTES:

4.1 Initial Condition - The existing deck covering was deteriorated, required to replace with new cosmetic polymeric deck covering.

4.2 The required red of color coat is same as DEX-O-TEX Cardinal Red #940 or Equal.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 Government Furnished Material as follows.

MATFRIAI I 1ST

____ MATERIAL_LIST----

QTY

ITEM PC REF I STOCK HAZ DOC REQD/ PARA

NO. NO NO. C DESCRIPTION NUMBER MAT NO. UNIT NO.

001 M SCREW, MACI-IINE,FLTI-ID,114"-2OUNC- 9B 5305 N 10/EA 3.1

2A,2"LG,QQ-N-281 NI-ALLOY R405,PIN 015453009

803-1385789 PCi 0, FOR FASTENER OF

DECK DRAIN STRAINER

002 M DECK COVERING, LIGIITWEGHT,

9Q 7220 N 10/EA 3.1

NONSLIP, MIL-PRF-24667 TY-XI COMP- 002050389

PS, 0.0081, 6W, 24"L, COARSE, BLACK

3/ /3