36H79718R0022-0003000.docx
DOCX document 21 KB Posted
- Attached to
- 36H79718R0022- CANANDAIGUA, NY LAUNDRY EQUIPMENT
- Solicitation number
- 36H79718R0022
About this file
36H79718R0022 0003 36H79718R0022 0003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36H79719C0015-000.docx | DOCX document | |
| 36H79718R0022-0002000.docx | DOCX document | |
| 36H79718R0022-0001000.docx | DOCX document | |
| 36H79718R0022-017.docx | DOCX document | |
| 36H79718R0022-019.pdf | ||
| 36H79718R0022-018.pdf | ||
| 36H79718R0022-016.docx | DOCX document | |
| 36H79718R0022-002.docx | DOCX document | |
| 36H79718R0022-003.docx | DOCX document | |
| 36H79718R0022-002.docx | DOCX document | |
| 36H79718R0022-003.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 05-31-2019 528-B82024 Department of Veterans Affairs OPAL, NAC, NCS, HTME Contracts P.O. Box 76 1st Ave., One Block North of Cermak Rd.
Hines
IL
60141 Department of Veterans Affairs OPAL/ National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines
IL
60141 To all Offerors/Bidders
36H79718R0022
X X
X The purpose of this amendment is to provide the Request for Information (RFI) Clarifications to all offerors.
The response date remain unchanged.
All other terms and conditions remain unchanged.
Donnie Reeves Contracting Officer
CONTINUATION RFI#2
General Questions/Statement of Work:
What are the working hours of the facility?
Answer-7:00am-3:30pm
With regards to installation requirements for the new piping, where does the mechanical room end? Does the process piping need to be run as new through the entire crawl space up to the floor penetrations beneath the washers?
Answer-Due to the age of the existing, the process piping will require replacement to provide proper flows/pressures. It is recommended that the contractor verify the sizes and lengths of said systems through site visit.
Item #1 - Water System Questions:
D.1 The specification referenced normal building grain hardness as specified but does not specify the hardness. Can a hardness value be provided so that the softener can be properly designed?
Answer-The hardness in PPM is 130, the grains are 7.59
E.2 The specification call for a 50-gallon cast iron condensate receiver tank and duplex pump. Can the VA verify that this is for the water system only and is not intended to be a replacement for the main condensate return pump in the mechanical room?
Answer-The 50-gallon cast iron condensate receiver tank and duplex pump are being procured to replace existing tank.
F.1 Should the remote status panel be located in the same place as the existing panel near the barrier wall on the clean side of the laundry?
Answer-Design layout is part of the contractor’s proposal; the placing of the remote status panel must be in the laundry plant.
Item #2 – Energy Monitoring System Questions:
Will the energy monitoring system need to require the sewer for the entire building or just the washers? Answer-Washers
Is a schematic acceptable for the energy monitoring system controls wiring as part of the 45 day submittal drawings or is a full drawing required?
Answer- (B.4 List of Deliverables) The drawings shall be ¼ inch scale drawings of layout of the textile care processing equipment offered. Drawings shall include adjacent equipment to show that equipment offered will fit into the location or space available.
Item #3 – Ironer Questions:
Are new roof penetrations for ductwork acceptable at this location?
Answer- New roof penetrations are allowed with proper flashing and caps on systems at and above the roof line.
Is ethernet required for the ironer?
Answer- Ethernet is required for the ironer.
How many spill response cabinets will be required for the thermal ironer?
Answer- Provide and install 2 each heavy duty wall mounted cabinet with spill response kit consisting of a minimum spill socks, pads, three pair gloves three pairs safety goggles disposable bags and ties per kit.
Feeder 1. Would a production rate of 900 pieces/hour be acceptable to the VA? This represents an 11% reduction to the specified rate of 1,020 pieces/hour.
Answer-The production rate of 900 will be acceptable.
Feeder 20. Are Green and Red belts acceptable rather than Green and Blue?
Answer- Provide and install 2 each heavy-duty wall mounted cabinet with spill response kit consisting of a minimum spill socks, pads, three pair gloves three pairs safety goggles disposable bags and ties per kit.
Ironer 2.iv. The specification calls for all pipe connections to be accessible from the side of the ironer. Due to the design of the deep-chest ironer, there are a few connections which are not accessible from the side. Will this be acceptable? If not, what will the testing protocol consist of during inspection to verify the successful bidder meets this requirement?
Answer- Yes
Ironer 2.vii. The specification calls for 2 pre-set contact pressures activated by program. Braun’s ironer uses a deep chest and torsion bar system to ensure equal down pressure across the roll and this functionality makes the need for programmable pressure moot. The down pressure is manually adjustable on the ironer as the pads wear out. Is this system acceptable to the VA?
Answer-Yes
Ironer 2.ix. The specification calls for bearing on both ends of the roll shafts. Is a roll with bearings on one end and a gearbox on the other end acceptable to the VA?
Answer- Yes
Ironer 2.xvi. The specification calls for 4” of insulation around the chest and 2” on the side frame. Would a deep-chest ironer with fully-insulated side shields (on the edges of the roll as opposed to the outside of the ironer) and an insulated canopy with an R-Value of R-5.7 be considered acceptable even though it does not meet the exact thickness? Flex chest ironers typically require larger amounts of insulation that are not required on a deep-chest ironer. If this is not acceptable, what is the required insulating R-Value of the 2” and 4” insulation? Additionally, what will the testing protocol consist of during inspection to verify the successful bidder meets this requirement?
Answer- Insulation in accordance with offered Manufactures equipment’s and recommendations.
Ironer 11-16. Would an ironer which incorporates the temperature readouts into the color, touch-screen PLC control as opposed to separate ½” LED displays be considered?
Answer- Yes
Ironer 12-13. These items are only applicable to steam ironers and are not applicable to thermal fluid heated ironers.
Answer- If not applicable to thermal fluid ironers then they will not apply.
Does the VA want to maintain their own database and software for this project?
Answer-The vendor will maintain the software through the warranty period, after that period as elapsed VA staff at the medical center will maintain the software.
The minimum functional specifications of this project state that the system is to have a local appliance that graphically displays the data via ArcNet of Web Server but it does not describe who if responsible for maintaining it. Typically, customers prefer that the OEM manage the database and software through a maintenance contract as it reduces upfront software licensing costs and overall maintenance responsibilities (data correction, report configuration, system upgrades, etc….).
Answer-The manufacturer will be required to provide this service through the warranty period at time of acceptance. After that period elapses, the Medical center will determine if we would like a service agreement with the vendor.
Can the VA verify if they would like to pursue the maintenance contract option?
Answer-The VA does not want to pursue a maintenance contract option for 36H79718R002 at present. After the warranty period the contractor can discuss a maintenance contract with hospital staff.
What are the units of measure for each metering point?
Answer- (For gas - ccf, water-gpm, compressed air-psi, and sewer we assume the most likely measurement being total volumetric flow but electricity-kWh has many different metrics.)
Can the VA verify what metrics/units of measure they require for each utility?
Answer- See above
Correction to RFI #1 Q2 – What are the working hours the successful bidder will be allowed to perform installation activity?
Answer-Laundry plant working hours are M-F 7:00am to 3:30pm. Work can be done at any time by the contractor, but we cannot interrupt plant services. We will still need to process laundry and the plant will need to be fully operational during working hours (M-F 7:00am to 3:30pm), except for us being able to process linen through the ironer. We will also need to be able to use our washers during work hours (M-F 7:00am to 3:30pm) so we will need full access to water during work hours.