36H79720R0006 0003.docx

DOCX document 29 KB Posted

Attached to
3695--Tuscaloosa, AL Textile Laundry Facility
Solicitation number
36H79720R0006
Issued by

About this file

This document contains an amendment to a solicitation for laundry equipment replacement at the VA Medical Center in Tuscaloosa, Alabama. The amendment provides responses to questions about replacing two pieces of laundry equipment: a 400/500 pound gas heated drying and conditioning tumbler with external lint collection and secondary lint collection system, and a semi-automatic cart washer/dryer. Key details include clarification that existing utilities can be reused, the dryer's internal lint collection may be sufficient so an external system is not required if performance standards are met, and modifications to concrete floors or electrical systems may not be needed if existing infrastructure is adequate. The response deadline was extended to September 3, 2020.

View the file

Other files

File Type Posted
36H79720R0006 0002.docx DOCX document
revised 36H79720R0006_2.docx DOCX document
36H79720R0006 0001.docx DOCX document
36H79720R0006_2.docx DOCX document
ACH Form.pdf PDF
PAST PERFORMANCE.pdf PDF
TECHNICAL PERFORMANCE SPECIFICATIONS TUSCALOOSA.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-20-2020 679-B02002 679-B02004 Y Department of Veterans Affairs OPAL/ National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines IL 60141

To all Offerors/Bidders

36H79720R0006 07-31-2020

X X X

9-3-2020 2PM CST

The purpose of this amendment is to provide responses to questions on Solicitation 36H79720R0006 for Buffalo, NY.

Please see attached.

This Solicitation has been extended to 9-3-2020 2PM.

All other terms and conditions within the Solicitaion remain unchanged.

Latasha Messer Senior Contract Specialist

REQUEST FOR INFORMATION – TUSCALOOSA, ALABAMA 36H79720R0006

B3 Statement of Work, page 10, General Installation Requirements Item 1 - Existing utilities shall be utilized to meet the performance requirements of this specification. Connection points for air, gas, water, steam, condensate and electrical shall be new. Electrical service shall be new from the existing electrical panel to the new equipment.

Q1. Can the gas piping servicing the current dryer be replaced up to the existing isolation valve or will a new isolation valve and header piping be required? If new header piping is required how far will the existing piping need to be replaced?

Answer: In Section B3 Statement of Work, page 10, General Installation Requirements, item 1 is changed to: Existing utilities shall be utilized to meet the performance requirements of this specification. Connection points for air, gas, water, steam, condensate and electrical shall be new. Electrical service shall be new from the existing electrical panel to the new equipment. The isolation valve is to be new. Existing header does not need to be replaced, piping from new equipment to existing header is to be new.

Technical Performance Specifications – Item #1 – Waste Managed, External Automated lint Collection System, page 4 #1 - Furnish and install one (1) each secondary external automatic dry type lint collector. The lint collector shall recover all residual lint after the primary lint collector. The lint collector shall be constructed of rust resistant, weatherproof, heavy gauge stainless steel or fire-retardant compound. The outside of the lint collector shall be equipped for suspension outdoors. The lint collection area shall be accessible for service and internally accessible for service and replacement of parts through an inspection door.

Q2. If the provided dryer is equipped with an internal automatic lint collection system (with 85% lint recovery capability) can that be substituted for the primary external lint collection system and the first external automatic lint collector (as detailed in the technical specifications) become the secondary lint collection system? This is how the site is currently configured.

Answer: #1 is changed to ADD: If the dryer has an internal lint collection system, it may be acceptable. The system is still required to be hooked up to an external secondary lint collection system outside the facility where the old one is currently located.

Technical Performance Specifications – Item #1 – Waste Managed, External Automated lint Collection System, page 4, #8 #8 - The existing Clean Cycle lint collector located outside of the laundry building shall be utilized as a secondary lint collector.

Q3. If an internal lint collector is not acceptable (per RFI #1) then is the vendor to furnish and install one (1) each secondary external automatic dry type lint collector or reuse the existing Clean Cycle lint collector?

Answer: #8 is changed to ADD: If an internal lint collector is not acceptable, then a new secondary external automatic dry type lint collector is to be installed.

Technical Performance Specifications – Item #1 – 400/500 Pound Gas Heated Drying and Conditioning Tumbler with External Lint Collection and Secondary Lint Collector, page 2, #12 #12 - A blow-down device will be installed within the dryer location. (A minimum 1 each) and shall be capable of reaching around the dryer.

Q4. A blow down device already exists in this location. Will this solicitation require the existing blow down device to be removed and replaced with a new blow down device that meets the technical specifications of Item #12?

Answer: #12 is changed to ADD: If a blow-down device already exists in this location, no new blow down device is required.

Technical Performance Specifications – Item #1 – 400/500 Pound Gas Heated Drying and Conditioning Tumbler with External Lint Collection and Secondary Lint Collector, page 3, #28 #28 - Provide 4-Plex GFI receptacle at the dryer location for mechanics use.

Q5. There is an existing 4-Plex GFI receptable already installed at the existing dryer location. Does the solicitation require that this 4-Plex GFI outlet be replaced with a new outlet, wiring, conduit and breaker? If the existing outlet is not to be replaced can the new 4-Plex GFI outlet be installed in the same location as the existing 4-Plex GFI outlet?

Answer: #28 is changed to ADD: If there is an existing 4-Plex GFI receptacle already installed at the existing dryer location, no new GFI is required.

Technical Performance Specifications – Item #1 – 400/500 Pound Gas Heated Drying and Conditioning Tumbler with External Lint Collection and Secondary Lint Collector, page 30, #30.

#30 - An I-beam or other acceptable means with a ½ ton electric hoist or other device shall be supplied and installed to remove dryer motors for maintenance.

Q6. If there are no motors installed on top of the new dryer, is it still a requirement to provide the I-Beam or lifting device to remove the dryer motors?

Answer: #30 is changed to ADD: If the motor for the dryer is located at floor level, then there does not need to be an I-beam and hoist.

Technical Performance Specifications – Item #2 – Semi Automatic Cart Washer/Dryer, page 7, #27 #27 - New unit shall be flush mounted with existing floor and any modification to the pit will be the successful contractor’s responsibility.

Q7. Is it acceptable, if the new cart washer is installed on grade with the finished concrete floor with a ramp on the loading and unloading side of the cart washer?

Answer: #27 is changed to ADD: The new Cart Washer can be on grade and ramps for loading and unloading.

Technical Performance Specifications – Item #2 – Semi Automatic Cart Washer/Dryer – Section C. Safety Features (Wash Design), page, 8, #9 #9 - A four (4) foot wide by twelve (12) foot long, 1 ½ inch deep concrete section shall be cut out of the floor and a 1 ½ inch deep fiberglass grate shall be installed on the unloading side of the cart washer to capture residual water from the washed carts when exiting the cart washer.

Q8. Please validate the overall concrete floor thickness in the area where the fiberglass grating is to be installed. Are there any in slab conduits or utilities in this area that will need to be relocated or accounted for during the installation of this fiberglass grating? Has the VA conducted an engineering study to determine saw cutting will not adversely impact the building’s structural integrity? If so, please provide a copy. If engineering has not yet been done, it will cost in excess of $20,000, should bidders include this cost in their proposals or will the VA commission this work?

Answer: #9 is changed to ADD: The slab thickness in the laundry is 5”. Cutting a trough into the slab should not affect the structural integrity of the slab. Incoming utilities are not directly underneath the cut area. The station engineering has not conducted an engineering study to determine the buildings structural from the saw cutting. That will be the responsibility of the successful contractor.