3703482_FA_REPORT.pdf

PDF 93 KB Posted

Attached to
F100 Containment Hardware 4th BOAS Spares Buy NSN 2840016028421NZ
Solicitation number
FA8121-23-Q0026
Issued by

About this file

This document is a first article requirements report for the procurement of F100 containment hardware spare parts. The report specifies that the contractor must deliver three first article samples of part number 4081980 for inspection and testing. One sample will be destructively tested while the other two will be part of the production quantity. The contractor must submit a test plan for government approval within 45 days and a test report within 60 days of completing testing. Approved parts will be delivered within 30 days of contract award, while disapproved parts will be returned to the contractor. The Air Force Sustainment Center is procuring the parts through solicitation FA8121-23-Q0026 to support the F100 engine program. Pratt & Whitney, as the prime contractor for the F100, will be exempt from first article testing requirements if selected for award.

View the file

Other files

File Type Posted
DID DI-NDTI-80809B Test Inspection Report.pdf PDF
DID DI NDTI 81307A FA Qual Test Plan.pdf PDF
LPF-QAR-003 Rev E.pdf PDF
3746505_PKGRQMT_REPORT.pdf PDF
MFR_QUALRQMT.pdf PDF
3746506_TRNSPDATA_REPORT.pdf PDF
1494589_UIIEC_REPORT.pdf PDF
3703503_SMW_REPORT.pdf PDF
ITEM_DESC_REPORT.pdf PDF
FA812123Q0026.pdf PDF
LPF-QAR-003.pdf PDF
CDRL1.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

17 MAY 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

77445 / 4081980

4. NSN

2840016028421NZ

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM 1

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

IDENTIFIED IN DRAWING 4081980, SUB-TIER DRAWINGS (IF AN ASSEMBLY), AND SPECIFICATIONS IDENTIFIED THEREIN.

B. The detailed technical requirements for First Article approval tests are contained in

BLOCK 12 OF THIS FORM AND LPF-QAR-003

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 45 days.

D. Contractor's notification to ACO and

PCO

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

AFLCMC/LZPED

FA Monitor DODAAC FA8111

3001 Staff Drive, STE 1AB85A

TINKER AFB, OK 73145-3041

(2) Government written notice of approval / disapproval due 60 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 0 calendar days from date contract.

(2) Notify 0 calendar days prior to shipment.

(3) Delivered to government at

N/A

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 0 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$2,500.0000

Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 3Generated by PRPS using Jasper Reports on 24 Aug 2023

17 MAY 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

X Other Disposition:

See block 12 of this form

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.

b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFLCMC/LPSEA

12. REMARKS

Nguyen, Hanson VNAME: 22 MAY 2023DATE:

5. First Article Quantity is 3 parts:

2 parts will be part of production quantity 1 part will be in addition to production quantity Block 9.B First article test requirements shall be per LPF-QAR-003 and the following:

a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3. Block 5 of LPF-QAR-003.

b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.

c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPFQAR-003.

NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Block 10. Disposition of First Articles:

Destructively tested first article assets will be condemned and disposed of at vendor's facility.

Block 11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a and/or 11.c.

First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.

This is a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.

Block 3: Part Number: _4081980___ Block 9: additional information for part C&E:

C. 1) DD Form 1423 ELIN:

2) Deliver due _____ calendar days from date of contract E. 1) DD Form 1423 ELIN:

2) Due ______ calendar days from date of contract

Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 3Generated by PRPS using Jasper Reports on 24 Aug 2023

17 MAY 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

McCaughan, William L

AFLCMC / LP E A 2

405-736-3946

336-3946

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

McCaughan, William L

AFLCMC / LP E A 2

405-736-3946

336-3946

Page 3 of 3AFMC IMT 260, 20020830, V-3 Version 3Generated by PRPS using Jasper Reports on 24 Aug 2023