36E77619R0086-012.pdf
PDF 16 MB Posted
- Attached to
- Replace Hemodialysis Unit Federal contract opportunity
- Solicitation number
- 36E77619R0086
About this file
36E77619R0086 Attachment 11 - Mechanical 1 of 3.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Replace Hemodialysis Unit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONFORMED CONSTRUCTION
DOCUMENTS
DN
UPDN
G
H
4.5
F5
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I E D
X
Y
E-1.3
E-1.5
E-F
E-E
E-1
E-1.6
AA
X.5
EXISTING
CABINET UNIT
HEATER TO
REMAIN.
UP TO EXISTING EXHAUST
FAN ON ROOF ABOVE
12x6
12x6
UP TO EXISTING EXHAUST
FAN ON ROOF ABOVE
REMOVE DUCTWORK
EXISTING
EXHAUST FAN
TO REMAIN.
EXISTING
EXHAUST FAN
TO REMAIN.
REMOVE EXISTING
EXHAUST FAN.
SERVES CRYOGENIC NITROGEN ASPHIXIATION
SERVES OXYGEN STORAGE ROOM
EXISTING HWS/R UP/DN
TO REMAIN
EXISTING HWS/R UP/DN
TO REMAINEXISTING HWS/R UP/DN
TO REMAIN
EXISTING FTR
TO REMAIN
EXISTING FTR
TO REMAIN
EXISTING FTR
TO REMAIN
RELOCATE AND RE-CONNECT EXISTING
SUPPLY DIFFUSER TO ACCOMMODATE
NEW PIPE CHASE. REBALANCE TO EXISTING CFM.
EXISITNG AC
CONDENSER
UNIT TO REMAIN.
EXISTING EXHAUST FAN AND AC UNIT SHALL
BE PROTECTED DURING CONSTRUCTION.
THE CONTRACTOR SHALL PROVIDE PROTECTION
AS REQUIRED TO MAINTAIN EQUIPMENT OPERTIONAL .
1) DEMOLITION AND NEW WORK SHALL BE PHASED TO MINIMIZE
DISRUPTION OF FACILITY OPERATION. PROVIDE TEMPORARY CAPPING
AND CONNECTIONS AS REQUIRED TO MAINTAIN EXISTING SYSTEMS
DURING CONSTRUCTION. COORDINATE ALL PHASING OF DEMOLITION
AND SHUT-DOWNS OF EXISTING SYSTEMS WITH BUILDING MANAGER.
2.)INFORMATION ON EXISTING SYSTEMS HAS BEEN OBTAINED FROM
ORIGINAL DESIGN DRAWINGS SUBSEQUENT RENOVATION DRAWINGS.
THE HVAC CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO DEMOLITION OR DEACTIVATION.
3.)THE HVAC CONTRACTOR SHALL PERFORM SITE VISITS AS NECESSARY
IN ORDER TO EVALUATE EXISTING CONDITIONS PRIOR TO SUBMITTING A BID.
4.)THE TERM "CAP" AND ITS INDICATION ON THESE PLANS IS FOR THE CONVENIENCE
OF THE CONTRACTOR REGARDLESS OF WHETHER OR NOT INDICATED, AFTER DEMOLITION
ALL DUCTS SHALL BE CAPPED AIR TIGHT. THIS SHALL INCLUDE TEMPORARY CAPS PENDING
NEW CONNECTIONS AND PERMANENT CAPPING INCLUDING INSULATION.
POINT OF DEMOLITION. CUT AND CAP UNTIL NEW WORK BEINGS. CUT AND RESUME DOWNSTREAM.
DEMOLITION GENERAL NOTES:
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:1 :1
P
M
MD.101
FIRST FLOOR - HVAC DUCTWORK AND
PIPING DEMOLITION PLAN
11/09/2018 Checker RPB
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
FIRST FLOOR - HVAC DEMOLITION PLAN
Number: Revisions: Date:
UP
10x10
8x
8x
8x8
16x14 x1
8"∅
10"∅
8"∅
10"∅ x1
8x6
X6
16X14
16x12
12x6
12x6 x1 x1 x6 x8
18x10
FD
14x10
14x6
10"∅
12x10
FD
FD
250 CFM
S-C21
S202
S203
S204
S221
S222
S223
S224
S225
S-C20
SD
SD
8"∅
8"∅
12"∅
12X10
FD12X6
X6
12X6
SP
FD
S-1-2
S201
CORRIDOR
FAMILY
WAITING
FAMILY/
CONSULT
TOILET
STAIR
TOILET
NURSE
MANAGER
ELECT.
E. ELECT.
TEL/DATA
ABG
CONNECTOR
CORRIDOR
ATS CLOSET
PACU POST OR
PRESURGERY
BED
PACU POST OR
PRESURGERY
BED
PACU POST OR
PRESURGERY
BED
PACU POST OR
PRESURGERY
BED
ANESTHESIA
WORK ROOM
SUPPLIES
SOILED ANDO2
VESTIBULE
CLEAN
UTILITIES
PATIENT
LOCKERS
PATIENT
TOILET LINEN CHUTE
IT CLOSET
ELECTRIC ROOM
ELECTRIC ROOM
12x10
G
H
4.5
F5
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I E D
X
Y
E-1.3
E-1.5
E-F
E-E
E-1
E-1.6
AA
X.5
10x8
EXISTING
EXHAUST UP
TO REMAIN.
10x8 EXISTING
EXHAUST DN
TO REMAIN.
REMOVE
EXISTING
DUCTWORK
ABOVE CEILING.
EXISTING
EXHAUST FAN
TO REMAIN.
EXISTING
EXHAUST FAN
TO REMAIN.
REMOVE
EXISTING
FAN
REMOVE EXISTING
STEAM RADIATOR
CONVECTORS. (TYPICAL
FOR 18). CAP EXISITNG
LPS & LPR BACK TO MAIN
RISER AT THE FLOOR BELOW.
EXISITNG
STEAM RISERS
TO REMAIN.
REMOVE
EXISTING
WINDOW AC UNITS.
EXISTING
6x4 EXHAUST
UP. CAP AND
SEAL AT SLAB
OF LEVEL 3.
EXISTING
CABINET
UNIT HEATER
TO REMAIN.
EXISTING FTR
TO REMAIN
REMOVE EXISTING FTR
CAP HWS/R BRANCH PIPING AT RISER.
EXISTING FTR
TO REMAIN
EXISTING HWS/R UP/DN
TO REMAIN.
EXISTING HWS/R UP/DN
TO REMAINEXISTING HWS/R UP/DN
TO REMAIN
1) DEMOLITION AND NEW WORK SHALL BE PHASED TO MINIMIZE
DISRUPTION OF FACILITY OPERATION. PROVIDE TEMPORARY CAPPING
AND CONNECTIONS AS REQUIRED TO MAINTAIN EXISTING SYSTEMS
DURING CONSTRUCTION. COORDINATE ALL PHASING OF DEMOLITION
AND SHUT-DOWNS OF EXISTING SYSTEMS WITH BUILDING MANAGER.
2.)INFORMATION ON EXISTING SYSTEMS HAS BEEN OBTAINED FROM
ORIGINAL DESIGN DRAWINGS SUBSEQUENT RENOVATION DRAWINGS.
THE HVAC CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO DEMOLITION OR DEACTIVATION.
3.)THE HVAC CONTRACTOR SHALL PERFORM SITE VISITS AS NECESSARY
IN ORDER TO EVALUATE EXISTING CONDITIONS PRIOR TO SUBMITTING A BID.
4.)THE TERM "CAP" AND ITS INDICATION ON THESE PLANS IS FOR THE CONVENIENCE
OF THE CONTRACTOR REGARDLESS OF WHETHER OR NOT INDICATED, AFTER DEMOLITION
ALL DUCTS SHALL BE CAPPED AIR TIGHT. THIS SHALL INCLUDE TEMPORARY CAPS PENDING
NEW CONNECTIONS AND PERMANENT CAPPING INCLUDING INSULATION.
POINT OF DEMOLITION. CUT AND CAP UNTIL NEW WORK BEINGS. CUT AND RESUME DOWNSTREAM.
DEMOLITION GENERAL NOTES:
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:1 :1
P
M
MD.102
SECOND FLOOR - HVAC DUCTWORK AND
PIPING DEMOLITION PLAN
11/09/2018 Checker RPB
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
SECOND FLOOR - HVAC DEMOLITION PLAN
Number: Revisions: Date:
TO SUB-BASEMENT
WASHER FAUCET
MAIL ROOM
MORGUE
STORAGE
CHASE
TREATMENT
CHASE
CHASE
CHASE
TREATMENT
STORGAGE
CHASE
OFFICE
OFFICE
STORAGE
SHOWER
BATH
CHIEF
CHASE
SHOWER
BATH
CHASE
CHASE
SECRETARY PROSTHETICS OFFICE CHIEF
PROSTHETICS
PURPLE
HEART ETC
DAV TRANSPT
BARBER
SHOP
CLOSET
STORAGE
ELECTRICAL
STORAGE
STORAGE
ELEVATOR
CHASE
KITCHEN
SHOWER
BATH
CHASE
CHASE
OFFICE
CHIEF
PHYSICAL
THERAPY
OFFICE
STAIR
STAIR
CLOSET
ELECTRICALCHASE
CHASE
CHASE
ELECTRICAL
CHASE
BIO MED
STORAGE
CHASE
STORAGE
STAIRWELL
CHASE
CORRIDOR
CHASE
CHASE
CHASE
CHASE
CORRIDOR
SPEC PUR
OFFICE OFFICE
CHASE
CHASE
MORGUE
CHASE
CHASE
ELEVATOR
PART OF
MORGUE
EFFECTS
PATIENT
NURSING ADMIN
STORAGE
ELECTRICAL ENGINEERING
CHASE
PRINTING
REPORTS
REPRODUCTION
UNIT
CLOSET
COMMUNICATION
TOILET
ELECTRICAL
CLOSET
CHASE
CHASE
ELECTRICAL
CLOSET
CORRIDOR
ELEVATOR
ELEVATOR
ELEVATOR
SERVICE
12A
12B
12E
12D
12F
12G
13A
13B
14B
14A
17 18
D001
D002
5 3
2B
21A
2A
P4
P2
P3
S1
A-B
C-B
3A
B-A17C
B-A16C
B-A15C
B-A18C
B-A19C
B-A23C
B-A24C
B-A25C
B-A20C
B-A14C
B-A13C
B-ST-1
B-AEC-1
B-A12C B-A11C
B-A10C B-A9C
B-A8C
B-C5C
21B
B-C4C
B-L40C
B-C7C
B-C6C
B-L-1
23B
B-C3C
B-C39C
B-CM-2C
B-CM-1C
23A
B-ME-1
D0001A
B-TCB
B-MT
B-EC-L1
B-B36C
B-B37C
B-TC-L1
B-A-C1
UP
DN
DN
EXISTING
AC CONDENSER
TO REMAIN.
EXISTING
AC UNITS
THRU WINDOW
TO REMAIN.
EXISTING
AC UNITS
THRU WINDOW
TO REMAIN.
2 1/2" HPS UP 1 1/4" HPR UP
1 1/2" PC UP
1 1/2" PC DN
1 1/4" HPR DN
2 1/2" HPS DN
SCOPE OF WORK
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:1 :1
P
M
MH.100
BASEMENT - HVAC DUCTWORK AND
PIPING PLAN
11/09/2018 KP RPB
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
BASEMENT - HVAC DUCTWORK AND PIPING PLAN
Number: Revisions: Date:
UPDN
T
T
G
H
4.5
F5
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I E D
X
Y
E-1.3
E-1.5
E-F
E-E
E-1
E-1.6
AA
X.5
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
12x6
12x6
EXISTING
FAN RELOCATED.
REBALANCE TO
EXISTING CFM.
EXISTING
CABINET UNIT
HEATER TO
REMAIN.
EXITING
EXHAUST
FAN TO REMAIN
EXISTING
EXHAUST FAN
TO REMAIN.
EXISTING
EXHAUST FAN
TO REMAIN.
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
2 1/2" HPS UP&DN
1 1/4" HPR UP&DN
1 1/2" PC UP&DN
1 1/4" GHS UP
1 1/4" GHR UP
EXISTING HWS/R UP/DN
TO REMAIN
EXISTING HWS/R UP/DN
TO REMAIN
EXISTING HWS/R UP/DN
TO REMAIN
EXISTING FTR
TO REMAIN
EXISTING FTR
TO REMAIN
EXISTING FTR
TO REMAIN
EXISTING T-STAT
TO REMAIN
2" HWR DN
2" HWS DN
MH.301
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
TEMPERATURE SENSOR
LOCATED WITHIN SOFFIT.
TO CONTROL
VALVE AT LEVEL 3
PENTHOUSE.
6'-0"
0.2 GPM
FTR-500-0101S6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
1" GHR
3/4" GHS
1/
4" G
H R
1/
4" G
H S
1/
4" G
H R
1 1/4" GHS
3/4" GHS
3/4" GHS
3/4" GHS
3/4" GHR
3/4" GHR
PROVIDE
24"X24"
ACCESS PANEL.
SERVES CRYOGENIC NITROGEN ASPHIXIATION
SERVES OXYGEN STORAGE ROOM
3/4" GHR
EXISTING AC
CONDENSER
TO REMAIN.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:1 :1
P
M
MH.101
FIRST FLOOR - HVAC DUCTWORK AND
PIPING PLAN
11/09/2018 KP RPB
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
FIRST FLOOR - HVAC DUCTWORK AND PIPING PLAN
Number: Revisions: Date:
12x10
10x10
8x
8x x1
8"∅
10"∅
8"∅ x1
8x6
X6
16X14
16x12
12x6
12x6 x1 x1 x6 x8
18x10
FD
14x10
14x6
12x10
FD
FD
250 CFM
S-C21
S202
S203
S204
S-1-2
S222
S223
S224
S225
S-C20
SD
SD
8"∅
8"∅
12"∅
12X10
FD12X6
X6
12X6
SP
FD
S201
CORRIDOR
FAMILY
WAITING
FAMILY/
CONSULT
TOILET
STAIR
TOILET
ELECT.
E. ELECT.
TEL/DATA
CONNECTOR
ATS CLOSET
PACU POST OR
PRESURGERY
BED
SOILED ANDO2
PATIENT
LOCKERS
PATIENT
TOILET
x1 x1
52x14 x1
66x20
52x14
60x36 SUPPLY UP
68x24 RETURN UP
G
H
4.5
TEAM SPACE
TREATMENT #7
214I
BARI. TREATMENT
#2
214H
BARI. TREATMENT
#1
214G
TREATMENT #1
214A
TREATMENT #2
214B
TREATMENT #3
214C
TREATMENT #4
214D
TREATMENT #5
214E
TREATMENT #6
214F
TREATMENT #8
214J
TREATMENT #9
214K
TREATMENT #10
214L
TREATMENT #11
214M
ISO TREATMENT #1
PRIVATE
TREATMENT #1
EXIST.
SOUTH STAIR
EXIST.
EAST STAIR
OFFICE, MD
OFFICE, DIRECTOR
MD.
OFFICE, PD
TRAINING
OFFICE, SOCIAL
WORKER
CORRIDOR A
C200A
CLEAN
UTILITY/SUPPLY
EXAM ROOM
STAFF CORRIDOR
C200D
STAFF LOCKER
EMERG. ELECT.
TREATMENT ROOM
CORRIDOR
SOILED UTILITY
CORRIDOR C
C200C
WATER TREATMENT
STORAGE
F5
HT/WT
STERILE SUPPLY
EQUIPMENT
STORAGE
STAFF TLT
STAFF TLT
PATIENT LOCKERS
OFFICE, DIETITIAN
CONFERENCE
STAFF LOUNGE
F E6
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
ELECT.
EQUIPMENT
PROCESSING,
CLEAN PREP/STORE
CORRIDOR B
C200B-2
OFFICE, FELLOW /
RN PD
NOURISHMENT
OFFICE, NURSE
MGR.
EQUIPMENT
PROCESSING,
SOILED
DIALYSATE PREP
WATER TREATMENT
EQUIPMENT REPAIR
MEDICATION
53 SF
EXIST. IT
SECUR. ROOM
229A
29 SF
EXIST. LINEN CHUTE
ALCOVE
CHASE
2C2C
I E D
X
Y
PATIENT TOILET
AA
WAITING
X.5
012S
VAV-507
ADS-24
ADE-23
ADE-22
ADS-21
0 10
100 100
ADR-12
ADS-11 100
ADS-11
ADS-11
ADS-11
ADS-12
ADR-11
ADS-11
ADS-11
ADR-11
ADE-11
ADR-12
ADS-12
ADS-13
ADR-12
ADS-23
ADR-14
ADS-12
ADS-12
ADE-11
ADE-11
ADE-11
ADE-12
ADS-11
ADS-12
ADE-11
ADR-11
ADS-11
ADS-11
ADR-11
ADS-11
ADR-11
ADR-12
ADS-12
ADS-13
ADS-13
ADR-12
ADS-11
ADR-12
ADS-13
ADS-13
ADR-61
ADE-11
ADE-11
ADR-11
ADS-11
ADS-13
ADS-13
012S
VAV-500
012S
VAV-501
012S
VAV-502
012S
VAV-503
012S
VAV-508
012S
VAV-509
012S
VAV-504
012S
CEAV-500
012S
VAV-511
012S
VAV-512
012S
VAV-513
012S
VAV-514
012S
VAV-515
012S
VAV-517
012S
VAV-516
012S
LVR-500
012S
VAV-518
012S
VAV-510
EXISITNG EXHAUST RELOCATED
EXISTING
CABINET
UNIT HEATER
TO REMAIN.
DEDUCT ALT#6
REFER TO PART PLAN 2 ON THIS SHEET
FOR ALTERNATE DUCTWORK
LAYOUT.
012S
VAV-521
ADS-11
ADR-11
ADE-13
ADS-12
012S
VAV-506
012S
VAV-519
ADS-12
ADS-12
ADE-12
ADS-11 150
ADE-11
ADR-14
ADR-14
ADR-14
ADR-14
PROVIDE
SEISMIC
JOINT
012S
VAV-505
ADS-11
ADS-11
ADS-42
ADS-42
ADR-11
ADS-13
ADS-13
ADR-22
x8
14x8
26x8
24x14
012S
VVR-502
x1 x1
16x12
14x6
FSD-503-012S
16x10
14x8
FSD-502-012S
x6
14x6 16x8
12x6
12x8
14x6 x6
14x8
12x6 x8 x6
12x6
12x6 x8
24x12 x1 x1
12x6
12x6
10x14
ADS-42
ADS-42
x8
24x8 24x14
12x6 12x6
12x8 14x6
012S
VVR-501
x6
16x10 x6 x6 x6
12x8
12x6 x1 x1
16x8
16x6 x6 x8
12x10 x6 x6
12x6
16x8
16x8
14x12 12 x1
12x6
14x8 x6
24x10 x1 x8 x8
12x6
12x8
12x6 x6
16x614x10
18x6
16x12 EXHAUST UP
12x812x6
12x8 12x6
14x10
16x6
14x8
12x10
12x8 12x6
12x6
16x10
14x8
10x8
EXISTING
EXHAUST UP
TO REMAIN.
10x8 EXISTING
EXHAUST DN
TO REMAIN.
PROVIDE
SEISMIC
JOINT
x6
DPS
x1
12x8
12x6 x1
12x6
12x8
12x6 x8
12x6
ADS-14
ADS-13 250
ADS-14
ADS-14
ADS-14 250
ADS-14
ADS-13
ADS-12
ADS-13
ADS-11
ADS-11
12x6
18x8
18x12 18x12
ADS-42
ADS-42
ADS-42
ADS-42
ADS-42
ADS-42
ADS-42
ADS-42400
ADR-42
ADR-42
ADR-42
ADR-42
ADR-42
ADR-42
MH.301
ADE-28
12x6
12x6 EXHAUST DUCT DN
TO LOW EXHAUST
GRILLE 7" ABOVE FLOOR.
16x10
30x14 x1
20x12
16x12
012S
VAV-520
ADS-12
SSACE-504-012S
x6 x8
12x6
16x6
16x8
24x14 x1
18x6
18x6
24x14
18x6
16x8
16x6
16x8
8x14
14x10
10x14
16x10
16x10
26x14 EXHAUST UP x1
24x10
FSD-501-012S
FSD-504-012S
FSD-500-012S
SSACE-505-012S
14x6
ADS-12
ADS-12
14x6
14x6 14x6
ADS-13
14x6
SAD-501-012S
SAD-500-012S
12x8
8x12
8x12
12x8 x1
2 18 x1
ADE-13
ADE-13
14x6
MEN'S PUBLIC
201A
WOMEN'S PUBLIC
201B
ADR-13
12x8
14x6
5'-0" SUPPLY LINEAR
DIFFUSER WITH PLENUM.
(TYPICAL FOR 12)
15'-0" CONTINUOUS
RETURN LINEAR
WITH 5'-0" ACTIVE
SECTIONS WITH PLENUMS.
(TYPICAL FOR 2)
ADS-21
PRESSURE SENSOR TO BE HARDWIRED TO AHU CONTROLLER AS SHOWN ON MI.803
KEYED NOTES:
x1
52x14
012S
VAV-507
ADE-22
ADR-12
ADS-13
ADR-12
ADS-11
ADR-12
012S
VAV-511
012S
VAV-518
DUCTWORK LAYOUT
FOR
DEDUCT ALT#6
012S
VAV-521
012S
VAV-506
ADR-14
ADS-11
ADS-11
24x14 x1
12x6
12x6
26x8
14x10
14x8
12x10
12x8 12x6
12x6
DPS
ADS-14
ADS-13
ADS-13
ADS-42
ADS-42
16x12 x6
16x6
16x8
16x10
26x14 EXHAUST UP x1
24x10
14x6
ADS-21
14x8
14x8
ADS-21
12x6
10x6
ADR-21
12x6
18x8
ADS-24
14x6
ADR-23
ADR-14
x8
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:2 :5
P
M
MH.102
SECOND FLOOR - HVAC DUCTWORK PLAN
11/09/2018 KP RPB
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
SECOND FLOOR - HVAC DUCTWORK PLAN
Level 2 Supply Air Terminal Box Schedule
Tag Location
(Building-Floor) Size Max CFM Min CFM GPM Integrated Sound
Attenuator Space-Mounted Devices AHU System Heat at max CFM Discharge Air
Temp Remarks
VAV-500 012S VCV-12 1125 CFM 750 CFM 1.7 GPM Yes AHU-500-013S Yes 75 °F
VAV-501 012S VCV-6 225 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-502 012S VCV-10 825 CFM 800 CFM 1.2 GPM Yes AHU-500-013S No 75 °F
VAV-503 012S VCV-6 400 CFM 200 CFM 0.9 GPM Yes AHU-500-013S Yes 85 °F
VAV-504 012S CV-6 350 CFM 350 CFM 0.6 GPM Yes AHU-500-013S No 75 °F
VAV-505 012S CV-6 400 CFM 400 CFM 0.6 GPM Yes AHU-500-013S No 75 °F
VAV-506 012S CV-6 250 CFM 250 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-507 012S VCV-10 825 CFM 475 CFM 0.7 GPM Yes AHU-500-013S No 75 °F
VAV-508 012S VCV-10 800 CFM 450 CFM 0.7 GPM Yes AHU-500-013S No 75 °F
VAV-509 012S VCV-10 800 CFM 350 CFM 1.8 GPM Yes AHU-500-013S Yes 85 °F
VAV-510 012S VCV-10 750 CFM 300 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-511 012S VCV-6 200 CFM 175 CFM 0.5 GPM Yes AHU-500-013S Yes 85 °F
VAV-512 012S VCV-6 200 CFM 75 CFM 0.5 GPM Yes AHU-500-013S Yes 85 °F
VAV-513 012S CV-6 200 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-514 012S CV-6 375 CFM 375 CFM 0.9 GPM Yes AHU-500-013S Yes 85 °F
VAV-515 012S VCV-6 300 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-516 012S CV-8 625 CFM 625 CFM 0.9 GPM Yes AHU-500-013S No 75 °F
VAV-517 012S CV-8 425 CFM 425 CFM 0.7 GPM No AHU-500-013S No 75 °F
VAV-518 012S CV-8 650 CFM 650 CFM 1.5 GPM Yes SETRA SPACE PRESSURE MONITOR AHU-500-013S Yes 85 °F
VAV-519 012S VCV-6 100 CFM 75 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-520 012S VCV-10 825 CFM 475 CFM 0.7 GPM Yes AHU-500-013S No 75 °F
VAV-521 012S VCV-10 750 CFM 300 CFM 1.7 GPM Yes AHU-500-013S Yes 85 °F
Level 2 Return Air Terminal Box Schedule
Tag Location
(Building-Floor) Size Max CFM Min CFM Integrated Sound
Attenuator Space-Mounted Devices AHU System
LVR-500 012S LVR-E 5900 CFM 2800 CFM Yes AHU-500-013S
VVR-501 012S VVR-10 800 CFM 400 CFM Yes AHU-500-013S
VVR-502 012S VVR-16 2025 CFM 925 CFM Yes AHU-500-013S
Level 2 Exhaust Air Valve Schedule
Tag Location
(Building-Floor) Size Max CFM Min CFM Sound Attenuator Space-Mounted Devices Exhaust System
CEAV-500 012S CEAV-1 850 850 Yes SETRA SPACE PRESSURE MONITOR EF-500A-013S
DEDUCT ALT#6
1/8" = 1'-0"
SECOND FLOOR DEDUCT ALT #6 - HVAC DUCTWORK PART PLAN
Number: Revisions: Date:
ADMIN
T
T
T
T
T
UP
013S
ACCH-501
013S
ACCH-500
013S
EF-500A
013S
HF-500
12"DIA.EXHAUST STACK UP
TERMINATE 10'-0"
ABOVE ROOF.
013S
EF-501
AD
B D
T B
D T ø
16x12 EXHAUST DN
FAN PLATFORM
WITH STAIRS.
G
H
4.5
F5
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I E D
X
Y
E-1.3
E-1.5
E-E
E-1
E-1.6
AA
X.5
AD
013S
EF-500B
ø
013S
AHU-500
4" G
C R
2" G
H S
2" G
H R
2" L
P S
C
4" G
C S
REMOVE EXISTING
CABINET UNIT
HEATER AND
RELOCATE TO
ADJACENT WALL.
EXISTING
CABINET UNIT HEATER
RELOCATED. RE-CONNECT
HOT WATER LINES AND
THERMOSAT.
MH.401
REFER
TO PART PLAN
DEDUCT ALT#6
4" G
CS
4" G
CR
REFRIGERANT
DN TO FLOOR BELOW
PROVIDE HEAT TRACE
STEAM PIPES
MH.301
MH.301
013S
SSACC-501
013S
SSACC-500
1 1/2" LPRC
4" GCS
4" GCR
013S
SSACC-502
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:1 :1
P
M
MH.103
THIRD FLOOR - HVAC ROOF PLAN
11/09/2018 KP RPB
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
THIRD FLOOR - HVAC ROOF PLAN
Number: Revisions: Date:
A B C D
UP
G
E18
E17
E14
E19
EB
EA
EC
ED
EE
EI
EH
EF
E10 E11
E12
E13
E16 E15
1.5
E
F
G.3
1.3
C
PD
C
PD
C
PD
CPD
H
PS
C
PD
4"CPD
HPS
EXISTING
2-1/2"LPS
2"LPR UP
1/3 120# TO 15# PRV
2/3 120# TO 15# PRV
LPS
1-1/2"
2-1/2"
2-1/2"
1-1/2"
2" 2-1/2"
1" 3/4"
2"
1-1/4"
H
PS
1-1/2"
HPS
6"HPS
HW
S
HW
R
2" HW
R
2" HW
S
2" HW
S/R UP TO BASEM
ENT
LP
S
LP
S
LPS
EXISTING FLASH
TANK
EXISTING
CONDENSATE
PUM
P TANK
EXISTING SUPPLY
FAN
MPC
LPR
2"
2"
2"
2"
LPC
M
PC
H
PC
H
PC
LPC
LPC
HPC
MPC
2-1/2"
2"
31/2"CONTROL VALVE (TYP.)
8"
4" RELIEF VENT
TO ROOF.
4"
UP TO OR.
UP TO OR.
CPD
HPS
MPS
M P
S
MPS
MPS
MPS
V
MPS
LPC
MPC
MPC
M P
S
L P
C
CPD
MPS
MPS
LPC
MPS
MPS
MPS
MPC
MPS
STEAM BY-PASS
ASSEMBLY
CAP
HPS-14
MPS-4
MPS
M
PS
H
PS
H
PS
H
PS
M
1 1/2" PC
1 1/4" HPR
1 1/2" PC UP
1 1/4" HPR UP
1-1/2"PC
DN TO EXISTING
CONDENSATE PUMP
RECEIVER.
1-1/4"HPR
DN TO EXISTING
FLASH TANK.
2 1/2" HPS UP
1 1/2" PC
1 1/4" HPR
1 1 /4"
H
PR
1 1 /2"
P C
2 1/2" HPS
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:1 :3
P
M
MP.SB
SUB BASEMENT - HVAC PIPING PLAN
11/09/2018 KP RPB
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
SUB BASEMENT - HVAC PIPING PLAN
Number: Revisions: Date:
T
T
T
T
T
T
RS&RL UP
THRU THE
ROOF
D
1"
3/4"
3/4"
3/4"
3/4" 1"
3/4"
1-1/4" 1"
3/4"
1"
1" HW
S/R DN. TO CUH
EXISITNG
1-1/4 MPS UP 1"
M
PR UP EXISTING
1-1/4 M
PS DN.
1" M
PR DN.
AC
TB-2
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T T
T
T
T
T
T
T
T
T
T
G
H
4.5
TEAM SPACE
TREATMENT #7
214I
BARI. TREATMENT
#2
214H
BARI. TREATMENT
#1
214G
TREATMENT #1
214A
TREATMENT #2
214B
TREATMENT #3
214C
TREATMENT #4
214D
TREATMENT #5
214E
TREATMENT #6
214F
TREATMENT #8
214J
TREATMENT #9
214K
TREATMENT #10
214L
TREATMENT #11
214M
ISO TREATMENT #1
PRIVATE
TREATMENT #1
EXIST.
SOUTH STAIR
EXIST.
EAST STAIR
OFFICE, MD
OFFICE, DIRECTOR
MD.
OFFICE, PD
TRAINING
OFFICE, SOCIAL
WORKER
CORRIDOR A
C200A
CLEAN
UTILITY/SUPPLY
EXAM ROOM
STAFF CORRIDOR
C200D
STAFF LOCKER
EMERG. ELECT.
TREATMENT ROOM
CORRIDOR
SOILED UTILITY
CORRIDOR C
C200C
WATER TREATMENT
STORAGE
F5
HT/WT
STERILE SUPPLY
EQUIPMENT
STORAGE
STAFF TLT
STAFF TLT
PATIENT LOCKERS
OFFICE, DIETITIAN
CONFERENCE
STAFF LOUNGE
F E6
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
ELECT.
EQUIPMENT
PROCESSING,
CLEAN PREP/STORE
CORRIDOR B
C200B-2
OFFICE, FELLOW /
RN PD
NOURISHMENT
OFFICE, NURSE
MGR.
EQUIPMENT
PROCESSING,
SOILED
DIALYSATE PREP
WATER TREATMENT
EQUIPMENT REPAIR
MEDICATION
53 SF
EXIST. IT
SECUR. ROOM
229A
29 SF
EXIST. LINEN CHUTE
ALCOVE
CHASE
2C2C
I E D
X
Y
PATIENT TOILET
AA
WAITING
X.5
012S
VAV-510
012S
VAV-509
012S
VAV-503
012S
VAV-508
012S
VAV-518
012S
CEAV-500
012S
VAV-507
012S
VAV-511
012S
VAV-512
012S
VAV-514
012S
VAV-516
012S
VAV-500
012S
VAV-501
7'-0"
0.5 GPM
RCP-502-012S
5'-10"
0.5 GPM
RCP-502-012S
7'-6"
0.5 GPM
RCP-501-012S
0.5 GPM
RCP-503-012S
0.5 GPM
RCP-503-012S
0.5 GPM
RCP-503-012S
2" HWR UP
2" HWS UP
1 1 /4"
H W
S
EXISTING
STEAM
RISERS TO
REMAIN.(TYP)
EXISTING
CABINET
UNIT HEATER
TO REMAIN.
1 1/4" GHR UP&DN
1 1/4" GHS UP&DN
012S
VAV-521
012S
VAV-505
012S
VAV-504
012S
VAV-502
012S
VAV-506
012S
VAV-517
012S
VAV-519
012S
VAV-515
012S
VAV-513
1" HW
R1" HW
S
1" HW
S
1" HW
R
1 1 /4"
H W
R
1 1/2" PC UP
2 1/2" HPS DN
1 1/4" HPR DN
1 1/2" PC DN
2 1/2" HPS UP
DEDUCT ALT#6
012S
VVR-502
012S
VVR-501
012S
LVR-500
EXISTING HWS/R UP/DN
TO REMAIN
EXISTING HWS/R UP/DN
TO REMAIN
EXISTING HWS/R UP/DN
TO REMAIN
EXISTING FTR
TO REMAINEXISTING FTR
TO REMAIN
EXISTING T-STAT
TO REMAIN
SETRA SPACE PRESSURE MONITOR
DEDUCT ALT#6
1 1/4" HWR
1 1/4" HWS
1/
4" H
W S
1/
4" H
W R
1 1/4" HWS
1 1/4" HWR
1/
2" H
W S
1/
2" H
W R
1" HWR
1" HWS
3/4" HWS
3/4" HWR
(TYPICAL)
1" HWS
1" HWR
(TYP.)
10'-6"
0.5 GPM
RCP-500-012S
11'-0"
0.5 GPM
RCP-500-012S
11'-0"
0.5 GPM
RCP-500-012S
11'-0"
0.5 GPM
RCP-500-012S
11'-0"
0.5 GPM
RCP-500-012S
11'-0"
0.5 GPM
RCP-500-012S
8'-5"
0.5 GPM
RCP-500-012S
6'-0"
0.5 GPM
RCP-500-012S
16'-0"
0.5 GPM
RCP-500-012S
MH.301
6'-7"
0.5 GPM
RCP-502-012S
7'-2"
0.5 GPM
RCP-500-012S
7'-4"
0.5 GPM
RCP-500-012S
8'-7"
0.5 GPM
RCP-501-012S
10'-0"
0.5 GPM
RCP-501-012S
8'-9"
0.5 GPM
RCP-501-012S
012S
VAV-520
1 1/4" HWS
1 1/4" HWR
EXISTING
TO REMAIN.
SSACE-504-012S
REFRIGERANT
LINES UP
3/4" HWR
3/4" HWS
3/4" HWS3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
0.5 GPM
RCP-503-012S
(TYPICAL FOR 5)
2" H
W S
2" H
W R
PROVIDE
SEISMIC
JOINT
REFRIGERANT LINES
UP
SSACE-505-012S
1" D
1" DRAIN
DN TO
OPEN-END DRAIN.
3/4" HWR
1" D
3/4 " H
W R
3/4 " H
W S
1" HWR
1" HWS
3/4" HWS
3/4" HWR
(TYPICAL FOR 3)
(TYPICAL FOR 2)
(TYPICAL FOR 2)
1" D
1" DRAIN
TO OPEN END
DRAIN ABOVE
CEILING.
RECEPTION
MEN'S PUBLIC
201AWOMEN'S PUBLIC
201BCORRIDOR C
C1AA
CORRIDOR C
C200C
STAFF CORRIDOR
C200D
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:2 :3
P
M
MP.202
SECOND FLOOR - HVAC PIPING PLAN
11/09/2018 Checker RPB
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
SECOND FLOOR - HVAC PIPING PLAN
Level 2 Supply Air Terminal Box Schedule
Tag Location
(Building-Floor) Size Max CFM Min CFM GPM Integrated Sound
Attenuator Space-Mounted Devices AHU System Heat at max CFM Discharge Air
Temp Remarks
VAV-500 012S VCV-12 1125 CFM 750 CFM 1.7 GPM Yes AHU-500-013S Yes 75 °F
VAV-501 012S VCV-6 225 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-502 012S VCV-10 825 CFM 800 CFM 1.2 GPM Yes AHU-500-013S No 75 °F
VAV-503 012S VCV-6 400 CFM 200 CFM 0.9 GPM Yes AHU-500-013S Yes 85 °F
VAV-504 012S CV-6 350 CFM 350 CFM 0.6 GPM Yes AHU-500-013S No 75 °F
VAV-505 012S CV-6 400 CFM 400 CFM 0.6 GPM Yes AHU-500-013S No 75 °F
VAV-506 012S CV-6 250 CFM 250 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-507 012S VCV-10 825 CFM 475 CFM 0.7 GPM Yes AHU-500-013S No 75 °F
VAV-508 012S VCV-10 800 CFM 450 CFM 0.7 GPM Yes AHU-500-013S No 75 °F
VAV-509 012S VCV-10 800 CFM 350 CFM 1.8 GPM Yes AHU-500-013S Yes 85 °F
VAV-510 012S VCV-10 750 CFM 300 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-511 012S VCV-6 200 CFM 175 CFM 0.5 GPM Yes AHU-500-013S Yes 85 °F
VAV-512 012S VCV-6 200 CFM 75 CFM 0.5 GPM Yes AHU-500-013S Yes 85 °F
VAV-513 012S CV-6 200 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-514 012S CV-6 375 CFM 375 CFM 0.9 GPM Yes AHU-500-013S Yes 85 °F
VAV-515 012S VCV-6 300 CFM 200 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-516 012S CV-8 625 CFM 625 CFM 0.9 GPM Yes AHU-500-013S No 75 °F
VAV-517 012S CV-8 425 CFM 425 CFM 0.7 GPM No AHU-500-013S No 75 °F
VAV-518 012S CV-8 650 CFM 650 CFM 1.5 GPM Yes SETRA SPACE PRESSURE MONITOR AHU-500-013S Yes 85 °F
VAV-519 012S VCV-6 100 CFM 75 CFM 0.5 GPM Yes AHU-500-013S No 75 °F
VAV-520 012S VCV-10 825 CFM 475 CFM 0.7 GPM Yes AHU-500-013S No 75 °F
VAV-521 012S VCV-10 750 CFM 300 CFM 1.7 GPM Yes AHU-500-013S Yes 85 °F
Level 2 Return Air Terminal Box Schedule
Tag Location
(Building-Floor) Size Max CFM Min CFM Integrated Sound
Attenuator Space-Mounted Devices AHU System
LVR-500 012S LVR-E 5900 CFM 2800 CFM Yes AHU-500-013S
VVR-501 012S VVR-10 800 CFM 400 CFM Yes AHU-500-013S
VVR-502 012S VVR-16 2025 CFM 925 CFM Yes AHU-500-013S
Level 2 Exhaust Air Valve Schedule
Tag Location
(Building-Floor) Size Max CFM Min CFM Sound Attenuator Space-Mounted Devices Exhaust System
CEAV-500 012S CEAV-1 850 850 Yes SETRA SPACE PRESSURE MONITOR EF-500A-013S
DEDUCT ALT#6
Number: Revisions: Date:
LEVEL 1
0' - 0"
LEVEL 2
11' - 11"
LEVEL 3
23' - 10"
FIRST FLOOR
90' - 5 1/4"
SECOND FLOOR
102' - 4 1/4"
EXISTING LEVEL 3
114' - 3 1/4"
G
TRUE GRADE AVG.
85' - 2 1/16"
STAIR EXIT LANDING
86' - 5 13/32"
LOADING ROOF (LOW)
100' - 11 1/4"
H
PENTHOUSE LEVEL
115' - 8 1/4"
F5 F E6
ROOF T.O.STL
115' - 2"
I E D
T.O. CONCRETE
99' - 4"
ADR-42
ADR-42
8x12
ADS-42
ADR-14
20x12
ADS-21
6'-7"
0.5 GPM
RCP-502-012S
ADS-42
012S
VAV-520
012S
VAV-510
012S
VAV-509
36x16
14x3012x20
26x8
ADS-12
18x6
3/4" HWR
7'-2"
0.5 GPM
RCP-500-012S
012S
VAV-507
012S
CEAV-500
3/4" HWS
1 1/4" HWR
1 1/4" HWS
013S
EF-500B
013S
HF-500
6'-0"
0.2 GPM
FTR-500-0101S6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
1" GHR
3/4" GHS
1" GHR
3/4" GHR
3/4" GHS
1 1/4" GHR
1 1/4" GHS
3/4" GHR
3/4" GHS
6'-0"
0.2 GPM
FTR-500-0101S6'-0"
0.2 GPM
FTR-500-0101S
6'-0"
0.2 GPM
FTR-500-0101S
8ø 8ø
18x12 18x12
8x12
DEDUCT ALT#6
EXHAUST STACK
FOURTH FLOOR
126' - 2 1/4"
FIFTH FLOOR
138' - 1 1/4"
PENTHOUSE LEVEL
115' - 8 1/4"
PENTHOUSE ROOF
127' - 9 1/4"
WZ
ROOF T.O.STL
115' - 2"
E4 XY X.5
013S
GHWP-502
013S
GHWP-503
013S
GSHP-504013S
GSHP-505
013S
FT-500013S
SCP-500013S
SPRD-500A
2 1/2" HPS
3" MPS
4" V 4" V
2" V
3" MPS
2" GHR
1" GHS
1" MPR
1 1/2" PC
2" V
1" HPR
3" LPR
013S
ACCH-501
4" GCR
4" GCS
4" V 4" V
4" V 2" V
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:1 :3
P
M
MH.301
HVAC SECTION
11/09/2018 KP RPB
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"
HVAC SECTION LOOKING SOUTH
1/4" = 1'-0"
HVAC PENTHOUSE SECTION LOOKING WEST
Number: Revisions: Date:
T
T
T
T
T
UP
F5
W
Z
F E6
D1
E4
EC ED EE
CC
E D
X
75 6 8
Y
E-1.5
E-F
E-E
E-1.6
AA
X.5013S
SCP-500
GLYCOL MIX
TANK W/ MANUAL PUMP
300 GALLON
CHILLED WATER
STORAGE TANK
013S
SPRD-500A
013S
SPRD-500B
013S
ET-500
013S
SWHE-502
013S
SWHE-503
013S
FT-500
013S
ET-501
013S
GHWP-502
013S
GHWP-503
013S
SWHE-500
013S
SWHE-501
WATER TREATMENT
CHEMICAL POT FEEDER
(BELOW)
013S
HWP-500
013S
HWP-501
013S
VFD-500
013S
VFD-501
013S
VFD-502
013S
VFD-503
BAS CONTROL PANELS
1/3
2/3
1/3
2/3
1/3
2/3
2/3
1/3
013S
GSHP-504
013S
GSHP-505
2" HWS DN
1 1/4" GHS DN
1 1/4" GHR DN
2" HWR DN
2"
2"
1 1/4" GHR
1 1/4" GHS
2" GHR
2" GHS
1"
1 1/4" GHS
2" 2"
013S
AS-501
013S
AS-500
2" MPR
2" HWS
2" HWR
2 1/2" MPS
2" G
H S
2" GHR
4" GCR
4" GCR
GLYCOL MIX TANK
W/ MANUAL PUMP
013S
AS-502
2" GHS2" GHS
2" L
P S
C
1/
4" G
H R
1/
4" G
H S
MH.301
2 1/2" HPS DN 1 1/2" PC DN
2 1/2" HPS
013S
CSG-500
3" M
P S
3" MPS
2" M
P S
3" MPS 3" MPS 3" MPS
3/4" MPR
4" V 2" V
4" V
4" V
2" V
2" V
1 1/2" MPR 3" MPR
1" M
P R
1" H
P R
1 1/2" PC
1/
2" P
C
VENTS UP
THROUGH ROOF.
013S
SSACC-500
1/
4" D
1 1/4" D
013S
SSACE-501
013S
SSACE-502
013S
SSACE-500
013S
SSACE-503
1 1/4" D
DRAIN TO NEAREST
FLOOR DRAIN
DRAIN TO NEAREST
FLOOR DRAIN
DRAIN TO NEAREST
FLOOR DRAIN
MH.506
AD
16x16 OPEN ENDED
EXHAUST DUCT WITH
1/2" W.M.S.
(1500 CFM)
013S
SPRV-500
50x14 OPEN END
DUCT WITH 1/2"
W.M.S.(1500 CFM)
AD
REFER ARCHITECTURAL
DRAWINGS FOR FINAL
INTAKE LOUVER LOCATION.
MH.503
4" GCS 4" GCS
4" GCR
1 1/2" LPRC
2" LPSC
4" G
C R
2" G
H R
2" G
H S
2" HWS
REFRIGERANT LINE
TO OUTDOOR UNIT
SSACC-502-013S
013S
VFD-504
013S
VFD-505
013S
VFD-507
013S
VFD-506
013T
VFD-508
013U
VFD-509
DEDUCT ALT#6
013S
SSACC-502
MH.503
MH.503
INTAKE PLENUM
6'-0"(W)x1'-6"(D)x1'-7"(H)
F5
W
Z
F E6
D1
E4
EC ED EE
CC
E D
X
75 6 8
Y
E-1.5
E-F
E-E
E-1.6
AA
X.5
4" VENT FROM PRV
TERMINATE 10' ABOVE ROOF
4" VENT FROM FTK-1/CP-1
TERMINATE 10' ABOVE ROOF
4" VENT FROM CSG-1
TERMINATE 10' ABOVE ROOF
MH.301
2" VENT BLOW DOWN SEPARATOR
TERMINATE 10' ABOVE ROOF
014S
EF-502
PROVIDE SEISMIC JOINT BALL JOINT ASSEMBLY FOR 2 1/2" HPS AND 1 1/2" PC. REFER TO THE STRUCTURAL PLANS FOR ANTICIPATED SEISMIC JOINT MOVEMENT. EXPANSION TO BE DESIGNED
FOR AN IMPORTANCE FACTOR OF 3 AND INCLUDE CALCULATION FOR THERMAL STRESS AND
EXPANSION.
KEYED NOTES:
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \H
V A
C
V A
P R
O V
V rp b b rp lu s a .c o m
.r v t
/5
/2
:1 :3
P
M
MH.401
THIRD FLOOR PENTHOUSE & PENTHOUSE
ROOF PART PLANS
11/09/2018 Checker RPB
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"
THIRD FLOOR - HVAC PENTHOUSE PART PLAN
1/4" = 1'-0"
PENTHOUSE ROOF - HVAC PIPING PLAN
Number: Revisions: Date:
| Legend MH.001 (1) |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MD-101 - FIRST FLOOR - HVAC DUCTWORK AND PIPING DEMOLITION PLAN |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MD-102 - SECOND FLOOR - HVAC DUCTWORK AND PIPING DEMOLITION PLAN |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-100 - BASEMENT - HVAC DUCTWORK AND PIPING PLAN |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-101 - FIRST FLOOR - HVAC DUCTWORK AND PIPING PLAN |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-102 - SECOND FLOOR - HVAC DUCTWORK PLAN |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-103 - THIRD FLOOR - HVAC ROOF PLAN |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MP-SB - SUB BASEMENT - HVAC PIPING PLAN |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MP-202 - SECOND FLOOR - HVAC PIPING PLAN |
| HVAC - VA PROV - V2016_rpb@brplusa.com - Sheet - MH-301 - HVAC SECTION |