National Estuarine Research Reserve System (NERRS) Land Acquisition and Construction Program for Fiscal Year 2021
TABLE OF CONTENTS
I. Funding Opportunity Description 3
A. Program Objective 3 B. Program Priorities 4 C. Program Authority 5
II. Award Information 5 A. Funding Availability 5 B. Project/Award Period 6 C. Type of Funding Instrument 6
III. Eligibility Information 6 A. Eligible Applicants 6 B. Cost Sharing or Matching Requirement 7 C. Other Criteria that Affect Eligibility 8
IV. Application and Submission Information 9 A. Address to Request Application Package 9 B. Content and Form of Application 9 C. Unique Entity Identifier and System for Award Management (SAM) 19 D. Submission Dates and Times 20 E. Intergovernmental Review 20 F. Funding Restrictions 20 G. Other Submission Requirements 21
V. Application Review Information 22 A. Evaluation Criteria 22 B. Review and Selection Process 26 C. Selection Factors 27 D. Anticipated Announcement and Award Dates 28
VI. Award Administration Information 28 A. Award Notices 28 B. Administrative and National Policy Requirements 29 C. Reporting 32
VII. Agency Contacts 33 VIII. Other Information 34
Notice of Federal Funding Page 1 of 34
NOTICE OF FUNDING OPPORTUNITY
EXECUTIVE SUMMARY
Federal Agency Name(s): National Ocean Service (NOS), National Oceanic and Atmospheric Administration (NOAA), Department of Commerce
Funding Opportunity Title: National Estuarine Research Reserve System (NERRS) Land Acquisition and Construction Program for Fiscal Year 2021
Announcement Type: Initial
Funding Opportunity Number: NOAA-NOS-OCM-2021-2006713
Catalog of Federal Domestic Assistance (CFDA) Number: 11.420, Coastal Zone Management Estuarine Research Reserves
Dates: Complete grant applications must be submitted by 11:59 p.m., Eastern Time, February 12, 2021
Funding Opportunity Description: The National Estuarine Research Reserve System (NERRS) consists of estuarine areas of the United States and its territories designated and managed for research and educational purposes (Reserve). Each Reserve within the NERRS is chosen to represent a different bio-geographic region and to include a variety of ecosystem types in accordance with the classification scheme of the national program as specified in 15 CFR Part
921. By funding Reserve lead agencies and universities to conduct land acquisition and construction projects that support the NERRS mission, NOAA will strengthen protection of key land and water areas, enhance long-term protection of Reserve areas for research and education, and provide for facility and exhibit construction that meet the highest sustainable design standards possible.
NOAA anticipates approximately $4.5 million in Fiscal Year 2021 will be available to designated lead Reserve agencies or universities in coastal states for approximately 5-20 construction and acquisition projects, and expected to range from approximately $20,000 to $1,000,000 per project and with project periods typically covering 12-36 months, depending on the availability of funds.
Notice of Federal Funding Page 2 of 34
FULL ANNOUNCEMENT TEXT
I. Funding Opportunity Description
A. Program Objective
The National Estuarine Research Reserve System (NERRS) consists of estuarine areas of the United States and its territories designated and managed for research and educational purposes (Reserve). Each Reserve within the NERRS is chosen to represent a different bio-geographic region and to include a variety of ecosystem types in accordance with the classification scheme of the national program as specified in 15 CFR 921. By funding designated Reserve agencies and universities to conduct land acquisition and construction projects that support the NERRS mission, NOAA will strengthen protection of key land and water areas, enhance long-term protection of Reserve areas for research and education, and provide for facility infrastructure and exhibit construction that meet the highest sustainable design standards possible.
NOAA provides funding to designated Reserve agencies for acquiring additional property interests and for construction projects that serve to strengthen protection of reserve key land and water areas; to enhance long-term protection of reserve areas for research and education;
and provide for facility infrastructure and exhibit construction. Each Reserve supports a wide range of beneficial uses important to ecological, economic, recreational, and aesthetic values, which are dependent upon the maintenance of a healthy ecosystem. The sites provide habitats for a wide range of ecologically and commercially important species of fish, shellfish, birds, and other aquatic and terrestrial wildlife. Each Reserve was designated to ensure its effectiveness as a conservation unit and as a site for long-term research and monitoring. In maintaining their effectiveness, the Reserves may find it necessary to expand their boundaries through strategically planned land acquisitions and/or to develop or enhance their reserve facilities, including their in-situ monitoring infrastructure, to meet the demands of research, monitoring, and education program objectives.
Within the NERRS, Construction and/or acquisition plans require the following information:
1) A construction plan must include general descriptions of proposed projects, general cost estimates and timelines. Sufficient information should be provided for both major and minor proposed construction projects to clearly articulate requirements in the initial phase of the project. See 15 CFR 921.13(a)(6).
2) An acquisition plan must identify the ecologically key land and water areas of the Reserve, rank these areas according to their relative importance, describe the methods of acquisition, and include a strategy for establishing adequate long-term state control over
Notice of Federal Funding Page 3 of 34 these areas sufficient to provide protection for Reserve resources to ensure a stable environment for research. See 15 CFR 921.13(a)(7).
B. Program Priorities
Overall, priority should be given to projects that increase a reserve’s natural or built infrastructure’s resiliency, sustainability, and factor anticipated climate change effects.
Regarding acquisitions projects, priority will be given to those projects that: (i) protect pathways for habitat and species migrations in response to sea level rise or changing lake levels; (ii) reduce existing stressors that hinder the ability of species or ecosystems to withstand climatic events; (iii) protect key ecosystem features, (e.g. keystone species or habitats); (iv) maintain species or habitat diversity; and (v) support the managed retreat of a reserve’s core facilities infrastructure. One exception is non-core/buffer lands that are identified as acquired for Reserve facility construction.
Regarding construction projects, priority will be given to core facilities (National Estuarine Research Reserve Standard Reserve 2004), especially, dormitories that meet two or more of the following qualifications:
- Facility is proposed in already disturbed areas outside of the 100-year flood zone and minimally disrupt the environment;
- Facility design is expected to conserve and protect water resources;
- Facility proposed will incorporate sustainable design principles (National Estuarine Research Reserve Sustainable Design Guidelines),
- Facility proposed optimizes energy performance reducing the Reserve’s greenhouse gas emissions and overall carbon footprint;
- Facility is designed to be resilient to the impacts of coastal hazards and flooding over the useful life; and
- Facility incorporates natural or nature-based infrastructure.
Core facility upgrades or retrofits are also eligible if the proposal can demonstrate the increased resiliency or sustainability aspects of the project. Additionally, small scale construction projects, including SWMP infrastructure, that either incorporate resilient or sustainable features or use applicable nature-based infrastructure approaches that mimic or support natural processes, such as, living shorelines and wetlands creation, are preferred to minimize the adverse impacts of coastal hazards and flooding on facilities that are located in the floodplain. Such projects should be consistent with NOAA’s guidelines for nature-based infrastructure.
The National Estuarine Research Reserve Standard Reserve and the National Estuarine Research Reserve Sustainable Design Guidelines documents referenced above can be
Notice of Federal Funding Page 4 of 34 accessed through the NERRS intranet https://coast.noaa.gov/NerrsIntranet/Default.aspx
Supporting definitions of key terms for the purpose of this FFO include:
- Core Facilities - Facilities that support the primary mission and goals of the Reserve and should be located near, and/or within, the Reserve boundary, preferably in the designated buffer area of the Reserve.
- Habitat Migration – The natural movement of habitats to a new area, in response to changes in environmental conditions.
- Nature-Based Infrastructure – human designed, engineered, and constructed systems that use natural features, including habitats, and providing multiple ecosystem service benefits, such as storm protection through wave attenuation or flood storage capacity, enhanced water services and security, and habitat for fish, wildlife and plants.
- Sustainable Facilities – Facilities that are designed, constructed and operated to create and maintain conditions that balance the economic, social, and environmental requirements of present and future generations.
- Resilient Facilities - The ability of a facility, exposed to hazards or disturbances, to absorb impacts while maintaining an acceptable level of functioning; reduce the amount of time and financial resources needed to return to full level of functioning; and adapt to future risks
- Small Scale Construction – Construction projects of less than $100,000 that improve existing core facilities or support non-core facility capabilities at a reserve.
C. Program Authority
Statutory authority for the NERRS Land Acquisition and Construction Program is established under the Coastal Zone Management Act, 16 U.S.C. 1461(e).
II. Award Information
A. Funding Availability
This funding opportunity announces that NOAA anticipates approximately $4.5 million will be available to designated Reserve agencies or universities for construction and acquisition projects in fiscal year 2021. Depending on the availability of funds, NOAA anticipates funding approximately 5-20 projects. Funding for land acquisition and construction awards is expected to range between approximately $20,000 to $1,000,000 depending on the size, location, and type of project.
Publication of this announcement does not obligate NOAA to establish any specific partnership or to obligate available funds for partnership activities. NOAA or the
Notice of Federal Funding Page 5 of 34
Department of Commerce (DOC) are not responsible for direct costs of proposal preparation.
There is no guarantee that funds will be available to make awards for this federal funding opportunity or that any proposal will be selected for funding. NOAA and DOC will not be responsible for project costs if this program fails to receive funding. If an applicant incurs any costs prior to receiving an award agreement signed by an authorized NOAA official, the applicant does so at its own risk of not receiving an award or these costs not being included in a subsequent award. Recipients and sub-recipients are subject to all federal laws and agency policies, regulations, and procedures applicable to federal financial assistance awards. Applicants must be in compliance with all existing NOAA grants or cooperative agreements and otherwise eligible to receive federal awards in order to be considered for funding under this competition.
B. Project/Award Period
The performance period for FY 2021-funded projects cannot exceed 36 months.
Applicants may submit applications covering a 12 to 36- month project period with anticipated start date(s) as early as July 1, 2021 or as late as November 1, 2021. The Federal share of project funding will be fully obligated at the time of award and is subject to payment provisions outlined in 2 CFR 200.305 and further implementing award terms.
C. Type of Funding Instrument
Successful applicants will enter into a grant with NOAA’s National Estuarine Research Reserve System (NERRS) Land Acquisition and Construction Program.
III. Eligibility Information
A. Eligible Applicants
Eligible applicants are NERRS lead state agencies or universities designated to receive NERRS operations funding through a Memorandum of Understanding with NOAA in coastal states and territories including the Pacific, Gulf of Mexico, Caribbean, Atlantic Coast and Great Lakes. Eligible applicants should meet requirements as stated in the NERRS regulations codified at 15 CFR 921.32 which are available online at http://go.usa.gov/xkGEf.
Federal agencies and employees are not allowed to receive funds under this announcement but may serve as collaborative project partners. Federal agencies and employees’ ‘in-kind’ services cannot be considered as part of an applicant’s match on shared costs. If federal agencies are collaborators, applicants are expected to provide detail on the planned level of federal engagement in the application. Examples might include, but are not limited to partnership services; serving in a review capacity; or participating in priority task teams, Notice of Federal Funding Page 6 of 34 working groups, or leadership teams.
B. Cost Sharing or Matching Requirement
The amount of Federal funds requested must be matched by the applicant as follows: 30 percent total project match for construction awards and 50 percent total project match for land acquisition awards as indicated in 15 CFR Part 921.31. Recipient contributions and third party in-kind contributions directly benefiting the project may be used to satisfy the matching requirements. If using previously acquired real property as match, a list of this “banked” match, and a description of the method of valuation of the cost consistent with 2 CFR 200.306(d),(h), or (i) should be included in the application. If the project is selected, all match will become part of the project, and subject to the requirements of the award.
Applicants must identify all match sources and amounts equal to that requested above.
Projects without match or with highly speculative match will not be considered eligible (see Section V.A.4. of this federal funding opportunity (FFO)).
“Cost sharing or matching” is defined by 2 CFR 200.29 as “the portion of project costs not paid by federal funds (unless otherwise authorized by federal statute).” Any shared costs or matching funds and all contributions, including cash and third party in- kind contributions of goods and services, will be accepted as part of an applications cost sharing or matching when they meet all of the following criteria listed in 2 CFR 200.306(b):
(1) Are verifiable from the non-federal entity's records;
(2) Are not included as contributions for any other federal award;
(3) Are necessary and reasonable for accomplishment of project or program objectives;
(4) Are allowable under Subpart E—Cost Principles of this part;
(5) Are not paid by the federal Government under another federal award, except where the federal statute authorizing a program specifically provides that federal funds made available for such program can be applied to matching or cost sharing requirements of other federal programs;
(6) Are provided for in the approved budget when required by the federal awarding agency; and
(7) Conform to other provisions of this part, as applicable.
Matching funds may come from a variety of public and private sources and may include third party in-kind goods and services such as private boat use and volunteer labor. Goods and services provided by the recipient have the valuation described in 2 CFR 200.306.
Federal agencies and employees’ in-kind services cannot be considered as part of an applicant’s matching funds, but can be described in the budget narrative to demonstrate additional leverage. Applicants are permitted to combine contributions from multiple non-federal partners in order to meet the 1:1 match requirement, consistent with the standards
Notice of Federal Funding Page 7 of 34 described in 2 CFR 200.306, and if funds are available within the project period stated in the application.
See also 15 C.F.R. 921.81(d)(2) regarding cost sharing in NERRS acquisition and construction projects.
Applicants should specify the source(s) of match in their proposal and detailed budget narrative and may provide or be asked to provide letters of commitment to confirm stated match contributions. Applicants whose proposals are selected for funding will be bound by the percentage of cost sharing reflected in the award document signed by the NOAA Grants Officer. Successful applicants should be prepared to carefully document matching contributions, including the number of volunteer or community participation hours devoted to specific projects, and all other cash or third party in-kind contributions.
Applicants may choose to designate part or all of their federally-negotiated indirect costs as match. This may be convenient because the valuation of such costs has already been federally-approved and documentation is readily available. Refer to the “Indirect Costs” policies in Section IV.B.14 and Section IV.D. of this announcement.
In addition, any Program Income that may arise in the project may be put toward cost sharing or added to the project, consistent with 2 CFR 200.307.
C. Other Criteria that Affect Eligibility
Projects eligible for funding must be identified in construction and/or acquisition plans, within an approved management plan or a complete draft that has been submitted for OCM Sector review in compliance with 15 CFR 921.13. Acquisition projects that involve the potential to invoke eminent domain are not eligible for funding. Construction projects must occur on land under adequate state control either through direct state ownership or pursuant to a long-term lease between the Reserve and the landowner. See also the clarification on the meaning of adequate state control set out at 15 CFR 921.30(d).
Eligible costs associated for administrative purposes related to acquisition and/or facility construction per 15 CFR 921.81; see also 2 CFR 200, Subpart E. Cost Principles [for Federal Awards]. Facility and acquisition planning alone may not constitute a proposal, but planning and administrative tasks may constitute up to 20% of facility and/or acquisition costs within the proposal. These planning efforts may address, among other things, evaluation of sustainable features appropriate for reserve future facility needs and associated maintenance or applicable environmental analyses required under federal statutes (e.g., ESA, NHPA, MMPA).
Notice of Federal Funding Page 8 of 34
Construction or acquisition projects identified in an approved management plan or a complete draft that has been submitted for OCM Sector review, including smaller scale projects that support reserve programmatic activities such as boardwalks and monitoring platforms, as well as, small scale habitat restoration activities associated with a construction and acquisition project, are eligible for funding per 15 CFR 921.31.
Examples of eligible proposed projects could include: preserving historic or culturally significant structures; preparing a site for facility construction; acquisition which includes small scale restoration to improve the property; installing an ecological restoration demonstration project; or restoring habitat impacted by construction activities. In addition, making sustainability (i.e., alternative energy generation onsite; energy efficient lighting systems; raingardens; Electric Vehicle charging stations; high efficiency environmental control systems; etc.) or resiliency upgrades (i.e., backup energy systems on-site; dry flood proofing structures; hurricane roof straps; metal roofs; elevating building utilities; or storm shutters; etc.) designed to minimize or reduce coastal hazard or disaster risks to an existing facility, with preference given to nature-based infrastructure approaches, are acceptable.
However, routine structural maintenance including unscheduled and scheduled maintenance repairs of buildings, structures, and installed building equipment to correct deficiencies are not eligible for funding. This includes preventive maintenance to achieve the expected life of the constructed asset or installed building equipment. Replacing previously federally funded structures lost due to natural hazard, such as catastrophic weather events, are also not eligible and recipients should follow the insurance provisions in 2 CFR 200.310, requiring that real property acquired with federal funds have equivalent insurance coverage to real property acquired with non-federal funds.
IV. Application and Submission Information
A. Address to Request Application Package
The standard SF-424 application package is available online at http://www.grants.gov. If this is not feasible, application packages may be requested from: Matt Chasse of the Office for Coastal Management at 240-533-0808 or email at Matt.Chasse@noaa.gov.
B. Content and Form of Application
A complete standard NOAA financial assistance application package should be submitted in accordance with the guidelines in this document.
Notice of Federal Funding Page 9 of 34
All application materials should use a legible 11- or 12-point font with 1-inch margins on all sides. The complete application package should include the following forms and documents and should be grouped in two separate files:
A project description (proposal), as described in the application component section below, should be limited to no more than a total of 15 pages. The project description should also include a title page and table of contents but these pages (title page and table of contents) will not count towards the project description 15-page limit.
Project descriptions that exceed the 15-page limit will be shortened by removing pages at the end of the proposal narrative (see element 3 of the component section below) before it is forwarded to merit reviewers for evaluation. Pages excised from lengthy applications will not be reviewed or considered. Applications that are incomplete, unclear, or contain numerous typographical errors may not be understood effectively by reviewers, resulting in lower evaluation scores, so applicants are advised to review their application materials closely before they are submitted to the agency for consideration.
The following Office of Management and Budget-approved Standard Forms must be included, as applicable:
--Application for Federal Assistance: Form SF-424 (7/03 version or newer) --Budget Information for Non-construction Programs (for acquisition proposals): Form 424A (Within the award, a Form SF-424A for each year of funding will be required)
--Assurances for Non-construction Programs: Form SF-424B --Budget Information for Construction Proposals (as applicable): Form 424C --Assurances for Construction Programs (as applicable): SF-424D --Certification Regarding Lobbying: Form CD-511 --Disclosure of Lobbying Activities: Form SF-LLL (if applicable)
Appendices should be limited to materials that directly support the main body of the proposal (e.g., resumes, references, lists of relevant work products or reports, detailed methodologies, data sources, detailed budget information, letters of collaboration, letters of support, lists of data sources, permits, and maps). Applicants should paginate their proposal and any appendices. Appendices should not total more than 30 total pages excluding forms, information to complete forms, detailed budget narrative, and National Environmental Policy Act (NEPA) and environmental compliance information.
Applicants may upload this additional supporting documentation, such as resumes and
Notice of Federal Funding Page 10 of 34 qualifications of applicants, and letters of support or statements of collaboration, by using the 'Optional Form' box under 'Other Attachments' in Grants.gov during the application submission process.
Federal forms and NEPA information, and information provided (e.g., Negotiated Indirect Cost Rate Agreement) to complete the federal forms can be separately submitted or combined and submitted in one PDF document.
Please keep in mind that the total electronic file size of the proposal narrative and appendices combined shall not exceed 5 megabytes. Files that are larger than five megabytes may not be properly downloaded, uploaded, or received by the agency or the reviewers. For applications submitted in electronic format, acceptable formats are limited to Adobe Acrobat (.PDF) or Microsoft Word files. Files that cannot be opened or downloaded will not be reviewed.
All applications should contain the following components:
1. Title Page with the following information:
A. Project Title B. Proposed project period (start and end dates) C. Type of Project (i.e., land acquisition or construction) D. Recipient name (must match registered name in Dun and Bradstreet Universal Numbering System (DUNS) E. Reserve Name F. Recipient DUNS number (must match applicant information in SAM.gov) G. Principal and other investigator (names, organization, and contact information)
H. Financial representative (names, organization, and contact information) I. Identify the following aspects of the project including the:
i) region and specific area where the project will take place,
ii) partners or technical networks that will be leveraged or created, if applicable,
iii) resilient design features (i.e., nature-based infrastructure); and
iv) identification of the programmatic priority or priorities identified in the NERRS management plan and/or strategic plan applicable to the project.
2. Project summary. Provide a one to two-page summary of the proposed project. The summary must contain the following sections:
A. Project name/title
B. Requested funding by year (as appropriate). Brief project summary including
Notice of Federal Funding Page 11 of 34 objectives, expected results and intended benefits and outcomes, and, if applicable, a short description of partners and professional or technical networks that will be leveraged or created.
3. Project Description (limited to 15 pages, excluding title page and table of contents). All project proposals should include the following sections:
A. Goal and Objective(s) - Describe in the narrative the specific project goals and objectives to be achieved.
Goals and objectives must be specific for each year of the work plan presented. Recipients will be required to submit semi-annual progress reports in which progress against these goals and objectives will be reported.
Sufficient detail should be provided to enable reviewers to evaluate the relevance and applicability of proposed work to program priorities described in Section I.B. of this announcement; to determine the technical/scientific merit of the proposed work; to adequately review the qualifications of the applicants; and to assess whether the proposed scope of work raises any concerns with regard to federal policy considerations, such as those related to the National Environmental Policy Act, Endangered Species Act, Historic Preservation Act, and Marine Mammal Protection Act.
B. Background - Provide sufficient background information for NOAA and non-NOAA reviewers to independently assess the significance of the proposed project.
Background information should summarize the problem, gap or need that the proposal addresses; the relationship of the proposed work to other regional efforts; and the importance of the project to the reserve including specific reference and page number(s) within an approved management plan or a complete draft that has been submitted for OCM Sector review; a summary of NOAA/NERRS funds provided for construction or acquisition from FY15 - FY20 with summary of progress; and any reference to the project in a CZMA Section 312 evaluation.
Applicants should address their qualifications for performing the project. Reserves may demonstrate in their applications that they have solid operating performance, preferably a full complement of core staff (manager, education coordinator, and research coordinator), and effective performance in completing past construction and acquisition projects.
Applicants may briefly address how they possess the necessary experience, education, training, and administrative resources, to accomplish the project. The individual reserve should be capable of performing the project in general and supporting the project by
Notice of Federal Funding Page 12 of 34 supplying the required match amounts (50/50 for acquisition projects and 70/30 for construction projects).
C. Approach - Provide a work plan that: identifies specific project tasks to be accomplished; explains the technical approach (including quality assurance) needed to accomplish the tasks; identifies the roles and qualifications of staff, partners, and cooperators; and identifies potential obstacles to successful completion of the goals and objectives.
The description should align with budget categories and fully explain the scope of work including preparatory work, environmental review, planning, design elements, sustainable or resilient features, etc. For acquisition or construction priorities, the description should address how the project will incorporate resilience or adaptation strategies to coastal hazards, to climate change, and/or reflect related outreach. For land acquisition projects with an ‘in-kind’ match parcel, provide information about the match parcel (in addition to the target property), such as its location, when acquired, cost/appraised value, current ownership, and relationship to the Reserve [or Reserve’s acquisition priorities]. For eligible facility retrofits, provide a description of the cost savings and other benefits resulting from the addition of sustainable or resilient features. For eligible small-scale construction projects, describe how either incorporating sustainable/resilient features or nature-based infrastructure enhances facility or infrastructure resilience to coastal hazards or climate risks. See Section I. B.
Program Priorities of this FFO. If the project includes federal partners, the roles and responsibilities of the federal partners must be clearly identified.
D. Task Outcomes or Products - Identify and describe the anticipated project products or outcomes.
Explain how the project will benefit reserve programs or capabilities in support of NERRS goals and describe how the project will evaluate success including performance measures. If the goal of the project is to build resilient research or educational capacity to support key management plan goals or objectives, describe how the proposed project will ensure that reserve goals or objectives will be met as a result of the project moving forward into the future
E. Milestone Schedule – The project must display time lines for major tasks, target milestones for important intermediate and final products, and key project outcomes.
4. Project Budget (Budget narrative and Justification).
NOAA Grants Management Division Budget Narrative Guidance is accessible at
Notice of Federal Funding Page 13 of 34 http://www.ago.noaa.gov/grants/training.html.
In order to allow reviewers to evaluate the appropriateness of all costs, applications should include a detailed budget narrative and a budget justification broken out by individual task.
The budget narrative submitted with the final application should match the dollar amounts included on all required forms and clearly link to the project narrative. Please explain each calculation and provide a narrative justification to explain expenditures for each budget category. The budget narrative should describe, by category of expenditure, the total funding needed to accomplish the objectives described in the project narrative for the entire award period. Please explain how categorical costs are derived in sufficient detail to enable reviewers to determine if costs are 'allowable and reasonable' according to the cost principles referenced in 2 CFR 200, Subpart E. Budget narrative categories should correspond to the standard object class categories listed in Section B of the SF-424A.
Applicants should include detailed budget information regarding all contracts and sub-awards, and indicate the basis for the cost estimates in the narrative. Describe project activities to occur or products or services to be obtained and indicate the applicability or necessity of each to the project. Each identified sub-award should include form SF-424A.
Detailed budget information includes:
• Name of identified qualified sub-recipient. Sub-recipient, affiliation, contact information, and method of selection. For “to be determined,” describe plans for selection.
Information must include the name and location (city, state, and Congressional district) of the entity receiving the funds and the location of the primary place of performance.
• Period of Performance. Include the dates for the performance period. If it involves a number of tasks, include the performance period for each task.
• Scope of Work. List and describe the specific activities or tasks to be performed and the criteria for measuring accountability. Include an itemized line item breakdown as well as total contract/award amount. If applicable, include any indirect costs paid under the contract/award and the indirect cost rate used.
• Itemized Budget. Include categories used in program budget for sub-recipients or contractors if applicable under 2 C.F.R. 200.101. If applicable, include any direct cost paid under the sub-award and the indirect cost rate used. All sub-awards and contracts must be made consistent with the requirements of 2 CFR 200.330-200.332 for sub-awards, and 200.317-200.326 for procurements.
For any equipment, a description of the item and associated costs is required, including a description of how it will be used in the project. Note that equipment is defined as tangible personal property (including information technology systems) having a useful life of more
Notice of Federal Funding Page 14 of 34 than one year and a per-unit acquisition cost which equals or exceeds the lesser of the capitalization level established by the non-federal entity for financial statement purposes, or $5,000. See 2 CFR 200.33 Equipment, 2 CFR 313, and 2 CFR 200.317-326.
The cost or price, purpose, and method of selection for identified and planned acquisition contracts should be thoroughly justified in the Budget Narrative. Describe products or services to be obtained and indicate the applicability or necessity of each to the project.
Procurements are subject to policies described in 2 CFR 200.317-326. For “to be determined,” describe plans for selection.
The budget narrative should also provide, to the extent possible, detailed information on travel, including costs, a description of anticipated travel, destinations, the number of travelers, and a justification of how the requested travel is directly relevant to the successful completion of the project. If actual trip details are unknown, applicants should state the basis for the proposed travel charges. Applicants should allocate travel funds for any coordination meetings at regional or national levels.
If a foreign air carrier is anticipated to be used for any portion of travel, prior approval is required under the DOC Financial Assistance Standard Terms and Conditions, Section G.05.d., https://go.usa.gov/xVS52, and therefore, such travel should be included in the proposal to avoid having to request prior approval after the project starts. Applicants may factor in travel costs for participation in an annual NOAA Grants Management Division (GMD) workshop for recipients.
Refer to item 16 below in this Section regarding treatment of Indirect Costs in the Budget Narrative.
Federal and non-federal costs per object class category identified in the NOAA grants package (Form SF 424-A and/or C) and a brief narrative justification of the budget including the source of match (50% for acquisition and 30% for construction). Administrative and/or planning costs, including data to support environmental analyses required under federal statutes (e.g., ESA, NHPA, MMPA), that are up to 20% of the federal portion of the budget are allowable. Restoration costs up to 20% of the proposed project are allowed for restoration or enhancement associated with the proposed (See Section I.B of this FFO). Cost categories for construction include: project planning and design; administrative and legal expenses; architectural and engineering costs; project inspection fees; site work; demolition and removal costs; equipment costs; and other construction tasks breakdown such as structural (i.e., windows, doors, roofing, flooring), carpentry, plumbing, heating, electrical.
For acquisition costs: personnel involved in the project; land acquisition fees; travel, Notice of Federal Funding Page 15 of 34 equipment, supplies, and contractual. A detailed budget narrative that includes additional information regarding the use of funds for budget categories found in Form SF-424A must be included in an appendix. In this appendix, the budget narrative also shall clearly identify the cost of separable elements of the proposed work and shall identify the elements of the project prioritized for revision or elimination if sufficient funding is not available for all proposed activities. For any equipment, a description of the item and associated costs is required, including a description of how it will be used in the project.
5. Appendices (30 page limit)
The following information should be included as appendices to the project description. Only material submitted as a single package will be reviewed. Appendices should be limited to materials that directly support the main body of the proposal (for example, letters of collaboration, resumes, references, lists of data sources, information to support environmental analyses, and maps). Provide résumés of the Principal Investigator for the project and other key personnel critical to the success of the project that address qualifications relevant to conducting the proposed work. Please limit résumés to a maximum of two pages for each key investigator.
6. Data Sharing Plan.
This announcement is not seeking proposals that generate environmental data. Therefore, a Data Management Plan is not required as part of the Proposal.
7. National Environmental Policy Act (NEPA)
The applicants selected for funding must complete questions 1 - 19 of the Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants accessible at https://www.nepa.noaa.gov/docs/NOAA- Grants-Questionnaire-final.pdf to provide detailed information on the activities to be conducted, locations, sites, species and habitat to be affected, possible construction activities, and any environmental concerns that may exist (e.g., the use and disposal of hazardous or toxic chemicals, introduction of non- indigenous species, impacts to endangered and threatened species, aquaculture projects, and impacts to coral reef systems).Questions 20 - 53 are not required with the initial application because NOAA anticipates that most projects funded through this competition would not have impacts related to damage assessment and restoration or fisheries sampling and analysis. See Section VI.B., Administrative and National Policy Requirements, below for additional NEPA information.
Notice of Federal Funding Page 16 of 34
8. Standard Form 424: Application for Federal Assistance (7/2003 version or newer)
Applicants requesting Federal funding in this program must submit a copy of Standard Form SF-424, 'Application for Federal Assistance'. If a hard copy final application is submitted, it must be signed and dated by the organization's authorized representative, and used as the cover page for the final application. An electronic signature and date stamp will automatically be included on SF-424 forms submitted via Grants.gov.
9. Standard Form 424A: Budget Information for Non-construction Programs (if applicable) (include a separate form for each proposed sub-award of $25,000 or more)
Applicants are required to submit a SF-424A Budget Form to summarize the budget for the proposed scope of work. The first column of sections A and B shows the federal funds requested, while the second column of sections A and B shows the non-federal matching funds provided for the project. Total award funding is shown in the final column of section B. Non-federal funding is broken out by source in section C. Forecasted cash needs in Section D should be inclusive of all funding for the project. Both federal and non- federal funds should be expended at a similar rate throughout the course of the project. Section E may be left blank. Section F summarizes the direct charges in line 21 and lists the indirect charges requested; please show the rate used in line 22. Please note that completion of the SF-424A form as described above represents NOAA's preference and may not be consistent with the instructions that accompany the SF-424A form. All budget figures should match the funding requested on the application cover sheet and correspond with the descriptions contained in the project and budget narratives.
All sub-awards should also be accompanied by a separate SF-424A form to fully document the proposed sub-award budget.
10. Standard Form 424B: Assurances for Non-Construction Programs
Applicants are required to submit a signed SF-424B, 'Assurances for Non-Construction Programs' for acquisition proposals.
11. Standard Form 424C: Budget for Construction Programs (if applicable)”
Applicants are required to submit a signed SF424C “Budget for Construction Programs” for construction projects.
Notice of Federal Funding Page 17 of 34
12. Standard Form 424D: Assurances for Non-Construction Programs
Applicants are required to submit a signed SF-424C, 'Assurances for Construction Programs' for construction projects
13. Standard Form CD-511: Certification Regarding Lobbying
Applicants are required to submit a form CD-511, 'Certifications Regarding Lobbying.
14. Standard Form LLL Disclosure of Lobbying Activities (if applicable)
If applicable, applicants may be required to disclose certain lobbying activities described in form SF-LLL.
15. Permits and Approvals
It is the responsibility of the applicant to obtain all necessary federal, state, and local government permits and approvals for the proposed work. Applicants must provide a list of all known permits that will be required to perform the proposed work and an indication of the status of any permits needed (e.g., not yet applied, permit application submitted/pending, permit granted, etc.) or a statement indicating that no permits are necessary. You should include this required element even if permits are not required.
Failure to apply for and/or obtain federal, state, and local permits, approvals, letters of agreement, or failure to provide environmental analyses where necessary (i.e., NEPA environmental assessment) will delay or prevent the award of funds for projects that have been preliminarily selected for funding.
For work proposed within National Marine Sanctuaries, National Parks, National Seashores, and other federally designated managed areas, it is the responsibility of the applicant to request and obtain any necessary permits or letters of agreement from the appropriate government agencies prior to commencement of an award. For applicants who propose to conduct research or monitoring activities that may affect any coral species that are listed under the Endangered Species Act, you will likely need an Endangered Species Act Section 10(a)(1)(A) permit.
16. Negotiated Indirect Cost Rate Agreement (if applicable)
Notice of Federal Funding Page 18 of 34
The proposed budget may include an amount for indirect or Facilities and Administrative costs if the applicant has an established indirect cost rate with the federal government.
Indirect costs are essentially overhead costs for basic operational functions (e.g., utilities, rent, and insurance) that are incurred for common or joint objectives and, therefore, cannot be identified specifically within a particular project. See 2 CFR 200.56-.57 and 200.412- .415.
A copy of the current, approved negotiated indirect cost agreement with the federal government should be included with the final application package, however, if an applicant has not previously established an indirect cost rate with a Federal agency they may choose to negotiate a rate with the Department of Commerce or use the de minimis indirect cost rate of 10% of Modified Total Direct Costs (as allowable under 2 C.F.R. §200.414). Refer to Section IV.F. of this announcement for more information.
C. Unique Entity Identifier and System for Award Management (SAM)
To enable the use of a universal identifier and to enhance the quality of information available to the public as required by the Federal Funding Accountability and Transparency Act, 31 U.S.C. 6101 note, to the extent applicable, any proposal awarded in response to this announcement will be required to use the System for Award Management (SAM), which may be accessed online at https://www.sam.gov/portal/public/SAM/.
Applicants are also required to use the Dun and Bradstreet Universal Numbering System (www.dnb.com) as identified in OMB guidance published at 2 CFR 25, found at http://go.usa.gov/xZZn4. A recipient's DUNS number must correspond with the recipient's information in SAM.Gov.
Applicants should allow a minimum of thirty days to receive a DUNS number and to be registered in SAM.Gov, or to assure that required annual updates are complete. Applicants are strongly encouraged not to wait until the application deadline date to begin the application process through www.grants.gov.
Each applicant, unless excepted under 2 C.F.R. 25.110, is required to be registered in SAM before submitting its application, provide a valid unique entity identifier in its application, and continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or application under consideration by a Federal agency. A Federal agency may not make an award to an applicant until the applicant has complied with all applicable unique entity identifier and SAM requirements, and if the applicant has not fully complied by the time the agency is ready to make an award, the
Notice of Federal Funding Page 19 of 34 agency may determine that the applicant is not qualified to receive and award and my use that determination as a basis for making an award to another applicant.
D. Submission Dates and Times
Applications submitted for funding under this competition must be (1) received and validated by Grants.gov; or (2) postmarked or provided to a delivery service that provides a tracking number and receipt on or before the deadline of 11:59 p.m. Eastern Time, on February 12, 2021.
Applicants should be aware that localized hazardous weather or other situations beyond their control impacting their ability to submit packages before deadlines may not result in changes to the application deadline.
E. Intergovernmental Review
Funding applications submitted under this competition are subject to Executive Order 12372, "Intergovernmental Review of Federal Programs." It is the state agency's responsibility to contact their state's Single Point of Contact (SPOC) to find out about and comply with the state's process under EO 12372. To assist the applicant, the names and addresses of the SPOCs are listed on the Office of Management and Budget's website < https://www.whitehouse.gov/wp-content/uploads/2020/04/SPOC-4-13-20.pdf >.
F. Funding Restrictions
1. Indirect Costs Applicants are permitted to request indirect costs if their organization has an established Negotiated Indirect Cost Rate Agreement with a federal agency that covers the period of the award. Applicants requesting indirect costs should submit a copy of their current and signed indirect cost rate agreement with their application package.
If an award recipient has not previously established an indirect cost rate with any federal agency, the recipient may request to use the de minimus rate described at 2 CFR 200.414, as described in Section IV.B. of this Announcement. Alternatively, the negotiation and approval of a new rate is subject to the procedures required by NOAA DOC. The U.S.
Department of Commerce, Financial Assistance Standard Terms and Conditions require that recipients within 90 days of the award start date, submit to the address listed below documentation (indirect cost proposal, cost allocation plan, etc.) necessary to perform the review.
Lamar Revis, Grants Officer
Notice of Federal Funding Page 20 of 34
NOAA Grants Management Division 1325 East West Highway, 9th Floor Silver Spring, Maryland 20910 Lamar.Revis@noaa.gov
Indirect-cost-rate-agreement documentation is not required for sub-awardees, however indirect cost rates at the negotiated levels should be paid by the primary awardee. Under 2 CFR 200.414 “Indirect (F&A) Costs,” any applicant that has never received a negotiated indirect cost rate may elect to charge a de minimis rate of 10% of modified total direct costs which may be used indefinitely. Costs must be consistently charged as either indirect or direct costs, but may not be double charged or inconsistently charged as both pursuant to 2 CFR 200.403 “Factors affecting allowability of costs.” If chosen, this methodology once elected must be used consistently for all Federal awards until such time as a cooperator chooses to negotiate for a rate, which the non-federal entity may apply to do at any time.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.