36E77619R0086-003.pdf
PDF 4 MB Posted
- Attached to
- Replace Hemodialysis Unit Federal contract opportunity
- Solicitation number
- 36E77619R0086
About this file
36E77619R0086 Attachment 2 - General.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Replace Hemodialysis Unit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:0 :1
P
M
GI.100
COVER SHEET
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
DEPARTMENT OF VETERANS AFFAIRS
VA MEDICAL CENTER PROVIDENCE, RHODE ISLAND
EXPAND BUILDING 1 TO REPLACE HEMODIALYSIS
VA PROJECT #650-342
PAYETTE PROJECT # 35922.00
Architect
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax:617-895-1002
MEP-FP Engineering
Bard, Rao + Athanas Consulting Engineers, LLC 10 Guest Street, 4th Floor Boston, MA 02135 Tel: 617-254-0016
Structural Engineering
Odeh Engineers 1223 Mineral Spring Avenue North Providence RI 02904 Tel: 401-724-1771 Fax: 401-724-1981
Number: Revisions: Date:
MATERIAL INDICATIONS DOOR TYPES REFLECTED CEILING PLANS GENERAL NOTES
ABBREVIATIONS
1. DIMENSIONS TO LOCATE PARTITIONS ARE GIVEN TYPICALLY TO THE FINISHED FACE.
PARTITIONS THAT GRAPHICALLY CENTER ON A GRID OR WINDOW MULLION ARE TO BE
CENTERED AS SHOWN UNLESS OTHERWISE NOTED. NEW PARTITIONS AND SURFACES
THAT ARE SHOWN TO ALIGN WITH EXISTING SURFACES ARE TO BE ALIGNED AND
FINISHED SMOOTH AND FLUSH.
2. CONTRACT LIMIT LINES SHALL BE WHERE INDICATED ON THE DRAWINGS.
HOWEVER, IN ORDER TO COMPLETE OR FACILITATE INDICATED WORK, CONTRACTOR
MAY BE REQUIRED TO CARRY OUT WORK ADJACENT TO, BUT OUTSIDE INDICATED
LIMITS.
3. COORDINATE THE SIZE AND LOCATION OF ALL MECHANICAL AND ELECTRICAL
EQUIPMENT PADS WITH EQUIPMENT PROVIDED.
4. AN UPPER CASE LETTER INDICATES NEW COLUMN GRID LINES. AN UPPER CASE LETTER
FOLLOWED BY A LOWER CASE LETTER "E" INDICATES EXISTING COLUMN GRID LINES.
UNDISTURBED EARTH
COMPACTED FILL
DRAINAGE FILL
CAST-IN-PLACE CONCRETE
PRECAST CONCRETE
STONE
BRICK
CONCRETE MASONRY UNITS
TERRA COTTA
STEEL
ALL OTHER METALS
PLYWOOD
HARDWOOD CUT IN SECTION
FINISH WOOD FACE SEEN IN ELEVATION
CONTINUOUS WOOD BLOCKING/FRAMING
NON-CONTINUOUS WOOD BLOCKING/FRAMING
PLASTIC LAMINATE
RIGID INSULATION
BATT INSULATION
SPRAYED FIRE-RESISTIVE MATERIAL
EXTERIOR INSULATION AND FINISH SYSTEM
WATERPROOFING
ROOFING
AIR BARRIER
GLASS
GYPSUM BOARD
FLOOR TILE
ACOUSTICAL CEILING TILE
TERRAZZO
SYMBOLS
COLUMN LINE
DOOR SYMBOL
WINDOW SYMBOL
DOOR NUMBER0105a A
WIN
LOUVER SYMBOL
WIN
CASEWORK SYMBOLS
CSWCSW
CSWCSW
PAINT COLOR DESIGNATION
X
X1
PARTITION TYPE SYMBOL
--- ROOM NUMBER
EQUIPMENT NUMBER
EQUIPMENT NUMBER
TOP OF SLAB
ELEV = 100'-0"
ELEVATION MARKER
DATUM POINT
TOP OF SLAB
ELEV = 100'-0"
PLAN DETAIL
SHEET NUMBER
SECTION IDENTIFICATION
IF APPLICABLE
A101
SIM
EXTERIOR ELEVATION
A
B
C
D
ELEVATION IDENTIFICATION
SHEET NUMBER
INTERIOR ELEVATION
A
B
C
D
ELEVATION IDENTIFICATION
SHEET NUMBER
WALL SECTION
--- SHEET NUMBER
SECTION IDENTIFICATION
BUILDING SECTION
--- SHEET NUMBER
SECTION IDENTIFICATION
DETAIL
--- SHEET NUMBER
SECTION IDENTIFICATION
TITLE
SCALE:
DRAWING SUBTITLE
DRAWING TITLE
TYPICAL DOOR
180° HOLD-OPEN
DOUBLE ACTING
CASED OPENING
SPRINKLER HEAD - TYPICAL
H
S
S
SPRINKLER HEAD - SPECIAL
SPRINKLER HEAD - SIDE WALL
HEAT DETECTOR
SMOKE DETECTOR
SPEAKER
EXIT SIGN - CEILING MOUNTED
EXIT SIGN - WALL MOUNTED
SUPPLY DIFFUSER
FLOOR PLANS
ROOM IDENTIFICATION
RETURN OR EXHAUST DIFFUSER
FLUORESCENT LIGHT FIXTURE - RECESSED
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED
BI-FOLDING DOOR
POCKET DOOR
UNEQUAL LEAF
OVERHEAD COILING DOOR
SLIDING DOOR
PAIR
DOUBLE EGRESS
WALL INDICATIONS
TYPICAL NEW CONSTRUCTION
TYPICAL WINDOW
WINDOW WALL
LOUVER
RECESSED ITEM
EXISTING TO REMAIN
EXISTING TO BE REMOVED
LINETYPES
OVERHEAD (OVERCOUNTER AND SOFFITS)
BELOW AND BEYOND
(UNDERCOUNTER AND FOOTINGS)
REFERENCE (COLUMN LINES AND MATCHLINES)
LIMIT OF WORK LINE
BREAK LINE
MATCH LINE
DOCUMENT REVISION
SEE DRAWING ---
SEE DRAWING ---
SMOKE PARTITION
2 HOUR FIRE RATING
1 HOUR FIRE RATING
FLUORESCENT LIGHT FIXTURE - SURFACE MOUNTED
FLUORESCENT LIGHT FIXTURE - PENDANT
FLUORESCENT LIGHT FIXTURE - LIGHT STRIP
INCANDESCENT LIGHT FIXTURE - SURFACE MOUNTED
INCANDESCENT LIGHT FIXTURE - RECESSED
INCANDESCENT LIGHT FIXTURE - WALL MOUNTED
SUSPENDED CEILING GRID
AP
ACCESS PANEL
ACOUSTIC TILE OR PANEL
FLOOR DRAIN F.D.
ROOF DRAIN R.D.
BUMPER RAIL
CORNER GUARD C.G.
ROOM AREA
ROOM NAME
AREA
Room Name
123 SF
ROOM IDENTIFICATION
ROOM NUMBER
AREA
CEILING FINISH KEY
WALL FINISH KEY
BASE FINISH KEY
FLOOR FINISH KEY
ROOM NAMERoom Name
F B W C
123 SF
& AND
L ANGLE
@ AT
C CENTERLINE
Ø DIAMETER
# POUND
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ALT ALTERNATE
AV AUDIOVISUAL
BOT BOTTOM
BOS BOTTOM OF STEEL
CG CORNER GUARD
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CASED OPENING
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CUH CABINET UNIT HEATER
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWG DRAWING
E EAST
EIFS EXTERIOR INSULATION & FINISH SYSTEM
EJ EXPANSION JOINT
EMER SHR EMERGENCY SHOWER
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXIST EXISTING
F/F FACE TO FACE
FACP FIRE ALARM CONTROL PANEL
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FTR FINNED TUBE RADIATION
G GAS
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GYP BD GYPSUM BOARD
HB HOSE BIBB
HPT HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IF INSIDE FACE
IG INSULATED GLASS
INT INTERIOR
L LEFT
LAB LABORATORY
LPT LOW POINT
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MO MASONRY OPENING
N NORTH
NIC NOT IN CONTRACT
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OF/CI OWNER FIRNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OPH OPPOSITE HAND
O OXYGEN
QT QUARRY TILE
R RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFRIGERATOR
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SHR SHOWER
SHRD SHOWER DRAIN
SIM SIMILAR
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
T TREAD
TD TRENCH DRAIN
TOC TOP OF CONCRETE SLAB
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
VAC VACUUM
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
W WEST
WH WALL HYDRANT
L
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:0 :2
P
M
GI.101
SHEET LIST & GENERAL NOTES,
ABBREVIATIONS & GRAPHIC STANDARDS
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
DRAWING LIST
Sheet Number Sheet Name
12 - FIRE PROTECTION
FP0000 FIRE PROTECTION
FPD1102 FIRE PROTECTION DEMO
FP1201 FIRE PROTECTION LEVEL 1
FP1202 FIRE PROTECTION LEVEL 2
FP1203 FIRE PROTECTION LEVEL 3
13 - PLUMBING
PL0000 PLUMBING LEGEND
PL0001 PLUMBING DETAILS
PL0002 PLUMBING SCHEDULES
PD1102 PLUMBING LEVEL 2 - DRAINAGE DEMOLITION
PD1202 PLUMBING LEVEL 2 - SUPPLY DEMOLITION
PL1201 PLUMBING LEVEL 1 - SUPPLY
PL1203 PLUMBING LEVEL 3 - SUPPLY
PD1101 PLUMBING LEVEL 1 - DRAINAGE DEMOLITION
PL1101 PLUMBING LEVEL 1 - DRAINAGE
PL1102 PLUMBING LEVEL 2 - DRAINAGE
PL1103 PLUMBING LEVEL 3 - DRAINAGE
PL1202 PLUMBING LEVEL 2 - SUPPLY
14 - MECHANICAL
MH.001 HVAC LEGEND
MD.101 FIRST FLOOR - HVAC DUCTWORK AND PIPING DEMOLITION PLAN
MD.102 SECOND FLOOR - HVAC DUCTWORK AND PIPING DEMOLITION PLAN
MH.100 BASEMENT - HVAC DUCTWORK AND PIPING PLAN
MH.101 FIRST FLOOR - HVAC DUCTWORK AND PIPING PLAN
MH.102 SECOND FLOOR - HVAC DUCTWORK PLAN
MH.103 THIRD FLOOR - HVAC ROOF PLAN
MP.SB SUB BASEMENT - HVAC PIPING PLAN
MP.202 SECOND FLOOR - HVAC PIPING PLAN
MH301 HVAC SECTIONS
MH.401 HVAC PENTHOUSE & PENTHOUSE ROOF PART PLANS
MH.500 HVAC AIR HANDLING UNIT DETAIL
MH.501 HVAC STANDARD DETAILS
MH.502 HVAC STANDARD DETAILS
MH.503 HVAC STANDARD DETAILS
MH.504 HVAC STANDARD DETAILS
MH.505 HVAC STANDARD DETAILS
MH.506 HVAC STANDARD DETAILS
MH.601 HVAC SCHEDULES
MH.602 HVAC SCHEDULES
MH.603 HVAC SCHEDULES
MH.604 HVAC SCHEDULES
MH.605 HVAC SCHEDULES
MH.701 HVAC AIR FLOW DIAGRAM
MH.702 HVAC STEAM FLOW DIAGRAM
MH.703 HVAC STEAM FLOW DIAGRAM
MH.704 HVAC CHILLED WATER FLOW DIAGRAM
MI.801 CONTROLS LEGEND
MI.802 CONTROLS LEGEND
MI.803 MIXED AIR AHU DIAGRAM AND POINTS LIST FOR AHU-1
MI.804 MIXED AIR AHU SEQUENCE OF OPERATION
MI.805 EXHAUST FAN DIAGRAMS, POINTS LIST & SEQUENCE OF OPERATION
MI.806 REHEAT / RADIANT SYSTEM STEAM TO HOT WATER HEX CONTROL
DIAGRAM, POINTS LIST & SEQUENCE OF OPERATION
MI.807 AHU / SOFFIT SYSTEM STEAM TO HOT WATER HEX CONTROL DIAGRAM,
POINTS LIST & SEQUENCE OF OPERATION
MI.808 PACKAGED AIR COOLED CHILLER SYSTEM CONTROLS
MI.809 TERMINAL UNIT DETAILS, POINTS LISTS & SEQUENCE OF OPERATIONS
MI.810 TERMINAL UNIT DETAIL, POINTS LIST & SEQUENCE OF OPERATION
MI.811 MECHANICAL CONTROL DIAGRAMS, POINTS LISTS & SEQUENCE OF
OPERATIONS
MI.812 PATIENT / ISOLATION ROOM DIAGRAMS, POINTS LISTS & SEQUENCE OF
OPERATIONS
MI.813 MISCELLANEOUS CONTROL DETAILS & POINTS LIST
MI.814 MISCELLANEOUS SYSTEMS
15 - ELECTRICAL
ES.000 ELECTRICAL LEGEND AND GENERAL NOTES
ES.101 ELECTRICAL POWER AND LICHTING DEMOLITION LEVEL 1
ES.102 ELECTRICAL POWER AND LIGHTING DEMOLITION LEVEL 2
ES.200 ELECTRICAL SITE LIGHTING
ES.201 ELECTRICAL LIGHTING LEVEL 1
ES.202 ELECTRICAL LIGHTING LEVEL 2
ES.203 ELECTRICAL LIGHTING LEVEL 3
ES.302 ELECTRICAL POWER LEVEL 2
ES.303 ELECTRICAL POWER LEVEL 3
ES.600 ELECTRICAL RISER
ES.601 ELECTRICAL SCHEDULES
ES.602 ELECTRICAL SCHEDULES
ES.700 ELECTRICAL DETAILS
ES.701 ELECTRICAL DETAILS
ES.800 ELECTRICAL LIGHTING PROTECTION PLAN
16 - FIRE ALARM
FA.001 FIRE ALARM DETAILS AND LEGEND
FA.002 FIRE ALARM RISER
FA.101 FIRE ALARM DEMOLITION LEVEL 1
FA.102 FIRE ALARM DEMOLITION LEVEL 2
FA.201 FIRE ALARM LEVEL 1
FA.202 FIRE ALARM LEVEL 2
FA.203 FIRE ALARM LEVEL 3
17 - NURSE CALL
NC.000 NURSE CALL LEGEND
NC.002 NURSE CALL RISER
NC.102 NURSE CALL DEMOLITION PLAN LEVEL 2
NC.202 NURSE CALL PLAN LEVEL 2
NC.700 NURSE CALL DETAILS
NC.701 NURSE CALL DETAILS
18 - TELECOM
T.000 COMMUNICATIONS LEGEND
T.002 COMMUNICATIONS RISER
T.102 COMMUNICATIONS DEMOLITION PLAN LEVEL 2
T.202 COMMUNICATIONS PLAN LEVEL 2
T.302 COMMUNICATIONS SPEAKER PLAN LEVEL 2
T.700 COMMUNICATIONS DETAILS
T.701 COMMUNICATIONS DETAILS
20 - SECURITY
SE.000 SECURITY LEGEND
SE.002 SECURITY RISER
SE.101 SECURITY DEMOLITION PLAN
SE.102 SECURITY DEMOLITION PLAN LEVEL 2
SE.201 SECURITY PLAN LEVEL 1
SE.202 SECURITY PLAN LEVEL 2
SE.700 SECURITY DETAILS
SE.701 SECURITY DETAILS
DRAWING LIST
Sheet Number Sheet Name
01 - GENERAL
GI.100 COVER SHEET
GI.101 SHEET LIST & GENERAL NOTES, ABBREVIATIONS & GRAPHIC STANDARDS
GI.102 PROPOSED SITE PLAN
02 - LIFE SAFETY
GI.103 FIRST FLOOR LIFE SAFETY PLAN
GI.104 SECOND FLOOR LIFE SAFETY PLAN
GI.105 THIRD FLOOR LIFE SAFETY PLAN
06 - CIVIL
EC.001 LOCUS PLAN NOTES AND LEGEND
EC.100 EXISTING CONDITIONS SITE PLAN
C.101 NOTES AND LEGEND
C.201 DEMOLITION, EROSION, AND SEDIMENT CONTROL PLAN
C.301 GENERAL PLAN
C.401 GRADING PLAN
C.501 DRAINAGE AND UTILITY PLAN
C.601 DETAILS 1
C.602 DETAILS 2
C.603 DETAILS 3
C.604 DETAILS 4
07 - LANDSCAPE
L1.00 LANDSCAPE PLAN
L2.00 LANDSCAPE LAYOUT PLAN
L3.00 LANDSCAPE DETAILS
L3.10 LANDSCAPE DETAILS
08 - STRUCTURAL
S0.0 GENERAL NOTES
S0.1 LOADS & DESIGN CRITERIA
S1.0 FOUNDATION PLAN
S1.1 SECOND FLOOR FRAMING PLAN
S1.2 ROOF FRAMING PLAN
S1.3 PENTHOUSE FRAMING PLAN
S1.4 SLAB REINFORCEMENT PLANS
S2.0 FRAMING ELEVATIONS
S2.1 FRAMING ELEVATIONS
S2.2 BUILDING SECTIONS
S2.3 BUILDING SECTIONS
S2.4 WALL SECTIONS
S3.0 FOUNDATION & CONCRETE DETAILS
S4.1 FRAMING DETAILS
S4.2 FRAMING DETAILS
S4.3 FRAMING DETAILS
S4.4 FRAMING DETAILS
S4.5 FRAMING DETAILS
S5.0 COLUMN SCHEDULE & BASE PLATE DETAILS
09 - ARCHITECTURAL
AD.100 FIRST FLOOR DEMOLITION PLAN
AD.101 SECOND FLOOR DEMOLITION PLAN
AD.102 HAZARDOUS MATERIALS SCOPING PLAN
AE.200 FIRST FLOOR PLAN
AE.201 SECOND FLOOR PLAN
AE.202 PENTHOUSE PLAN
AE.203 ROOF PLAN
AE.300 EXTERIOR ELEVATIONS
AE.301 EXTERIOR ELEVATIONS
AE.302 BUILDING SECTIONS
AE.401A SECOND FLOOR ENLARGED FLOOR PLAN
AE.401B SECOND FLOOR ENLARGED FLOOR PLAN
AE.402 FIRST & PENTHOUSE PARTIAL ENLARGED PLANS
AE.500 TYPICAL MOUNTING HEIGHTS
AE.501 INTERIOR ELEVATIONS
AE.502 INTERIOR ELEVATIONS
AE.503 INTERIOR ELEVATIONS - EXAM ROOM
AE.504 INTERIOR ELEVATIONS - TREATMENT BAY
AE.505 INTERIOR ELEVATIONS - ISOLATION ROOM
AE.506 INTERIOR ELEVATIONS - TEAM SPACE
AE.507 INTERIOR ELEVATIONS
AE.508 INTERIOR ELEVATIONS
AE.509 INTERIOR ELEVATIONS
AE.510 INTERIOR ELEVATIONS
AE.600 FIRST FLOOR REFLECTED CEILING PLAN
AE.601A SECOND FLOOR ENLARGED REFLECTED CEILING PLAN
AE.601B SECOND FLOOR ENLARGED REFLECTED CEILING PLAN
AE.602 PENTHOUSE REFLECTED CEILING PLAN
AE.800 WALL SECTIONS
AE.801 WALL SECTIONS
AE.803 METAL PANEL DETAILS
AE.804 EXTERIOR DETAILS
AE.805 ROOF DETAILS
AE.806 WINDOW DETAILS
AE.900 INTERIOR PARTITION SCHEDULE AND DETAILS
AE.901 TYPICAL FLOOR DETAILS & EXPANSION JOINTS
AE.910 TYPICAL CEILING DETAILS
AE.930 DOOR & FRAME SCHEDULES & DETAILS
AE.931 HOLLOW METAL FRAME DETAILS
AE.940 TYPICAL INTERIOR CASEWORK & MILLWORK DETAILS
AE.941 MISC. INTERIOR DETAILS
AI.100 SECOND FLOOR ENLARGED INTERIOR FINISH PLAN - AREA A
AI.101 SECOND FLOOR ENLARGED INTERIOR FINISH PLAN - AREA B
AQ.101 SECOND FLOOR ENLARGED EQUIPMENT PLAN
AQ.102 SECOND FLOOR ENLARGED EQUIPMENT PLAN
NEW CONSTRUCTION
BUILDING 1
C WING
A WING
ICU ADDITION
BLDG. 14
B WING
E WING
RENOVATION
PENTHOUSE
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:0 :3
P
M
GI.102
PROPOSED SITE PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1" = 20'-0"
1 SITE PLAN
N
BUILDING 14
PTSD CLINIC
PHARMACY
ICU ADDITION (ABOVE)
MAINTAIN EXISTING EGRESS DOOR
DURING CONSTRUCTION; STAIR
DOOR IS REQUIRED EXIT FROM
FLOORS ABOVE.
MAINTAIN EGRESS FROM
BUILDING STAIRWELL DURING
CONSTRUCTION; STAIR IS
REQUIRED EGRESS FOR
FLOORS ABOVE/BELOW.
EXIST. SOUTH
STAIR
NEW EGRESS STAIR;
SEE ARCHITECTURAL
PLANS
EXISTING LOADING DOOR AND
STAIRWELL TO REMAIN; MAINTAIN
EGRESS AND DELIVERY ACCESS FROM
PHARMACY DURING CONSTRUCTION.
48"
36"
BLDG. 27
FIRE PUMP
LOADING DOCK
C WING
BLDG. 1
MAIN LOBBY
ELEVATORS
36"
MAINTAIN EXISTING EXIT
DOOR TO PATIO DURING
RENOVATION OF
RAMPWAY
CREATE TEMPORARY PATH OF
EGRESS FROM COURTYARD
THROUGH LOADING ZONE; G.C.
REVIEW IMPACTS WITH VAMC
MAINTAIN EXISTING EXIT DOOR
DURING CONSTRUCTION; DOOR
PROVIDES EGRESS ACCESS
FROM FLOORS ABOVE
EXISTING DOOR MAY TEMPORARILY
SWING INWARD DURING CONSTRUCTION,
AS EGRESS FROM PHARMACY IS
PROVIDED FOR LESS THAN 50
OCCUPANTS.
EXIST.
NORTH
STAIR 'C'
EXIST. EAST
STAIR 'A'
LIFE SAFETY LEGEND
EGRESS PATH
2 HOUR FIRE RATING
3 HOUR FIRE RATING
CARE SUITE (NEW)
ADDED SMOKE
COMPARTMENT AREA
1 HOUR FIRE RATING
36"
EGRESS ACCESS
AND WIDTH
PROPOSED
TEMPORARY
EGRESS ACCESS
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:0 :3
P
M
GI.103
FIRST FLOOR LIFE SAFETY PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR- LIFE SAFETY PLAN
SEISMIC JOINT,
CONT.
EXIST.
SOUTH STAIR
EXISTING 1-HOUR
SMOKE BARRIER-
RELOCATE DOOR
AS SHOWN
REPLACE SMOKE
BARRIER WITH 2-HOUR
SEPARATION
AT EXISTING SECURITY
CLOSET
EXISTING 45 MINUTE
SMOKE AND FIRE
BARRIER
EXISTING SMOKE
COMPARTMENT # 2
ADDED AREA TO SMOKE
COMPARTMENT #1 (INCLUDING
TREATMENT AND OFFICE SUITES)
NEW 90 MINUTE RATED
EGRESS DOOR
EXIST. NORTH STAIR 'C'
NEW 90 MINUTE FIRE
RATED CROSS
CORRIDOR DOOR
SM
OKE
P
AR
TI
TI
ON
ALL CORRIDOR WALLS
TO BE CONSTRUCTED
AS SMOKE PARTITIONS
IN EXISTING A-WING
NEW 45 MINUTE
CROSS CORRIDOR
DOOR
NEW 90 MINUTE
FIRE RATED
CORRIDOR DOOR
SMOKE PARTITION
SM
OKE
P
AR
TI
TI
ON
90 MINUTE
FIRE RATED
DOOR
36"
36"
ICU ADDITION
BY SEPARATE PROJECT
BUILDING 1 "A" WING
BLDG. 27
EXISTING 2-HOUR
STAIR SEPARATION
M A X T
R A V E
L D
IS
T A N
C E T
O S
M O
K E C
O R
R
ID
O R
'-0
(7 6'
-0 A C
T U
A L)
EXIST. EAST
STAIR 'A'
SMOKE PARTITION
SMOKE PARTITION
ALL STAFF CORRIDOR
WALLS TO BE
CONSTRUCTED AS
SMOKE PARTITIONS
STAFF CORRIDOR
CORRIDOR C
TREATMENT
ROOM CORRIDOR
EXISTING SMOKE
COMPARTMENT # 1
(LIMITED CARE
FACILITY)
TREATMENT
SUITE
S M
O K E P
A R
T
IT
IO
N
ALL PUBLIC CORRIDOR
WALLS TO BE
CONSTRUCTED AS
SMOKE PARTITIONS
2- H
O U
R F
IR
E B
A R
R
IE
R
2-HOUR FIRE BARRIER
S M
O K E P
A R
T
IT
IO
N
M
AX DEAD END 30'-0"
(25'-0")
MAX DEAD END 30'-0"
(10'-0")
M
IN. TYP.
6' - 0"
M
IN. TYP.
6' - 0"
72"
SMOKE PARTITIONS
LIFE SAFETY LEGEND
EGRESS PATH
2 HOUR FIRE RATING
3 HOUR FIRE RATING
CARE SUITE (NEW)
ADDED SMOKE
COMPARTMENT AREA
1 HOUR FIRE RATING
36"
EGRESS ACCESS
AND WIDTH
PROPOSED
TEMPORARY
EGRESS ACCESS
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:0 :4
P
M
GI.104
SECOND FLOOR LIFE SAFETY PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
1 SECOND FLOOR- LIFE SAFETY PLAN
NEW 90 MINUTE EGRESS DOOR
*NOTE SWING PERMITTED AS
UNDER 50 OCCUPANTS
EXIST. SOUTH
STAIR
36"
2-HOUR CONSTRUCTION
AT TRANSFORMER ROOM
(INCLUDING FLOOR SLAB)
2-HOUR SEPARATION AT
FACE OF EXISTING
BUILDING
2-HOUR
SEPARATION AT
EXISTING STAIR
STAIRWELL A-3
M
AXIM
UM
TRAVEL DISTANCE 100'-0"
(60'-0" ACTUAL)
LIFE SAFETY LEGEND
EGRESS PATH
2 HOUR FIRE RATING
3 HOUR FIRE RATING
CARE SUITE (NEW)
ADDED SMOKE
COMPARTMENT AREA
1 HOUR FIRE RATING
36"
EGRESS ACCESS
AND WIDTH
PROPOSED
TEMPORARY
EGRESS ACCESS
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:0 :4
P
M
GI.105
THIRD FLOOR LIFE SAFETY PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
1 ROOF FLOOR - LIFE SAFETY PLAN
| Sheets |
| AD.100 - FIRST FLOOR DEMOLITION PLAN |
| AD.101 - SECOND FLOOR DEMOLITION PLAN |
| AD.102 - HAZARDOUS MATERIALS SCOPING PLAN |
| AE.200 - FIRST FLOOR PLAN |
| AE.201 - SECOND FLOOR PLAN |
| AE.202 - PENTHOUSE PLAN |
| AE.203 - ROOF PLAN |
| AE.300 - EXTERIOR ELEVATIONS |
| AE.301 - EXTERIOR ELEVATIONS |
| AE.302 - BUILDING SECTIONS |
| AE.401A - SECOND FLOOR ENLARGED FLOOR PLAN |
| AE.401B - SECOND FLOOR ENLARGED FLOOR PLAN |
| AE.402 - FIRST & PENTHOUSE PARTIAL ENLARGED PLANS |
| AE.500 - TYPICAL MOUNTING HEIGHTS |
| AE.501 - INTERIOR ELEVATIONS |
| AE.502 - INTERIOR ELEVATIONS |
| AE.503 - INTERIOR ELEVATIONS - EXAM ROOM |
| AE.504 - INTERIOR ELEVATIONS - TREATMENT BAY |
| AE.505 - INTERIOR ELEVATIONS - ISOLATION ROOM |
| AE.506 - INTERIOR ELEVATIONS - TEAM SPACE |
| AE.507 - INTERIOR ELEVATIONS |
| AE.508 - INTERIOR ELEVATIONS |
| AE.509 - INTERIOR ELEVATIONS |
| AE.510 - INTERIOR ELEVATIONS |
| AE.600 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE.601A - SECOND FLOOR ENLARGED REFLECTED CEILING PLAN |
| AE.601B - SECOND FLOOR ENLARGED REFLECTED CEILING PLAN |
| AE.602 - PENTHOUSE REFLECTED CEILING PLAN |
| AE.800 - WALL SECTIONS |
| AE.801 - WALL SECTIONS |
| AE.803 - METAL PANEL DETAILS |
| AE.804 - EXTERIOR DETAILS |
| AE.805 - ROOF DETAILS |
| AE.806 - WINDOW DETAILS |
| AE.900 - INTERIOR PARTITION SCHEDULE AND DETAILS |
| AE.901 - TYPICAL FLOOR DETAILS & EXPANSION JOINTS |
| AE.910 - TYPICAL CEILING DETAILS |
| AE.930 - DOOR & FRAME SCHEDULES & DETAILS |
| AE.931 - HOLLOW METAL FRAME DETAILS |
| AE.940 - TYPICAL INTERIOR CASEWORK & MILLWORK DETAILS |
| AE.941 - MISC. INTERIOR DETAILS |
| AI.100 - SECOND FLOOR ENLARGED INTERIOR FINISH PLAN - AREA A |
| AI.101 - SECOND FLOOR ENLARGED INTERIOR FINISH PLAN - AREA B |
| AQ.101 - SECOND FLOOR ENLARGED EQUIPMENT PLAN |
| AQ.102 - SECOND FLOOR ENLARGED EQUIPMENT PLAN |
| GI.100 - COVER SHEET |
| GI.101 - SHEET LIST & GENERAL NOTES, ABBREVIATIONS & GRAPHIC STANDARDS |
| GI.102 - PROPOSED SITE PLAN |
| GI.103 - FIRST FLOOR LIFE SAFETY PLAN |
| GI.104 - SECOND FLOOR LIFE SAFETY PLAN |
| GI.105 - THIRD FLOOR LIFE SAFETY PLAN |
File details come from the government source that posted it.