This document is a First Article Requirements form related to a federal contract opportunity for an F-16 Charger Battery, NSN 6130-01-486-6660HY, Part Number 713290-2.
The key details are: The first article quantity is 1 unit that will be part of the production quantity. The contractor must conduct testing per the Specification Control Drawing, design, and technical documentation, and provide a test report. The government will also conduct Form, Fit, and Function testing per the Acceptance Test Procedure. The first article is due within 180 calendar days from the contract date, and the government has 60 days to provide written notice of approval or disapproval after receipt. First article testing will not be waived. The cognizant engineering organization responsible for approving and conducting the testing is 422 SCMS/GUEAB. The first articles are to be shipped to the address provided for government testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EO_2012C1083_T.pdf | ||
| 2561454_UIIEC_REPORT.pdf | ||
| 3943290_TRNSPDATA_REPORT.pdf | ||
| DID_ILSS_80858_Test_Report.pdf | ||
| 3938635_CDRL1_REPORT.pdf | ||
| SPRTA124R0234_SOL.pdf | ||
| 3943291_PKGRQMT_REPORT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
14 AUG 2023(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
22830 / 713290-2
4. NSN
6130014866660HY
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM EA
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
Contractor Test: Successful testing per GE's Specification Control Drawing(s), design, and technical documentation. Additionally, contractor shall include as part of the report an updated indentured BOM (i.e. Class II piece part updates) for the purposes of updating USAF Technical Order Illustrated Parts Breakdown (IPB).
Government: Form, Fit, Function testing to take place in organic backshop per Acceptance Test Procedure IAW TO 8D2-47-3 and 33DA26-17-1.
B. The detailed technical requirements for First Article approval tests are contained in
GE's Specification Control Drawing for PN 713290-2, design, and technical documentation.
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
Mr. Kelly Ward
(Requesting Activity) of test time and location due 30 days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
SEE BLOCK 12
(4) Government written notice of approval / disapproval due
(2) Due
(1) DD Form 1423 ELIN days after receipt of contractor's report.60 calendar days from date contract.
AFMC IMT 260, 20230316, V-5,
Version 5Generated by PRPS using Jasper Reports on 26 Jun 2024
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
F. FIRST ARTICLE DELIVERY
(1) Due within 180 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
SEE BLOCK 12
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 60 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$13,500.0000
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles
X will be returned to the contractor will be retained by pending disposition instructions from the contractor.
X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. Provided not more than months have elapsed since completion of the contract.
e. X First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
AFMC IMT 260, 20230316, V-5,
Version 5Generated by PRPS using Jasper Reports on 26 Jun 2024
12. REMARKS
Ward, Kelly KNAME: 20 JUL 2022DATE:
First Article Justification: FA testing deemed necessary because contractor has not produced this item before. Item has Form, Fit, and Function (FFF) verification requirements to determine contractor's ability to produce this item.
Block 3 Part Number: 713290-2 Block 9 C: N/A Block 9 C(1): DD Form 1423 ELIN: N/A Block 9 C(2): Deliver due N/A calendar days from date of contract.
Block 9E: Required Block 9 E(1): DD Form 1423 ELIN: See 1423-1 for this NSN.
Block 9 E(2): Due 180 calendar days from date of contract.
Block 9 E(3): Submit contractor test report to the address below.
Block 9 F(3): Following successful contractor testing and development of test report, ship the First Articles to address below for Government testing. Government testing to be IAW Block 9 A.
Block 9 E(3) and 9 F(3):
DDOO-SOP/FIRST ARTICLES
BLDG 18, DR 16
8080 PERIMETER RD
TINKER AFB, OK 73145-8000
DODAAC: FY2303
Phone: 405-739-5090
Mark For:
FIRST ARTICLES (Ensure the words "FIRST ARTICLES" are marked on the outside of the box)
ATTN: DDOO-SOP
DO NOT POST, NON-ACCOUNTABLE; DO NOT PUT INTO SUPPLY
DODAAC: FY2303
Elden, Mark ENAME: 09 AUG 2018DATE:
Coordinated and Approved by Mark Elden,, Chief, 422 SCMS/GUEAB Engineering
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Ward, Kelly K
422 SCMS/GUEAB
405-582-5355
852-5355
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Ward, Kelly K
422 SCMS/GUEAB
405-582-5355
852-5355
AFMC IMT 260, 20230316, V-5,
Version 5Generated by PRPS using Jasper Reports on 26 Jun 2024
File details come from the government source that posted it. Updated .