36E77619R0086-012.pdf

PDF 16 MB Posted

Attached to
Replace Hemodialysis Unit Federal contract opportunity
Solicitation number
36E77619R0086
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77619R0086 Attachment 11 - Mechanical 1 of 3.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Hemodialysis Unit, newest first.
File Type Posted
36E77619R0086-0002001.pdf PDF
36E77619R0086-0002002.pdf PDF
36E77619R0086-0002000.docx DOCX document
36E77619R0086-0002002.pdf PDF
36E77619R0086-0002001.pdf PDF
36E77619R0086-0001000.docx DOCX document
36E77619R0086-0001001.pdf PDF
36E77619R0086-0001001.pdf PDF
36E77619R0086-0001000.docx DOCX document
36E77619R0086-007.pdf PDF
36E77619R0086-010.pdf PDF
36E77619R0086-020.docx DOCX document
36E77619R0086-012.pdf PDF
36E77619R0086-014.pdf PDF
36E77619R0086-018.pdf PDF
36E77619R0086-003.pdf PDF
36E77619R0086-001.docx DOCX document
36E77619R0086-016.pdf PDF
36E77619R0086-005.pdf PDF
36E77619R0086-002.pdf PDF
36E77619R0086-006.pdf PDF
36E77619R0086-015.pdf PDF
36E77619R0086-017.pdf PDF
36E77619R0086-004.pdf PDF
36E77619R0086-021.pdf PDF
36E77619R0086-019.docx DOCX document
36E77619R0086-009.pdf PDF
36E77619R0086-013.pdf PDF
36E77619R0086-016.pdf PDF
36E77619R0086-017.pdf PDF
36E77619R0086-021.pdf PDF
36E77619R0086-008.pdf PDF
36E77619R0086-002.pdf PDF
36E77619R0086-011.pdf PDF
36E77619R0086-019.docx DOCX document
36E77619R0086-020.docx DOCX document
36E77619R0086-009.pdf PDF
36E77619R0086-004.pdf PDF
36E77619R0086-006.pdf PDF
36E77619R0086-014.pdf PDF
36E77619R0086-013.pdf PDF
36E77619R0086-001.docx DOCX document
36E77619R0086-018.pdf PDF
36E77619R0086-005.pdf PDF
36E77619R0086-010.pdf PDF
36E77619R0086-015.pdf PDF
36E77619R0086-003.pdf PDF
36E77619R0086-007.pdf PDF
36E77619R0086-000.docx DOCX document
36E77619R0086-000.docx DOCX document
Show all 50

Replace Hemodialysis Unit has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONFORMED CONSTRUCTION

DOCUMENTS

DN

UPDN

G

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

I E D

X

Y

E-1.3

E-1.5

E-F

E-E

E-1

E-1.6

AA

X.5

EXISTING

CABINET UNIT

HEATER TO

REMAIN.

UP TO EXISTING EXHAUST

FAN ON ROOF ABOVE

12x6

12x6

UP TO EXISTING EXHAUST

FAN ON ROOF ABOVE

REMOVE DUCTWORK

EXISTING

EXHAUST FAN

TO REMAIN.

EXISTING

EXHAUST FAN

TO REMAIN.

REMOVE EXISTING

EXHAUST FAN.

SERVES CRYOGENIC NITROGEN ASPHIXIATION

SERVES OXYGEN STORAGE ROOM

EXISTING HWS/R UP/DN

TO REMAIN

EXISTING HWS/R UP/DN

TO REMAINEXISTING HWS/R UP/DN

TO REMAIN

EXISTING FTR

TO REMAIN

EXISTING FTR

TO REMAIN

EXISTING FTR

TO REMAIN

RELOCATE AND RE-CONNECT EXISTING

SUPPLY DIFFUSER TO ACCOMMODATE

NEW PIPE CHASE. REBALANCE TO EXISTING CFM.

EXISITNG AC

CONDENSER

UNIT TO REMAIN.

EXISTING EXHAUST FAN AND AC UNIT SHALL

BE PROTECTED DURING CONSTRUCTION.

THE CONTRACTOR SHALL PROVIDE PROTECTION

AS REQUIRED TO MAINTAIN EQUIPMENT OPERTIONAL .

1) DEMOLITION AND NEW WORK SHALL BE PHASED TO MINIMIZE

DISRUPTION OF FACILITY OPERATION. PROVIDE TEMPORARY CAPPING

AND CONNECTIONS AS REQUIRED TO MAINTAIN EXISTING SYSTEMS

DURING CONSTRUCTION. COORDINATE ALL PHASING OF DEMOLITION

AND SHUT-DOWNS OF EXISTING SYSTEMS WITH BUILDING MANAGER.

2.)INFORMATION ON EXISTING SYSTEMS HAS BEEN OBTAINED FROM

ORIGINAL DESIGN DRAWINGS SUBSEQUENT RENOVATION DRAWINGS.

THE HVAC CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS

PRIOR TO DEMOLITION OR DEACTIVATION.

3.)THE HVAC CONTRACTOR SHALL PERFORM SITE VISITS AS NECESSARY

IN ORDER TO EVALUATE EXISTING CONDITIONS PRIOR TO SUBMITTING A BID.

4.)THE TERM "CAP" AND ITS INDICATION ON THESE PLANS IS FOR THE CONVENIENCE

OF THE CONTRACTOR REGARDLESS OF WHETHER OR NOT INDICATED, AFTER DEMOLITION

ALL DUCTS SHALL BE CAPPED AIR TIGHT. THIS SHALL INCLUDE TEMPORARY CAPS PENDING

NEW CONNECTIONS AND PERMANENT CAPPING INCLUDING INSULATION.

POINT OF DEMOLITION. CUT AND CAP UNTIL NEW WORK BEINGS. CUT AND RESUME DOWNSTREAM.

DEMOLITION GENERAL NOTES:

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:1 :1

P

M

MD.101

FIRST FLOOR - HVAC DUCTWORK AND

PIPING DEMOLITION PLAN

11/09/2018 Checker RPB

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

FIRST FLOOR - HVAC DEMOLITION PLAN

Number: Revisions: Date:

UP

10x10

8x

8x

8x8

16x14 x1

8"∅

10"∅

8"∅

10"∅ x1

8x6

X6

16X14

16x12

12x6

12x6 x1 x1 x6 x8

18x10

FD

14x10

14x6

10"∅

12x10

FD

FD

250 CFM

S-C21

S202

S203

S204

S221

S222

S223

S224

S225

S-C20

SD

SD

8"∅

8"∅

12"∅

12X10

FD12X6

X6

12X6

SP

FD

S-1-2

S201

CORRIDOR

FAMILY

WAITING

FAMILY/

CONSULT

TOILET

STAIR

TOILET

NURSE

MANAGER

ELECT.

E. ELECT.

TEL/DATA

ABG

CONNECTOR

CORRIDOR

ATS CLOSET

PACU POST OR

PRESURGERY

BED

PACU POST OR

PRESURGERY

BED

PACU POST OR

PRESURGERY

BED

PACU POST OR

PRESURGERY

BED

ANESTHESIA

WORK ROOM

SUPPLIES

SOILED ANDO2

VESTIBULE

CLEAN

UTILITIES

PATIENT

LOCKERS

PATIENT

TOILET LINEN CHUTE

IT CLOSET

ELECTRIC ROOM

ELECTRIC ROOM

12x10

G

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

I E D

X

Y

E-1.3

E-1.5

E-F

E-E

E-1

E-1.6

AA

X.5

10x8

EXISTING

EXHAUST UP

TO REMAIN.

10x8 EXISTING

EXHAUST DN

TO REMAIN.

REMOVE

EXISTING

DUCTWORK

ABOVE CEILING.

EXISTING

EXHAUST FAN

TO REMAIN.

EXISTING

EXHAUST FAN

TO REMAIN.

REMOVE

EXISTING

FAN

REMOVE EXISTING

STEAM RADIATOR

CONVECTORS. (TYPICAL

FOR 18). CAP EXISITNG

LPS & LPR BACK TO MAIN

RISER AT THE FLOOR BELOW.

EXISITNG

STEAM RISERS

TO REMAIN.

REMOVE

EXISTING

WINDOW AC UNITS.

EXISTING

6x4 EXHAUST

UP. CAP AND

SEAL AT SLAB

OF LEVEL 3.

EXISTING

CABINET

UNIT HEATER

TO REMAIN.

EXISTING FTR

TO REMAIN

REMOVE EXISTING FTR

CAP HWS/R BRANCH PIPING AT RISER.

EXISTING FTR

TO REMAIN

EXISTING HWS/R UP/DN

TO REMAIN.

EXISTING HWS/R UP/DN

TO REMAINEXISTING HWS/R UP/DN

TO REMAIN

1) DEMOLITION AND NEW WORK SHALL BE PHASED TO MINIMIZE

DISRUPTION OF FACILITY OPERATION. PROVIDE TEMPORARY CAPPING

AND CONNECTIONS AS REQUIRED TO MAINTAIN EXISTING SYSTEMS

DURING CONSTRUCTION. COORDINATE ALL PHASING OF DEMOLITION

AND SHUT-DOWNS OF EXISTING SYSTEMS WITH BUILDING MANAGER.

2.)INFORMATION ON EXISTING SYSTEMS HAS BEEN OBTAINED FROM

ORIGINAL DESIGN DRAWINGS SUBSEQUENT RENOVATION DRAWINGS.

THE HVAC CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS

PRIOR TO DEMOLITION OR DEACTIVATION.

3.)THE HVAC CONTRACTOR SHALL PERFORM SITE VISITS AS NECESSARY

IN ORDER TO EVALUATE EXISTING CONDITIONS PRIOR TO SUBMITTING A BID.

4.)THE TERM "CAP" AND ITS INDICATION ON THESE PLANS IS FOR THE CONVENIENCE

OF THE CONTRACTOR REGARDLESS OF WHETHER OR NOT INDICATED, AFTER DEMOLITION

ALL DUCTS SHALL BE CAPPED AIR TIGHT. THIS SHALL INCLUDE TEMPORARY CAPS PENDING

NEW CONNECTIONS AND PERMANENT CAPPING INCLUDING INSULATION.

POINT OF DEMOLITION. CUT AND CAP UNTIL NEW WORK BEINGS. CUT AND RESUME DOWNSTREAM.

DEMOLITION GENERAL NOTES:

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:1 :1

P

M

MD.102

SECOND FLOOR - HVAC DUCTWORK AND

PIPING DEMOLITION PLAN

11/09/2018 Checker RPB

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

SECOND FLOOR - HVAC DEMOLITION PLAN

Number: Revisions: Date:

TO SUB-BASEMENT

WASHER FAUCET

MAIL ROOM

MORGUE

STORAGE

CHASE

TREATMENT

CHASE

CHASE

CHASE

TREATMENT

STORGAGE

CHASE

OFFICE

OFFICE

STORAGE

SHOWER

BATH

CHIEF

CHASE

SHOWER

BATH

CHASE

CHASE

SECRETARY PROSTHETICS OFFICE CHIEF

PROSTHETICS

PURPLE

HEART ETC

DAV TRANSPT

BARBER

SHOP

CLOSET

STORAGE

ELECTRICAL

STORAGE

STORAGE

ELEVATOR

CHASE

KITCHEN

SHOWER

BATH

CHASE

CHASE

OFFICE

CHIEF

PHYSICAL

THERAPY

OFFICE

STAIR

STAIR

CLOSET

ELECTRICALCHASE

CHASE

CHASE

ELECTRICAL

CHASE

BIO MED

STORAGE

CHASE

STORAGE

STAIRWELL

CHASE

CORRIDOR

CHASE

CHASE

CHASE

CHASE

CORRIDOR

SPEC PUR

OFFICE OFFICE

CHASE

CHASE

MORGUE

CHASE

CHASE

ELEVATOR

PART OF

MORGUE

EFFECTS

PATIENT

NURSING ADMIN

STORAGE

ELECTRICAL ENGINEERING

CHASE

PRINTING

REPORTS

REPRODUCTION

UNIT

CLOSET

COMMUNICATION

TOILET

ELECTRICAL

CLOSET

CHASE

CHASE

ELECTRICAL

CLOSET

CORRIDOR

ELEVATOR

ELEVATOR

ELEVATOR

SERVICE

12A

12B

12E

12D

12F

12G

13A

13B

14B

14A

17 18

D001

D002

5 3

2B

21A

2A

P4

P2

P3

S1

A-B

C-B

3A

B-A17C

B-A16C

B-A15C

B-A18C

B-A19C

B-A23C

B-A24C

B-A25C

B-A20C

B-A14C

B-A13C

B-ST-1

B-AEC-1

B-A12C B-A11C

B-A10C B-A9C

B-A8C

B-C5C

21B

B-C4C

B-L40C

B-C7C

B-C6C

B-L-1

23B

B-C3C

B-C39C

B-CM-2C

B-CM-1C

23A

B-ME-1

D0001A

B-TCB

B-MT

B-EC-L1

B-B36C

B-B37C

B-TC-L1

B-A-C1

UP

DN

DN

EXISTING

AC CONDENSER

TO REMAIN.

EXISTING

AC UNITS

THRU WINDOW

TO REMAIN.

EXISTING

AC UNITS

THRU WINDOW

TO REMAIN.

2 1/2" HPS UP 1 1/4" HPR UP

1 1/2" PC UP

1 1/2" PC DN

1 1/4" HPR DN

2 1/2" HPS DN

SCOPE OF WORK

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:1 :1

P

M

MH.100

BASEMENT - HVAC DUCTWORK AND

PIPING PLAN

11/09/2018 KP RPB

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

BASEMENT - HVAC DUCTWORK AND PIPING PLAN

Number: Revisions: Date:

UPDN

T

T

G

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

I E D

X

Y

E-1.3

E-1.5

E-F

E-E

E-1

E-1.6

AA

X.5

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

12x6

12x6

EXISTING

FAN RELOCATED.

REBALANCE TO

EXISTING CFM.

EXISTING

CABINET UNIT

HEATER TO

REMAIN.

EXITING

EXHAUST

FAN TO REMAIN

EXISTING

EXHAUST FAN

TO REMAIN.

EXISTING

EXHAUST FAN

TO REMAIN.

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

2 1/2" HPS UP&DN

1 1/4" HPR UP&DN

1 1/2" PC UP&DN

1 1/4" GHS UP

1 1/4" GHR UP

EXISTING HWS/R UP/DN

TO REMAIN

EXISTING HWS/R UP/DN

TO REMAIN

EXISTING HWS/R UP/DN

TO REMAIN

EXISTING FTR

TO REMAIN

EXISTING FTR

TO REMAIN

EXISTING FTR

TO REMAIN

EXISTING T-STAT

TO REMAIN

2" HWR DN

2" HWS DN

MH.301

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

TEMPERATURE SENSOR

LOCATED WITHIN SOFFIT.

TO CONTROL

VALVE AT LEVEL 3

PENTHOUSE.

6'-0"

0.2 GPM

FTR-500-0101S6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

1" GHR

3/4" GHS

1/

4" G

H R

1/

4" G

H S

1/

4" G

H R

1 1/4" GHS

3/4" GHS

3/4" GHS

3/4" GHS

3/4" GHR

3/4" GHR

PROVIDE

24"X24"

ACCESS PANEL.

SERVES CRYOGENIC NITROGEN ASPHIXIATION

SERVES OXYGEN STORAGE ROOM

3/4" GHR

EXISTING AC

CONDENSER

TO REMAIN.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:1 :1

P

M

MH.101

FIRST FLOOR - HVAC DUCTWORK AND

PIPING PLAN

11/09/2018 KP RPB

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

FIRST FLOOR - HVAC DUCTWORK AND PIPING PLAN

Number: Revisions: Date:

12x10

10x10

8x

8x x1

8"∅

10"∅

8"∅ x1

8x6

X6

16X14

16x12

12x6

12x6 x1 x1 x6 x8

18x10

FD

14x10

14x6

12x10

FD

FD

250 CFM

S-C21

S202

S203

S204

S-1-2

S222

S223

S224

S225

S-C20

SD

SD

8"∅

8"∅

12"∅

12X10

FD12X6

X6

12X6

SP

FD

S201

CORRIDOR

FAMILY

WAITING

FAMILY/

CONSULT

TOILET

STAIR

TOILET

ELECT.

E. ELECT.

TEL/DATA

CONNECTOR

ATS CLOSET

PACU POST OR

PRESURGERY

BED

SOILED ANDO2

PATIENT

LOCKERS

PATIENT

TOILET

x1 x1

52x14 x1

66x20

52x14

60x36 SUPPLY UP

68x24 RETURN UP

G

H

4.5

TEAM SPACE

TREATMENT #7

214I

BARI. TREATMENT

#2

214H

BARI. TREATMENT

#1

214G

TREATMENT #1

214A

TREATMENT #2

214B

TREATMENT #3

214C

TREATMENT #4

214D

TREATMENT #5

214E

TREATMENT #6

214F

TREATMENT #8

214J

TREATMENT #9

214K

TREATMENT #10

214L

TREATMENT #11

214M

ISO TREATMENT #1

PRIVATE

TREATMENT #1

EXIST.

SOUTH STAIR

EXIST.

EAST STAIR

OFFICE, MD

OFFICE, DIRECTOR

MD.

OFFICE, PD

TRAINING

OFFICE, SOCIAL

WORKER

CORRIDOR A

C200A

CLEAN

UTILITY/SUPPLY

EXAM ROOM

STAFF CORRIDOR

C200D

STAFF LOCKER

EMERG. ELECT.

TREATMENT ROOM

CORRIDOR

SOILED UTILITY

CORRIDOR C

C200C

WATER TREATMENT

STORAGE

F5

HT/WT

STERILE SUPPLY

EQUIPMENT

STORAGE

STAFF TLT

STAFF TLT

PATIENT LOCKERS

OFFICE, DIETITIAN

CONFERENCE

STAFF LOUNGE

F E6

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

ELECT.

EQUIPMENT

PROCESSING,

CLEAN PREP/STORE

CORRIDOR B

C200B-2

OFFICE, FELLOW /

RN PD

NOURISHMENT

OFFICE, NURSE

MGR.

EQUIPMENT

PROCESSING,

SOILED

DIALYSATE PREP

WATER TREATMENT

EQUIPMENT REPAIR

MEDICATION

53 SF

EXIST. IT

SECUR. ROOM

229A

29 SF

EXIST. LINEN CHUTE

ALCOVE

CHASE

2C2C

I E D

X

Y

PATIENT TOILET

AA

WAITING

X.5

012S

VAV-507

ADS-24

ADE-23

ADE-22

ADS-21

0 10

100 100

ADR-12

ADS-11 100

ADS-11

ADS-11

ADS-11

ADS-12

ADR-11

ADS-11

ADS-11

ADR-11

ADE-11

ADR-12

ADS-12

ADS-13

ADR-12

ADS-23

ADR-14

ADS-12

ADS-12

ADE-11

ADE-11

ADE-11

ADE-12

ADS-11

ADS-12

ADE-11

ADR-11

ADS-11

ADS-11

ADR-11

ADS-11

ADR-11

ADR-12

ADS-12

ADS-13

ADS-13

ADR-12

ADS-11

ADR-12

ADS-13

ADS-13

ADR-61

ADE-11

ADE-11

ADR-11

ADS-11

ADS-13

ADS-13

012S

VAV-500

012S

VAV-501

012S

VAV-502

012S

VAV-503

012S

VAV-508

012S

VAV-509

012S

VAV-504

012S

CEAV-500

012S

VAV-511

012S

VAV-512

012S

VAV-513

012S

VAV-514

012S

VAV-515

012S

VAV-517

012S

VAV-516

012S

LVR-500

012S

VAV-518

012S

VAV-510

EXISITNG EXHAUST RELOCATED

EXISTING

CABINET

UNIT HEATER

TO REMAIN.

DEDUCT ALT#6

REFER TO PART PLAN 2 ON THIS SHEET

FOR ALTERNATE DUCTWORK

LAYOUT.

012S

VAV-521

ADS-11

ADR-11

ADE-13

ADS-12

012S

VAV-506

012S

VAV-519

ADS-12

ADS-12

ADE-12

ADS-11 150

ADE-11

ADR-14

ADR-14

ADR-14

ADR-14

PROVIDE

SEISMIC

JOINT

012S

VAV-505

ADS-11

ADS-11

ADS-42

ADS-42

ADR-11

ADS-13

ADS-13

ADR-22

x8

14x8

26x8

24x14

012S

VVR-502

x1 x1

16x12

14x6

FSD-503-012S

16x10

14x8

FSD-502-012S

x6

14x6 16x8

12x6

12x8

14x6 x6

14x8

12x6 x8 x6

12x6

12x6 x8

24x12 x1 x1

12x6

12x6

10x14

ADS-42

ADS-42

x8

24x8 24x14

12x6 12x6

12x8 14x6

012S

VVR-501

x6

16x10 x6 x6 x6

12x8

12x6 x1 x1

16x8

16x6 x6 x8

12x10 x6 x6

12x6

16x8

16x8

14x12 12 x1

12x6

14x8 x6

24x10 x1 x8 x8

12x6

12x8

12x6 x6

16x614x10

18x6

16x12 EXHAUST UP

12x812x6

12x8 12x6

14x10

16x6

14x8

12x10

12x8 12x6

12x6

16x10

14x8

10x8

EXISTING

EXHAUST UP

TO REMAIN.

10x8 EXISTING

EXHAUST DN

TO REMAIN.

PROVIDE

SEISMIC

JOINT

x6

DPS

x1

12x8

12x6 x1

12x6

12x8

12x6 x8

12x6

ADS-14

ADS-13 250

ADS-14

ADS-14

ADS-14 250

ADS-14

ADS-13

ADS-12

ADS-13

ADS-11

ADS-11

12x6

18x8

18x12 18x12

ADS-42

ADS-42

ADS-42

ADS-42

ADS-42

ADS-42

ADS-42

ADS-42400

ADR-42

ADR-42

ADR-42

ADR-42

ADR-42

ADR-42

MH.301

ADE-28

12x6

12x6 EXHAUST DUCT DN

TO LOW EXHAUST

GRILLE 7" ABOVE FLOOR.

16x10

30x14 x1

20x12

16x12

012S

VAV-520

ADS-12

SSACE-504-012S

x6 x8

12x6

16x6

16x8

24x14 x1

18x6

18x6

24x14

18x6

16x8

16x6

16x8

8x14

14x10

10x14

16x10

16x10

26x14 EXHAUST UP x1

24x10

FSD-501-012S

FSD-504-012S

FSD-500-012S

SSACE-505-012S

14x6

ADS-12

ADS-12

14x6

14x6 14x6

ADS-13

14x6

SAD-501-012S

SAD-500-012S

12x8

8x12

8x12

12x8 x1

2 18 x1

ADE-13

ADE-13

14x6

MEN'S PUBLIC

201A

WOMEN'S PUBLIC

201B

ADR-13

12x8

14x6

5'-0" SUPPLY LINEAR

DIFFUSER WITH PLENUM.

(TYPICAL FOR 12)

15'-0" CONTINUOUS

RETURN LINEAR

WITH 5'-0" ACTIVE

SECTIONS WITH PLENUMS.

(TYPICAL FOR 2)

ADS-21

PRESSURE SENSOR TO BE HARDWIRED TO AHU CONTROLLER AS SHOWN ON MI.803

KEYED NOTES:

x1

52x14

012S

VAV-507

ADE-22

ADR-12

ADS-13

ADR-12

ADS-11

ADR-12

012S

VAV-511

012S

VAV-518

DUCTWORK LAYOUT

FOR

DEDUCT ALT#6

012S

VAV-521

012S

VAV-506

ADR-14

ADS-11

ADS-11

24x14 x1

12x6

12x6

26x8

14x10

14x8

12x10

12x8 12x6

12x6

DPS

ADS-14

ADS-13

ADS-13

ADS-42

ADS-42

16x12 x6

16x6

16x8

16x10

26x14 EXHAUST UP x1

24x10

14x6

ADS-21

14x8

14x8

ADS-21

12x6

10x6

ADR-21

12x6

18x8

ADS-24

14x6

ADR-23

ADR-14

x8

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:2 :5

P

M

MH.102

SECOND FLOOR - HVAC DUCTWORK PLAN

11/09/2018 KP RPB

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

SECOND FLOOR - HVAC DUCTWORK PLAN

Level 2 Supply Air Terminal Box Schedule

Tag Location

(Building-Floor) Size Max CFM Min CFM GPM Integrated Sound

Attenuator Space-Mounted Devices AHU System Heat at max CFM Discharge Air

Temp Remarks

VAV-500 012S VCV-12 1125 CFM 750 CFM 1.7 GPM Yes AHU-500-013S Yes 75 °F

VAV-501 012S VCV-6 225 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-502 012S VCV-10 825 CFM 800 CFM 1.2 GPM Yes AHU-500-013S No 75 °F

VAV-503 012S VCV-6 400 CFM 200 CFM 0.9 GPM Yes AHU-500-013S Yes 85 °F

VAV-504 012S CV-6 350 CFM 350 CFM 0.6 GPM Yes AHU-500-013S No 75 °F

VAV-505 012S CV-6 400 CFM 400 CFM 0.6 GPM Yes AHU-500-013S No 75 °F

VAV-506 012S CV-6 250 CFM 250 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-507 012S VCV-10 825 CFM 475 CFM 0.7 GPM Yes AHU-500-013S No 75 °F

VAV-508 012S VCV-10 800 CFM 450 CFM 0.7 GPM Yes AHU-500-013S No 75 °F

VAV-509 012S VCV-10 800 CFM 350 CFM 1.8 GPM Yes AHU-500-013S Yes 85 °F

VAV-510 012S VCV-10 750 CFM 300 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-511 012S VCV-6 200 CFM 175 CFM 0.5 GPM Yes AHU-500-013S Yes 85 °F

VAV-512 012S VCV-6 200 CFM 75 CFM 0.5 GPM Yes AHU-500-013S Yes 85 °F

VAV-513 012S CV-6 200 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-514 012S CV-6 375 CFM 375 CFM 0.9 GPM Yes AHU-500-013S Yes 85 °F

VAV-515 012S VCV-6 300 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-516 012S CV-8 625 CFM 625 CFM 0.9 GPM Yes AHU-500-013S No 75 °F

VAV-517 012S CV-8 425 CFM 425 CFM 0.7 GPM No AHU-500-013S No 75 °F

VAV-518 012S CV-8 650 CFM 650 CFM 1.5 GPM Yes SETRA SPACE PRESSURE MONITOR AHU-500-013S Yes 85 °F

VAV-519 012S VCV-6 100 CFM 75 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-520 012S VCV-10 825 CFM 475 CFM 0.7 GPM Yes AHU-500-013S No 75 °F

VAV-521 012S VCV-10 750 CFM 300 CFM 1.7 GPM Yes AHU-500-013S Yes 85 °F

Level 2 Return Air Terminal Box Schedule

Tag Location

(Building-Floor) Size Max CFM Min CFM Integrated Sound

Attenuator Space-Mounted Devices AHU System

LVR-500 012S LVR-E 5900 CFM 2800 CFM Yes AHU-500-013S

VVR-501 012S VVR-10 800 CFM 400 CFM Yes AHU-500-013S

VVR-502 012S VVR-16 2025 CFM 925 CFM Yes AHU-500-013S

Level 2 Exhaust Air Valve Schedule

Tag Location

(Building-Floor) Size Max CFM Min CFM Sound Attenuator Space-Mounted Devices Exhaust System

CEAV-500 012S CEAV-1 850 850 Yes SETRA SPACE PRESSURE MONITOR EF-500A-013S

DEDUCT ALT#6

1/8" = 1'-0"

SECOND FLOOR DEDUCT ALT #6 - HVAC DUCTWORK PART PLAN

Number: Revisions: Date:

ADMIN

T

T

T

T

T

UP

013S

ACCH-501

013S

ACCH-500

013S

EF-500A

013S

HF-500

12"DIA.EXHAUST STACK UP

TERMINATE 10'-0"

ABOVE ROOF.

013S

EF-501

AD

B D

T B

D T ø

16x12 EXHAUST DN

FAN PLATFORM

WITH STAIRS.

G

H

4.5

F5

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

I E D

X

Y

E-1.3

E-1.5

E-E

E-1

E-1.6

AA

X.5

AD

013S

EF-500B

ø

013S

AHU-500

4" G

C R

2" G

H S

2" G

H R

2" L

P S

C

4" G

C S

REMOVE EXISTING

CABINET UNIT

HEATER AND

RELOCATE TO

ADJACENT WALL.

EXISTING

CABINET UNIT HEATER

RELOCATED. RE-CONNECT

HOT WATER LINES AND

THERMOSAT.

MH.401

REFER

TO PART PLAN

DEDUCT ALT#6

4" G

CS

4" G

CR

REFRIGERANT

DN TO FLOOR BELOW

PROVIDE HEAT TRACE

STEAM PIPES

MH.301

MH.301

013S

SSACC-501

013S

SSACC-500

1 1/2" LPRC

4" GCS

4" GCR

013S

SSACC-502

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:1 :1

P

M

MH.103

THIRD FLOOR - HVAC ROOF PLAN

11/09/2018 KP RPB

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

THIRD FLOOR - HVAC ROOF PLAN

Number: Revisions: Date:

A B C D

UP

G

E18

E17

E14

E19

EB

EA

EC

ED

EE

EI

EH

EF

E10 E11

E12

E13

E16 E15

1.5

E

F

G.3

1.3

C

PD

C

PD

C

PD

CPD

H

PS

C

PD

4"CPD

HPS

EXISTING

2-1/2"LPS

2"LPR UP

1/3 120# TO 15# PRV

2/3 120# TO 15# PRV

LPS

1-1/2"

2-1/2"

2-1/2"

1-1/2"

2" 2-1/2"

1" 3/4"

2"

1-1/4"

H

PS

1-1/2"

HPS

6"HPS

HW

S

HW

R

2" HW

R

2" HW

S

2" HW

S/R UP TO BASEM

ENT

LP

S

LP

S

LPS

EXISTING FLASH

TANK

EXISTING

CONDENSATE

PUM

P TANK

EXISTING SUPPLY

FAN

MPC

LPR

2"

2"

2"

2"

LPC

M

PC

H

PC

H

PC

LPC

LPC

HPC

MPC

2-1/2"

2"

31/2"CONTROL VALVE (TYP.)

8"

4" RELIEF VENT

TO ROOF.

4"

UP TO OR.

UP TO OR.

CPD

HPS

MPS

M P

S

MPS

MPS

MPS

V

MPS

LPC

MPC

MPC

M P

S

L P

C

CPD

MPS

MPS

LPC

MPS

MPS

MPS

MPC

MPS

STEAM BY-PASS

ASSEMBLY

CAP

HPS-14

MPS-4

MPS

M

PS

H

PS

H

PS

H

PS

M

1 1/2" PC

1 1/4" HPR

1 1/2" PC UP

1 1/4" HPR UP

1-1/2"PC

DN TO EXISTING

CONDENSATE PUMP

RECEIVER.

1-1/4"HPR

DN TO EXISTING

FLASH TANK.

2 1/2" HPS UP

1 1/2" PC

1 1/4" HPR

1 1 /4"

H

PR

1 1 /2"

P C

2 1/2" HPS

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:1 :3

P

M

MP.SB

SUB BASEMENT - HVAC PIPING PLAN

11/09/2018 KP RPB

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

SUB BASEMENT - HVAC PIPING PLAN

Number: Revisions: Date:

T

T

T

T

T

T

RS&RL UP

THRU THE

ROOF

D

1"

3/4"

3/4"

3/4"

3/4" 1"

3/4"

1-1/4" 1"

3/4"

1"

1" HW

S/R DN. TO CUH

EXISITNG

1-1/4 MPS UP 1"

M

PR UP EXISTING

1-1/4 M

PS DN.

1" M

PR DN.

AC

TB-2

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T T

T

T

T

T

T

T

T

T

T

G

H

4.5

TEAM SPACE

TREATMENT #7

214I

BARI. TREATMENT

#2

214H

BARI. TREATMENT

#1

214G

TREATMENT #1

214A

TREATMENT #2

214B

TREATMENT #3

214C

TREATMENT #4

214D

TREATMENT #5

214E

TREATMENT #6

214F

TREATMENT #8

214J

TREATMENT #9

214K

TREATMENT #10

214L

TREATMENT #11

214M

ISO TREATMENT #1

PRIVATE

TREATMENT #1

EXIST.

SOUTH STAIR

EXIST.

EAST STAIR

OFFICE, MD

OFFICE, DIRECTOR

MD.

OFFICE, PD

TRAINING

OFFICE, SOCIAL

WORKER

CORRIDOR A

C200A

CLEAN

UTILITY/SUPPLY

EXAM ROOM

STAFF CORRIDOR

C200D

STAFF LOCKER

EMERG. ELECT.

TREATMENT ROOM

CORRIDOR

SOILED UTILITY

CORRIDOR C

C200C

WATER TREATMENT

STORAGE

F5

HT/WT

STERILE SUPPLY

EQUIPMENT

STORAGE

STAFF TLT

STAFF TLT

PATIENT LOCKERS

OFFICE, DIETITIAN

CONFERENCE

STAFF LOUNGE

F E6

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

ELECT.

EQUIPMENT

PROCESSING,

CLEAN PREP/STORE

CORRIDOR B

C200B-2

OFFICE, FELLOW /

RN PD

NOURISHMENT

OFFICE, NURSE

MGR.

EQUIPMENT

PROCESSING,

SOILED

DIALYSATE PREP

WATER TREATMENT

EQUIPMENT REPAIR

MEDICATION

53 SF

EXIST. IT

SECUR. ROOM

229A

29 SF

EXIST. LINEN CHUTE

ALCOVE

CHASE

2C2C

I E D

X

Y

PATIENT TOILET

AA

WAITING

X.5

012S

VAV-510

012S

VAV-509

012S

VAV-503

012S

VAV-508

012S

VAV-518

012S

CEAV-500

012S

VAV-507

012S

VAV-511

012S

VAV-512

012S

VAV-514

012S

VAV-516

012S

VAV-500

012S

VAV-501

7'-0"

0.5 GPM

RCP-502-012S

5'-10"

0.5 GPM

RCP-502-012S

7'-6"

0.5 GPM

RCP-501-012S

0.5 GPM

RCP-503-012S

0.5 GPM

RCP-503-012S

0.5 GPM

RCP-503-012S

2" HWR UP

2" HWS UP

1 1 /4"

H W

S

EXISTING

STEAM

RISERS TO

REMAIN.(TYP)

EXISTING

CABINET

UNIT HEATER

TO REMAIN.

1 1/4" GHR UP&DN

1 1/4" GHS UP&DN

012S

VAV-521

012S

VAV-505

012S

VAV-504

012S

VAV-502

012S

VAV-506

012S

VAV-517

012S

VAV-519

012S

VAV-515

012S

VAV-513

1" HW

R1" HW

S

1" HW

S

1" HW

R

1 1 /4"

H W

R

1 1/2" PC UP

2 1/2" HPS DN

1 1/4" HPR DN

1 1/2" PC DN

2 1/2" HPS UP

DEDUCT ALT#6

012S

VVR-502

012S

VVR-501

012S

LVR-500

EXISTING HWS/R UP/DN

TO REMAIN

EXISTING HWS/R UP/DN

TO REMAIN

EXISTING HWS/R UP/DN

TO REMAIN

EXISTING FTR

TO REMAINEXISTING FTR

TO REMAIN

EXISTING T-STAT

TO REMAIN

SETRA SPACE PRESSURE MONITOR

DEDUCT ALT#6

1 1/4" HWR

1 1/4" HWS

1/

4" H

W S

1/

4" H

W R

1 1/4" HWS

1 1/4" HWR

1/

2" H

W S

1/

2" H

W R

1" HWR

1" HWS

3/4" HWS

3/4" HWR

(TYPICAL)

1" HWS

1" HWR

(TYP.)

10'-6"

0.5 GPM

RCP-500-012S

11'-0"

0.5 GPM

RCP-500-012S

11'-0"

0.5 GPM

RCP-500-012S

11'-0"

0.5 GPM

RCP-500-012S

11'-0"

0.5 GPM

RCP-500-012S

11'-0"

0.5 GPM

RCP-500-012S

8'-5"

0.5 GPM

RCP-500-012S

6'-0"

0.5 GPM

RCP-500-012S

16'-0"

0.5 GPM

RCP-500-012S

MH.301

6'-7"

0.5 GPM

RCP-502-012S

7'-2"

0.5 GPM

RCP-500-012S

7'-4"

0.5 GPM

RCP-500-012S

8'-7"

0.5 GPM

RCP-501-012S

10'-0"

0.5 GPM

RCP-501-012S

8'-9"

0.5 GPM

RCP-501-012S

012S

VAV-520

1 1/4" HWS

1 1/4" HWR

EXISTING

TO REMAIN.

SSACE-504-012S

REFRIGERANT

LINES UP

3/4" HWR

3/4" HWS

3/4" HWS3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

0.5 GPM

RCP-503-012S

(TYPICAL FOR 5)

2" H

W S

2" H

W R

PROVIDE

SEISMIC

JOINT

REFRIGERANT LINES

UP

SSACE-505-012S

1" D

1" DRAIN

DN TO

OPEN-END DRAIN.

3/4" HWR

1" D

3/4 " H

W R

3/4 " H

W S

1" HWR

1" HWS

3/4" HWS

3/4" HWR

(TYPICAL FOR 3)

(TYPICAL FOR 2)

(TYPICAL FOR 2)

1" D

1" DRAIN

TO OPEN END

DRAIN ABOVE

CEILING.

RECEPTION

MEN'S PUBLIC

201AWOMEN'S PUBLIC

201BCORRIDOR C

C1AA

CORRIDOR C

C200C

STAFF CORRIDOR

C200D

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:2 :3

P

M

MP.202

SECOND FLOOR - HVAC PIPING PLAN

11/09/2018 Checker RPB

100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"

SECOND FLOOR - HVAC PIPING PLAN

Level 2 Supply Air Terminal Box Schedule

Tag Location

(Building-Floor) Size Max CFM Min CFM GPM Integrated Sound

Attenuator Space-Mounted Devices AHU System Heat at max CFM Discharge Air

Temp Remarks

VAV-500 012S VCV-12 1125 CFM 750 CFM 1.7 GPM Yes AHU-500-013S Yes 75 °F

VAV-501 012S VCV-6 225 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-502 012S VCV-10 825 CFM 800 CFM 1.2 GPM Yes AHU-500-013S No 75 °F

VAV-503 012S VCV-6 400 CFM 200 CFM 0.9 GPM Yes AHU-500-013S Yes 85 °F

VAV-504 012S CV-6 350 CFM 350 CFM 0.6 GPM Yes AHU-500-013S No 75 °F

VAV-505 012S CV-6 400 CFM 400 CFM 0.6 GPM Yes AHU-500-013S No 75 °F

VAV-506 012S CV-6 250 CFM 250 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-507 012S VCV-10 825 CFM 475 CFM 0.7 GPM Yes AHU-500-013S No 75 °F

VAV-508 012S VCV-10 800 CFM 450 CFM 0.7 GPM Yes AHU-500-013S No 75 °F

VAV-509 012S VCV-10 800 CFM 350 CFM 1.8 GPM Yes AHU-500-013S Yes 85 °F

VAV-510 012S VCV-10 750 CFM 300 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-511 012S VCV-6 200 CFM 175 CFM 0.5 GPM Yes AHU-500-013S Yes 85 °F

VAV-512 012S VCV-6 200 CFM 75 CFM 0.5 GPM Yes AHU-500-013S Yes 85 °F

VAV-513 012S CV-6 200 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-514 012S CV-6 375 CFM 375 CFM 0.9 GPM Yes AHU-500-013S Yes 85 °F

VAV-515 012S VCV-6 300 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-516 012S CV-8 625 CFM 625 CFM 0.9 GPM Yes AHU-500-013S No 75 °F

VAV-517 012S CV-8 425 CFM 425 CFM 0.7 GPM No AHU-500-013S No 75 °F

VAV-518 012S CV-8 650 CFM 650 CFM 1.5 GPM Yes SETRA SPACE PRESSURE MONITOR AHU-500-013S Yes 85 °F

VAV-519 012S VCV-6 100 CFM 75 CFM 0.5 GPM Yes AHU-500-013S No 75 °F

VAV-520 012S VCV-10 825 CFM 475 CFM 0.7 GPM Yes AHU-500-013S No 75 °F

VAV-521 012S VCV-10 750 CFM 300 CFM 1.7 GPM Yes AHU-500-013S Yes 85 °F

Level 2 Return Air Terminal Box Schedule

Tag Location

(Building-Floor) Size Max CFM Min CFM Integrated Sound

Attenuator Space-Mounted Devices AHU System

LVR-500 012S LVR-E 5900 CFM 2800 CFM Yes AHU-500-013S

VVR-501 012S VVR-10 800 CFM 400 CFM Yes AHU-500-013S

VVR-502 012S VVR-16 2025 CFM 925 CFM Yes AHU-500-013S

Level 2 Exhaust Air Valve Schedule

Tag Location

(Building-Floor) Size Max CFM Min CFM Sound Attenuator Space-Mounted Devices Exhaust System

CEAV-500 012S CEAV-1 850 850 Yes SETRA SPACE PRESSURE MONITOR EF-500A-013S

DEDUCT ALT#6

Number: Revisions: Date:

LEVEL 1

0' - 0"

LEVEL 2

11' - 11"

LEVEL 3

23' - 10"

FIRST FLOOR

90' - 5 1/4"

SECOND FLOOR

102' - 4 1/4"

EXISTING LEVEL 3

114' - 3 1/4"

G

TRUE GRADE AVG.

85' - 2 1/16"

STAIR EXIT LANDING

86' - 5 13/32"

LOADING ROOF (LOW)

100' - 11 1/4"

H

PENTHOUSE LEVEL

115' - 8 1/4"

F5 F E6

ROOF T.O.STL

115' - 2"

I E D

T.O. CONCRETE

99' - 4"

ADR-42

ADR-42

8x12

ADS-42

ADR-14

20x12

ADS-21

6'-7"

0.5 GPM

RCP-502-012S

ADS-42

012S

VAV-520

012S

VAV-510

012S

VAV-509

36x16

14x3012x20

26x8

ADS-12

18x6

3/4" HWR

7'-2"

0.5 GPM

RCP-500-012S

012S

VAV-507

012S

CEAV-500

3/4" HWS

1 1/4" HWR

1 1/4" HWS

013S

EF-500B

013S

HF-500

6'-0"

0.2 GPM

FTR-500-0101S6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

1" GHR

3/4" GHS

1" GHR

3/4" GHR

3/4" GHS

1 1/4" GHR

1 1/4" GHS

3/4" GHR

3/4" GHS

6'-0"

0.2 GPM

FTR-500-0101S6'-0"

0.2 GPM

FTR-500-0101S

6'-0"

0.2 GPM

FTR-500-0101S

8ø 8ø

18x12 18x12

8x12

DEDUCT ALT#6

EXHAUST STACK

FOURTH FLOOR

126' - 2 1/4"

FIFTH FLOOR

138' - 1 1/4"

PENTHOUSE LEVEL

115' - 8 1/4"

PENTHOUSE ROOF

127' - 9 1/4"

WZ

ROOF T.O.STL

115' - 2"

E4 XY X.5

013S

GHWP-502

013S

GHWP-503

013S

GSHP-504013S

GSHP-505

013S

FT-500013S

SCP-500013S

SPRD-500A

2 1/2" HPS

3" MPS

4" V 4" V

2" V

3" MPS

2" GHR

1" GHS

1" MPR

1 1/2" PC

2" V

1" HPR

3" LPR

013S

ACCH-501

4" GCR

4" GCS

4" V 4" V

4" V 2" V

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:1 :3

P

M

MH.301

HVAC SECTION

11/09/2018 KP RPB

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"

HVAC SECTION LOOKING SOUTH

1/4" = 1'-0"

HVAC PENTHOUSE SECTION LOOKING WEST

Number: Revisions: Date:

T

T

T

T

T

UP

F5

W

Z

F E6

D1

E4

EC ED EE

CC

E D

X

75 6 8

Y

E-1.5

E-F

E-E

E-1.6

AA

X.5013S

SCP-500

GLYCOL MIX

TANK W/ MANUAL PUMP

300 GALLON

CHILLED WATER

STORAGE TANK

013S

SPRD-500A

013S

SPRD-500B

013S

ET-500

013S

SWHE-502

013S

SWHE-503

013S

FT-500

013S

ET-501

013S

GHWP-502

013S

GHWP-503

013S

SWHE-500

013S

SWHE-501

WATER TREATMENT

CHEMICAL POT FEEDER

(BELOW)

013S

HWP-500

013S

HWP-501

013S

VFD-500

013S

VFD-501

013S

VFD-502

013S

VFD-503

BAS CONTROL PANELS

1/3

2/3

1/3

2/3

1/3

2/3

2/3

1/3

013S

GSHP-504

013S

GSHP-505

2" HWS DN

1 1/4" GHS DN

1 1/4" GHR DN

2" HWR DN

2"

2"

1 1/4" GHR

1 1/4" GHS

2" GHR

2" GHS

1"

1 1/4" GHS

2" 2"

013S

AS-501

013S

AS-500

2" MPR

2" HWS

2" HWR

2 1/2" MPS

2" G

H S

2" GHR

4" GCR

4" GCR

GLYCOL MIX TANK

W/ MANUAL PUMP

013S

AS-502

2" GHS2" GHS

2" L

P S

C

1/

4" G

H R

1/

4" G

H S

MH.301

2 1/2" HPS DN 1 1/2" PC DN

2 1/2" HPS

013S

CSG-500

3" M

P S

3" MPS

2" M

P S

3" MPS 3" MPS 3" MPS

3/4" MPR

4" V 2" V

4" V

4" V

2" V

2" V

1 1/2" MPR 3" MPR

1" M

P R

1" H

P R

1 1/2" PC

1/

2" P

C

VENTS UP

THROUGH ROOF.

013S

SSACC-500

1/

4" D

1 1/4" D

013S

SSACE-501

013S

SSACE-502

013S

SSACE-500

013S

SSACE-503

1 1/4" D

DRAIN TO NEAREST

FLOOR DRAIN

DRAIN TO NEAREST

FLOOR DRAIN

DRAIN TO NEAREST

FLOOR DRAIN

MH.506

AD

16x16 OPEN ENDED

EXHAUST DUCT WITH

1/2" W.M.S.

(1500 CFM)

013S

SPRV-500

50x14 OPEN END

DUCT WITH 1/2"

W.M.S.(1500 CFM)

AD

REFER ARCHITECTURAL

DRAWINGS FOR FINAL

INTAKE LOUVER LOCATION.

MH.503

4" GCS 4" GCS

4" GCR

1 1/2" LPRC

2" LPSC

4" G

C R

2" G

H R

2" G

H S

2" HWS

REFRIGERANT LINE

TO OUTDOOR UNIT

SSACC-502-013S

013S

VFD-504

013S

VFD-505

013S

VFD-507

013S

VFD-506

013T

VFD-508

013U

VFD-509

DEDUCT ALT#6

013S

SSACC-502

MH.503

MH.503

INTAKE PLENUM

6'-0"(W)x1'-6"(D)x1'-7"(H)

F5

W

Z

F E6

D1

E4

EC ED EE

CC

E D

X

75 6 8

Y

E-1.5

E-F

E-E

E-1.6

AA

X.5

4" VENT FROM PRV

TERMINATE 10' ABOVE ROOF

4" VENT FROM FTK-1/CP-1

TERMINATE 10' ABOVE ROOF

4" VENT FROM CSG-1

TERMINATE 10' ABOVE ROOF

MH.301

2" VENT BLOW DOWN SEPARATOR

TERMINATE 10' ABOVE ROOF

014S

EF-502

PROVIDE SEISMIC JOINT BALL JOINT ASSEMBLY FOR 2 1/2" HPS AND 1 1/2" PC. REFER TO THE STRUCTURAL PLANS FOR ANTICIPATED SEISMIC JOINT MOVEMENT. EXPANSION TO BE DESIGNED

FOR AN IMPORTANCE FACTOR OF 3 AND INCLUDE CALCULATION FOR THERMAL STRESS AND

EXPANSION.

KEYED NOTES:

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it \H

V A

C

V A

P R

O V

V rp b b rp lu s a .c o m

.r v t

/5

/2

:1 :3

P

M

MH.401

THIRD FLOOR PENTHOUSE & PENTHOUSE

ROOF PART PLANS

11/09/2018 Checker RPB

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"

THIRD FLOOR - HVAC PENTHOUSE PART PLAN

1/4" = 1'-0"

PENTHOUSE ROOF - HVAC PIPING PLAN

Number: Revisions: Date:

Legend MH.001 (1)
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MD-101 - FIRST FLOOR - HVAC DUCTWORK AND PIPING DEMOLITION PLAN
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MD-102 - SECOND FLOOR - HVAC DUCTWORK AND PIPING DEMOLITION PLAN
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-100 - BASEMENT - HVAC DUCTWORK AND PIPING PLAN
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-101 - FIRST FLOOR - HVAC DUCTWORK AND PIPING PLAN
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-102 - SECOND FLOOR - HVAC DUCTWORK PLAN
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-103 - THIRD FLOOR - HVAC ROOF PLAN
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MP-SB - SUB BASEMENT - HVAC PIPING PLAN
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MP-202 - SECOND FLOOR - HVAC PIPING PLAN
HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-301 - HVAC SECTION

File details come from the government source that posted it.