36E77619R0086-015.pdf

PDF 19 MB Posted

Attached to
Replace Hemodialysis Unit Federal contract opportunity
Solicitation number
36E77619R0086
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77619R0086 Attachment 14 - Electrical.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Hemodialysis Unit, newest first.
File Type Posted
36E77619R0086-0002002.pdf PDF
36E77619R0086-0002000.docx DOCX document
36E77619R0086-0002001.pdf PDF
36E77619R0086-0002002.pdf PDF
36E77619R0086-0002001.pdf PDF
36E77619R0086-0001001.pdf PDF
36E77619R0086-0001000.docx DOCX document
36E77619R0086-0001001.pdf PDF
36E77619R0086-0001000.docx DOCX document
36E77619R0086-017.pdf PDF
36E77619R0086-004.pdf PDF
36E77619R0086-021.pdf PDF
36E77619R0086-019.docx DOCX document
36E77619R0086-009.pdf PDF
36E77619R0086-013.pdf PDF
36E77619R0086-008.pdf PDF
36E77619R0086-011.pdf PDF
36E77619R0086-014.pdf PDF
36E77619R0086-018.pdf PDF
36E77619R0086-003.pdf PDF
36E77619R0086-001.docx DOCX document
36E77619R0086-016.pdf PDF
36E77619R0086-005.pdf PDF
36E77619R0086-002.pdf PDF
36E77619R0086-006.pdf PDF
36E77619R0086-015.pdf PDF
36E77619R0086-007.pdf PDF
36E77619R0086-010.pdf PDF
36E77619R0086-012.pdf PDF
36E77619R0086-019.docx DOCX document
36E77619R0086-020.docx DOCX document
36E77619R0086-009.pdf PDF
36E77619R0086-004.pdf PDF
36E77619R0086-006.pdf PDF
36E77619R0086-014.pdf PDF
36E77619R0086-013.pdf PDF
36E77619R0086-001.docx DOCX document
36E77619R0086-018.pdf PDF
36E77619R0086-005.pdf PDF
36E77619R0086-010.pdf PDF
36E77619R0086-003.pdf PDF
36E77619R0086-007.pdf PDF
36E77619R0086-002.pdf PDF
36E77619R0086-011.pdf PDF
36E77619R0086-016.pdf PDF
36E77619R0086-017.pdf PDF
36E77619R0086-021.pdf PDF
36E77619R0086-008.pdf PDF
36E77619R0086-000.docx DOCX document
36E77619R0086-000.docx DOCX document
Show all 50

Replace Hemodialysis Unit has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phase

CONFORMED CONSTRUCTION

DOCUMENTS

G

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

EXISTING FIRE

PUMP BLDG. 27

I E D

X

Y

E-1.3

E-1.5

E-F

E-E

E-1

E-1.6

AA

X.5

DEMOLITION

SCOPE

RELOCATE EXISTING EXHAUST FAN MOUNTED ON

ROOF. COORDIANTE EXACT LOCATION WITH HVAC

CONTRACTOR PRIOR TO WORK.

RELOCATE EXISTING MECHANICAL LIFT. INTERCEPT AND

EXTEND EXISTING CONDUCTORS AS NECESSARY.

COORDIANTE EXACT LOCATION WITH ARCHITECT

CONTRACTOR PRIOR TO WORK.

DISCONNECT EXISTING 60A PANELBOARD

LOCATED IN THE TEMPORARY TRAILER.

ABANDON AND SEAL EXISTING CONDUIT.

COORDINATE WITH VA HOSPITAL PRIOR TO

WORK FOR FURTHER INFORMATION.

ETD

ETD

ETDETD

ETD ETD

EXISTING TRAILER

INTERCEPT AND ISOLATE

EXISTING AUTODOOR CIRCUIT TO

CONNECT NEW AUTODOOR.

ETD

ETD

DEMOLISH EXISTING

EXHAUST FAN MOUNTED

ON THE ROOF

DEMOLITION

SCOPE

RELOCATE EXISTING LIGHT FIXTURE

PNL TRA-1

RELOCATE EXISTING MECHANICAL

LIFT IF NECESSARY. COORDINATE

WITH ARCHITECT PRIOR TO WORK.

EXIST ENL

EXIST

EXIST

ENL

ENL

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :4

A

M

ES.101

ELECTRICAL POWER AND LIGHTING

DEMOLITION LEVEL 1

11/09/2018 PC PF

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 1 - Power and Lighting Demo

DEMOLITION PLAN NOTES:

1. REFER TO ELECTRICAL LEGEND DRAWING FOR SYMBOLS AND

GENERAL NOTES.

Number: Revisions: Date:

Phase

NEW

OPENING

7' - 0"

NEW

OPENING

9' - 10"

NEW

OPENING

8' - 1 1/2"

1"

) V

.I.

F

20' - 1 1/4" (+/_) V.I.F

DEMOLITON SCOPE

PANEL FK

SDP4

FC-1

FC

ETR

ETR

ETR

ETD

ETR

ETR

2CRA

2LSA

ETR

ETR

ETR

ETR

ETR

ETR

CRITICAL BUS

LIFE SAFETY BUS

480/277V NORMAL BUS

208/120V NORMAL BUS

ETR

ETR

NP-012A4

NP-012A3

NP-012A2

NP-012A1

DFGI

E

H

E1

5.5

E5

6.1

F5

8.1

ELECTRICAL CONTRACTOR TO VERIFY THAT NO

EXISTING CIRCUITS IN PANEL FK TO BE

DEMOLISHED ARE REQUIRED TO BE

MAINTAINED.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :4

A

M

ES.102

ELECTRICAL POWER AND LIGHTING

DEMOLITION LEVEL 2

11/09/2018 PC PF

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 2 - Power and Lighting Demo

DEMOLITION PLAN NOTES:

1. REFER TO ELECTRICAL LEGEND DRAWING FOR SYMBOLS AND

GENERAL NOTES.

Number: Revisions: Date:

Phase

E-1

2'

1/

4"

C

LE

AR

8' - 6"

FAM

ILY

W

AITINGS202 CONNECTOR

CORRIDOR

2-DC-1

CORRIDOR

2-DC-1A

♦♦S

♦♦S

♦♦S

♦♦S

♦♦S

♦♦S

♦♦S

♦♦S

♦♦S

♦♦S

♦♦S

♦♦S

♦S

♦S

♦S

♦S

♦S

♦S

♦S

♦S

S

S

S

S

S

S

S

S

G

H

4.5

F5

F E6

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

EXIST. MAIL OUT

EXIST. PHARM.

RECEIVING AREA

EXIST. MAIL

SUPPLIES

EXIST. CLEAN

STORAGE

121A

EXIST. RESEARCH

DRUG STORAGE

EXISTING FIRE

PUMP BLDG. 27

I E D

X

Y

AA

PHARMACY

MANAGER

FILLING AND

ASSEMBLY

EXIST. SOUTH

STAIR

X.5

PL1

PL1

PL1

PL1 PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1 PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

PL1

NP-504-012S- 12

NP-504-012S- 10

LS-501-012S- 2

SEE NOTE 10 (TYPICAL)

SLV

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :5

A

M

ES.201

ELECTRICAL LIGHTING LEVEL 1

11/09/2018 PC PF

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 1 - Lighting (Plan View)

LIGHTING PLAN NOTES:

1. REFER TO ELECTRICAL LEGEND DRAWING FOR SYMBOLS AND

GENERAL NOTES.

2. REFER TO ARCHITECTURAL ELEVATIONS FOR COORDINATION OF

WALL MOUNTED DEVICES AND FIXTURE LOCATIONS.

3. REFER TO ARCHITECTURAL FLOOR PLANS FOR EQUIPMENT

LOCATION

4. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR

COORDINATION OF FIXTURE LOCATIONS AND ORIENTATION.

5. CIRCUIT NUMBERS ARE SHOWN FOR DESCRIPTIVE PURPOSES

ONLY. EXACT NUMBERS SHALL BE DETERMINED IN FIELD.

ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION

AND EXISTING SPARE CAPACITY OF ALL PANELBOARDS AND

REPORT OF ANY DISCREPANCIES.

6. PROVIDE FOR EACH EXISTING PANELBOARD AN UPDATED TYPED

WRITTEN CIRCUIT DIRECTORY INDICATING TYPE OF LOADS (I.E.

LIGHTING, RECEPTACLES ETC.).

7. THE ELECTRICAL CONTRACTOR SHALL NOTIFY THE ARCHITECT

OF ANY ADDITIONAL REQUIRED ELECTRICAL WORK THAT NEEDS TO

BE PERFORMED OUTSIDE THE AREAS DESIGNATED AS LIMIT OF

WORK.

8. FOR ELECTRIC PANEL LOCATIONS, REFER TO RESPECTIVE

POWER FLOOR PLAN.

9. MEASURE TOTAL EXISTING CIRCUIT LOAD AMPACITY PRIOR

CONNECTING TO EXISTING LIGHTING CIRCUITS.

10. PROVIDE EMERGENCY BY-PASS RELAY FOR ALL LIFE SAFETY

LIGHT FIXTURES MEANS OF EGREES.

Number: Revisions: Date:

Phase

H

4.5

TEAM SPACE

TREATMENT #7

214I

BARI. TREATMENT

#2

214H

BARI. TREATMENT

#1

214G

TREATMENT #1

214A

TREATMENT #2

214B

TREATMENT #3

214C

TREATMENT #4

214D

TREATMENT #5

214E

TREATMENT #6

214F

TREATMENT #8

214J

TREATMENT #9

214K

TREATMENT #10

214L

TREATMENT #11

214M

ISO TREATMENT #1

PRIVATE

TREATMENT #1

EXIST.

SOUTH STAIR

EXIST.

EAST STAIR

EXIST.

NORTH STAIR

OFFICE, MD

OFFICE, DIRECTOR

MD.

OFFICE, PD

TRAINING

OFFICE, SOCIAL

WORKER

CORRIDOR A

C200A

CLEAN

UTILITY/SUPPLY

EXAM ROOM

STAFF CORRIDOR

C200D

STAFF LOCKER

EMERG. ELECT.

TREATMENT ROOM

CORRIDOR

SOILED UTILITY

CORRIDOR C

C200C

WATER TREATMENT

STORAGE

F5

HT/WT

STERILE SUPPLY

EQUIPMENT

STORAGE

STAFF TLT

STAFF TLT

PATIENT LOCKERS

OFFICE, DIETITIAN

CONFERENCE

STAFF LOUNGE

F E6

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

ELECT.

EQUIPMENT

PROCESSING,

CLEAN PREP/STORE

EXIST. VESTIBULE

CORRIDOR B

C200B-2

OFFICE, FELLOW /

RN PD

NOURISHMENT

OFFICE, NURSE

MGR.

EQUIPMENT

PROCESSING,

SOILED

DIALYSATE PREP

WATER TREATMENT

EQUIPMENT REPAIR

MEDICATION

53 SF

EXIST. IT

SECUR. ROOM

229A

29 SF

EXIST. LINEN CHUTE

ALCOVE

CHASE

2C2C

I E D

X

Y

PATIENT TOILET

AA

WAITING

X.5

R1

SLA

R1

A4A4

SLA

SLA

DL2DL2DL2

DL2

A4

A4

A4

A4

A4

A4

A4

SLA

LED COVE LIGHT

LED COVE LIGHT

LED COVE LIGHT

A4 A4 A4

A4A4A4

A4 A4A4

A4

A4

A4

A4

A4

A4

A4

A4

A4

R1

A4

A4

A4

A4

A4

A4

A4

A4 A4

A4

A4

A1 A1

A1

A4 a a a a a a a a a a a a a a a a a,b a a a aa a a a a a aa a a a aa n n n n n n n n n n n n n n y y y,z,p z z z z,p z m m m m m m m m m z z,p z z z z v v v v vvv v v v r r s s s t r a a a a a a a a

NP-504-0

12S-1

11 1

NP-504-012S-4

NP-504-012S-5

NP-504-012S-3

NP-504-012S-6

6 6 a

LS-501-012S-11

bc a a a a a a a w w

CR-502-012S-17

17 17 b a,b a,b

X2

X1

X1 X1

X2

X1

X2

X1

X2 X2

X1

X1

X1

X1

X2

X2 15 a a a a

X1

X2

CR-502-012S-15

S

S p

7 w

P2

P2

P2

P2 z,p a,b a17 a

17 b a,b

PROVIDE SENSOR BLINDERS/TAPE AS NECESSARY.

PROVIDE ADDITIONAL SET OF CONTACTS ON POWER

PACKS FOR BMS/ATC CONTRACTOR (TYPICAL)

a a a

X1 z,p

A4

A4 a

A4

A4

PROVIDE AUTOMATIC DAYLIGHT HARVEST

DIMMING FOR SELECTED ZONES. DIMMER

SWITCH SHALL OVERRIDE THE PHOTOCELL.

4 a a

6 a

SLA

SLA

SLA

SLA

SLA

A1

A1

A1

A1 a a a

6 a

11 a

11 a

A1

A1

A1

A1

A1

A1

A1

A1

A4

A4

A4

A4

A4

A4 A4 a a11

A4

A4

6 a

6 a y9 q

15 q q q3 q3 q3 q3 q q

LS-501-012S-15

DL2

7 w w

PROVIDE DEDUCT ALTERNATE #1

REFER TO ARCHITECTURAL

DRAWINGS FOR ADDITIONAL

INFORMATION.

DL2

7 w v

41 a,b a,b41 a,b41 a,b41 a,b41 a,b41 a,b41 a,b a,b a,b a,b a,b a,b a,ba,ba,ba,b a,ba,b a,b39 a,b a,b39 a,b39 a,b39 a,b39a,b39a,b39a,b29a,b29 a,b 29a,b29a,b29a,b29a,b29a,b29a,b29a,b29 a,b a,b c a7

A1A1 a7 a7

CR-502-012S-29

DL2DL2

m a a

A4 a

A4 a7

LS-501-01

2S-7

A4

A4

A4A4 a

R1 v

R1 a11 a

A4

A4

A4

A4

A4

A4

A4

A4

DL2 DL2

z5 a,b39

A4 A4

A4 p

P2 z,p

X19

X1

LS-501-012S-9

A5-B

A5-B

A5-B

A5-A A5-A

A5-A

A5-A

A5-BA5-A

A5-A

A5-AA5-AA5-AA5-AA5-A

A5-A

A5-B

A5-B

A5-B

A5-B

A5-A A5-A

A5-A A5-A

A5-A A5-A

A5-A A5-A A5-A A5-A A5-A A5-A A5-A A5-A

A5-B

A5-B A5-B

A5-BA5-B

A5-A A5-A

A5-AA5-BA5-A

A1 A1

CR-502-012S-39

CR-502-012S-41

DL2

z5

UCR 5

a4 A4

A4

A4

A4

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :0

A

M

ES.202

ELECTRICAL LIGHTING LEVEL 2

11/09/2018 PC PF

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 2 - Lighting (Plan View)

LIGHTING PLAN NOTES:

1. REFER TO ELECTRICAL LEGEND DRAWING FOR SYMBOLS AND

GENERAL NOTES.

2. REFER TO ARCHITECTURAL ELEVATIONS FOR COORDINATION OF

WALL MOUNTED DEVICES AND FIXTURE LOCATIONS.

3. REFER TO ARCHITECTURAL FLOOR PLANS FOR EQUIPMENT

LOCATION

4. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR

COORDINATION OF FIXTURE LOCATIONS AND ORIENTATION.

5. CIRCUIT NUMBERS ARE SHOWN FOR DESCRIPTIVE PURPOSES

ONLY. EXACT NUMBERS SHALL BE DETERMINED IN FIELD.

ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION

AND EXISTING SPARE CAPACITY OF ALL PANELBOARDS AND

REPORT OF ANY DISCREPANCIES.

6. PROVIDE FOR EACH EXISTING PANELBOARD AN UPDATED TYPED

WRITTEN CIRCUIT DIRECTORY INDICATING TYPE OF LOADS (I.E.

LIGHTING, RECEPTACLES ETC.).

7. THE ELECTRICAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF

ANY ADDITIONAL REQUIRED ELECTRICAL WORK THAT NEEDS TO BE

PERFORMED OUTSIDE THE AREAS DESIGNATED AS LIMIT OF WORK.

8. FOR ELECTRIC PANEL LOCATIONS, REFER TO RESPECTIVE

POWER FLOOR PLAN.

9. MEASURE TOTAL EXISTING CIRCUIT LOAD AMPACITY PRIOR

CONNECTING TO EXISTING LIGHTING CIRCUITS.

Number: Revisions: Date:

Phase

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

PENTHOUSE

VESTIBULE

MECHANICAL

PENTHOUSE

ELECT. ROOM

I E D

X

Y

AA

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PRIMARY CARE

OFFICE

VEST

ELECTRICAL

CLOSET

JAN. CLOSET

STORAGE

SOCIAL WORKER

OFFICE

PSYCH OFFICE

CHARTING

STAFF LOUNGE

GROUP ROOM

OTP DIRECTOR

OFFICE

X.5

S a

S

LS-501-012S-13

a

S a

S a

S a

S a

S a

S a

S a

S

WITH INTEGRAL PHOTOCELL AND MOTION DETECTION (TYPICAL)

P5

P5

X113

X1

S

P5

NP-504-012S-7

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :2

A

M

ES.203

ELECTRICAL LIGHTING LEVEL 3

11/09/2018 PC PF

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 3 - Lighting (Plan View)

LIGHTING PLAN NOTES:

1. REFER TO ELECTRICAL LEGEND DRAWING FOR SYMBOLS AND

GENERAL NOTES.

2. REFER TO ARCHITECTURAL ELEVATIONS FOR COORDINATION OF

WALL MOUNTED DEVICES AND FIXTURE LOCATIONS.

3. REFER TO ARCHITECTURAL FLOOR PLANS FOR EQUIPMENT

LOCATION

4. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR

COORDINATION OF FIXTURE LOCATIONS AND ORIENTATION.

5. CIRCUIT NUMBERS ARE SHOWN FOR DESCRIPTIVE PURPOSES

ONLY. EXACT NUMBERS SHALL BE DETERMINED IN FIELD.

ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION

AND EXISTING SPARE CAPACITY OF ALL PANELBOARDS AND

REPORT OF ANY DISCREPANCIES.

6. PROVIDE FOR EACH EXISTING PANELBOARD AN UPDATED TYPED

WRITTEN CIRCUIT DIRECTORY INDICATING TYPE OF LOADS (I.E.

LIGHTING, RECEPTACLES ETC.).

7. THE ELECTRICAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF

ANY ADDITIONAL REQUIRED ELECTRICAL WORK THAT NEEDS TO BE

PERFORMED OUTSIDE THE AREAS DESIGNATED AS LIMIT OF WORK.

8. FOR ELECTRIC PANEL LOCATIONS, REFER TO RESPECTIVE

POWER FLOOR PLAN.

9. MEASURE TOTAL EXISTING CIRCUIT LOAD AMPACITY PRIOR

CONNECTING TO EXISTING LIGHTING CIRCUITS.

Number: Revisions: Date:

Phase

DN

DNDN

UP

DN

DN

PDA

J

J

J

J

J

J

J

J

J

J

J

PDA

PDA

J

S

J

J

G

H

4.5

TEAM SPACE

TREATMENT #7

214I

BARI. TREATMENT

#2

214H

BARI. TREATMENT

#1

214G

TREATMENT #1

214A

TREATMENT #2

214B

TREATMENT #3

214C

TREATMENT #4

214D

TREATMENT #5

214E

TREATMENT #6

214F

TREATMENT #8

214J

TREATMENT #9

214K

TREATMENT #10

214L

TREATMENT #11

214M

ISO TREATMENT #1

PRIVATE

TREATMENT #1

EXIST.

SOUTH STAIR

EXIST.

EAST STAIR

EXIST.

NORTH STAIR

OFFICE, MD

OFFICE, DIRECTOR

MD.

OFFICE, PD

TRAINING

OFFICE, SOCIAL

WORKER

CORRIDOR A

C200A

CLEAN

UTILITY/SUPPLY

EXAM ROOM

STAFF CORRIDOR

C200D

STAFF LOCKER

EMERG. ELECT.

TREATMENT ROOM

CORRIDOR

SOILED UTILITY

CORRIDOR C

C200C

WATER TREATMENT

STORAGE

F5

HT/WT

STERILE SUPPLY

EQUIPMENT

STORAGE

STAFF TLT

STAFF TLT

PATIENT LOCKERS

OFFICE, DIETITIAN

CONFERENCE

STAFF LOUNGE

F E6

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

ELECT.

EQUIPMENT

PROCESSING,

CLEAN PREP/STORE

EXIST. VESTIBULE

CORRIDOR B

C200B-2

OFFICE, FELLOW /

RN PD

NOURISHMENT

OFFICE, NURSE

MGR.

EQUIPMENT

PROCESSING,

SOILED

DIALYSATE PREP

WATER TREATMENT

EQUIPMENT REPAIR

MEDICATION

53 SF

EXIST. IT

SECUR. ROOM

229A

29 SF

EXIST. LINEN CHUTE

ALCOVE

CHASE

2C2C

I E D

X

Y

PATIENT TOILET

AA

WAITING

X.5

ETR

ETR

ETR

ETR

ETR

2CRA

2LSA

NP-505-012S

NP-505-012S

NP-504-012S

NP-504-012S

FC

SDP4

FC-1

E-500 -012S

ETR

ETR

CRITICAL BUS

LIFE SAFETY BUS

480/277V NORMAL BUS

208/120V NORMAL BUS

ETR

ETR

ETR

ETR

ETR

ETR

NP-012A4

NP-012A3

NP-012A2

NP-012A1

CR-502-012S

CR-502-012S

E-503-012S

LS-501-012S

REF

UCR

CL

NP-505-012S-2

NP-505-012S-4

NP-505-012S-6

16 16

NP-505-012S-11

NP-505-012S-14

20 20

C

REF

394143

53 4

NP-505-012S-55

NP-505-012S-53

NP-505-012S-51

NP-505-012S-43

NP-505-012S-37

USB

TR

TR

TR

USB

C

20 18

NP-505-012S-30

NP-505-012S-13

NP-505-012S-32,34

NP-505-012S-40

NP-505-012S-28

NP-505-012S-26

NP-505-012S-24

NP-505-012S-22

NP-505-012S-18

NP-505-012S-13

TV

NP-505-012S-36

NP-505-01

2S-23

NP-505-012S-27

NP-505-012S-15

NP-505-012S-10

NP-505-012S-8

NP-505-012S-

NP-505-012S-20

NP-505-012S-12

8101214161820

24 26 28 30

CR-502-012S-30

CR-502-012S-2

CR-502-012S-4

CR-502-012S-6

CR-502-012S-8

CR-502-012S-10

CR-502-012S-12CR-502-012S-14CR-502-012S-16

CR-502-012S-20

CR-502-012S-22

CR-502-012S-24 CR-502-012S-26

CR-502-012S-28

CR-502-012S-32

CR-502-012S-1

CR-502-012S-3

CR-502-012S-5

E-503-012S-1

E-503-012S-2

E-503-012S-3

E-503-012S-4

E-503-012S-6

E-503-012S-5 E-503-012S-7

E-503-012S-8

E-503-012S-9

E-503-012S-10

E-503-012S-12

E-503-012S-13

E-503-012S-14

E-503-012S-15E-503-012S-11

CR-502-012S-7

CR-502-012S-9

TV

CR-502-012S-11

CR-502-012S-42

TV TV

FOR LIFT

CR-502-012S-44

CR-502-012S-46

TV

TVTV

TV

TV

16CR-502-012S-48

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

ATC

EQ-502-013S-44

ATC

ATC

ATC

ATC

EQ-502-013S-6

ATC

ATC

ATC

ATC

ATC

EQ-502-013S-8

PRESSURE MONITOR,

COORDINATE EXACT

LOCATION WITH HVAC

CONTRACTOR

LS-501-012S-4

CR-502-012S-50

1,3

5,3

TV

CEILING

MOUNTED

PROJECTOR

NP-504-012S-48

NP-505-012S-3

NP-505-012S-5

NP-505-012S-7

NP-505-012S-9

PROVIDE DEDUCT ALTERNATE #1

REFER TO ARCHITECTURAL

DRAWINGS FOR ADDITIONAL

INFORMATION.

1SECURITY

ROOM

EXISTING IT ROOM &

NURSE CALL PANEL

LOCATION

TV

TV

TV

TV

TV

TV

TV

TR

CR-502-012S-31

C

NP-505-012S-25

ES.302

CR-502-012S-19

CR-502-012S-34

CR-502-012S-33,35

NP-504-012S-16

CR-502-012S-13

CR-502-012S-27

UPS

NP-505-012S-35

NP-505-012S-39

NP-505-012S-49

49 47

NP-505-012S-47

NP-505-012S-45

43 41

NP-505-012S-41

NP-505-012S-33

NP-505-012S-29

NP-505-012S-31

NP-505-012S-38

CL

SWITCH FOR

PROJECTOR

72" AFF

C 23 23 C

ICE

C

C

CR-502-012S-52

NP-505-012

S-21

SSACE-504

-012S

CR-502-012S-43,45

SSACE-505

-012S

ES.302

Sim

AD

AD LS-501-012S-14

P

P

CR-502-012S-49

P

WATER TREATMENT

F

G

F5

CR-502-012S

-21, 23, 25

EQ-502-013S-15, 17

EQ-502-013S-9,11,13

60A-3P 4#8 &1#8-3/4"C

RO

DISCONNECT

TO RO

DISCONNECT

25 25

J

CR-502-012S-36, 38,40

pH REMOTE

DISCONNECT

RO REMOTE

DISCONNECT

D

6.1

8.1

AD

LS-501-012S-14

P P

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :2

A

M

ES.302

ELECTRICAL POWER LEVEL 2

11/09/2018 PC PF

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 2 - Power

POWER PLAN NOTES:

1. REFER TO ELECTRICAL LEGEND DRAWING FOR SYMBOLS AND

GENERAL NOTES.

2. REFER TO ARCHITECTURAL ELEVATIONS FOR COORDINATION OF

WALL MOUNTED DEVICES AND FIXTURE LOCATIONS.

3. REFER TO ARCHITECTURAL FLOOR PLANS FOR EQUIPMENT

LOCATION.

4. CIRCUIT NUMBERS ARE SHOWN FOR DESCRIPTIVE PURPOSES

ONLY. EXACT NUMBERS SHALL BE DETERMINED IN FIELD.

5. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT

LOCATION AND EXISTING SPARE CAPACITY OF ALL PANELBOARDS

AND REPORT OF ANY DISCREPANCIES.

6. COORDINATE EXACT LOCATION OF ALL MECHANICAL EQUIPMENT

WITH MECHANICAL DRAWINGS.

7. PROVIDE FOR EACH EXISTING PANELBOARD AN UPDATED TYPED

WRITTEN CIRCUIT DIRECTORY INDICATING TYPE OF LOADS (I.E.

LIGHTING, RECEPTACLES ETC.).

8. THE ELECTRICAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF

ANY ADDITIONAL REQUIRED ELECTRICAL WORK THAT NEEDS TO BE

PERFORMED OUTSIDE THE AREAS DESIGNATED AS LIMIT OF WORK.

POWER KEY NOTES:

COORDINATE EXACT POWER REQUIREMENTS AND LAYOUT OF

IT ROOM, NURSE CALL PANEL AND SECURITY ROOM WITH VA

HOSPITAL IT DEPARTMENT PRIOR TO WORK.

COORDINATE EXACT POWER REQUIREMENTS AND LAYOUT

WITH DIALYSIS WATER TREATMENT VENDOR DRAWINGS

PRIOR TO WORK.

SEISMIC JOIN LINE. REFER TO STRUCTURAL DRAWINGS FOR

EXACT LOCATION. PROVIDE EXPANSION CONNECTIONS AND

EXPANSION BONDING JUMPERS FOR CIRCUITS AND FEEDERS

WHEN CROSS THE EXPANSION SEISMIC LINE.

1/4" = 1'-0"

LEVEL 2 - Power - Water Treatment Room

1/8" = 1'-0"

LEVEL 1 - Power - RAMP ENTRANCE

Number: Revisions: Date:

Phase

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

PENTHOUSE

VESTIBULE

MECHANICAL

PENTHOUSE

ELECT. ROOM

I E D

X

Y

AA

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PRIMARY CARE

OFFICE

VEST

ELECTRICAL

CLOSET

JAN. CLOSET

STORAGE

SOCIAL WORKER

OFFICE

PSYCH OFFICE

CHARTING

STAFF LOUNGE

GROUP ROOM

OTP DIRECTOR

OFFICE

X.5

EQ-500-013S

ATS

EQ-501-013S

EQ-502-013S

T3 A

TS

NP-504-012S-43

NP-504-012S-45

WP

WP

EQ-502-013S-10

ATC

EQ-502-013S-12

ATC

EF-500A-013S

EF-500B-013S

EF-501-

013S

TO VFD

EQ-501-013S-3

WP

WP

WP

FCU-500-013S

EQ-501-013S-4

WPACCH-501

-013S

GSHP-504

-013S

EQ-501-013S-7

EQ-501-013S-8

GHWP-502-013S

EQ-501-013S-9

GHWP-503-013S

EQ-501-013S-10

HWP-500-013S

EQ-501-013S-11

HWP-501-013S

EQ-501-013S-12

AHU-500-013S

EQ-501-013S-16

WPSUPPLY RETURN

EQ-502-013S-5

LIGHT

EQ-502-013S-1,7

,19

POWER

NP-504-012S-47

RELOCATE EXISTING

CABINET UNIT HEATER

CUH

EXIST

C U

H

ENL

NP-504-012S-49

EQ-501-013S-15

WP

EQ-501-013S-17

WP

EQ-501-013S-18

WP

EQ-502-013S-3

U/V

LIGHT

EQ-502-013S-14

EF-502-014S

LOCATED ON

ROOF ABOVE

EQ-502-013S-25,27

EQ-502-013S-21,23

NP-504-012S

-50

EQ-502-013S-3

GSHP-505

-013SCSG-

SCP-5

00-013 S

500- 013S

(STANDBY)

(STANDBY)

ACCH-500

-013S

COORDINATE ALL VFD LOCATIONS

WITH MECHANICAL DRAWINGS

(TYPICAL)

SSACE-502

-013SSSACE-503

-013S

SSACC-502-013S

SSACE-500

-013S

SSACE-501

-013S

SSACC-500-013S

EQ-502-013S-29,31

SSACC-501-013S

EQ-502-013S-28,30

EQ-502-013S

-24,26

EQ-502-013

S-16,18

EQ-502

-013S- 20,22

V F

D V

F D

V F

D V

F D

V F

D

V F

D

EQ-501-013S-5

EQ-501-013S-6

WP

TO AHU-500-013S

RETURN

TO AHU-500-013S

RETURN

TO AHU-500-013S

TO AHU-500-013S

SUPPLY

SUPPLY

TO VFD

TO VFD

TO VFDTO VFD

EQ-501-013S-1 EQ-501-013S-2

V F

D

V F

D

V F

D

V F

D

TO HWP-501-013S TO HWP-500-013S

TO VFD

TO VFD

TO EF-500A-013S TO EF-500B-013S

TO VFD

TO VFD

TO GHWP-503-013S TO GHWP-502-013S

TO VFD

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :3

A

M

ES.303

ELECTRICAL POWER LEVEL 3

11/09/2018 PC PF

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 3 - Power

POWER PLAN NOTES:

1. REFER TO ELECTRICAL LEGEND DRAWING FOR SYMBOLS AND

GENERAL NOTES.

2. REFER TO ARCHITECTURAL ELEVATIONS FOR COORDINATION OF

WALL MOUNTED DEVICES AND FIXTURE LOCATIONS.

3. REFER TO ARCHITECTURAL FLOOR PLANS FOR EQUIPMENT LOCATION.

4. CIRCUIT NUMBERS ARE SHOWN FOR DESCRIPTIVE PURPOSES ONLY.

EXACT NUMBERS SHALL BE DETERMINED IN FIELD.

5. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION

AND EXISTING SPARE CAPACITY OF ALL PANELBOARDS AND REPORT OF

ANY DISCREPANCIES.

6. COORDINATE EXACT LOCATION OF ALL MECHANICAL EQUIPMENT WITH

MECHANICAL DRAWINGS.

7. PROVIDE FOR EACH EXISTING PANELBOARD AN UPDATED TYPED

WRITTEN CIRCUIT DIRECTORY INDICATING TYPE OF LOADS (I.E. LIGHTING,

RECEPTACLES ETC.).

8. THE ELECTRICAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF

ANY ADDITIONAL REQUIRED ELECTRICAL WORK THAT NEEDS TO BE

PERFORMED OUTSIDE THE AREAS DESIGNATED AS LIMIT OF WORK.

Number: Revisions: Date:

Phase

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

EXISTING FIRE

PUMP BLDG. 27

I E D

X

Y

E-1.3

E-1.5

E-F

E-E

E-1

E-1.6

AA

X.5

CONTRACTOR TO DEMOLISH EXISTING

WEATHERPROOF HORN APPLIANCE AND

PROVIDE NEW WEATHERPROOF

SPEAKER/STROBE APPLIANCE

DEMOLITION

SCOPE

DEMOLITION

SCOPE

WP

ETD

WP

CONTRACTOR TO RELOCATE

EXISTING CIRCUIT AND PROVIDE

NEW MANUAL PULLSTATION

DEMOLITION GENERAL NOTES:

1. REFER TO SHEET FA.001 FOR GENERAL REQUIREMENTS AND

ADDITIONAL INFORMATION REGARDING SYSTEM DESIGN,

INTENDED PERFORMANCE, PRODUCTS AND INSTALLATION.

2. DISCREPANCIES BETWEEN THE DRAWINGS AND

SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF

BR+A CONSULTING ENGINEERS, LLC.

3. COORDINATE ALL WORK WITH THE SYSTEM SUPPLIER'S

APPROVED SHOP DRAWINGS AND INSTALLATION MANUALS FOR

ADDITIONAL INFORMATION.

4. THE OWNER MUST BE INFORMED BEFORE ANY PART OF THE

EXISTING FIRE ALARM SYSTEM IS DISABLED IN ANY WAY. SEE

SPECIFICATIONS FOR NOTIFICATION REQUIREMENTS AND

IMPAIRMENT PROCEDURES.

5. WORK IS BEING DONE WHILE THE BUILDING IS OCCUPIED.

THE CONTRACTOR SHALL TAKE CARE TO REDUCE THE

HAZARD TO BUILDING OCCUPANTS. DO NOT LEAVE TOOLS

UNATTENDED UNLESS SECURED. MARK WORK AREAS USING

YELLOW CAUTION TAPE TO RESTRICT ACCESS. CLEANUP ALL

DEBRIS AND MATERIALS AT THE END OF EACH WORK DAY OR

WHENEVER THE AREA IS UNATTENDED.

6. THE CONTRACTOR SHALL RETAIN THE SERVICES OF THE

CURRENT SERVICE COMPANY OF RECORD AND

MANUFACTURER'S REPRESENTATIVE TO COORDINATE

MODIFICATION, REPROGRAMMING AND RE-ACCEPTANCE OF

THE EXISTING SYSTEM.

7. ALL WORK SHALL BE CONDUCTED UNDER THE DIRECTION

OF THE OWNER'S DESIGNATED REPRESENTATIVE, AN

AUTHORIZED MANUFACTURER'S REPRESENTATIVE AND THE

SERVICE COMPANY OF RECORD.

8. THE CONTRACTOR SHALL UPGRADE, MODIFY, AND EXPAND

THE EXISTING FIRE ALARM CONTROL SYSTEM TO SUPPORT

THE SYSTEM CHANGES SHOWN AND REQUIRED.

9. THE CONTRACTOR SHALL SUBMIT A DETAILED PHASING AND

IMPAIRMENT PLAN TO INCLUDE TEMPORARY PROTECTION

WHERE EXISTING SYSTEMS ARE IMPAIRED FOR MORE THAN 8

HOURS, AND AS DIRECTED BY THE OWNER AND AUTHORITY

HAVING JURISDICTION.

10. PROVIDE TEMPORARY PROTECTION AND REPROGRAMMING

OF THE EXISTING SYSTEM TO ACCOMMODATE PROJECT

PHASING AND SYSTEM CHANGE-OVER.

11. THE EXISTING SYSTEM SHALL REMAIN OPERATIONAL AT ALL

TIMES; COORDINATE THE PHASED REPLACEMENT OF EXISTING

DEVICES AND WIRING WITH CURRENT SERVICE COMPANY OF

RECORD.

12. REMOVE ANY EXISTING DEVICES AND ASSOCIATED WIRING

WITHIN THE AREA OF WORK BACK TO THE NEAREST DEVICE

WHICH IS INTENDED TO REMAIN. ALL CIRCUITS SHALL BE

MODIFIED AND RESTORED TO NORMAL OPERATION TO

MAINTAIN SYSTEM OPERATION AND SUPERVISION.

13. PROVIDE NEW DEVICES AND WIRING AS SHOWN AND

DIRECTED BY THE SYSTEM SUPPLIER TO MATCH EXISTING.

ALL CHANGES SHALL BE SUBJECT TO REVIEW AND APPROVAL

BY THE OWNER AND ENGINEER OF RECORD.

14. PROVIDE TEMPORARY REPROGRAMMING OF THE EXISTING

SYSTEM TO ACCOMMODATE SYSTEM CHANGE-OVER, WITH

FINAL PROGRAMMING, SYSTEM ADJUSTMENT AND RE-

ACCEPTANCE TESTING IN ACCORDANCE WITH OWNER AND

(LOCAL) FIRE DEPARTMENT REQUIREMENTS.

15. PROVIDE ALL HARDWARE AND WIRING TO ESTABLISH NEW

INTERCONNECTIONS WITH THE PROTECTED PREMISES

SYSTEM; INCLUDE ALL NECESSARY PROGRAMMING TO

MAINTAIN SYSTEM OPERATION AS DIRECTED BY THE OWNER

AND ENGINEER OF RECORD.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :3

A

M

FA.101

FIRE ALARM DEMOLITION LEVEL 1

11/09/2018 PC FLH

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 1 - Fire Alarm Demo

Number: Revisions: Date:

Phase

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

I E D

X

Y

E-1.3

E-1.5

E-F

E-E

E-1

E-1.6

AA

X.5

DEMOLITON SCOPE

DEMOLITION GENERAL NOTES:

1. REFER TO SHEET FA.001 FOR GENERAL REQUIREMENTS AND

ADDITIONAL INFORMATION REGARDING SYSTEM DESIGN,

INTENDED PERFORMANCE, PRODUCTS AND INSTALLATION.

2. DISCREPANCIES BETWEEN THE DRAWINGS AND

SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF

BR+A CONSULTING ENGINEERS, LLC.

3. COORDINATE ALL WORK WITH THE SYSTEM SUPPLIER'S

APPROVED SHOP DRAWINGS AND INSTALLATION MANUALS FOR

ADDITIONAL INFORMATION.

4. THE OWNER MUST BE INFORMED BEFORE ANY PART OF THE

EXISTING FIRE ALARM SYSTEM IS DISABLED IN ANY WAY. SEE

SPECIFICATIONS FOR NOTIFICATION REQUIREMENTS AND

IMPAIRMENT PROCEDURES.

5. WORK IS BEING DONE WHILE THE BUILDING IS OCCUPIED.

THE CONTRACTOR SHALL TAKE CARE TO REDUCE THE

HAZARD TO BUILDING OCCUPANTS. DO NOT LEAVE TOOLS

UNATTENDED UNLESS SECURED. MARK WORK AREAS USING

YELLOW CAUTION TAPE TO RESTRICT ACCESS. CLEANUP ALL

DEBRIS AND MATERIALS AT THE END OF EACH WORK DAY OR

WHENEVER THE AREA IS UNATTENDED.

6. THE CONTRACTOR SHALL RETAIN THE SERVICES OF THE

CURRENT SERVICE COMPANY OF RECORD AND

MANUFACTURER'S REPRESENTATIVE TO COORDINATE

MODIFICATION, REPROGRAMMING AND RE-ACCEPTANCE OF

THE EXISTING SYSTEM.

7. ALL WORK SHALL BE CONDUCTED UNDER THE DIRECTION

OF THE OWNER'S DESIGNATED REPRESENTATIVE, AN

AUTHORIZED MANUFACTURER'S REPRESENTATIVE AND THE

SERVICE COMPANY OF RECORD.

8. THE CONTRACTOR SHALL UPGRADE, MODIFY, AND EXPAND

THE EXISTING FIRE ALARM CONTROL SYSTEM TO SUPPORT

THE SYSTEM CHANGES SHOWN AND REQUIRED.

9. THE CONTRACTOR SHALL SUBMIT A DETAILED PHASING AND

IMPAIRMENT PLAN TO INCLUDE TEMPORARY PROTECTION

WHERE EXISTING SYSTEMS ARE IMPAIRED FOR MORE THAN 8

HOURS, AND AS DIRECTED BY THE OWNER AND AUTHORITY

HAVING JURISDICTION.

10. PROVIDE TEMPORARY PROTECTION AND REPROGRAMMING

OF THE EXISTING SYSTEM TO ACCOMMODATE PROJECT

PHASING AND SYSTEM CHANGE-OVER.

11. THE EXISTING SYSTEM SHALL REMAIN OPERATIONAL AT ALL

TIMES; COORDINATE THE PHASED REPLACEMENT OF EXISTING

DEVICES AND WIRING WITH CURRENT SERVICE COMPANY OF

RECORD.

12. REMOVE ANY EXISTING DEVICES AND ASSOCIATED WIRING

WITHIN THE AREA OF WORK BACK TO THE NEAREST DEVICE

WHICH IS INTENDED TO REMAIN. ALL CIRCUITS SHALL BE

MODIFIED AND RESTORED TO NORMAL OPERATION TO

MAINTAIN SYSTEM OPERATION AND SUPERVISION.

13. PROVIDE NEW DEVICES AND WIRING AS SHOWN AND

DIRECTED BY THE SYSTEM SUPPLIER TO MATCH EXISTING.

ALL CHANGES SHALL BE SUBJECT TO REVIEW AND APPROVAL

BY THE OWNER AND ENGINEER OF RECORD.

14. PROVIDE TEMPORARY REPROGRAMMING OF THE EXISTING

SYSTEM TO ACCOMMODATE SYSTEM CHANGE-OVER, WITH

FINAL PROGRAMMING, SYSTEM ADJUSTMENT AND RE-

ACCEPTANCE TESTING IN ACCORDANCE WITH OWNER AND

(LOCAL) FIRE DEPARTMENT REQUIREMENTS.

15. PROVIDE ALL HARDWARE AND WIRING TO ESTABLISH NEW

INTERCONNECTIONS WITH THE PROTECTED PREMISES

SYSTEM; INCLUDE ALL NECESSARY PROGRAMMING TO

MAINTAIN SYSTEM OPERATION AS DIRECTED BY THE OWNER

AND ENGINEER OF RECORD.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :4

A

M

FA.102

FIRE ALARM DEMOLITION LEVEL 2

11/09/2018 PC FLH

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 2 - Fire Alarm Demo

Number: Revisions: Date:

Phase

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

I E D

X

Y

E-1.3

E-1.5

E-F

E-E

E-1

E-1.6

AA

X.5

WP

ETR

ETR

GENERAL NOTES:

1. CONSULT THE PROJECT SPECIFICATIONS AND PROJECT

NARRATIVE FOR ADDITIONAL INFORMATION REGARDING

SYSTEM DESIGN, INTENDED PERFORMANCE, PRODUCTS AND

INSTALLATION.

2. DISCREPANCIES BETWEEN THE DRAWINGS AND

SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF

BR+A CONSULTING ENGINEERS, LLC.

3. CONSULT MANUFACTURER'S APPROVED SHOP DRAWINGS

AND INSTALLATION MANUALS FOR ADDITIONAL INFORMATION.

4. ALL INSTALLATION WORK SHALL CONFORM WITH THE

REQUIREMENTS OF NFPA 1, 70, 72, AND 241.

5. WHERE EQUIPMENT MUST BE INSTALLED ON SUSPENDED

CEILINGS OR BETWEEN BUILDING STRUCTURAL COMPONENTS,

ADEQUATE FIXTURE BARS OR OTHER SUPPORT SHALL BE

PROVIDED.

6. CONTROL UNITS SHALL BE INSTALLED SO THAT WORKING

CLEARANCES ARE MAINTAINED AROUND THE UNITS IN

ACCORDANCE WITH NFPA 70 NATIONAL ELECTRICAL CODE.

7. ALL WIRING WITHIN CONTROL EQUIPMENT SHALL BE

INSTALLED SO THAT WIRING AND EQUIPMENT ARE

ACCESSIBLE. WIRING SHALL BE INSTALLED SO THAT

EQUIPMENT CAN BE SERVICED OR REMOVED WITHOUT

DISCONNECTING OR MOVING UNRELATED CIRCUITS. ALL

WIRING WITHIN CONTROL UNITS, JUNCTION BOXES, AND

TERMINAL CABINETS SHALL BE NEATLY TRIMMED, DRESSED,

LABELED, AND INSTALLED IN GUTTERS OR CHANNELS.

8. REFER TO MECHANICAL/HVAC DRAWINGS TO COORDINATE

QUANTITIES AND LOCATIONS OF ALL EQUIPMENT AND DEVICES

TO BE INTEGRATED WITH THE FIRE ALARM SYSTEM.

9. REFER TO FIRE PROTECTION DRAWINGS FOR EXACT

QUANTITIES AND LOCATIONS OF RELATED SYSTEMS AND

DEVICES.

10. COORDINATE EQUIPMENT INSTALLATION WITH

ARCHITECTURAL DOCUMENTS INCLUDING ELEVATIONS,

REFLECTED CEILING PLANS AND DETAILS.

11. COORDINATE SMOKE COMPARTMENTS AND SYSTEM

OPERATION WITH THE APPROVED LIFE SAFETY PLANS.

12. CIRCUITS SHALL BE INDIVIDUALLY ISOLATED SO THAT A

WIRING FAULT WILL NOT AFFECT THE OPERATION OF CIRCUITS

SERVING ANY OTHER FLOOR OR EVACUATION ZONE.

13. THE INSTALLING CONTRACTOR IS RESPONSIBLE FOR

OBTAINING APPROVAL FOR, AND MAKING ALL NECESSARY

ADJUSTMENTS IN CIRCUITING AS REQUIRED TO

ACCOMMODATE THE RELOCATION OF EQUIPMENT AND/OR

DEVICES WHICH ARE EFFECTED BY AN AUTHORIZED CHANGE

OR FIELD INSTALLATION REQUIREMENTS.

14. PROVIDE TRANSIENT VOLTAGE SURGE SUPPRESSOR

(TVSS) ON ALL CIRCUITS THAT RUN EXTERIOR TO THE

BUILDING.

KEYED NOTES:

FIRE/SMOKE DAMPER INTERFACE - REFER TO DETAIL #3 ON

SHEET FA.001 FOR ADDITIONAL INFORMATION.

DUCT SMOKE/AHU INTERFACE - REFER TO DETAIL #4 ON

SHEET FA.001 FOR ADDITIONAL INFORMATION.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :4

A

M

FA.201

FIRE ALARM LEVEL 1

11/09/2018 PC FLH

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 1 - Fire Alarm

Number: Revisions: Date:

Phase

H

4.5

TEAM SPACE

TREATMENT #7

214I

BARI. TREATMENT

#2

214H

BARI. TREATMENT

#1

214G

TREATMENT #1

214A

TREATMENT #2

214B

TREATMENT #3

214C

TREATMENT #4

214D

TREATMENT #5

214E

TREATMENT #6

214F

TREATMENT #8

214J

TREATMENT #9

214K

TREATMENT #10

214L

TREATMENT #11

214M

ISO TREATMENT #1

PRIVATE

TREATMENT #1

EXIST.

SOUTH STAIR

EXIST.

EAST STAIR

EXIST.

NORTH STAIR

OFFICE, MD

OFFICE, DIRECTOR

MD.

OFFICE, PD

TRAINING

OFFICE, SOCIAL

WORKER

CORRIDOR A

C200A

CLEAN

UTILITY/SUPPLY

EXAM ROOM

STAFF CORRIDOR

C200D

STAFF LOCKER

EMERG. ELECT.

TREATMENT ROOM

CORRIDOR

SOILED UTILITY

CORRIDOR C

C200C

WATER TREATMENT

STORAGE

F5

HT/WT

STERILE SUPPLY

EQUIPMENT

STORAGE

STAFF TLT

STAFF TLT

PATIENT LOCKERS

OFFICE, DIETITIAN

CONFERENCE

STAFF LOUNGE

F E6

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

ELECT.

EQUIPMENT

PROCESSING,

CLEAN PREP/STORE

EXIST. VESTIBULE

CORRIDOR B

C200B-2

OFFICE, FELLOW /

RN PD

NOURISHMENT

OFFICE, NURSE

MGR.

EQUIPMENT

PROCESSING,

SOILED

DIALYSATE PREP

WATER TREATMENT

EQUIPMENT REPAIR

MEDICATION

53 SF

EXIST. IT

SECUR. ROOM

229A

29 SF

EXIST. LINEN CHUTE

ALCOVE

CHASE

2C2C

I E D

X

Y

PATIENT TOILET

AA

WAITING

X.5

EXISTING FIRE ALARM

TERMINAL CABINET

ETR

1-HOUR SMOKE PARTITION

1-

HOUR S

M

OKE P

ARTIT

IO

N

SM

OKE PARTITION

SM

OKE PARTITION

FSD-501-012S

LS-501-012

S- 8

FSD-503-012S

TC

FSD-504-012S

FSD-502-012S

FSD-500-012S

GENERAL NOTES:

1. CONSULT THE PROJECT SPECIFICATIONS AND PROJECT

NARRATIVE FOR ADDITIONAL INFORMATION REGARDING

SYSTEM DESIGN, INTENDED PERFORMANCE, PRODUCTS AND

INSTALLATION.

2. DISCREPANCIES BETWEEN THE DRAWINGS AND

SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF

BR+A CONSULTING ENGINEERS, LLC.

3. CONSULT MANUFACTURER'S APPROVED SHOP DRAWINGS

AND INSTALLATION MANUALS FOR ADDITIONAL INFORMATION.

4. ALL INSTALLATION WORK SHALL CONFORM WITH THE

REQUIREMENTS OF NFPA 1, 70, 72, AND 241.

5. WHERE EQUIPMENT MUST BE INSTALLED ON SUSPENDED

CEILINGS OR BETWEEN BUILDING STRUCTURAL COMPONENTS,

ADEQUATE FIXTURE BARS OR OTHER SUPPORT SHALL BE

PROVIDED.

6. CONTROL UNITS SHALL BE INSTALLED SO THAT WORKING

CLEARANCES ARE MAINTAINED AROUND THE UNITS IN

ACCORDANCE WITH NFPA 70 NATIONAL ELECTRICAL CODE.

7. ALL WIRING WITHIN CONTROL EQUIPMENT SHALL BE

INSTALLED SO THAT WIRING AND EQUIPMENT ARE

ACCESSIBLE. WIRING SHALL BE INSTALLED SO THAT

EQUIPMENT CAN BE SERVICED OR REMOVED WITHOUT

DISCONNECTING OR MOVING UNRELATED CIRCUITS. ALL

WIRING WITHIN CONTROL UNITS, JUNCTION BOXES, AND

TERMINAL CABINETS SHALL BE NEATLY TRIMMED, DRESSED,

LABELED, AND INSTALLED IN GUTTERS OR CHANNELS.

8. REFER TO MECHANICAL/HVAC DRAWINGS TO COORDINATE

QUANTITIES AND LOCATIONS OF ALL EQUIPMENT AND DEVICES

TO BE INTEGRATED WITH THE FIRE ALARM SYSTEM.

9. REFER TO FIRE PROTECTION DRAWINGS FOR EXACT

QUANTITIES AND LOCATIONS OF RELATED SYSTEMS AND

DEVICES.

10. COORDINATE EQUIPMENT INSTALLATION WITH

ARCHITECTURAL DOCUMENTS INCLUDING ELEVATIONS,

REFLECTED CEILING PLANS AND DETAILS.

11. COORDINATE SMOKE COMPARTMENTS AND SYSTEM

OPERATION WITH THE APPROVED LIFE SAFETY PLANS.

12. CIRCUITS SHALL BE INDIVIDUALLY ISOLATED SO THAT A

WIRING FAULT WILL NOT AFFECT THE OPERATION OF CIRCUITS

SERVING ANY OTHER FLOOR OR EVACUATION ZONE.

13. THE INSTALLING CONTRACTOR IS RESPONSIBLE FOR

OBTAINING APPROVAL FOR, AND MAKING ALL NECESSARY

ADJUSTMENTS IN CIRCUITING AS REQUIRED TO

ACCOMMODATE THE RELOCATION OF EQUIPMENT AND/OR

DEVICES WHICH ARE EFFECTED BY AN AUTHORIZED CHANGE

OR FIELD INSTALLATION REQUIREMENTS.

14. PROVIDE TRANSIENT VOLTAGE SURGE SUPPRESSOR

(TVSS) ON ALL CIRCUITS THAT RUN EXTERIOR TO THE

BUILDING.

KEYED NOTES:

FIRE/SMOKE DAMPER INTERFACE - REFER TO DETAIL #3 ON

SHEET FA.001 FOR ADDITIONAL INFORMATION.

DUCT SMOKE/AHU INTERFACE - REFER TO DETAIL #4 ON

SHEET FA.001 FOR ADDITIONAL INFORMATION.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :5

A

M

FA.202

FIRE ALARM LEVEL 2

11/09/2018 PC FLH

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 2 - Fire Alarm

Number: Revisions: Date:

Phase

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

PENTHOUSE

VESTIBULE

MECHANICAL

PENTHOUSE

ELECT. ROOM

I E D

X

Y

AA

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PRIMARY CARE

OFFICE

VEST

ELECTRICAL

CLOSET

JAN. CLOSET

STORAGE

SOCIAL WORKER

OFFICE

PSYCH OFFICE

CHARTING

STAFF LOUNGE

GROUP ROOM

OTP DIRECTOR

OFFICE

X.5

HO

HO

AHU-1

WP

WP

LOCATE IN A

CONDITIONED SPACE;

COORDINATE WITH

ARCHITECT

LOCATE IN A

CONDITIONED SPACE;

COORDINATE WITH

ARCHITECT

EXHAUST FAN

PLATFORM

AHU-1

PLATFORM

GENERAL NOTES:

1. CONSULT THE PROJECT SPECIFICATIONS AND PROJECT

NARRATIVE FOR ADDITIONAL INFORMATION REGARDING

SYSTEM DESIGN, INTENDED PERFORMANCE, PRODUCTS AND

INSTALLATION.

2. DISCREPANCIES BETWEEN THE DRAWINGS AND

SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF

BR+A CONSULTING ENGINEERS, LLC.

3. CONSULT MANUFACTURER'S APPROVED SHOP DRAWINGS

AND INSTALLATION MANUALS FOR ADDITIONAL INFORMATION.

4. ALL INSTALLATION WORK SHALL CONFORM WITH THE

REQUIREMENTS OF NFPA 1, 70, 72, AND 241.

5. WHERE EQUIPMENT MUST BE INSTALLED ON SUSPENDED

CEILINGS OR BETWEEN BUILDING STRUCTURAL COMPONENTS,

ADEQUATE FIXTURE BARS OR OTHER SUPPORT SHALL BE

PROVIDED.

6. CONTROL UNITS SHALL BE INSTALLED SO THAT WORKING

CLEARANCES ARE MAINTAINED AROUND THE UNITS IN

ACCORDANCE WITH NFPA 70 NATIONAL ELECTRICAL CODE.

7. ALL WIRING WITHIN CONTROL EQUIPMENT SHALL BE

INSTALLED SO THAT WIRING AND EQUIPMENT ARE

ACCESSIBLE. WIRING SHALL BE INSTALLED SO THAT

EQUIPMENT CAN BE SERVICED OR REMOVED WITHOUT

DISCONNECTING OR MOVING UNRELATED CIRCUITS. ALL

WIRING WITHIN CONTROL UNITS, JUNCTION BOXES, AND

TERMINAL CABINETS SHALL BE NEATLY TRIMMED, DRESSED,

LABELED, AND INSTALLED IN GUTTERS OR CHANNELS.

8. REFER TO MECHANICAL/HVAC DRAWINGS TO COORDINATE

QUANTITIES AND LOCATIONS OF ALL EQUIPMENT AND DEVICES

TO BE INTEGRATED WITH THE FIRE ALARM SYSTEM.

9. REFER TO FIRE PROTECTION DRAWINGS FOR EXACT

QUANTITIES AND LOCATIONS OF RELATED SYSTEMS AND

DEVICES.

10. COORDINATE EQUIPMENT INSTALLATION WITH

ARCHITECTURAL DOCUMENTS INCLUDING ELEVATIONS,

REFLECTED CEILING PLANS AND DETAILS.

11. COORDINATE SMOKE COMPARTMENTS AND SYSTEM

OPERATION WITH THE APPROVED LIFE SAFETY PLANS.

12. CIRCUITS SHALL BE INDIVIDUALLY ISOLATED SO THAT A

WIRING FAULT WILL NOT AFFECT THE OPERATION OF CIRCUITS

SERVING ANY OTHER FLOOR OR EVACUATION ZONE.

13. THE INSTALLING CONTRACTOR IS RESPONSIBLE FOR

OBTAINING APPROVAL FOR, AND MAKING ALL NECESSARY

ADJUSTMENTS IN CIRCUITING AS REQUIRED TO

ACCOMMODATE THE RELOCATION OF EQUIPMENT AND/OR

DEVICES WHICH ARE EFFECTED BY AN AUTHORIZED CHANGE

OR FIELD INSTALLATION REQUIREMENTS.

14. PROVIDE TRANSIENT VOLTAGE SURGE SUPPRESSOR

(TVSS) ON ALL CIRCUITS THAT RUN EXTERIOR TO THE

BUILDING.

KEYED NOTES:

FIRE/SMOKE DAMPER INTERFACE - REFER TO DETAIL #3 ON

SHEET FA.001 FOR ADDITIONAL INFORMATION.

DUCT SMOKE/AHU INTERFACE - REFER TO DETAIL #4 ON

SHEET FA.001 FOR ADDITIONAL INFORMATION.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

J J o b s \P

C .J

\B

IM

\M

E P

\E L E

C

V A

P R

O V

V

.r v t

/6

/2

:1 :0

A

M

FA.203

FIRE ALARM LEVEL 3

11/09/2018 PC FLH

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

LEVEL 3 - Fire Alarm

Number: Revisions: Date:

Phase

ES.000 - ELECTRICAL LEGEND
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
ES.200 - ELECTRICAL SITE LIGHTING
ES.201 - ELECTRICAL LIGHTING LEVEL 1
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
ES.202 - ELECTRICAL LIGHTING LEVEL 2
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
ES.203 - ELECTRICAL LIGHTING LEVEL 3
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
ES.303 - ELECTRICAL POWER LEVEL 3
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
ES.600 - ELECTRICAL RISER ES.600 (1)
ES.601 - ELECTRICAL SCHEDULES
ES.602 - ELECTRICAL SCHEDULES
ES.700 - ELECTRICAL DETAILS
ES.701 - ELECTRICAL DETAILS
ES.800 - ELECTRICAL LIGHTNING PROTECTION
FA.001 - FIRE ALARM DETAILS AND LEGEND
FA.002 - FIRE ALARM RISER
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
FA.201 - FIRE ALARM LEVEL 1
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.201 - ELECTRICAL LIGHTING LEVEL 1
ES.202 - ELECTRICAL LIGHTING LEVEL 2
ES.203 - ELECTRICAL LIGHTING LEVEL 3
ES.302 - ELECTRICAL POWER LEVEL 2
ES.303 - ELECTRICAL POWER LEVEL 3
FA.101 - FIRE ALARM DEMOLITION LEVEL 1
FA.102 - FIRE ALARM DEMOLITION LEVEL 2
FA.201 - FIRE ALARM LEVEL 1
FA.202 - FIRE ALARM LEVEL 2
FA.203 - FIRE ALARM LEVEL 3
FA.202 - FIRE ALARM LEVEL 2
Sheets
ES.101 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 1
ES.102 - ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.