This document is a Statement of Work (SOW) for the installation of a new hot water pump at the United States Coast Guard (USCG) Station Gloucester. The SOW details the scope of work, which includes the removal and replacement of the existing Raypak hot water boiler with a new Raypak condensing boiler model RWH1514. The new boiler must meet specific technical requirements, including greater than 80% efficiency and 515k BTU/hr capacity. The contractor must provide all labor, tools, materials, and equipment necessary to install and make the new boiler operational, as well as address any hazardous materials encountered during the work. The period of performance is 30 days after the award date, with work permitted between 0600-1600 hours on weekdays. The contractor must coordinate with the USCG Contracting Officer's Representative (COR) and other contractors that may be on-site during the project. The contractor must also provide submittals for approval prior to ordering materials.

View the file

Other files

File Type Posted
Wage rates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

SCOPE OF WORK FOR

Installation of Hot Water Pump USCG Station Gloucester

PSN 37010PR240002089

UNITED STATES COAST GUARD

FIRST DISTRICT

SECTOR BOSTON

COMMANDING OFFICER

UNITED STATES COAST GUARD

427 Commercial St. Boston MA. 02109

1. Introduction/Background In the winter season it was discovered the Raypak hot water boiler (HWB) in the Multi Missions Building (MMB) started failing due to service life capacity (Installed in 1996). Temporary repairs were made however the licensed contractor reported replacement was needed and continued issues will become more frequent. The Raypak HWB supplies H/W to the all restroom and galley spaces. A new replace-in-kind natural gas mounted hot water pump will need to be installed in the mechanical room at Station Gloucester with new water hook-ups to existing lines. The location, type and capacity of the proposed hot water pump will be discussed below.

2. Scope of Work

1. The contractor (licensed in the state of Massachusetts) shall provide all labor, tools, material, equipment and work lifts necessary to install and make operational, a natural gas fired condensing boiler that is a direct replacement for current unit within the mechanical space of the MMB, 1st floor.

2. The proposed heating pump unit will comply with the following specifications:

a. Install one Raypak boiler model RWH1514 condensing boiler, >80% efficient, 515k Btu/hr units.

b. Power shall be provided to the unit according to manufacturer specifications for gas hookup.

c. All electrical work necessary to meet demands of the new unit and the State of Massachusetts will be meet per the manufacture’s installation instructions.

d. Power shall be provided from the panel in the space supported by the back-up generator, if needed.

e. Natural gas supply lines shall be provided to the unit. Gas shall be disconnected from the existing unit in the mechanical space to serve the new unit.

f. Exhaust duct work will be replaced as needed. Approval through the contracting officer (KO).

3. The existing Raypak unit located in the mechanical room will be removed and disposed of per MASS code.

4. Technical exhibits of the current setup are located below.

3. Safety

1. Unforeseen Hazardous Material

a. If material(s) that may be hazardous to human health upon disturbance are encountered during construction operations, stop that portion of work and notify the KO immediately. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.236-2 Differing Site Conditions. The US Coast Guard does not have test reports for known hazardous materials in the work areas.

4. Period of Performance

1. The overall period of performance is 30 days after the award date.

2. Work may be performed between 0600-1600.

3. Prior to work commencing contractor share provide scheduled start time at least 5 days prior to start.

4. No work shall be allowed on weekends or holidays without prior approval by the contracting officer.

7. Base Access

1. The contractors shall provide an access list of personnel authorized access to the station and work area 48 hours before starting work. All persons musty have/present a valid government issued ID to enter the station, there will be no exceptions. Deliveries of materials and equipment must be received by contractor personnel if delivered to the USCG facility.

8. General

1. Inspection

a. The Government will have a Contracting Officers Represented (COR) on the site. The COR for this contract is Matthew Johnston, Matthew.H.Johnston@uscg.mil. The contractor shall inform the COR of day-to-day activities and plans. At the start of each workday, the contractor shall check in with the COR.

2. Coordination with the Coast Guard and other Contractors

a. Other projects may be in progress during this contract execution. In the event of conflicts, arrangements will be made to coordinate all activities between other contractors and/or Coast Guard personnel. The COR will make every attempt to provide notice of changes at least 24 hours prior to established dates to allow for revisions to the schedule.

b. Areas of the facility not under construction shall remain in operation during construction. Keep all construction activities and personnel clear of facility operations. Coast Guard operations shall take priority if conflicts are present.

3. Operation of Government Facilities

a. The facility may have Government personnel working in certain areas during the execution of the contract. The Coast Guard will keep interference with the contractor’s operation to a minimum. However, the contractor shall take precautions to see that no debris, materials, equipment, or personnel shall endanger the safety of Coast Guard or other personnel working in the area.

4. Methods of Materials Qualifications

a. To demonstrate that the materials to be used in this project conform to these specifications and the Buy American Act, the contractor may pursue any of the following:

i. Certificates of compliance with specification requirements signed by an authorized officer of the manufacturer or processor of approved trade association involved. Such certificates shall show the name and address of the contractor and the name and location of the project. The certificate shall be accompanied by all supporting product data so that adequate evaluation by the Government can be made.

ii. Labeling by the manufacturer on unbroken/unopened containers.

iii. Official marking or labeling by recognized grading organization or national code association indicating compliance.

5. Temporary Utilities and Controls

a. Temporary utilities (e.g., electricity and water) will be provided by the Government at no cost to the contractor. The contractor shall provide and remove at no cost to the Government, all additional equipment and other apparatus necessary to serve the work site. The government makes no guarantee as to quality, quantity or continuity of such services and will not be liable for any effects these services have on contractor’s equipment or the progress schedule.

6. Sanitary Facilities

a. The contractor may utilize sanitary facilities as indicated by the COR. If additional sanitary facilities are needed, the contractor shall provide and remove temporary facilities at no cost to the Government, with location coordinated with the COR/KO. The government makes no guarantee as to quality, quantity or continuity of such services and will not be liable for any effects these services have on contractor’s equipment or the progress schedule.

7. Removals

a. All rubbish and trash created as a result of fulfilling these specifications shall be removed from the site daily at contractor’s expense or as otherwise dictated within this scope. The contractor is responsible for the transfer of material to and from the worksite and/or dumpster area as well as any debris caused in-between.

8. Delivery Storage and Handling

a. The contractor shall deliver all materials to the job site in the manufacturer’s sealed and undamaged containers or wrappings and place in designated storage/lay down areas. Damaged materials shall not be used.

9. Cleanup

a. The contractor shall remove all scraps and debris generated by this operation by the end of each working day. After each job completion/installation/etc. the area shall be cleaned. All debris shall be removed and disposed of in accordance with applicable City, State and Federal Laws.

b. At the completion of the project all spaces must be cleaned and disinfected.

10. Smoking

a. All contractor and subsequent employees shall not smoke cigarettes, cigars, vapes, and/or pipes in any Government Building or within 50ft of thereof. Smoking outside the building will be permitted passed the 50ft mark and/or in designated areas only. The contractor shall be responsible for maintaining a clean environment in the designated smoking areas if used.

11. Protection of Existing Structures, Utilities, Work

a. The contractor shall supply and maintain protective measures against damage to existing structures, utilities, or interruption of any service. Failure to do so may result in cessation of all work. All damages or interruption of utilities serves resulting from failure to take necessary precautions shall be repaired or restored at no additional cost to the Government.

9. Submittals Contractor shall provide submittals as pdf or word documents to the US Coast Guard for approval, prior to ordering any of the materials. The contractor must receive in writing from the US Coast Guard that the submittals are approved prior to ordering the associated materials by the KO.

10. Technical exhibits

6 | Page image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg