36E77619R0086-010.pdf
PDF Posted
- Attached to
- Replace Hemodialysis Unit Federal contract opportunity
- Solicitation number
- 36E77619R0086
About this file
36E77619R0086 Attachment 9 - Fire Protection.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Replace Hemodialysis Unit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE GENERAL CONTRACTOR/CONSTRUCTION MANAGER SHALL PROVIDE ALL SUBCONTRACTORS, AT
THE TIME OF BID, THEIR SITE SPECIFIC TEMPORARY PROTECTION/IMPAIRMENT PLAN THAT IS IN
ACCORDANCE WITH NFPA 241. ALL COSTS ASSOCIATED WITH THE BELOW SAFEGUARDING DURING
DEMOLITION, ALTERATION, CONSTRUCTION, PHASING, SHUTDOWNS, ETC. WITH REGARD TO FIRE
PROTECTION SYSTEMS SHALL BE INCLUDED IN THE EACH OF THE FIRE PROTECTION CONTRACTOR'S
BASE BIDS.
2. THE CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION DURING CONSTRUCTION, ALTERATION
AND DEMOLITION ACTIVITIES. TEMPORARY PROTECTION SHALL BE PROVIDED WHILE PORTIONS OF
THE EXISTING FIRE PROTECTION SPRINKLER SYSTEM OR EXISTING FIRE PROTECTIVE SIGNALING
SYSTEMS ARE IMPAIRED OR OUT OF SERVICE.
3. TEMPORARY PROTECTION SHALL BE INSTALLED THROUGHOUT THE AFFECTED AREAS IN
ACCORDANCE WITH LOCAL FIRE DEPARTMENT REQUIREMENTS. REFER TO FIRE ALARM
SPECIFICATION, DIVISION 28, FOR TEMPORARY FIRE DETECTION EQUIPMENT OPTIONS.
4. TEMPORARY FIRE PROTECTIVE DEVICES SHALL BE INSTALLED IN ACCORDANCE WITH THE
PRODUCT'S LABELING, MANUFACTURER'S LISTING REQUIREMENTS AND APPLICABLE CODES.
5. INSTALLATION OF TEMPORARY FIRE PROTECTIVE DEVICES SHALL BE COORDINATED WITH THE
CONSTRUCTION ALTERATION AND DEMOLITION CONDITIONS AND SHALL ACCOUNT FOR STRUCTURAL
MEMBERS, DUCTWORK, PIPING AND CONDUIT RACKS AS THEY OCCUR OR ARE ENCOUNTERED
DURING CONSTRUCTION.
6. TEMPORARY FIRE PROTECTIVE DEVICES SHALL BE CONNECTED TO THE BUILDING'S FIRE ALARM
SYSTEM AND SHALL FUNCTION AS PERMANENT UNTIL REPLACED WITH FINAL FIRE PROTECTION AND
FIRE PROTECTIVE SYSTEMS. REFER TO FIRE ALARM SPECIFICATION, DIVISION 28, FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
7. TEMPORARY FIRE DEVICE LAYOUT SHALL BE CHANGED AS NECESSARY DURING CONSTRUCTION IN
ORDER TO MAINTAIN PROPER COVERAGE INCLUDING SPACING AND LOCATION OF DEVICES AS WORK
PROGRESSES AND BUILDING AREAS ARE IMPACTED.
8. TEMPORARY FIRE PROTECTIVE DEVICES SHALL BE ADDED OR RELOCATED AS DIRECTED BY THE
LOCAL FIRE DEPARTMENT.
9. SAFEGUARDING OF THE BUILDING DURING DEMOLITION, ALTERATION AND CONSTRUCTION SHALL BE
A JOINT COOPERATIVE EFFORT INVOLVING THE ENTIRE PROJECT TEAM, AND PRIMARILY THE FIRE
PROTECTION CONTRACTOR, THE FIRE ALARM CONTRACTOR, THE GENERAL
CONTRACTOR/CONSTRUCTION MANAGER, OWNER AND ALL AUTHORITIES HAVING JURISDICTION. THE
FIRE PROTECTION CONTRACTOR AND FIRE ALARM CONTRACTOR SHALL COORDINATE WITH ANY AND
ALL PARTIES AS APPROPRIATE IN ORDER TO ACHIEVE PROPER SAFEGUARDING AS DESCRIBED IN
THE PROJECT DOCUMENTS.
10. THE CONTRACTORS SHALL ENSURE PROPER BUILDING PROTECTION AND SAFEGUARDING AT ALL
TIMES DURING DEMOLITION, ALTERATION, AND CONSTRUCTION IN COMPLETE COMPLIANCE WITH ALL
APPLICABLE CODES, REGULATIONS AND STANDARDS.
11. DURING TIMES WHEN THE EXISTING NEW BUILDING FIRE PROTECTION SYSTEMS ARE IMPAIRED, THE
CONTRACTORS SHALL PROVIDE APPROPRIATE SAFEGUARDING OF THE RENOVATION WORK AREA,
AND TEMPORARY HEAT DETECTION OR ADEQUATE ALTERNATE PROTECTION THROUGHOUT THE
SPACE, AS COORDINATED WITH, AND APPROVED BY, THE TENANT'S AND OWNER'S FIRE PREVENTION
PROGRAM MANAGER, BUILDING MANAGER, CONSTRUCTION MANAGER, INSURANCE UNDERWRITERS,
AND ALL AUTHORITIES HAVING JURISDICTION.
12. SAFEGUARDING SHALL ALSO APPLY TO ALL RELATED PHASING, SHUT-DOWNS, SWING SPACES, TEMPORARY SERVICES AND FACILITIES, RELOCATIONS, ETC. ALTERNATIVE SAFEGUARDING SUCH
AS, BUT NOT LIMITED TO, FIRE WATCH PERSONNEL, OR TEMPORARY FIRE PROTECTION SYSTEMS, MAY BE CONSIDERED IF ACCEPTABLE TO THE TENANT/OWNER AND AUTHORITIES HAVING
JURISDICTION. REFER TO, AND COORDINATE WITH, FIRE ALARM SYSTEMS DOCUMENTS, AND
SAFEGUARDING AND IMPAIRMENTS NOTES AND SPECIFICATIONS. COORDINATE WITH FIRE ALARM
SYSTEM CONTRACTOR AND ALL OTHER TRADES.
13. PROVIDE (AND INCLUDE AS SHOP DRAWINGS SUBMITTALS) A COMPLETE DEMOLITION, ALTERATION, CONSTRUCTION, PHASING AND IMPAIRMENT PLAN TO INCLUDE THE SAFEGUARDING INFORMATION
ABOVE, A SCHEDULE OF PROJECT MILESTONES AND RELATED WORK, AND AN ANTICIPATED
SCHEDULE FOR INSTALLATION, IMPAIRMENTS, PROGRAMMING AND ALL PHASES OF FINAL TESTING
AND COMPLETION OF THE WORK. THIS PLAN SHALL BE COORDINATED WITH ALL AUTHORITIES
HAVING JURISDICTION, THE TENANT'S/OWNER'S FIRE PREVENTION PROGRAM MANAGER,
CONSTRUCTION MANAGER, AND SHALL INCLUDE ANY AND ALL INFORMATION, DRAWINGS, AND
GRAPHICS TO MEET THE APPROVAL OF THE AUTHORITIES HAVING JURISDICTION. THE
CONTRACTORS SHALL PROVIDE FIREWATCH PERSONNEL OR TEMPORARY PROTECTION AS
REQUIRED BY ANY AUTHORITIES HAVING JURISDICTION, THE TENANT/OWNER, OR THE
TENANT'S/OWNER'S INSURANCE UNDERWRITERS.
14. THE ABOVE IMPAIRMENT PLAN SHALL BE APPROVED BY ALL AUTHORITIES, TENANT/OWNER FIRE
PREVENTION PROGRAM MANAGER, TENANT/OWNER INSURANCE UNDERWRITERS, ETC., PRIOR TO
ANY SHUTDOWNS OR IMPAIRMENTS.
FIRE PROTECTION GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND SYSTEMS TO WHICH NEW
CONNECTIONS ARE MADE BECAUSE THIS WORK IS RENOVATION WORK. LOCATIONS OF PIPING,
ELEVATIONS, SIZES, ETC. HAVE BEEN OBTAINED FROM THE BEST SOURCES AVAILABLE AND MUST
BE FIELD VERIFIED PRIOR TO COMMENCING WORK IN AREAS WHERE RENOVATIONS ARE TO TAKE
PLACE. NOTIFY ARCHITECT FOR DIRECTION IF ANY DIFFERENCES ARISE BETWEEN ON-SITE
CONDITIONS AND CONDITIONS SHOWN ON THE DRAWINGS AS EXISTING.
2. NEW HEADS AND PIPING ETC. ARE DRAWN IN HEAVILY.
3. EXISTING AND/OR NOT IN CONTRACT SPRINKLER AND STANDPIPE PIPING, HEADS AND DEVICES
ARE DRAWN LIGHTLY OR ARE NOTED ON PLANS.
4. EXISTING SPRINKLER AND STANDPIPE PIPING, HEADS AND DEVICES TO BE REMOVED ARE DRAWN
CROSSHATCHED OR ARE NOTED ON PLANS.
5. COORDINATE SPRINKLER SYSTEM SHUTDOWN WITH OWNER AND GENERAL CONTRACTOR,
PERFORM SHUTDOWNS ON PREMIUM TIME IF NECESSARY. NOTIFY OWNER AT LEAST (1) WEEK
PRIOR TO ANY SHUTDOWN.
6. COORDINATE WORK WITH PHASING SCHEDULE. ALL WORK TO OCCUR AT OWNER'S CONVENIENCE.
NOTIFY OWNER WELL IN ADVANCE OF BEGINNING ANY PHASE OF WORK.
7. AFTER ANY SHUTDOWN, RETURN REMAINING SYSTEM TO ACTIVE CONDITION AS SOON AS
POSSIBLE.
8. IN NO CASE SHALL THE SPRINKLER SYSTEM BE INACTIVE AFTER WORKING HOURS.
9. IN CASES WHERE PORTIONS OF THE EXISTING BUILDING SHALL REMAIN IN OPERATION DURING
CONSTRUCTION, THE PHASING REQUIREMENTS SHALL BE MET BY THIS SUBCONTRACTOR AND ALL
REQUIRED PIPE, VALVES, AND FITTINGS NECESSARY TO ACCOMPLISH SAME SHALL BE PROVIDED.
10. IT SHALL BE THE RESPONSIBILITY OF THE FIRE PROTECTION SUBCONTRACTOR DURING
DEMOLITION TO SUPPORT AND PROTECT FROM DAMAGE ALL FIRE PROTECTION SYSTEMS WHICH
ARE EXISTING TO REMAIN. FIRE PROTECTION SYSTEMS SHALL BE SUPPORTED IN ACCORDANCE
WITH NFPA 13 AND 14.
11. FIRE PROTECTION SUBCONTRACTOR SHALL TAKE NOTICE OF THE BUILDING/SPRINKLER SYSTEM
ALARM ZONE SEPARATIONS INDICATED. FIRE PROTECTION SUBCONTRACTOR SHALL CONNECT
SPRINKLER HEADS AND PIPING FOR EACH BUILDING/ZONE TO THE SPRINKLER MAIN ORIGINATING
FROM THE FLOOR CONTROL VALVE STATION(S) SERVING THAT PARTICULAR ZONE.
12. SPRINKLER HEADS SHALL BE CENTERED IN CEILING TILES IN ALL LOCATIONS THAT HAVE CEILING
GRID.
13. IN AREAS WITHOUT FINISHED CEILINGS UPRIGHT SPRINKLER HEADS SHALL BE USED.
14. IN AREAS WITH FINISHED CEILINGS CONCEALED SPRINKLER HEADS SHALL BE USED UNLESS
OTHERWISE NOTED.
ARROW INDICATES DIRECTION OF SLOPE DOWN
INDICATING VALVE WITH SUPERVISORY SWITCH
CHECK VALVE W/ AUTOMATIC BALL DRIP
FPC
EX.
FIRE PROTECTION CONTRACTOR
EXISTING
NC
FBO
TYP
AFG
AFF
F & I
NTS
LFPC
NORMALLY CLOSED
FURNISHED BY OWNER
FURNISH & INSTALL
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
LIMIT OF FIRE PROTECTION CONTRACT
TYPICAL
NOT TO SCALE
NIFPC
MACV
FCVA
DCVA
TB
NOT IN FIRE PROTECTION CONTRACT
CONCRETE THRUST BLOCK
DOUBLE CHECK VALVE ASSEMBLY
FLOOR CONTROL VALVE ASSEMBLY
WET MAIN ALARM CHECK VALVE
FS
CV
VIV
WATERTIGHT SLEEVE
VALVE IN VERTICAL
FLOW SWITCH
CV
SD
ARROW INDICATES DIRECTION OF FLOW
CHECK VALVE
CAPPED PIPE
UPRIGHT SPRINKLER
PENDENT SPRINKLER
SIDEWALL SPRINKLER
SPRINKLER DRAIN
F
SPR
FSP
F
FIRE MAIN
FIRE MAIN UNDERGROUND
WET SPRINKLER PIPE
SPRINKLER RISER
NON-INDICATING VALVE
ELECTRIC ALARM BELL
DROP PIPE DROP
DN
UP
PIPE DOWN
PIPE UP
AP ACCESS PANEL
HOSE END DRAIN VALVEDV
FIRE PROTECTION LEGEND, SYMBOLS AND ABBREVIATIONS
HYDRAULIC NODE POINT DESIGNATION
SD
FSP
SPR
TH FIRE PUMP TEST HEADERTH
FDC FIRE DEPARTMENT INLET CONNECTIONFDC
FDC FIRE DEPARTMENT CONNECTION
WTS
F
F
EXTENDED COVERAGE SPRINKLER
EX
FLOOR:
AREA OF APPLICATION
FT2
HOSE ALLOWANCE
GPM
DENSITY
GPM/FT2
REMARKS:
SYSTEM TYPE:
HAZARD CLASSIFICATION
COVERAGE PER
SPRINKLER (FT2)
DENOTES SPRINKLER DESIGN
CRITERIA
TH FIRE PUMP TEST HEADER
TEMPORARY PROTECTION, IMPAIRMENTS
AND SAFEGUARDING
DRY PENDANT SPRINKLER
C-CLAMP WITH RESTRAINING STRAP
FOR PIPING 3" AND SMALLER
C-CLAMP WITH RESTRAINING STRAP TOP
BEAM FOR PIPING 3" AND SMALLER
SIDE BEAM CLAMP
HANGER ROD- TYPICAL
(SEE NOTE 1)
DOUBLE SIDED
BEAM CLAMP
STRUCTURAL STEEL
OR OPEN WEB STEEL
JOISTS - TYPICAL
CONCRETE FLOOR OR ROOF SLAB
METAL DECKING
METAL CHANNEL STRUT
NUT AND
WASHER
(TYPICAL)
BEAM CLAMP
(TYPICAL)
NOTE 1:
REFER TO PIPE HANGER DETAIL FOR HANGER ROD SIZE, FOR CEILING SUSPENDED EQUIPMENT PROVIDE MINIMUM 3/8"
DIAMETER HANGER ROD (REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS).
TYPICAL METHODS OF SECURING HANGER RODS TO
STRUCTURE STEEL DETAIL
NTS
HANGER ROD
LOCKING NUT
SUPPORT NUT
CLEVIS HANGER
PIPE
PROVIDE SPACER BAR TO
PREVENT HYDRAULIC UPLIFT
AT END OF BRANCH PIPING
BAND HANGER
3 INCH AND LARGER 2 1/2 INCH AND SMALLER
PIPE SIZE
4" AND SMALLER
5", 6" AND 8"
HANGER ROD SCHEDULE MAXIMUM HANGER SPACING
PIPE SIZE
1"
1 1/4"
1 1/2"
2"
2 1/2"
12'-0"
ROD SIZE
3/8" DIA.
1/2" DIA.
SPRINKLER PIPE HANGER
INSTALLATION DETAIL
NTS
BRANCH PIPING END RESTRAINT (LOCATED ONLY AT END
OF BRANCH PIPING) INSTALLED PER NFPA 13
HANGER SPACING
3"
4" - 8"
NOTE: ALL HANGERS SHALL BE IN ACCORDANCE WITH
NFPA 13, NFPA 14 AND NFPA 24.
12'-0"
15'-0"
15'-0"
15'-0"
15'-0"
15'-0"
STANDARD ROLL GROOVE SPECIFICATIONS AND ALLOWANCES
REQUIRED FOR FIRE PROTECTION STEEL PIPING
NTS
D
C
BA
FOD
B
T
NOMINAL
SIZE
(INCHES)
PIPE
OUTSIDE
DIAMETER
"O.D."
(INCHES)
GASKET
SEAT
"A"
(INCHES)
GROOVED
WIDTH
"B"
(INCHES)
GROOVED
DIAMETER
"C"
(INCHES)
GROOVED
DEPTH
"D"
(INCHES)
MINIMUM
ALLOWABLE
WALL
THICKNESS
"T"
(INCHES)
MAXIMUM
ALLOWABLE
FLARE
DIAMETER
"F"
(INCHES)
2 1/2 2.875 0.625 0.344 2.720 0.078 2.98 0.083
3 3.500 0.625 0.344 3.344 0.078 3.60 0.083
4 4.500 0.625 0.344 4.334 0.083 4.60 0.083
6 6.625 0.625 0.344 6.455 0.085 6.73 0.109
8 8.625 0.750 0.469 8.441 0.092 8.80 0.109
10 10.750 0.750 0.469 10.562 0.094 10.92 0.134
12 12.750 0.750 0.469 12.531 0.109 12.92 0.156
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \P
F P
V
A P
R O
V
V z ro h lf s b rp lu s a .c o m
.r v t
/5
/2
:3
:0
A
M
FP0000
FIRE PROTECTION
11/09/2018 RWH ZTR
100% CONSTRUCTION
DOCUMENTS
Number: Revisions: Date:
drussoniello Snapshot
UP
DN
G
H
5.5
F5
F E6 E D
W
Z
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I
X
Y
E-1.3
E-1.5E-F
E-E
E-1
E-1.6
AA
REMOVE FIRE PROTECTION MAIN
PIPING BACK TO LIMIT OF RENOVATION.
EX. 4" SPR
EX.
FCVA
DEMOLISH ALL FIRE PROTECTION
PIPING AND SPRINKLERS WITHIN
INDICATED AREA.
EX. 6" STANDPIPE UP&DN
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \P
F P
V
A P
R O
V
V z ro h lf s b rp lu s a .c o m
.r v t
/5
/2
:3
:0
A
M
FPD1102
FIRE PROTECTION LEVEL 2 - DEMOLITION
11/09/2018 RWH ZTR
100% CONSTRUCTION
DOCUMENTS
Number: Revisions: Date:
DNUP
UPDN
G
H
5.5
F5
F E6 E D
W
Z
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I
X
Y
E-1.3
E-1.5E-F
E-E
E-1
E-1.6
AA
4" SPR
4" S
P R
4" S
P R
4" SPR
4" S
P R4"
S
PR
4" SPR
4"
SPR
EX. FCVA
EX. 6" STANDPIPE UP&DN
EX. 4" SPR
EX. 4" SPR
4" SPR 4" SPR4" SPR 4" SPR 4" SPR
4" S
P R
4" S
P R
4" S
P R
4"
SPR
SYSTEM TYPE:
DENSITY:
REMARKS:
AREA OF APPLICATION
HOSE ALLOWANCE
GPM/FT²
GPM/SPRINKLER
MAX PROTECTION AREA
FT²
AREA BELOW INTERSTITIAL SPACE; NO
PARKED CARS.
WET
ORDINARY HAZARD GROUP 1
0.15 1,500
1. QUICK RESPONSE, RECESSED
PENDANTS SHALL BE PROVIDED IN
AREAS WITH CEILINGS.
2. QUICK RESPONSE, UPRIGHT
SPRINKLERS SHALL BE PROVIDED IN
AREAS WITHOUT CEILINGS.
BEAM PENETRATION
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \P
F P
V
A P
R O
V
V z ro h lf s b rp lu s a .c o m
.r v t
/5
/2
:3
:0
A
M
FP1201
FIRE PROTECTION LEVEL 1
11/09/2018 RWH ZTR
100% CONSTRUCTION
DOCUMENTS
Number: Revisions: Date:
BBFBBF
G
H
5.5
CONFERENCE
OFFICE,
MD
OFFICE,
DIRECTOR
MD.
OFFICE,
PD
TRAINING
OFFICE,
SOCIAL
WORKER
CORRIDOR
A
C200A
CLEAN
UTILITY/SUPPLY
EXAM
ROOM
STAFF
CORRIDOR
C200D
STAFF
LOUNGE
STAFF
LOCKER
EMERG.
ELECT.
TEAM
SPACE
TREATMENT
#7
214I
BARI.
TREATMENT
#2
214H
BARI.
TREATMENT
#1
214G
TREATMENT
#1
214A
TREATMENT
#2
214B
TREATMENT
#3
214C
TREATMENT
#4
214D
TREATMENT
#5
214E
TREATMENT
#6
214F
TREATMENT
#8
214J
TREATMENT
#9
214K
TREATMENT
#10
214L
TREATMENT
#11
214M
ISO
TREATMENT
#1
PRIVATE
TREATMENT
#1
ELECT.
EQUIPMENT
STORAGE
SOILED
UTILITY
EQUIPMENT
PROCESSING,
CLEAN
PREP/STORE
CORRIDOR
C
C200C
EXIST.
SOUTH
STAIR
A-2-S
WATER
TREATMENT
STORAGE
F5
STERILE
SUPPLY
STAFF TLT
STAFF TLT
PATIENT
LOCKERS
EXIST.
EAST
STAIR
CORRIDOR
B
C200B-2
TREATMENT
ROOM
CORRIDOR
PATIENT
TOILET
OFFICE,
DIETITIAN
EXIST.
NORTH
STAIR
EXIST.
VESTIBULE
HT/WT
OFFICE,
FELLOW /
RN PD
NOURISHMENT
ALCOVE,
CRASH
CART
218A
OFFICE,
NURSE
MGR.
EQUIPMENT
PROCESSING,
SOILED
DIALYSATE
PREP
WATER
TREATMENT
EQUIPMENT
REPAIR
MEDICATION
EX. FCVA
EX. 4" SPR
4"
SPR
4" SPR
3" SPR
3" SPR1"
S
PR
4" S
P R
3" SPR
3" SPR
3" SPR
EX. 6" STANDPIPE UP&DN
F E6 E D
W
Z
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I
X
Y
E-1.3
E-1.5E-F
E-E
E-1
E-1.6
AA
SYSTEM TYPE:
DENSITY:
REMARKS:
AREA OF APPLICATION
HOSE ALLOWANCE
GPM/FT²
GPM/SPRINKLER
MAX PROTECTION AREA
FT²
EQUIPMENT PROCESSING, SOILED
WET
ORDINARY HAZARD GROUP 2
0.20 1,500
1. QUICK RESPONSE, RECESSED
PENDANTS SHALL BE PROVIDED IN
AREAS WITH CEILINGS.
2. QUICK RESPONSE, UPRIGHT
SPRINKLERS SHALL BE PROVIDED IN
AREAS WITHOUT CEILINGS.
SYSTEM TYPE:
DENSITY:
REMARKS:
AREA OF APPLICATION
HOSE ALLOWANCE
GPM/FT²
GPM/SPRINKLER
MAX PROTECTION AREA
FT²
STORAGE ROOMS, CLEANING ROOMS,
REPAIR ROOMS, LOCKER ROOMS
WET
ORDINARY HAZARD GROUP 2
0.20 1,500
1. QUICK RESPONSE, RECESSED
PENDANTS SHALL BE PROVIDED IN
AREAS WITH CEILINGS.
2. QUICK RESPONSE, UPRIGHT
SPRINKLERS SHALL BE PROVIDED IN
AREAS WITHOUT CEILINGS.
EX. 4" SPR
SYSTEM TYPE:
DENSITY:
REMARKS:
AREA OF APPLICATION
HOSE ALLOWANCE
GPM/FT²
GPM/SPRINKLER
MAX PROTECTION AREA
FT²
STORAGE, SUPPLY, EMERGENCY
ELECTRICAL
WET
ORDINARY HAZARD GROUP 2
0.20 1,500
1. QUICK RESPONSE, RECESSED
PENDANTS SHALL BE PROVIDED IN
AREAS WITH CEILINGS.
2. QUICK RESPONSE, UPRIGHT
SPRINKLERS SHALL BE PROVIDED IN
AREAS WITHOUT CEILINGS.
CORRIDOR
B
EXIST. IT
SECUR.
ROOM
229A
EXIST.
LINEN
CHUTE
ALCOVE
CHASE
2C2C
WAITING
ISO TLT #1
216A
ANTE-ROOM
ISO
TREATMENT
#1
WOMEN'S
PUBLIC
201B
MEN'S
PUBLIC
201A
4" SPR
3" SPR 3" SPR
4" S
P R
3" SPR
3" SPR
CORRIDOR
C
C1AA
RECEPTION
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \P
F P
V
A P
R O
V
V z ro h lf s b rp lu s a .c o m
.r v t
/5
/2
:3
:0
A
M
FP1202
FIRE PROTECTION LEVEL 2
11/09/2018 RWH ZTR
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
LEVEL 2 - RCP
Number: Revisions: Date:
G
H
5.5
F5
F E6 E D
W
Z
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I
X
Y
E-1.3
E-1.5 E-F
E-E
E-1
E-1.6
AA
ELECT.
ROOM
MECHANICAL
PENTHOUSE
EXIST.
SOUTH
STAIR
EXIST.
STAIRHALL
A-3
121B
PENTHOUSE
VESTIBULE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PRIMARY
CARE
OFFICE
VEST
ELECTRICAL
CLOSET
JAN.
CLOSET
STORAGE
SOCIAL
WORKER
OFFICE
PSYCH
OFFICE
CHARTING
306STAFF
LOUNGE
GROUP
ROOM
OTP
DIRECTOR
STEAM
CHASE
D300
EX. FCVA
EX. 6" STANDPIPE UP&DN3"
S
P R
3" SPR
3" SPR
3" SPR
3" SPR
3" SPR
1" SPR
EX. 4" SPR
SYSTEM TYPE:
DENSITY:
REMARKS:
AREA OF APPLICATION
HOSE ALLOWANCE
GPM/FT²
GPM/SPRINKLER
MAX PROTECTION AREA
FT²
STORAGE, SUPPLY, EMERGENCY
ELECTRICAL
WET
ORDINARY HAZARD GROUP 2
0.20 1,500
1. QUICK RESPONSE, RECESSED
PENDANTS SHALL BE PROVIDED IN
AREAS WITH CEILINGS.
2. QUICK RESPONSE, UPRIGHT
SPRINKLERS SHALL BE PROVIDED IN
AREAS WITHOUT CEILINGS.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \P
F P
V
A P
R O
V
V z ro h lf s b rp lu s a .c o m
.r v t
/5
/2
:3
:0
A
M
FP1203
FIRE PROTECTION LEVEL 3
11/09/2018 RWH ZTR
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
LEVEL 3 - Fire Protection
Number: Revisions: Date:
drussoniello Snapshot
| FP0000 - FIRE PROTECTION |
| FPD1102 - FIRE PROTECTION LEVEL 2 - DEMOLITION |
| FP1201 - FIRE PROTECTION LEVEL 1 |
| FP1202 - FIRE PROTECTION LEVEL 2 |
| FP1203 - FIRE PROTECTION LEVEL 3 |