36L79723Q0005_1.docx

DOCX document 163 KB Posted

Attached to
3695--60-65 WASHER EXTRACTOR Federal contract opportunity
Solicitation number
36L79723Q0005
Issued by
Department of Veterans Affairs

View the file

Other files for this federal contract opportunity

Other files attached to 3695--60-65 WASHER EXTRACTOR, newest first.
File Type Posted
36L79723Q0005 0001.docx DOCX document
36L79723Q0005 Updated Statement of Work Amendment 0001.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36L79723Q0005

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE:

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

36L79723Q0005 James Curatella 708-786-5136 05-01-2023

12:00PM

CST

36L797 Department of Veterans Affairs OPAL/National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines, IL 60141 X X 333310 1000 Employees N/A X Portland VAMC-Vancouver 1601 E. 4 th Plain Blvd.

Building 2 Vancouver, WA 98661

36L797 Department of Veterans Affairs OPAL/National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines, IL 60141

In accordance with 852.232-72.

60-65 LB Soft-Mount Washer Extractor with Steam Injection

MODEL #: _______________

EA

MANUFACTURER: _______________

TRADE IN OF EXISTING EQUIPMENT "AS-IS" CONDITION

MODEL #: _

EA

MANUFACTURER: _____________

This is a single award, 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. The soft mount washer extractor shall be delivered within 120 days after the effective date of contract. Installation of the washer extractor Shall take place no more than 30 days after the delivery date. The 1-day same day onsite shakedown and onsite training is included in the installation timeframe. Training shall consist of 2 hours for both the operator and maintenance, SUBTOTAL at a minimum. Trainings shall not be conducted concurrently X X X

1 SCAN &

1 HARDCOPY

Table of Contents

SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 CONTRACT ADMINISTRATION DATA3
B.2 STATEMENT OF WORK4
B.3 TECHNICAL SPECIFICATIONS21
B.4 LIST OF DELIVERABLES24
SECTION C - CONTRACT CLAUSES28
C.1 ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES28
C.2 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (JAN 2023)(DEVIATION)29
C.3 VAAR 852.219-76 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING--CERTIFICATE OF COMPLIANCE FOR SUPPLIES AND PRODUCTS (JAN 2023)(DEVIATION)32
C.4 VAAR 852.211-70 EQUIPMENT OPERATION AND MAINTENANCE MANUALS (NOV 2018)35
C.5 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)35
C.6 VAAR 852.247-74 ADVANCE NOTICE OF SHIPMENT (OCT 2018)35
C.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)36
C.8 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2023)37
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS46
SECTION E - SOLICITATION PROVISIONS47
E.1 ADDENDUM to 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2023)47
E.2 52.212-2 EQUIVALENT EVALUATION OF QUOTES50
E.3 52.204-20 PREDECESSOR OF OFFEROR (AUG 2020)51
E.4 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)52
E.5 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION (OCT 2020)55
E.6 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS—REPRESENTATION (NOV 2015)55
E.7 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)56
E.8 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)56
E.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)73

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: James Curatella/Contracting Officer 36L797 Department of Veterans Affairs OPAL/National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines IL 60141

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] 80% of equipment price at delivery; Remaining 20%

of equipment price and 100% installation costs upon final inspection/acceptance.

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

36L79723Q0005

Page 1 of Page 1 of Page 1 of Page 1 of

AMENDMENT NO
DATE

B.2 STATEMENT OF WORK

1. INTRODUCTION

1.1. Background

The Veterans Health Administration (VHA) Textile Care Management (TCM) Program consists of the Textile Care Processing and Textile Management Services (uniform management, textile management and distribution, and patient assistance program) both contribute to the proper distribution, handling, processing and management of textile goods and services within VA medical facilities. The TCM Program, outlines the procedures, reporting requirements, and operating guidelines for TCM and Textile Care Facility Operations within VA medical facilities.

The Department of Veterans Affairs (VA), on behalf of the Veterans Health Administration (VHA), Textile Care Management Program will procure Textile Care Processing Facility laundry equipment.

The mission of the National Acquisition Center (NAC), High Tech Medical Equipment Picture Archiving and Communication Systems and Laundry Division, is to meet the VA’s five core values that underscore the obligations inherent in VA’s mission: Integrity, Commitment, Advocacy, Respect, and Excellence.

1.2. Purpose and Objectives

Textile Care Processing Facilities (TCPFs) are responsible for providing textile processing services, which ensures a consistent supply of bacteriologically clean textiles to support patient treatment programs. VA laundries provide clean laundry for VA patients in a variety of settings.

Textile Care Processing operations are the primary focus of the established directive which outlines the responsibilities, procedures, and processes that:

a. Minimize the infection risks of handling and processing contaminated textiles.

b. Ensure an efficient operation through measurable quality assurance indicators.

c. Identify and require the practice of safety precautions to promote workplace safety.

d. Ensure continuity of service in case of an emergency shutdown.

1.3. Contract Duration

The 60/65 LB washer extractor is to be delivered within 120 calendar days after the effective date of the contract. Delivery dates specified may be adjusted by the CO to coincide with the date the TCPF will be ready to receive installation. The CO will advise the contractor of the new delivery date at least 45 days prior to the original or adjusted delivery date(s). Deliveries, cranes, or haulage will be arranged with the Contracting Officer Representative (COR), as to NOT interfere with day-to-day ancillary VA Medical services such as nutrition/food service, laundry delivery, maintenance routes, etc. If the physical structure must be modified to permit transport of the equipment to the installation site, the contractor shall be fully responsible for the modifications and the structure attached to and for restoring the modifications and the structure attached to their original or better condition.

The 60/65 lb washer extractor shall be delivered within 120 days after the effective award date. Installation of the 60/65 lb washer extractor shall take place no more than 31 days after the delivery date. The 1-day onsite shakedown and onsite training are included in the installation timeframe. Training shall consist of two (2) hours for both operator and maintenance personnel at a minimum. Trainings shall not to be conducted concurrently. The total contract duration is 151 days.

Note: Installation shall be continuous, without interruption, Monday through Friday, excluding Federal holidays, until all installation and testing work has been completed. Installation may take place on the weekends if pre-approval is given by the COR.

1. Site Specific Project Requirements

1.1. The contractor shall furnish the supervision, labor, equipment, tools, safety, rigging, hoisting, supplies and installation services necessary to meet the terms and conditions in accordance with the Statement of Work (SOW).

1.2. This SOW includes removal of trade-in equipment, delivery, installation, and training of the new laundry equipment installed. The equipment and installation shall be conducted in conformance with the SOW and Technical Specifications provided herein. All items provided by the contractor shall be new. The contractor shall not utilize any refurbished equipment, machinery, or parts.

1.3. The 60/65 lb washer extractor is to be located within Building 2, Room B100.

1.4. Within the new design layout of the laundry area, the contractor shall provide new energy-efficient, light-emitting diode (LED) lighting for the new workstation.

New lighting shall comply with VA Lighting Design Guide, January 2022; and shall be 50 foot-candles (minimum) measured 30-inches above floor for workstation task areas, and 35 foot-candles (minimum) for storage areas.

1.5. All valves within the layout of the laundry and equipment shall be ball valves with the appropriate ratings and that are part of the scope of work within this RFQ.

1.6. All old piping, drain piping, ductwork, vents, hangers, water piping, and electrical conductors associated with existing equipment shall be removed.

1.7. All piping, water, steam, condensate and air lines shall be new and originate from the nearest header within 25’ to the new 60/65 lb washer extractor and electrical for the new 60/65 lb washer extractor will originate from the electrical panel identified by the station. All piping, water, conduit, and air lines within this RFQ shall be new.

1.8. All piping headers steam and condensate piping shall be new from the nearest header within 25’ of the new 60/65 lb washer extractor to include new valves.

1.9. All drain piping that is broken, collapsed or inoperable directly connected to the new equipment and below grade shall be replaced.

1.10. All areas of the epoxy floor that is exposed due to the removal or relocation of braces, supports, and equipment shall be replaced with the same material. Information on the existing floor material will be provided after award.

1.11. Waste Material Sorting/Recycling

The contractor shall divert discarded items and other wastes to recycling trash disposal scheduled regularly. Items which need to be sent for recycling or resale unless not feasible include pallets, metals (iron, copper, brass, etc.) cardboard, mercury items, used oil, electronic, rechargeable batteries, wood products and debris.

The contractor shall not store waste materials and items held for recycling. Waste materials shall be stored prior to pick up in a manner that does not allow the items to become a fire, health, environmental or safety hazard or provide harborage for pests and consistent with federal, state and VA (listed in order of preference) laws and regulations governing storage of waste materials. Actions include using drip drains pans, storing liquid wastes or items that rot in closed containers, removing Freon from junked air conditioning, observing Occupational Safety and Health Administration (OSHA) and National Fire Protection Association (NFPA) limits on sizes of piles of lumber or wood products. Dumpsters larger than one and one-half (1 ½) cubic yards in size must be located at least ten (10) feet from exterior walls of buildings.

Painted or treated lumber, paint chips, a potential asbestos containing, or asbestos contaminated items should not be recycled but shall be disposed of properly. No waste material disposal is allowed on Government property.

1.12. The COR designated contractor staging area (TBD after award) will be fully enclosed completely with fencing and fence covering provided by the contractor. The fencing height shall be a minimum of six (6) feet high, with covering, signage and sandbags or plastic temporary fence weights.

1.13. External Equipment/Motor Protection Filters are to be provided for all air intakes to include but not limited to washer extractors, electronic boxes, mechanical equipment, etc., wherever air intakes are located. These are used as a primary pre-filtration defense to help prevent damage and extensive maintenance that large volumes of lint/debris can cause. They are to fit all air intakes, motors etc. and be made of three-dimensional electrostatic media and encased in a 1/8"-3/8" rigid magnetic galvanized steel frame and contain 2 layers of polypropylene media. The media will not shed fibers, absorb moisture, or promote bacterial growth; the filter should be designed for UV protected, and stands up to extreme outdoor or indoor exposure, corrosive chemicals, high velocity air flow, as well as industrial cleaning and maintenance handling.

1.14. The contractor shall supply lock-out/tag-out devices for each piece of equipment. All lock-out/tag-out and Confined Space (CS) locations shall be marked and identified on the machine with instructions on lock-out or CS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, air lines, hydraulic, etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air lines etc.

1.15. The contractor shall supply one (1) lock-out and tag-out kits with the lock-out/tag-out devices for each piece of equipment. The location of the kits shall be in the maintenance shop. All lock-out / tag-out and Permit Required Confined Space (PRCS) locations shall be marked and identified on the machine with instructions on lock-out or PRCS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, air lines, hydraulic etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air etc.

1.16. Number and nomenclature will separately identify all equipment with no less than two (2) inch numbers and letters. Each piece of equipment will be separately identified and labeled. Example: Hot Water Heater 1, Hot Water Storage Tank etc. The equipment shall be made compatible to meet production requirements specified in the technical specifications.

1.17. Contractor bears all responsibility for all new utility connections. All new utility piping that has been added shall be leak tested (electric, air, water, steam and condensate).

1.18. Connections to VA supplied utilities shall be within 25’ to equipment. Penetrations in floors, walls and ceilings not utilized will be filled with existing floor, wall, and ceiling like material. All braces, pipes (steam and condensate, water, electrical, panel to be identified by station within electrical closet B104), conduit and duct work that will not be utilized shall be removed back to the source that pertains to the equipment directly associated with this RFQ.

1.19. The contractor shall not damage equipment frame, door panels, cylinder, cylinder panels, control box on the Government installation. If the Contractor causes damages to any Government property, the Contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the Contractor fails or refuses to make such repair(s) or replacement(s), the Contractor shall be liable for the cost, which may be deducted from the contract price.

1.20. Existing equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.

1.21. Utility Shutdowns

Contractor shall provide Seven (7) calendar days’ advance notice for any planned utility shutdowns and should be indicated on the project schedule.

1.22. The TCPF will be open during the project. The contractor will have access to the TCPF seven days a week from 7:00 am through 4:30pm. On the evening and weekends there will be a TCPF staff member on station to allow entrance and will remain with the contractor while they are on station.

NOTE: With COR approval the contractor may work evenings and/or weekends to accomplish the work required. Work area will be available after 4:30 PM Monday through Friday. All utilities will be restored NLT 5:00 AM Monday through Friday.

VA may be required to work on a weekend due to production needs. COR will communicate to the contractor as needed.

1.23. Badge Requirements

The contractor’s personnel (including subcontractors) anticipated to be on site for more than two (2) days will need to obtain a PIV badge through the VA COR. [Note: PIV badges require at least 30 days to secure so it would be beneficial for the contractor to start this process immediately.]

1.24. Site Visit

The contractor has the responsibility of visiting the site and examining the Vancouver, WA TCPF Building 2, drawings of the installation area. Failure on the part of the contractor to accomplish a site visit and become thoroughly familiar with all conditions that may affect their quote will be at the contractor’s risk. The VA does not guarantee that the drawings of the installation area are 100% accurate.

The Vancouver, WA TCPF (1601 E. 4th Plain Blvd. Vancouver, WA) will accommodate site visits as they are requested. The site visits may be on different dates or all on the same date, depending on if/when requests are made by the contractor. The contractor must request a scheduled date to visit the Vancouver, WA VA TCPF and the COR will determine if the requested date is available. Site visit requests shall be made by contacting:

Mr. Michael Major Office Phone – (360) 696-4061 Ext 33482 Work Cell – (503) 572-0908 Email: Michael.major@va.gov

1.25. Exemption Certificate

The COR will provide a valid certificate of exemption for the State of Washington sales and use tax to the Contractor.

2. General Installation Requirements

2.1. Existing utilities shall be utilized to meet the performance requirements of the technical specifications. Connection points for all equipment shall be from Building 2 to all equipment. When existing service lines require removal, they shall be removed back to the source.

2.2. The contractor shall ensure maximum utilization of existing equipment space to prevent additional plumbing, electrical or other utilities.

2.3. Should additional utilities be required for the equipment, these utilities shall be the responsibility of the contractor. Utilities are electric, steam and condensate, water, and air lines.

2.4. All exposed utility/ductwork/piping systems, control boxes and motors that are exposed to floor traffic shall be appropriately guarded and protected.

2.5. Equipment and materials shall be suitable for installation in available space, arranged for safe, efficient, and convenient operation and maintenance, and if applicable with referenced specifications to include a summary of routine preventative maintenance for each piece of equipment.

2.6. The contractor shall furnish all labor and materials necessary for storage and installation of new equipment. Installation shall include, but is not limited to:

2.6.1. All mounting holes shall be utilized for anchoring equipment. Secure mounts shall be laid out in advance for review and approval by the COR.

2.6.2. Any and all penetrations of walls, ceilings and floors for the installation or removal of electrical conduit, pipes, ductwork, liquid supply lines, communication wiring, etc. shall be sealed with an approved fire-retardant material (not foam) and shall match existing materials on both sides of the penetration.

2.6.3. Contractor is to supply new utility connections (i.e., wall/ceiling mounts, junction boxes, raceways, and conduits).

2.6.4. The contractor shall be responsible for all control wiring including disconnects interconnections, and conduit. Interconnecting consists of all control wiring, all ductwork, interconnecting pieces of equipment and outside vents, all airlines, and all connections from VA supplied utilities.

2.6.5. All installation and/or modifications of utilities and structures, shall match existing materials. No wooden platforms allowed.

2.6.6. All pipes, vents, drains, electrical boxes, ductwork, electrical wiring, and conduit shall be new.

2.6.7. All pipes and ductwork shall be insulated. All conduits and air pipes shall not be painted. All vents and drains shall be painted, (REFER TO THE TABLE BELOW FOR COLORS). All insulation shall be wrapped with white PVC plastic as indicated below. PVC covering shall be a minimum .030” thickness. Flow markings and identification of all pipes, vents, ductwork, and airlines to equipment shall be appropriately marked with a minimum of two (2) inch letters. Pre-made adhesives are acceptable, spray-painting stencils are not acceptable.

Air Piping:
(Only identification/flow markings)
Air Intake Ductwork:
Safety White PVC (Identification and flow markings)
Hot Water Piping:
Safety White PVC (Identification and flow markings)
Tempered Water Piping:
Safety White PVC (Identification and flow markings)
Soft Water:
Safety White PVC (Identification and flow markings)
Vent Pipe:
Painted Flat Black (Identification and flow markings)
Steam and Condensate:
Safety White PVC (Identification and flow markings)
Drain Line:
Painted Flat Black (Identification and flow markings)
Domestic Water:
Safety White PVC (Identification and flow markings)
Outside Exposed Ductwork:
Sealed watertight and weather-proofed to protect from the environment
All Conduits:
Not Painted

2.6.8. Installation of piping, sleeves, inserts, hangers, and equipment shall be in accordance with the installation design drawing and shall be sealed by a licensed professional Architect and Engineer, which were previously approved by the COR. In the installation design drawings, the contractor shall locate drains, piping, sleeves, inserts, hangers, and equipment out of the way of windows, doors, openings, light outlets and other services and utilities. All piping shall be installed to comply with accepted national and local plumbing practices. Mechanical or grooved fittings on mechanical piping are acceptable.

2.6.9. Only new equipment drains shall be cleaned.

2.6.10. If necessary to drill through structural sections, the contractor shall notify the COR immediately. The COR shall work with a structural engineer to determine proper location. The COR shall instruct contractor on structural location to continue work.

2.6.11. Install gauges, thermometers, valves, and other mechanical and electrical devices for ease of reading, operating, and maintaining. Servicing shall not require dismantling of adjacent equipment, electric or pipe work.

2.6.12. Valve Tags - Furnish and install valve tags on all compressed air, steam and condensate and water valves on equipment and connection points. Tags shall be engraved with identification (Steam and condensate, air etc.), black filled identification, numbers, and letters not less than ½ inch high for number designation and not less than ¼ inch for service designation on 19 gauge 1-1/2-inch round brass disc; tags shall be attached with brass hooks or brass chain.

2.6.13. The contractor shall provide two (2) valve lists on typed plastic-coated cards, sized 8-1/2-inch X 11 inch showing tag number, valve type, valve function and location area of valve for each service or system to the COR.

2.6.14. Equipment, motors, piping, ductwork and any other components or materials shall be protected against physical damage from carts with guardrails supplied by the contractor.

2.6.15. Belts, chains, pulleys, couplings, motor shafts, gears or other moving parts shall be fully guarded in accordance with OSHA 1910.219. Guard parts shall be rigid and suitably secured and be readily removable without disassembling the guarded unit.

2.7. A minimum clearance of 36 inches between moving parts and fixed objects and 24 inches between non-moving parts and fixed objects is required in accordance with OSHA 1910.219. All conveyor rollers shall have roll caps installed and guards will be provided under all conveyors.

3. Plumbing Requirements

Plumbing/Steam and Condensate

3.1. Grooved or mechanical fittings are allowed on piping.

3.2. The contractor shall not use cast iron fittings, and components or malleable/ductile fittings anywhere in the high-pressure and medium pressure steam system (15 psi or above). The contractor shall only use cast steel or forged steel fittings and components, in accordance with applicable VA Master Specifications found at https://www.cfm.va.gov/til/spec.asp

3.3. Traps

The contractor shall provide traps on all sanitary branch waste
connections from fixtures or equipment not provided with traps. Exposed brass shall be polished brass chromium plated with nipple and set screw escutcheons. Concealed traps may be rough cast brass. Slip joints are not permitted on sewer side of trap. Traps shall correspond to fittings on cast iron soil pipe or steel pipe respectively, and size shall be as required by connected service or fixture.

3.4. Fittings:

3.4.1. Butt weld fittings are required and shall be wrought steel. ANSI B16.9 (2014 Edition)

3.4.2. Socket Welds are required with threaded fittings and shall be forged steel, ANSI B16.9. (2014 Edition)

3.4.3. Joints shall be welded in accordance with ANSI B31.8. (2014 Edition)

3.5. Fittings for Steel Pipe

3.5.1. 50 mm (2 inches) and Smaller: Screwed or welded.

3.5.1.1. Cast iron fittings or piping is not acceptable for steam and steam condensate piping. Bushing reduction or use of close nipples is not acceptable.

3.5.1.2. Forged steel, socket welding or threaded: ASME B16.11, 13,790 kPa (2000 psig) class with ASME B1.20.1 threads. Use Schedule 80 pipe and fittings for threaded joints. Lubricant or sealant will be oil and graphite, or other compound approved for the intended service.

3.5.1.3. Unions: Forged steel, 13,790 kPa (2000 psig) class or 20,685 kPa (3000 psig) class on piping 50 mm (2 inches) and under.

3.5.1.4. Steam line drip station and strainer quick-couple blowdown hose connection: Straight through, plug and socket, screw or cam locking type for 15 mm (1/2 inch) ID hose. No integral shut-off is required.

3.5.2. 65 mm (2-1/2 inches) and Larger: Welded or flanged joints.

3.5.2.1. Cast iron fittings or piping is not acceptable for steam and steam condensate piping.

3.5.2.2. Butt welding fittings: ASME B16.9 with same wall thickness as connecting piping. Elbows will be long radius type, unless otherwise noted.

3.5.2.3. Welding flanges and bolting: ASME B16.5:

3.5.2.3.1. Steam service: Weld neck or slip-on, raised face, with non-asbestos gasket. Non-asbestos gasket will either be stainless steel spiral wound strip with flexible graphite filler or compressed inorganic fiber with nitrile binder rated for saturated and superheated steam service 400 degrees C (750 degrees F) and 10,342 kPa (1500 psig).

3.5.2.3.2. Flange bolting: Carbon steel machine bolts or studs and nuts, ASTM A307, Grade B.

3.5.3. Back Flow Preventers

3.5.3.1. The contractor shall provide a back flow prevention device at any point in the plumbing system where the potable water supply comes in contact with a potential source of contamination. Device shall be certified by the American Society of Sanitary Engineers (ASSE). Listed below is a partial list of connection to the potable water system which shall be protected against back flow or back siphonage.

3.5.3.2. Atmospheric Vacuum Breaker.

3.5.3.3. Hose bibs and sinks with threaded outlets.

3.5.4. Shock or Water Hammer Arrestors

3.5.4.1. Contractor shall conform to the standards from Plumbing and Drainage institute (PDI) Water Hammer Arrestors (WH) Standard PDI-WH201, American Society of Sanitary Engineers (ASSE) 1010, or American Society of Mechanical Engineer (ANSI) A112.26.1, size as required. Units shall be the standard factory prefabricated products of a manufacturer regularly engaged in the production of such devices.

3.5.4.2. New arrestor assemblies are required to be installed at each hot and cold water inlet point.

3.6. Plumbing Installation

In accordance with the National Standard Plumbing Code, 2021 Edition or latest edition.

3.6.1. Pipe saddles shall be installed on the outside of all insulation and PVC coverings.

3.6.2. Escutcheons shall be installed at all floors, wall and ceiling locations that pipe, conduits, vents and ductwork penetrate.

3.6.3. Pipe shall be round and straight. Cutting shall be done with proper tools. Pipe, except for plastic and glass, shall be reamed to full size after cutting.

3.6.4. All pipe runs shall be laid out to avoid interference with other work.

3.6.5. Install valves with stem in horizontal position whenever possible. All valves shall be easily accessible.

3.6.6. Piping shall conform to the following:

Waste, Storm Water Drain and Vent: Drain to main stack as follows:

Pipe SizeMinimum Pitch
3 inch and smaller1/4 inch to the foot
4 inch and larger1/8 inch to the foot

3.6.7. Exhaust Vent

Extend exhaust vents separately through roof. Sanitary vents shall not connect to exhaust vents.

3.6.8. Insulation Requirements

Unless specified in other sections of the Technical Specifications, cellular glass insulation is required for hot water piping. A minimum 1.5 inches thick for hot water is required. All Insulation on piping and equipment shall be terminated square at items not to be insulated, access openings and nameplates. Cover all exposed raw insulation with sealer or jacket material that does match the color of the insulation.

3.7. Water Piping

3.7.1. Interior domestic water piping shall be copper tube, type L drawn per ASTM B88. Fittings for copper tube must be wrought copper or bronze castings conforming to ANSI B16.18 and B16.22. Unions shall be bronze in accordance with federal specification WW-U-516 with solder or braze joints including adapters for joining screwed pipe to copper tubing.

3.8. Air Piping

3.8.1. Interior to the building and outdoor external air piping shall be copper tube.

3.8.2. All piping shall be installed parallel to walls and column centerlines. Pipe shall be round and straight. Cutting shall be done with proper tools. Except for plastic and glass, pipe shall be reamed to full size after cutting. Copper piping work shall be performed in accordance with best practices requiring accurately cut clean joints and soldering in accordance with the recommended practices for the material and solder employed.

3.8.3. All pipe runs shall be laid out to avoid interference with other work

3.8.4. Install ball valves in horizontal position. All valves shall be easily accessible.

3.8.5. Pipe saddles shall be on the outside of all insulation and PVC coverings.

3.8.6. Pipe escutcheons will be used for all pipe penetrations through walls, floors, and ceilings.

4. Electrical Requirements

Electrical

4.1. Electrical Installation

4.1.1. Conduits, Fittings, and Electrical Wire

4.1.1.1. All electrical installations shall conform to requirements of the National Electrical Code (NEC).

4.1.1.2. Install a new power disconnect box for each piece of equipment.

4.1.1.3. All electrical wire shall be copper, heat resistant grade, thermoplastic insulated. Control wiring shall be (stranded) Thermoplastic High Heat Nylon (THHN)/Thermoplastic Heat and Water-Resistant Nylon (THWN) or equal. Intermediate wall conduit is required. Provide conduit trapeze hangers.

4.1.1.4. All power wiring shall have a minimum conduit size of 3/4-inch in diameter. Color coding of all wiring shall be in accordance with established NFPA 70.

4.1.1.5. All low voltage communication wire used for data management systems, liquid supply systems and intercoms shall be installed in minimum 3/4-inch diameter protective conduit. Wire nuts shall not be used for any connections.

4.1.1.6. All conduits will be compression fittings

4.2. Electrical Wiring Installation

In accordance with NFPA 79 – Electrical Standard for Industrial Machinery 2021 edition:

4.2.1. Wiring shall not be cut, abraded, nor have excessive insulation stripped, and shall be properly and tightly joined at terminals.

4.2.1.1. Wire nuts shall not be used, and solderless connectors shall have insulation grip. Wiring shall have adequate slack to provide strain relief. Wire nuts are only acceptable for electrical installation of motors and terminal boxes.

4.2.1.2. Wiring shall be provided between motors, controllers, timers, pushbuttons, starters, and limit switches installed on or within the equipment and shall be done with materials as applicable, except liquid tight flexible conduit shall be used where required for belt adjustment by moving a motor or for vibration isolation.

4.2.1.3. All writing shall terminate in connection boxes with provisions for connections beyond the machine; each conductor shall be identified by a different color.

4.3. Electrical Identification Installation

In accordance with NFPA 79 – Electrical Standard for Industrial Machinery 2021 edition:

Install nameplates - center on device, cover plate, or enclosure.

4.3.1. Use power source designations defined in the Technical Specifications. Indicate electrical power loads served using designations from electrical schedules and designations from the appropriate trade furnishing the equipment served.

4.3.2. Lettering shall include name of equipment, the specific unit number, and any reference to ON/OFF or other instructions that are applicable.

4.3.3. All labeling shall be on laminated phenolic nameplates and shall be placed on equipment.

4.3.4. Nameplates shall be laminated phenolic with a Blue surface (480 Volts)/Black surface (208 Volts) and white core. Use 1/16-inch thick material for plates up to 2 inch X 4 inch. For larger sizes, use 1/8-inch thick material.

4.3.5. The contractor shall mark all 4-plex outlets and boxes with the electrical panel, circuit, and branch identification.

4.4. Electrical Protection

The contractor shall provide any protective methodology or devices necessary to protect the equipment from:

4.4.1. Damage due to electrical power problems, including brownouts, emergency power interruptions, electrical surges, sags, and electrical storms.

4.4.2. Any equipment located outside the building or on the roof shall have lightning protection installed.

4.4.3. Data loss due to electrical power problems. All equipment electronics shall be protected with a power monitor hook-up point and power monitor.

4.4.4. Existing equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.

4.4.5. Uninterrupted Power Supply (UPS) shall be installed for all equipment supplied. (Minimum 2-hour back-up).

4.5. Electrical Receptacles and Outlets

Receptacles shall be Underwriters Laboratories certified.

4.5.1. Mounting screws, mounting strap and terminal screws shall be brass or a copper alloy metal.

4.5.2. Receptacles shall have provisions for back wiring from four (minimum) separate wiring holes and side wiring from four captivity held binding screws.

4.5.3. Ground Fault Interrupter (GFI) four-plex receptacles shall be single phase, 20 ampere, 120 volts, 2-pole, 3-wire, US National Electrical Manufacturers Association (NEMA) 5-2OR.

4.5.4. The duplex type receptacles shall have break-off feature for two circuit operation. The ungrounded pole of each receptacle shall be provided with a separate terminal.

4.5.5. The receptacle bodies shall be white in color.

4.5.6. Four-plex receptacles with GFI shall be an integral unit suitable for mounting in a standard outlet box.

4.5.7. GFI shall consist of a differential current transformer, solid state sensing circuitry and a circuit interrupter switch and shall be rated for operation on a 160 Hz, 120-volt, 20 ampere branch circuit. The device shall have nominal sensitivity to ground leakage current of five (5) milliamperes and shall function to interrupt the current supply for any value of ground leakage current above five (5) milliamperes on the load side of the device. The device shall have a minimum nominal tripping time of 1/30th of a second.

4.5.8. Receptacles 20, 30 and 50 ampere, 250 volt: Shall be complete with appropriate cord grip plug.

4.6. Weatherproof Receptacles

Shall consist of a duplex receptacle, mounted in box with gasket, weatherproof, cast metal cover plate and cap over each receptacle opening. The cap shall be permanently attached to the cover plate by a spring hinged flap. The weatherproof integrity shall not be affected when heavy duty specification or hospital grade attachment plug caps are inserted. Cover plates on outlet boxes mounted flush in the wall shall be gasket to the wall in a watertight manner.

4.7. Wall Plates

Wall plates for switches and receptacles shall be as specified by the COR. Oversize plates will not be acceptable.

Wall Plate color shall be stainless steel.

4.8. Standard NEMA design, so that products of different manufacturers must be interchangeable.

4.9. For receptacles or switches mounted adjacent to each other, wall plates shall be common for each group of receptacles or switches.

4.10. The contractor shall provide 4-Plex receptacle at each equipment location for mechanic’s use.

4.11. Label Tapes

Use for all junction and outlet boxes or portions of junction boxes with power wiring, communication systems, pull and junction boxes, and conduit installed for future use. For all boxes with power wiring, indicate appropriate panel and circuit number(s) where applicable, etc. Label inside covers in finished areas and outside covers in unfinished areas. Labeling shall be completed using permanent, waterproof, quick drying marking pen.

Label each conductor at origin and destination points and at all junction boxes where two or more feeder or control circuits are present. Identify with branch circuit or feeder number for power and lighting circuits, and with control conductors, number as indicated on schematic and interconnection diagrams or equipment manufacturer's drawings for control wiring. Using cloth, plastic, split sleeve or tubing type wire and cable label markers.

4.12. Dielectric Fittings

Provide dielectric couplings or unions between ferrous and non-ferrous pipe. In addition, Provide threaded dielectric unions for pipe sizes 2 inches and under. For 2-1/2 inches and above, provide copper and steel flanges electrically isolated at gasket and by sleeves at bolts. Fittings on cold water and soft water lines shall be rated for 100 psi, 80 degrees F. Fittings on other services shall be rated for the maximum pressure and temperature conditions of the service. Where copper piping is connected to steel piping, provide dielectric connections.

5. Prefabricated Roof Curbs

Galvanized steel or extruded aluminum 12 inches overall height, continuous welded corner seams, treated wood nailer, 1-1/2 inch thick, 3 lb density rigid mineral fiberboard insulation with metal liner, and built-in curved cantilever strip. Provide raised cantilever strip (recessed mounting flange) to start at the upper surface of the insulation. Curbs shall be constructed for pitched roof or ridge mounting as required to keep top of curb level.

6. Installation Requirements

6.1. Approval for the contractor to proceed with installation shall be contingent upon the acceptance of the design submittals and written notification to proceed with installation from the COR.

The contractor shall be responsible for the determination of, and compliance with, federal, state, and local code requirements, design data, and other factors necessary to design and install the system.

6.2. The contractor shall verify the location of existent utilities and shall specify any additional utilities required or any utilities which require relocation or removal. The contractor shall connect to designated utilities in a manner conforming to a nationally recognized code and at a time satisfactory to minimize or preclude disruption to existing functions or clinical services.

6.3. Cables and connections to the Vancouver, WA VAMC TCPF.

6.4. The contractor shall be responsible for installation, which consists of assembling, positioning, and mounting of all equipment and connections of all cables. The contractor is responsible for furnishing and pulling all interconnecting wiring and cabling, including wiring, and cabling to be pulled through conduit and raceways. It is the responsibility of the contractor to supply and install junction boxes; wall/ceiling mounts and support structures.

6.5. The contractor shall provide certified field engineers or technicians to conduct all necessary tests during installation. Contractor shall provide copies of the certifications upon Government request.

6.6. The contractor shall inform the CO and COR of any problems as they occur in connection with installation, or issues which will affect optimum performance shall be reported prior to the start of installation. Installation shall not proceed under such circumstances until authorized by the CO.

7. Availability of Parts and Service

The Original Equipment Manufacturer shall guarantee the contractor availability of servicing and replacement parts for a period of ten (10) years to the government for the laundry equipment being procured under the resultant contract.

8. Incorporation of Documents

The following documents are hereby incorporated by reference and made a part of this RFQ.

The equipment and installation supplies shall conform to the following standards:

· Air Moving and Conditioning Association, Inc. (AMCA) Standards, 2009 Edition.

· American National Standards Institute (ANSI), 2021 Edition. Z8.1-2006 Safety Requirements for Commercial Laundry and Dry Cleaning Operations.

· FEMP: Federal Energy Management Program (Energy efficient product rating).

· HVAC Duct Construction Standards-Metal & Flexible.

· National Electrical Manufacturers Association (NEMA), 2021 Edition.

· National Fire Protection Association (NFPA), 2021 Edition. ALL NFPA Standards and codes. National Electrical Code (NEC), 2020 Edition.

· National Standard Plumbing Code, 2021 Edition.

· Occupational Safety and Health Administration (OSHA) 29 CFR 1910.

· Sheet Metal and Air Conditioning Contractors National Association (SMACNA), 2021 Edition.

· Sheet Metal Contractors National Association Inc. Publication, 2019 Edition.

· Underwriters Laboratories Standards, 2022 Edition.

· City, County, State, Federal, VA and National Environmental, Fire and Safety Regulations/Standards.

B.3 TECHNICAL SPECIFICATIONS

Item 0001. 60/65 LB Soft Mount Washer Extractor with Steam Injection:

Furnish and install one (1) new, front-loading soft-mount washer extractor with steam injection. The washer extractor shall be of the shell and cylinder type.

A. The washer extractor shall be designed for hand loading and unloading with a minimum amount of effort from employees. The washer extractor will not be used to meet production requirements. However, it will be interfaced with an existing liquid supply injection system.

1. Furnish and install new 480-volt power disconnect boxes for the new washer extractor. Install a red warning indicator and a lock-on device on the handle of the branch circuit breaker for the power supply circuit for the washer extractor to within six (6) feet of the floor. Electrical characteristics - 480 volts, 3 phase, 60 cycles.

2. Washer extractor shall have thermostatically controlled automatic steam injection.

3. Utility connections shall be derived from the water header on the clean side of the laundry. Install all new drain piping between the washer and extend to the washer trench.

4. Regardless of manufacturer, a Class 1 - Liquid supply system will be interfaced for the dispensing of eight (8) types of chemicals followed by a fresh water flush capability.

5. A door shall be provided with a window of heat-treated glass capable of resisting high mechanical and thermal shock.

6. Automatic thermal overflow cool down required.

7. Pipe and connections are to be furnished for utilizing a liquid supply system.

8. Automatic cycle control is required to be of the color touch screen/ microprocessor type. The control shall utilize a solid-state timing system.

9. Manual dry supply tanks with automatic fresh water flush.

10. Washer extractor shall be equipped with an illuminating when activated emergency stop button. Normal stop and emergency stop buttons shall be colored red. A yellow background with legend shall also be installed with each emergency stop button.

11. Steam injection is required.

12. Provide and install 4-Plex (120v) Ground Fault Interrupter (GFI) receptacles at each equipment location for mechanics use.

13. Washer extractor shall have a color touch screen controls & information systems that incorporate automatic/manual machine operation, self-testing, fault display and built-in diagnostics and automatic cycle control type. Balancing of load prior to extraction is required. Washer extractor shall be capable of being programmed for wash loads.

14. Washer extractor shall be vented to the outside atmosphere

15. An hour meter shall be installed on the washer extractor that will show actual hours of run time. of the washer extractor.

16. Washer extractor shall have a beacon LED rotary light (colored Amber) identifying end of wash cycle for the hearing impaired. Washer shall also have an audible alarm to indicate when washing cycle has ended.

17. A blow-down device will be installed within the washer location. A minimum (1 each) and shall be capable of reaching around all washers. This device(s) shall include:

a.A gauged air pressure regulator, with quick disconnect, capable of regulating air pressure from 0 PSI to 30 PSI.
b.Minimum 50 foot length of heavy duty, reinforced non-kink air hose on an automatic retractable reel.
c.Trigger operated air nozzle with any necessary extensions for reaching hard to reach areas.
d.Locations of the blow down device(s) shall be depicted on drawings.

18. Each wash program shall be listed on a printed card or paper showing the items wash program. Example – Program 1 – Micro Mops – 130 degrees – Wash Time 35 min – Extract Time 8 minutes on a laminated card or paper and attached to the washer for the employees use.

B. Wash System Controls:

Wash System Controls: Furnish and install wash system controls on the new washer extractor as part of one central control or connect to existing wash system control being utilized if not then the system will consist of the below:

System shall have one (1) remote system that shall be capable of programming wash and chemical formulas and reviewing the systems operations from the textile care manager’s office and shall also have a color laser printer for printing all activities and reports, a wireless mouse and wireless keyboard. The monitor minimum of 32” for the system shall be wall mounted.

1. The central control systems shall be located in the office of the Textile Care Manager office. All controls shall be solid state of the matrix variety.

2. The central control system shall be capable of monitoring and managing all aspects of wash system production and non-production machines. The washer extractors shall be connected to the central wash system, i.e., chemical formulas and water consumption.

3. The system shall incorporate all options and programs offered with the manufacturer’s wash systems controls and shall allow for both visual and actual print-out of data. A color LaserJet printer shall also be provided to print reports and data.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .