36E77619R0086-018.pdf
PDF Posted
- Attached to
- Replace Hemodialysis Unit Federal contract opportunity
- Solicitation number
- 36E77619R0086
About this file
36E77619R0086 Attachment 17 - Security.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Replace Hemodialysis Unit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRONIC SAFETY AND SECURITY SYMBOLS
ELECTRONIC SAFETY AND SECURITY ABBREVIATIONS
CR
RX
EL
SECURITY CAMERA SUBSCRIPT LEGEND
POI POINT OF INTERFACE
POTS PLAIN OLD TELEPHONE SERVICE
PR PAIR
PVC POLYVINYL CHLORIDE
SE SERVICE ENTRANCE
SP SERVICE PROVIDER
SPC STORED PROGRAM CONTROL
SPD SURGE PROTECTION DEVICE
SPG SINGLE-POINT GROUND
STA STATION
STP SHIELDED TWISTED PAIR
SW STATION WIRE
SYS SYSTEM
TBBC TELECOMMUNICATIONS BACKBONE BONDING CONDUCTOR
TBC TELECOMMUNICATION BONDING CONDUCTOR
TC TELECOMMUNICATIONS CLOSET
TEL TELEPHONE
TELCO TELEPHONE COMPANY
TERM TERMINAL
TGB TELECOMMUNICATIONS GROUNDING BUSBAR
THD TOTAL HARMONIC DISTORTION
TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION
TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR
TO TELECOMMUNICATIONS OUTLET
TPDDI TWISTED PAIR DISTRIBUTED DATA INTERFACE
TPPMD TWISTED PAIR PHYSICAL MEDIA DEPENDENT
TR TELECOMMUNICATIONS ROOM
TT TELEPHONE TERMINAL
TTB TELEPHONE TERMINAL BOARD
TTY TEXT TELEPHONES
TVSS TRANSCEINT VOLTAGE SURGE SUPPRESSOR
TYP TYPICAL
UG UNDERGROUND
UL UNDERWRITERS LABORATORIES
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
ISDN INTEGRATED SERVICES DIGITAL NETWORK
ISO INTEGRATED STANDARDS ORGANIZARION
IW INSIDE WIRING (CABLE)
KHz KILOHERTZ
KTS KEY TELEPHONE SYSTEM
LAN LOCAL AREA NETWORK
LASER LIGHT AMPLIFICATION BY STIMULATED EMISSION OF RADIATION
LATA LOCAL ACCESS TRANSPORT AREA
LBO LINE BUILDOUT
LEC LOCAL EXCHANGE CARRIER
LED LIGHT EMITTING DIODE
LOCAP LOW CAPACITANCE
MAX MAXIMUM
MC MAIN CROSS-CONNECT
MDF MAIN DISTRIBUTION FRAME
M/G MOTOR/GENERATOR SET
MH MAINTENANCE HOLE
MICRON MICROMETER
MIN MINIMUM
MISC MISCELLANEOUS
MODEM MODULATOR/DEMODULATOR
NEC NATIONAL ELECTRIC CODE
NESC NATIONAL ELECTRIC SAFETY CODE
NIC NOT IN CONTRACT
NID NETWORK INTERFACE DEVICE
NIU NETWORK INTERFACE UNIT
NRTL NATIONALLY RECOGNIZED TESTING LABORATORY
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFNP OPTICAL FIBER NON-CONDUCTIVE PLENUM
OFNR OPTICAL FIBER NON-CONDUCTIVE RISER
OPD OVERCURRENT PROTECTION DEVICE
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OSP OUTSIDE PLANT
PAM PULSE AMPLITUDE MODULATE
PB PULL BOX
PBX PRIVATE BRANCH EXCHANGE
PCM PULSE CODE MODULATION
PIC POLYETHYLENE INSULATED CONDUCTOR
D/A DIGITAL TO ANALOG CONVERSION
DAF DEDICATED ACCESS FACILITY
DB DECIBEL
DC DIRECTED CURRENT
DD DISTRIBUTION DESIGNER
DEMARC DEMARCATION POINT
DW DISTRIBUTION WIRE
DWG DRAWING(S)
EBC EQUIPMENT BONDING CONDUCTOR
EC ELECTRICAL CONTRACTOR
EF ENTRANCE FACILITY
EIA ELECTRONICS INDUSTRY ASSOCIATION
ELEC ELECTRICAL
EMC ELECTROMAGNETIC COMPATABILITY
EMI ELECTROMAGNETIC INTERFACE
EMT ELECTRICAL METALLIC TUBING
EXT EXTENSION
FCC FEDERAL COMMUNICATIONS COMMISSION
FD FLOOR DISTRIBUTION
FDDI FIBER DISTRIBUTION DATA INTERFACE
FDM FREQUENCY DIVISION MULTIPLEXING
FDR FEEDER
FO FIBER OPTIC
FOTP FIBER OPTIC TRANSMISSION SYSTEM
FREQ FREQUENCY
FTP FOIL TWISTED PAIR
GA GAUGE
GEC GROUNDING ELECTRIC CONDUCTOR
GHz GIGAHERTZ
GND GROUND
HC HORIZONTAL CROSS-CONNECT
HF HIGH FREQUENCY
HH HANDHOLE
HVAC HEATING, VENTILATION AND AIR CONDITIONING
Hz HERTZ
IC INTERMEDIATE CROSS-CONNECT
ICEA INSULATED CABLE ENGINEERS ASSOCIATION
IDC INSULATION DISPLACEMENT CONNECTION
IDF INTERMEDIATE DISTRIBUTION FRAME
IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
8P8C 8-POSITION, 8-CONDUCTOR
AC ALTERNATING CURRENT
A/D ANALOG TO DIGITAL CONVERSION
ADA AMERICANS WITH DISABILITIES ACT
AER AERIAL
AFF ABOVE FINISHED FLOOR
AIA AMERICAN INSTITUTE OF ARCHITECTS
AM AMPLITUDE MODULATION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ARMM PIC RISER, EXPANDED POLYETHYLENE PVC, 24 AWG, ALVYN
ASCII AMERICAN STANDARD CODE FOR INFORMATION INTERCHANGE
ATM ASYNCHRONOUS TRANSFER MODE
AWG AMERICAN WIRE GAUGE
BD BUILDING DISTRIBUTOR
BDF BUILDING DISTRIBUTION FRAME
BEF BUILDING ENTRANCE FACILITY
BER BIT ERROR RATE
BIC BUILDING INDUSTRY CONSULTANT
BICSI BUILDING INDUSTRY CONSULTING SERVICES
BRISDN BASIC RATE INTEGRATED SERVICES DIGITAL NETWORK
BTU BRITISH THERMAL UNIT
CATV CABLE TELEVISION
CBC COUPLED BONDING CONDUCTOR
CC COMMUNICATIONS CONTRACTOR
C CONDUIT
CER COMPUTER EQUIPMENT ROOM
CIRC CIRCUIT
CFC COMMUNICATIONS FLAT CABLE
CLO CLOSET
CO CENTRAL OFFICE
CODEC CODER/DECODER
COE CENTRAL OFFICE EQUIPMENT
COT CENTRAL OFFICE TERMINAL
CPC CUSTOMER PREMISES COMMUNICATIONS
CPE CUSTOMER PREMISES EQUIPMENT
CPU CENTRAL PROCESSING UNIT
CSA CANADIAN STANDARDS ASSOCIATION
CSMA/CA CARRIER SENSE MULTIPLE ACCESS/COLLISION AVOIDANCE
CSMA/CD CARRIER SENSE MULTIPLE ACCESS/COLLISION DETECTION
DC
ACP
PP
NVR
DVR
PS
JB
MG
L
DR
F 180° 360°
PTZ
CAMERA TYPE
# CAMERA NUMBER
ES
CARD READER
REQUEST-TO-EXIT
ELECTRONIC LOCK
ELECTRIC STRIKE
DOOR CONTACT
PUSH PLATE
ACCESS CONTROL PANEL
LOCKDOWN BUTTON
SECURITY DOOR RELEASE BUTTON
NETWORK VIDEO RECORDER
DIGITAL VIDEO RECORDER
POWER SUPPLY
JUNCTION BOX
MAGNETIC LOCK
CEILING MOUNTED FIXED IP CAMERA - PROVIDE (1) CATEGORY 6 CABLE TERMINATED TO SECURITY
RACK LOCATED IN SECURITY ROOM 229A.
CEILING MOUNTED 360° CAMERA - PROVIDE (1) CATEGORY 6 CABLE TERMINATED TO SECURITY
RACK LOCATED IN SECURITY ROOM 229A.
WALL MOUNTED FIXED CAMERA - PROVIDE (1) CATEGORY 6 CABLE TERMINATED TO SECURITY
RACK LOCATED IN SECURITY ROOM 229A.
ELECTRONIC SAFETY AND SECURITY GENERAL NOTES
ICM INTERCOM MASTER STATION
ICS INTERCOM SUB-STATION
F
360°
F
IC INTERCOM
HC HANDICAP PUSH PLATE
CB CODE BLUE DEVICE
EA EQUIPMENT ALARMS
SECURITY RACEWAY REQUIREMENTS GENERAL NOTES:
1. SECURITY DETAILS ARE DIAGRAMMATIC AND INTENDED FOR OWNING THE SCOPE OF THE SYSTEMS AND
REQUIREMENTS, ALL FINAL INSTALLATIONS SHALL BE BASED ON APPROVED SHOP DRAWINGS.
2. CONTRACTOR SHALL PROVIDE DETAILED SHOP DRAWINGS INDICATING FINAL CABLING AND CONDUIT
SIZES AS COORDINATED WITH APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN
3. PRIOR TO ROUGH-IN, CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS, RCPs, ELEVATIONS AND
SCHEDULES FOR ALL FINAL MOUNTING HEIGHTS AND LOCATIONS.
4. THE CONTRACTOR SHALL PROVIDE DETAILED COORDINATION DRAWINGS FOR SUBMITTAL TO ENSURE
THAT ALL SIZES, AND SYSTEMS ARE COORDINATED WITH ALL TRADES AND SYSTEMS.
5. INSTALLATION OF ALL RACEWAYS SYSTEMS SHALL BE PROVIDED IN ACCORDANCE WITH REFERENCED
STANDARDS NOTED IN SPECIFICATIONS AND CONTRACT DOCUMENTS HEREIN.
EXT
EXTERIOR
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \T
E C
H
V A
P R
O V
V
H
S h o ja i@ b rp lu s a .c o m
.r v t
/5
/2
:4 :2
P
M
SE.000
SECURITY LEGEND
11/09/2018 JJL JJL
100% CONSTRUCTION
DOCUMENTS
41 TERMINALS, CONNECTORS, DEVICES, CIRCUITS, CABLES, AND CABLE TERMINATIONS SHALL BE CLEARLY, LOGICALLY, AND PERMANENTLY MARKED DURING INSTALLATION. ALL EQUIPMENT AND CONDUITS SHALL BE IDENTIFIED.
42 ALL WIRING AND ELECTRICAL CIRCUITS SHALL BE NUMERICALLY IDENTIFIED AT BOTH ENDS AS REQUIRED BY THE CONTRACT DOCUMENTS. EACH SYSTEM CONDUIT JUNCTION BOX, PULL BOX, OR ELECTRICAL ENCLOSURE (FROM TERMINATION TO TERMINATION) CONTAINING SYSTEM CONDUCTORS, INCLUDING INITIATING DEVICE, NOTIFICATION
APPLIANCE, AND AUXILIARY FUNCTION CIRCUITS.
43 AC POWER CONDUCTORS OR GROUNDING CONDUCTORS SHALL BE UNIQUELY AND PERMANENTLY LABELED WITH A NUMBERED TAG, LABEL OR STENCIL. LABEL SYSTEM PROPOSED BY THE CONTRACTOR SHALL BE TYPEWRITTEN AND
APPROVED BY OWNER OR THEIR AUTHORIZED REPRESENTATIVE.
44 ENCLOSURES, CABINETS, HOUSINGS, CONSOLES, POWER SUPPLY ENCLOSURES, CONTROL AND TERMINAL CABINETS, CONTROL UNITS, WIRING GUTTERS AND OTHER COMPONENT HOUSINGS, BOXES AND FITTINGS OR EVERY PRODUCT DESCRIPTION, COLLECTIVELY REFERRED TO AS ENCLOSURES, SHALL BE SO FORMED AND ASSEMBLED AS TO BE
STURDY AND RIGID.
45 ALL WIRING SHALL BE RUN PERPENDICULAR OR PARALLEL TO THE FLOOR PLANE, WITH ALL BENDS MADE AT NEAT
RIGHT ANGLES.
46 ALL WIRING WITHIN THE CABINET SHALL BE PERMANENTLY ATTACHED USING SPIRAL WRAP TUBING AND NYLON WIRE TIES WITH MECHANICAL (I.E.: SCREWS, RIVETS) FASTENERS. THE USE OF SELF-ADHESIVE FASTENERS INSIDE THE
CABINET(S) IS SPECIFICALLY PROHIBITED.
47 ALL ENCLOSURE PENETRATIONS SHALL BE FROM THE BOTTOM UNLESS THE SYSTEM DESIGN REQUIRES PENETRATIONS FROM OTHER DIRECTIONS. PENETRATIONS OF INTERIOR ENCLOSURES INVOLVING TRANSITIONS OF CONDUIT FROM INTERIOR TO EXTERIOR, AND ALL PENETRATIONS ON EXTERIOR ENCLOSURES SHALL BE SEALED WITH RUBBER SILICONE SEALANT TO PRECLUDE THE ENTRY OF WATER. THE TERMINATOR SHALL BE FILLED WITH AN APPROVED SEALANT AS RECOMMENDED BY THE CABLE MANUFACTURER AND IN SUCH A MANNER THAT THE CABLE IS
NOT DAMAGED.
48 ALL WIRING WITHIN THE CABINET SHALL BE NEATLY ROUTED IN HORIZONTAL AND VERTICAL CHANNELS PARALLEL TO THE CABINET'S SIDES AND THE INTERIOR TERMINAL STRIPS. WIRING SHALL NOT BE ROUTED OVER CIRCUIT BOARDS, TRANSFORMERS, OR TERMINAL STRIPS. AS GENERAL PRACTICE, RUN ALL POWER CABLES, CONTROL CABLES, AND HIGH-LEVEL CABLES ON ONE SIDE OF AN EQUIPMENT CABINET. RUN ALL OTHER CABLES ON THE OPPOSITE SIDE OF AN EQUIPMENT CABINET. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF A TWELVE (12) INCH DISTANCE BETWEEN ALL PARALLEL RUNS OF AC ELECTRICAL POWER AND LOW VOLTAGE CONDUIT OR LOW VOLTAGE WIRING.
49 PROVIDE TESTING AND VERIFY THAT ALL SYSTEM CABLING AND FIELD WIRING IS FREE OF SHORTS, GROUNDS, OPENS, HIGH RESISTANCE, AND OTHER FAULTS PRIOR TO TERMINATION TO DEVICES AND EQUIPMENT. THE CONTRACTOR SHALL PROVIDE A DETAILED REPORT OF THE TEST TO OWNER'S SECURITY AND ITS AUTHORIZED REPRESENTATIVE.
50 ALL CONDUITS SHALL BE IN INSTALLED IN ACCORDANCE WITH NFPA 70, THE NATIONAL ELECTRICAL CODE (NEC), AMERICAN DISABILITY ACT (ADA) AND THE CONTRACT DOCUMENTS.
51 ALL CONDUIT ROUTES SHALL BE SO DESIGNED TO ENSURE THAT ALL LOW VOLTAGE WIRE AND CONDUIT MAINTAIN THE REQUIRED MINIMUM OF TWELVE-INCH (12") DISTANCE SEPARATION FROM ANY OPEN CONDUCTORS OF POWER, OR CLASS 1 CIRCUIT AND SHALL NOT BE PLACED IN ANY CONDUIT, JUNCTION BOX OR RACEWAY CONTAINING THESE
CONDUCTORS, AS PER NFPA 70, THE NATIONAL ELECTRICAL CODE (NEC).
52 ALL CONDUITS, RACEWAYS, AND OTHER ASSOCIATED ITEMS RELATED TO THE SYSTEM INSTALLED, SHALL NOT OBSTRUCT ANY PORTION OF A WINDOW, DOORWAY, STAIRWELL, OR PASSAGEWAY AND SHALL NOT INTERFERE WITH
THE OPERATION OF ANY EXISTING MECHANICAL OR ELECTRICAL EQUIPMENT.
53 ALL BACK BOXES PROVIDED FOR RECESSED CEILING INSTALLATION SHALL INCLUDE ADEQUATE ACCESS AND SHALL BE RATED FOR USE IN CEILINGS AND SHALL MEET OR EXCEED ALL APPLICABLE NATIONAL AND LOCAL ELECTRICAL
CODES.
54 ALL JUNCTION BOXES DEFINED BY THE RECORD SPECIFICATION MAY BE CONCEALED BUT MUST REMAIN ACCESSIBLE FOR SERVICE AND TESTING. SECURITY JUNCTIONS BOXES MAY BE RECESSED INTO WALL OR CEILING.
55 ALL JUNCTION BOXES AND SMALL DEVICE ENCLOSURES BELOW THE CEILING AND EASILY ACCESSIBLE TO EMPLOYEES OR THE PUBLIC SHALL BE TAMPER PROOF, MONITORED, AND COVERED WITH SUITABLE COVER PLATE. ALL JUNCTION BOXES ABOVE CEILING LEVEL IN OCCUPIED AREAS OF THE BUILDING SHALL NOT BE CONSIDERED TO BE EASILY ACCESSIBLE. ALL LOCATIONS CONTAINING SECURITY SYSTEM COMPONENTS UNDER THESE CONDITIONS SHALL
INCORPORATE SECURE TAMPERPROOF SCREWS OR SIMILAR APPROVED DEVICES.
56 ALL SYSTEM CABLING PROVIDED, AS PART OF THIS SYSTEM SHALL BE INSTALLED IN DEDICATED CONDUIT RACEWAYS, WHICH ARE NOT USED FOR ANY OTHER PURPOSE, FUNCTION, OR SYSTEM.
57 CONDUIT SHALL BE CONCEALED IN ALL FINISHED AREAS. EXPOSED CONDUIT IS PERMITTED IN ELECTRICAL, MECHANICAL AND UNFINISHED AREAS ONLY AS DETERMINED BY THE ARCHITECT PRIOR TO INSTALLATION.
58 ANY RUN OF EXPOSED CONDUIT SHALL BE PARALLEL OR AT A RIGHT ANGLE TO THE BUILDING LINES.
59 ALL DEVICES GENERATING RADIO FREQUENCIES SHALL BE CERTIFIED TO COMPLY WITH THE REQUIREMENTS OF FCC
PART 15 AND LABELED AS SET FORTH IN FCC PART 15.
60 CONTRACTOR SHALL TAKE ALL OTHER PRECAUTIONS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS
TO PREVENT ELECTROMAGNETIC INTERFERENCE WITH DATA TRANSMISSIONS.
61 NON-SECURITY SYSTEM WIRING SHALL NOT SHARE SECURITY CONDUIT.
62 THE SECURITY SYSTEM NETWORK SHALL COMMUNICATE WITH THE SYSTEM CONTROL WORKSTATIONS THROUGH INDUSTRY STANDARD NETWORK SWITCHES AND ROUTERS AND SHALL NOT BE REQUIRED TO RESIDE ON THE SAME
SUBNET, AS THE INFORMATION TECHNOLOGY NETWORK.
63 THE SECURITY CONTRACTOR SHALL COORDINATE WITH THE CONTRACTOR OF DIVISION 08 700-DOOR HARDWARE.
64 ALL ELECTRIFIED DOORS SHALL BE OPERATIONAL FROM THE INSIDE WITHOUT USE OF A KEY OR ANY SPECIAL
KNOWLEDGE OR EFFORT PER NFPA 101.
65 THE SECURITY CONTRACTOR SHALL COORDINATE WITH THE DOOR HARDWARE CONTRACTOR AS TO INTERCONNECTION OF ALL INPUT TRIGGERS FOR RELEASE OF ELECTRICAL LOCKING HARDWARE AND CONTACT
OUTPUTS REQUIRED TO MONITOR DOOR RELATED ALARM POINTS.
66 ALL CAMERA CABLING SHALL BE CONCEALED AND PROTECTED IN A RIGID ENCASEMENT, CONDUIT, ARMORED FLEX, OR SIMILAR APPROVED PASSAGES. CAMERA PLACEMENTS IN THE FIELD ARE FORBIDDEN TO HAVE UNPROTECTED AND EXPOSED CONNECTORS, POWER CABLE, AND VIDEO FEEDS. INTEGRATED ARMATURES THAT PASS THE CABLING FROM THE CAMERA TO THE WALL / JUNCTION BOX WITHOUT EXPOSING THE CABLING AT ANY POINT SHALL BE DEEMED
ACCEPTABLE.
67 PROVIDE BACK BOX AND ASSOCIATED CONDUIT, LOCKNUTS, COUPLINGS, THREADED BUSHINGS, AND PULL ROPE FOR
ALL DEVICES AS INDICATED ON DRAWINGS AND AS SPECIFIED.
68 THE FINAL FIELD PLACEMENT AND FIELD OF VIEW FOR EACH CAMERA LOCATION SHALL BE DETERMINED BY ON SITE CONDITIONS. PRIOR TO THE PURCHASE OF ANY (CCTV) HARDWARE THE CONTRACTOR SHALL OBTAIN WRITTEN ACCEPTANCE OF PROPOSED PLACEMENTS AND ASSOCIATED FOCAL LENGTHS FROM THE OWNER OR ITS AUTHORIZED
REPRESENTATIVE.
80 ALL PENETRATIONS THROUGH FIRE RATED BUILDING STRUCTURES, WALLS, AND FLOORS SHALL BE SEALED WITH AN APPROPRIATE FIRE STOP SYSTEM. THIS REQUIREMENT APPLIES TO THROUGH PENETRATIONS (COMPLETE PENETRATION) AND MEMBRANE PENETRATIONS (THROUGH ONE SIDE OF A HOLLOW FIRE RATED STRUCTURE). ANY PENETRATING ITEMS I.E., RISER SLOTS AND SLEEVES, CABLES, CONDUIT, CABLE TRAY, AND RACEWAYS, ETC. SHALL BE PROPERLY FIRE STOPPED. THE CONTRACTOR SHALL ENSURE THAT ANY FIRE STOP SYSTEMS SHALL BE UL
CLASSIFIED TO ASTM E8 14 (UL 1479).
81 THE CONTRACTOR SHALL ENSURE THAT ALL FIRE STOP SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND SHALL BE COMPLETELY INSTALLED AND AVAILABLE FOR INSPECTION BY
THE LOCAL INSPECTION AUTHORITIES PRIOR TO CABLE SYSTEM ACCEPTANCE.
82 UPON SUCCESSFUL COMPLETION OF THE INSTALLATION, THE CONTRACTOR SHALL CONDUCT FULL SYSTEM TESTING TO ASSURE THAT THE SYSTEMS ARE CORRECTLY INSTALLED AND FULLY OPERATIONAL. CONFIRM IN WRITING TO THE ARCHITECT THAT ALL ASPECTS OF THE SYSTEM HAVE BEEN TESTED BY THE CONTRACTOR AND FOUND TO BE FULLY
OPERATIONAL AND READY FOR FINAL ACCEPTANCE TESTING.
83 AT THE CONCLUSION OF TESTING PROVIDE (2) COPIES OF ALL TEST REPORT DOCUMENTATION OF THE TESTS THAT SHALL REFLECT THE DATE, TIME, AND SYSTEM TESTING RESULTS. ADJUST, BALANCE AND TUNE ALL EQUIPMENT AS REQUIRED FOR OPTIMUM QUALITY TO MEET MANUFACTURER'S PUBLISHED PERFORMANCE SPECIFICATIONS AND
OWNERS REQUIREMENTS.
1 ALL WIRING AND CABLE BETWEEN DEVICES SHALL BE IN ACCORDANCE WITH THE OPERATING REQUIREMENTS OF THE DESIGNATED SYSTEM AND SHALL SUPPORT COMMUNICATIONS FOR POINT IDENTIFICATION AND ACCESS CONTROL
TRANSACTIONS TO/FROM EACH DEVICE.
2 THE CONTROL WIRING BETWEEN FIELD DEVICES, REMOTE ACCESS CONTROL EQUIPMENT AND FIELD PANELS/DATA GATHERING PANELS SHALL BE A MINIMUM OF No. 18 AWG AND SHALL BE COLOR-CODED.
3 PROVIDE WIRING FROM THE SMS FIELD PANEL TO THE INSTALLED FIRE ALARM SYSTEM SUCH THAT IN THE EVENT OF A FIRE ALARM OR WHEN THE FIRE ALARM SYSTEM IS ACTIVATED, ALL DOORS FITTED WITH ELECTROMAGNETIC LOCKS SHALL REVERT TO FAIL SAFE MODE OF OPERATION IN ACCORDANCE WITH THE LOCAL AUTHORITY HAVING
JURISDICTION AND OWNER OR THEIR AUTHORIZED REPRESENTATIVE.
4 ALL NON STAIRWELL DOORS FITTED WITH ELECTRIC MORTISE LOCKS SHALL REVERT TO A FAIL SECURE MODE OF OPERATION IN ACCORDANCE WITH THE LOCAL AUTHORITY HAVING JURISDICTION AND OWNER'S SECURITY.
5 ALL STAIRWELL DOORS FITTED WITH ELECTRIC MORTISE LOCKS SHALL REVERT TO A FAIL SAFE MODE OF OPERATION.
6 PROVIDE A HARD WIRED CONNECTION TO A 120 VAC, 20AMP EMERGENCY CIRCUIT THAT IS DEDICATED TO SECURITY FOR EACH SECURITY EQUIPMENT POWER SUPPLY LOCATION AS INDICATED ON THE DRAWINGS. THE CIRCUIT CONNECTION SHALL BE PROVIDED WITHIN A BACK BOX, SURFACE MOUNTED AT 18" A.F.F. UNLESS OTHERWISE NOTED.
TERMINATE WIRE ENDS WITH INSULATED WIRE NUTS.
7 REVIEW ALL CONTRACT DRAWINGS AND SURVEY EXISTING SITE CONDITIONS PRIOR TO ORDERING EQUIPMENT OR
PROCEEDING WITH WORK.
8 DRAWINGS SHALL BE USED BY THE CONTRACTOR AS A REFERENCE FOR THE REQUIREMENT AND LOCATION OF THE SYSTEM COMPONENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ACQUAINT THEMSELVES WITH ALL OF THE CONTRACT DRAWINGS, AND CONFIRM THE REQUIRED QUANTITIES OF DEVICES AND SPECIFIC OPTIONS ON
LOCATION.
9 PERFORM ALL WORK, PROVIDE PRODUCTS, SYSTEM INTEGRATION, COORDINATION, ENGINEERING, AND DESIGN WORK REQUIRED FOR THE PROJECT IN ORDER TO ENSURE THE PROPER INSTALLATION OF THE COMPLETE AND FULLY
OPERATIONAL SYSTEMS PURSUANT TO THE CONTRACT DOCUMENTS.
10 ALL SYSTEMS PROVIDED SHALL BE IN ACCORDANCE WITH THE MOST CURRENT REVISION OF THE FEDERAL, STATE, AND LOCAL CODES AND STANDARDS. THE AUTHORITY HAVING JURISDICTION SHALL PROVIDE FINAL CLARIFICATION OF CODE REQUIREMENTS. CONFLICT OF ANY CODE REQUIREMENT WILL REQUIRE THE ADAPTATION OF THE MORE STRINGENT REQUIREMENT FOR THE APPLICATION UNLESS A VARIANCE IS AUTHORIZED BY THE LOCAL AUTHORITY
HAVING JURISDICTION.
11 PROVIDE ALL COMPONENTS, INTERCONNECTION CONDUIT, CABLE/WIRE, APPURTENANCES, AND MATERIALS AS
REQUIRE TO FORM A COMPLETE COORDINATED SYSTEM READY FOR OPERATION.
12 PROVIDE ALL PLAN CHECKS, PERMITS, AND LICENSES NECESSARY FOR THE EXECUTION OF WORK AS APPLICABLE FOR THE PROJECT. ALL FEES, CHANGES, AND OTHER ASSOCIATED COSTS INCURRED BY THE FOREGOING SHALL BE BORNE
BY THE CONTRACTOR.
13 THE CONTRACTOR SHALL PROVIDE A QUALIFIED AND COMPETENT FACTORY TRAINED AND STATE LICENSED FIELD SUPERVISOR ON-SITE TO ENSURE THE PROPER INSTALLATION OF ALL SYSTEMS SPECIFIED AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH OTHER
CONTRACTORS, TRADES, AND OWNER OR THEIR AUTHORIZED REPRESENTATIVE.
14 THE CONTRACTOR SHALL PROVIDE FACTORY TRAINED AND STATE LICENSED TECHNICIANS FOR THE INSTALLATION
AND SHALL PROVIDE PROOF OF SUCH SYSTEMS AUTHORIZED TRAINING.
15 PROVIDE ALL WIRING FROM EQUIPMENT HARDWARE MANUFACTURER'S TERMINAL STRIPS TO FINAL CONNECTION
POINTS OF EQUIPMENT.
16 THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS AND ANY CRITICAL DIMENSIONS ASSOCIATED WITH THE SCOPE OF WORK PRIOR TO SUBMITTING THE CONSTRUCTION BID. THE CONTRACTOR SHALL CONFIRM THAT ALL WORK OUTLINED WITHIN THE CONTRACT DOCUMENTS CAN BE ACCOMPLISHED AS SHOWN, AND SHALL NOTIFY IN WRITING AN AUTHORIZED REPRESENTATIVE OF ANY CONDITIONS
ENCOUNTERED WHICH MAY AFFECT BUILDING CODE COMPLIANCE.
17 VERIFY PARTITION LOCATIONS, AND AVOID CONFLICTS WITH LIGHTS, DIFFUSERS, GRILLS, AND OTHER LIKE OBSTRUCTIONS. LOCATIONS OF ALL VISIBLE DEVICES AND EQUIPMENT SHALL BE COORDINATED WITH THE ARCHITECT
FOR REVIEW AND APPROVAL PRIOR TO INITIATION OF WORK.
18 COORDINATE A FINAL SECURITY SYSTEM EQUIPMENT LAYOUT AND ROUTING OF THE CONDUIT WITH THE CONTRACT DOCUMENTS. ANY CONFLICTS DISCOVERED SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE OWNER
FOR REVIEW AND APPROVAL PRIOR TO INITIATION OF WORK.
19 EQUIPMENT AND COMPONENTS SHOWN ON THESE PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT TO BE SCALED FOR EXACT DEVICE LOCATIONS. CONTRACTOR SHALL LOCATE DEVICES BASED ON APPLICABLE CODE, KEY
NOTES, AND AS DESIGNED BY THE ARCHITECT.
20 INSTALL ALL MATERIALS AND EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S DIRECTION, TESTING
AND OPERATIONAL PROCEDURES.
21 ALL MATERIALS, DEVICES, AND EQUIPMENT SHALL BE UNUSED, OF CURRENT MANUFACTURER, AND MEET OR EXCEED THE LATEST PUBLISHED SPECIFICATIONS OF THE MANUFACTURER. DEVICES AND EQUIPMENT SHALL BE THE LATEST MODEL OF THE MANUFACTURER UNLESS OTHERWISE INDICATED, OR UNLESS SUCH MODEL FAILS TO MEET THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS.
22 ALL ELECTRONICS COMPONENTS SHALL BE STANDARD, UNMODIFIED PRODUCTION MODELS EXCEPT AS NOTED WITH THE LATEST FIRMWARE/BIOS OFFERED BY THE MANUFACTURER AT THE TIME OF THE FINAL TEST.
23 PROTECT ALL EXISTING WORK, AND THE WORK OF OTHER ASSOCIATED TRADES FROM DAMAGE. ALL EQUIPMENT PROVIDED SHALL BE KEPT INTERNALLY CLEAN AND PROTECTED AGAINST BLOWING DUST, WIND, STORMS, SUN, FLOOD, RAIN, SNOW, HEAT, RAIN, MOISTURE, AND ANY OTHER DAMAGING FACTORS. ALL
INSTALLATION WORK SHALL BE COVERED AND PROTECTED AGAINST DAMAGE.
24 EQUIPMENT AND MATERIALS SHALL BE PROPERLY STORED, ADEQUATELY PROTECTED AND CAREFULLY HANDLED TO
PREVENT DAMAGE BEFORE AND DURING INSTALLATION.
25 ELECTRICAL CONTRACTOR SHALL PROVIDE PRIMARY, DEDICATED ELECTRICAL POWER (120/220 VAC).
26 ALL PRIMARY CONTROL PANELS, COMMUNICATION TRANSPORTATION DEVICES, POWER SUPPLIES NETWORK VIDEO RECORDERS, AND DIGITAL VIDEO RECORDERS SHALL BE CONNECTED TO UPS BACKUP CIRCUITS, BATTERY BACKUP, OR GENERATOR POWER BACKUP SYSTEM.
27 PROVIDE ALL THE INTERCONNECTIONS BETWEEN POWERED JUNCTION BOXES AND THE SECURITY EQUIPMENT.
28 ADHERE TO ALL SYSTEM AND COMPONENT GROUNDING REQUIREMENTS AS SPECIFIED BY THE EQUIPMENT
MANUFACTURERS.
29 PROVIDE SURGE SUPPRESSION, GROUNDING AND BONDING THAT WILL EFFECTIVELY PROTECT, WITHIN TESTED LIMITS, THE SYSTEMS HARDWARE AND EQUIPMENT AGAINST LIGHTNING TRANSIENTS, INTERNAL AND EXTERNAL SWITCHING TRANSIENTS, AND OTHER SURGE TRANSIENTS THROUGHOUT THE USEFUL LIFE OF THE SYSTEM.
30 ALL WIRING SHALL BE PROPERLY SUPPORTED AND INSTALLED IN CONDUIT AND CABLE TRAY, ON CENTER AS
REQUIRED IN CONTRACT DOCUMENTS.
31 ALL CONDUIT FILL SHALL NOT EXCEED 40 PERCENT OF INTERIOR CROSS SECTIONAL AREA WHERE THREE OR MORE
CABLES ARE CONTAINED WITHIN A SINGLE CONDUIT.
32 CABLES, RACEWAYS, AND CONDUIT SHALL NOT BE SUPPORTED FROM DUCTWORK, PIPING, PLUMBING SYSTEMS, CEILING TILE AND LIGHTING FIXTURE SUSPENSION WIRES OR BUILDING STRUCTURE.
33 CABLES SHALL BE ROUTED IN CONDUIT OR OTHER SUITABLE RACEWAY SUBJECT TO ACCEPTANCE BY THE ARCHITECT.
34 AT LOCATIONS WHERE CABLES PASS THROUGH METAL STUDS OR DOOR FRAMES, THE CONTRACTOR SHALL INSTALL A
BUSHING OR GROMMET TO PREVENT DAMAGE TO THE CABLES.
35 ALL CABLES MUST BE FREE OF TENSION AT BOTH ENDS AND OVER THE ENTIRE LENGTH OF THE RUN.
36 CABLE TIES AND SUPPORTS SHALL NOT PINCH, BIND, CRIMP, OR IN ANY WAY CAUSE PHYSICAL OR ELECTRICAL CHARACTERISTIC DAMAGE TO THE CABLING. THE CONTRACTOR SHALL ASSURE THAT DURING AND UPON COMPLETION OF THE INSTALLATION, ALL CABLES ARE FREE OF KINKS, SHARP BENDS, TWISTS, GOUGES, CUTS OR ANY OTHER
PHYSICAL DAMAGE.
37 ALL CABLING SHALL BE PLENUM RATED IN ACCORDANCE WITH THE NEC.
38 PLENUM RATED CABLE TIES AND CABLE SUPPORTS SHALL BE UTILIZED IN ALL PLENUM RATED SPACES.
39 ALL CABLE RUNS SHALL BE CONTINUOUS BETWEEN DEVICES WITHOUT SPLICES. CONNECTIONS SHALL BE MADE USING TERMINAL BLOCKS. WIRES CONNECTED TOGETHER SHALL HAVE THE SAME COLOR INSULATION. ALL CONNECTIONS SHALL BE ACCESSIBLE FOR INSPECTION AND SERVICES AND SHALL BE CLEARLY IDENTIFIED ON THE CONTRACTOR'S AS-BUILT DRAWINGS. ALL DEVICE BACK BOXES, JUNCTION BOXES AND PULL BOXES SHALL BE LABELED AND
ACCESSIBLE FOR INSPECTION AND MAINTENANCE.
40 WIRING COLOR CODE SHALL BE MAINTAINED THROUGHOUT THE INSTALLATION AS REQUIRED BY THE SPECIFICATIONS.
Number: Revisions: Date:
CONFORMED CONSTRUCTION
DOCUMENTS
UPDN
G
H
4.5
F5
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I E D
X
Y
E-1.3
E-1.5
E-F
E-E
E-1
E-1.6
AA
X.5
X
EXISTING CAMERA TO BE DEMOLISHED. REMOVE CAMERA
AND HAND OVER TO VA SECURITY. DEMOLISH ALL CABLING
BACK TO ITS SOURCE PANEL(S)
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \T
E C
H
V A
P R
O V
V
H
S h o ja i@ b rp lu s a .c o m
.r v t
/5
/2
:4 :3
P
M
SE.101
SECURITY DEMOLITION PLAN LEVEL 1
11/09/2018 JJL JJL
100% CONSTRUCTION
DOCUMENTS
Number: Revisions: Date:
UP
DN
G
H
4.5
F5
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I E D
X
Y
E-1.3
E-1.5
E-F
E-E
E-1
E-1.6
AA
X.5
DEMOLISH ALL SECURITY EQUIPMENT . REMOVE ALL WIRING
BACK TO ITS SOURCE PANEL(S).
DEMOLITION NOTES:
1. IDENTIFY ALL CABLING AND DEVICES AFFECTED BY THE DEMOLITION OF EXISTING
WALL, ANY CABLES OR EQUIPMENT SERVING OTHER AREAS SHALL BE PROTECTED
FROM DEMOLITION.
2. REFER TO NEW WORK SECURITY DRAWINGS FOR ADDITIONAL INFORMATION.
3. PROVIDE TEMPORARY SERVICES TO ANY SECURITY DEVICE FED FROM
DEMOLISHED SECURITY EQUIPMENT.
LOCATION OF EXISTING SECURITY PANELS.
COORDINATE THE TEMPORARY RELOCATION
OF ANY EXISTING PANELS WITH PROVIDENCE
VA SECURITY PRIOR DEMOLITION OF
EXISTING WALL.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \T
E C
H
V A
P R
O V
V
H
S h o ja i@ b rp lu s a .c o m
.r v t
/5
/2
:4 :3
P
M
SE.102
SECURITY DEMOLITION PLAN LEVEL 2
11/09/2018 JJL JJL
100% CONSTRUCTION
DOCUMENTS
Number: Revisions: Date:
UPDN
G
H
4.5
F5
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I E D
X
Y
E-1.3
E-1.5
E-F
E-E
E-1
E-1.6
AA
X.5
ABC
DEFGHI
EXT
EXT
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \T
E C
H
V A
P R
O V
V
H
S h o ja i@ b rp lu s a .c o m
.r v t
/5
/2
:4 :3
P
M
SE.201
SECURITY PLAN LEVEL 1
11/09/2018 JJL JJL
100% CONSTRUCTION
DOCUMENTS
KEYED NOTES:
EXTERIOR CAMERAS SHALL BE SURFACE MOUNTED TO STRUCTURE ABOVE, COORDINATE BUILDING PENETRATION WITH ARCHITECT PRIOR TO START OF WORK. CAMERAS SHALL BE PELCO SARIX IME 3 MP ENVIRONMENTAL MINI DOMES.
Number: Revisions: Date:
UP
DN
G
H
4.5
F5
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
I E D
X
Y
E-1.3
E-1.5
E-F
E-E
E-1
E-1.6
AA
X.5
CR
F
CR
F
CR
SE.700
SE.700
SE.700
DR
COORDINATE MOUNTING OF
THE DOOR RELEASE BUTTON
WITH ARCHITECT PRIOR TO
INSTALLATION.
CB
CB
CB
CB
NUMBERED NOTES:
CODE BLUE SECURITY PUSH BUTTONS SHALL BE SAFETY TECHNOLOGY INTERNATIONAL STOPPER
STATIONS MODEL NUMBER SS2409EM-EN WITH CLEAR COVER STI SS24420ZA-EN. THE BUTTON SHALL BE BLUE WITH THE CUSTOM LABEL CODE BLUE. THE PUSH BUTTON SHALL TERMINATE ON THE JOHNSTON
CONTROLS PEGASYS SYSTEM LOCATED IN SECURITY ROOM 229A.
PROVIDE (2) PELCO SARIX IME 3 MP MINI DOMES CAMERAS POINTED IN OPPOSITE DIRECTIONS.
GENERAL NOTES:
1. REFRIGERATOR ALARMS SHALL CONNECT TO THE JOHNSTON CONTROLS PEGASYS SYSTEM FOR
REPORTING TO THE VA DISPATCH PEGASYS WORKSTATION COMPUTER. COORDINATE THE LCATION AND QUANTITY OF ALARMS WITH THE ARCHITECT AND PROVIDE (1) 18/4 AWG CABLE TO THE PEGASYS
SYSTEM LOCATED IN ROOM 229A.
2. COORDINATE FIRE ALARM DOOR RELEASE WITH ELECTRICAL CONTRACTOR PRIOR TO START OF
WORK
CR
SE.700
F
F
C200D
A-2-S
C200C A
201A
SE.202
KEYED NOTES:
PROVIDE JCI SPA1B800-3E10 CONTROL PANEL ALONG BACK WALL OF SECURITY
ROOM 229A. COORDINATE THE RELOCATION/RECONFIGURATION OF ALL EXISTING
ACCESS CONTROL EQUIPMENT WITH VAMC SECURITY PRIOR TO START OF WORK.
SECURITY NETWORK CABLING AND FIBER OPTIC CABLING NETWORK ARE EXISTING
TO BE RELOCATED. COORDINATE CONNECTION OF SECURITY EQUIPMENT WITH
VAMC IT DEPARTMENT.
WALL MOUNTED CABINET IS EXISTING TO BE RELOCATED. PROVIDE THE
FOLLOWING NETWORK EQUIPMENT TO CONNECT THE ADDED CAMERAS TO THE
VIDEO SURVEILLANCE NETWORK LOCATED IN BUILDING 4.
- (1) CISCO CATALYST WS-C3850-24XU-S, STACKABLE X SERIES 24 PORT SWITCH
- (2) CISCO PWR-C1-1100WAC POWER SUPPLY MODULE 800W
- (1) CISCO C3850-NM-4-10G, 4 X GIGABIT ETHERNET NETWORK MODULE
- (1) CISCO XPS2200 REDUNDANT POWER SUPPLIES
- (2) CISCO XPS2200 POWER CABLES
- (1) SINGLE MODE PAIR SC TYPE PATCH CABLES
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \T
E C
H
V A
P R
O V
V
H
S h o ja i@ b rp lu s a .c o m
.r v t
/5
/2
:4 :4
P
M
SE.202
SECURITY PLAN LEVEL 2
11/09/2018 JJL JJL
100% CONSTRUCTION
DOCUMENTS
Number: Revisions: Date:
1/2" = 1'-0"
LEVEL 2 - EXISTING SECURITY ROOM
ACCESS/ENTRY SIDE
INTERIOR/EGRESS SIDE
ACCESSIBLE CEILING
TO ACCESS CONTROL PANEL
JUNCTION BOX ABOVE
ACCESSIBLE CEILING
EL
PROXIMITY
CARD READER
JB
DOOR
ELECTRO MECHANICAL
LOCKSET WITH INTEGRAL
REQUEST TO EXIT
CONCEALED DOOR
CONTACT SWITCH (TYPICAL)
DC
FINISHED FLOOR
CR
POWER TRANSFER
HINGE
3/4" CONCEALED CONDUIT
1-1/4" CONDUIT
DOOR FRAME
RX
PROXIMITY
CARD READER
CR
ACCESS/ENTRY SIDE
INTERIOR/EGRESS SIDE
JB
ACCESSIBLE CEILING
ELECTRIC STRIKE
JUNCTION BOX ABOVE
ACCESSIBLE CEILING
CONCEALED
DOOR
CONTACT SWITCH
DOOR
FINISHED FLOOR
DCES
3/4" CONCEALED CONDUIT
DOOR FRAME
TO ACCESS CONTROL PANEL
1-1/4" CONDUIT
RX
CR ACCESS/ENTRY SIDE
INTERIOR/EGRESS SIDE
ACCESSIBLE CEILING
TO ACCESS CONTROL PANEL
JUNCTION BOX ABOVE
ACCESSIBLE CEILING
MG
JB
DOOR
DELAYED EGRESS
MAGNETIC LOCK
(TYPICAL)
FINISHED FLOOR
MG
MGMG
PP
DOOR FRAME
1-1/4" CONDUIT
3/4" CONCEALED CONDUIT
PROXIMITY
CARD READER
CABLE TYPE KEYNOTES
(1) #18 AWG, 8-CONDUCTOR SHIELDED TWISTED PAIR CABLE
(1) #18 AWG, 2-CONDUCTOR UNSHIELDED TWISTED PAIR CABLE
(1) #16 AWG, 2-CONDUCTOR UNSHIELDED TWISTED PAIR CABLE
(1) #16 AWG, 2-CONDUCTOR UNSHIELDED TWISTED PAIR CABLE
(1) #16 AWG, 4-CONDUCTOR UNSHIELDED TWISTED PAIR CABLE
(1) #18 AWG, 4-CONDUCTOR UNSHIELDED TWISTED PAIR CABLE
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \T
E C
H
V A
P R
O V
V
H
S h o ja i@ b rp lu s a .c o m
.r v t
/5
/2
:4 :4
P
M
SE.700
SECURITY DETAILS
11/09/2018 JJL JJL
100% CONSTRUCTION
DOCUMENTS
1" = 1'-0"
SECURITY OPENING-DOUBLE UNEVEN ACCESS CONTROLLED DOOR
1" = 1'-0"
SECURITY OPENING-SINGLE ACCESS CONTROLLED DOOR WITH ELECTRIC STRIKE
1" = 1'-0"
SECURITY OPENING-DOUBLE INTERIOR ACCESS CONTROLLED DOOR WITH MAG LOCKS
Number: Revisions: Date:
ACCESSIBLE CEILING - SEE ARCHITECTURAL
RCP
CATEGORY CABLE TO NEAREST
TELECOMMUNICATIONS ROOM
CAMERA - REFER TO PLANS AND
SPECIFICATIONS FOR ADDITIONAL
INFORMATION
1" CONDUIT TO NEAREST
TELECOMMUNICATIONS ROOM
PROVIDE 4-11/16"x4-11/16"x3" BACK BOX
CATEGORY PATCH CORD
TO CAMERA
1-PORT SURFACE MOUNTED BOX
1G DEVICE PLATE
TYPICAL CAMERA HOUSING
CADDY 512A ADJUSTABLE
SNAP-ON CEILING BOX HANGER
1" CONDUIT TO NEAREST
TELECOMMUNICATIONS ROOM
CATEGORY CABLE TO NEAREST
TELECOMMUNICATIONS ROOM
WALL MOUNTED CAMERA MOUNTING
ASSEMBLY
PROVIDE 4-11/16"x4-11/16"x3" BACK BOX
PARTITION - SEE ARCHITECTURAL
FLOOR PLANS
1-PORT SURFACE MOUNTED BOX
1G DEVICE PLATE
CAMERA HOUSING
CAMERA - REFER TO PLANS AND
SPECIFICATIONS FOR ADDITIONAL
INFORMATION
CATEGORY
PATCH CORD TO
CAMERA
1" CONDUIT TO NEAREST
TELECOMMUNICATIONS ROOM
CATEGORY CABLE TO NEAREST
TELECOMMUNICATIONS ROOM
PROVIDE 4-11/16"x4-11/16"x3" BACK BOX
PARTITION - SEE ARCHITECTURAL
FLOOR PLANS
1-PORT SURFACE MOUNTED BOX
1G DEVICE PLATE
CAMERA HOUSING
CAMERA - REFER TO PLANS AND
SPECIFICATIONS FOR ADDITIONAL
INFORMATION
CATEGORY 6 PATCH CORD TO
CAMERA
3/8" = 1'-0"
TYPICAL SECURITY CAMERA - CEILING MOUNTED
6" = 1'-0"
TYPICAL SECURITY CAMERA - WALL MOUNTED WITH BRACKET
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it \T
E C
H
V A
P R
O V
V
H
S h o ja i@ b rp lu s a .c o m
.r v t
/5
/2
:4 :4
P
M
SE.701
SECURITY DETAILS
11/09/2018 JJL JJL
100% CONSTRUCTION
DOCUMENTS
6" = 1'-0"
TYPICAL SECURITY CAMERA - WALL MOUNTED
Number: Revisions: Date:
| SE-000 - SECURITY LEGEND |
| Sheets |
| NC.000 - NURSE CALL LEGEND |
| NC.102 - NURSE CALL DEMOLITION PLAN LEVEL 2 |
| NC.202 - NURSE CALL PLAN LEVEL 2 |
| NC.700 - NURSE CALL DETAILS |
| NC.701 - NURSE CALL DETAILS |
| SE.000 - SECURITY LEGEND |
| SE.101 - SECURITY DEMOLITION PLAN LEVEL 1 |
| SE.102 - SECURITY DEMOLITION PLAN LEVEL 2 |
| SE.201 - SECURITY PLAN LEVEL 1 |
| SE.202 - SECURITY PLAN LEVEL 2 |
| SE.700 - SECURITY DETAILS |
| SE.701 - SECURITY DETAILS |
| T.000 - COMMUNICATIONS LEGEND |
| T.102 - COMMUNICATIONS DEMOLITION PLAN LEVEL 2 |
| T.202 - COMMUNICATIONS PLAN LEVEL 2 |
| T.302 - COMMUNICATIONS SPEAKER PLAN LEVEL 2 |
| T.700 - COMMUNICATIONS DETAILS |
| T.701 - COMMUNICATIONS DETAILS |
| SE-002 - SECURITY RISER |
| SE-101 - SECURITY DEMOLITION PLAN LEVEL 1 |
| Sheets |
| NC.000 - NURSE CALL LEGEND |
| NC.102 - NURSE CALL DEMOLITION PLAN LEVEL 2 |
| NC.202 - NURSE CALL PLAN LEVEL 2 |
| NC.700 - NURSE CALL DETAILS |
| NC.701 - NURSE CALL DETAILS |
| SE.000 - SECURITY LEGEND |
| SE.101 - SECURITY DEMOLITION PLAN LEVEL 1 |
| SE.102 - SECURITY DEMOLITION PLAN LEVEL 2 |
| SE.201 - SECURITY PLAN LEVEL 1 |
| SE.202 - SECURITY PLAN LEVEL 2 |
| SE.700 - SECURITY DETAILS |
| SE.701 - SECURITY DETAILS |
| T.000 - COMMUNICATIONS LEGEND |
| T.102 - COMMUNICATIONS DEMOLITION PLAN LEVEL 2 |
| T.202 - COMMUNICATIONS PLAN LEVEL 2 |
| T.302 - COMMUNICATIONS SPEAKER PLAN LEVEL 2 |
| T.700 - COMMUNICATIONS DETAILS |
| T.701 - COMMUNICATIONS DETAILS |
| SE-102 - SECURITY DEMOLITION PLAN LEVEL 2 |
| Sheets |
| NC.000 - NURSE CALL LEGEND |
| NC.102 - NURSE CALL DEMOLITION PLAN LEVEL 2 |
| NC.202 - NURSE CALL PLAN LEVEL 2 |
| NC.700 - NURSE CALL DETAILS |
| NC.701 - NURSE CALL DETAILS |
| SE.000 - SECURITY LEGEND |
| SE.101 - SECURITY DEMOLITION PLAN LEVEL 1 |
| SE.102 - SECURITY DEMOLITION PLAN LEVEL 2 |
| SE.201 - SECURITY PLAN LEVEL 1 |
| SE.202 - SECURITY PLAN LEVEL 2 |
| SE.700 - SECURITY DETAILS |
| SE.701 - SECURITY DETAILS |
| T.000 - COMMUNICATIONS LEGEND |
| T.102 - COMMUNICATIONS DEMOLITION PLAN LEVEL 2 |
| T.202 - COMMUNICATIONS PLAN LEVEL 2 |
| T.302 - COMMUNICATIONS SPEAKER PLAN LEVEL 2 |
| T.700 - COMMUNICATIONS DETAILS |
| T.701 - COMMUNICATIONS DETAILS |
| SE-201 - SECURITY PLAN LEVEL 1 |
| Sheets |
| NC.000 - NURSE CALL LEGEND |
| NC.102 - NURSE CALL DEMOLITION PLAN LEVEL 2 |
| NC.202 - NURSE CALL PLAN LEVEL 2 |
| NC.700 - NURSE CALL DETAILS |
| NC.701 - NURSE CALL DETAILS |
| SE.000 - SECURITY LEGEND |
| SE.101 - SECURITY DEMOLITION PLAN LEVEL 1 |
| SE.102 - SECURITY DEMOLITION PLAN LEVEL 2 |
| SE.201 - SECURITY PLAN LEVEL 1 |
| SE.202 - SECURITY PLAN LEVEL 2 |
| SE.700 - SECURITY DETAILS |
| SE.701 - SECURITY DETAILS |
| T.000 - COMMUNICATIONS LEGEND |
| T.102 - COMMUNICATIONS DEMOLITION PLAN LEVEL 2 |
| T.202 - COMMUNICATIONS PLAN LEVEL 2 |
| T.302 - COMMUNICATIONS SPEAKER PLAN LEVEL 2 |
| T.700 - COMMUNICATIONS DETAILS |
| T.701 - COMMUNICATIONS DETAILS |
| SE-202 - SECURITY PLAN LEVEL 2 |
| Sheets |
| NC.000 - NURSE CALL LEGEND |
| NC.102 - NURSE CALL DEMOLITION PLAN LEVEL 2 |
| NC.202 - NURSE CALL PLAN LEVEL 2 |
| NC.700 - NURSE CALL DETAILS |
| NC.701 - NURSE CALL DETAILS |
| SE.000 - SECURITY LEGEND |
| SE.101 - SECURITY DEMOLITION PLAN LEVEL 1 |
| SE.102 - SECURITY DEMOLITION PLAN LEVEL 2 |
| SE.201 - SECURITY PLAN LEVEL 1 |
| SE.202 - SECURITY PLAN LEVEL 2 |
| SE.700 - SECURITY DETAILS |
| SE.701 - SECURITY DETAILS |
| T.000 - COMMUNICATIONS LEGEND |
| T.102 - COMMUNICATIONS DEMOLITION PLAN LEVEL 2 |
| T.202 - COMMUNICATIONS PLAN LEVEL 2 |
| T.302 - COMMUNICATIONS SPEAKER PLAN LEVEL 2 |
| T.700 - COMMUNICATIONS DETAILS |
| T.701 - COMMUNICATIONS DETAILS |
| SE-700 - SECURITY DETAILS |
| Sheets |
| NC.000 - NURSE CALL LEGEND |
| NC.102 - NURSE CALL DEMOLITION PLAN LEVEL 2 |
| NC.202 - NURSE CALL PLAN LEVEL 2 |
| NC.700 - NURSE CALL DETAILS |
| NC.701 - NURSE CALL DETAILS |
| SE.000 - SECURITY LEGEND |
| SE.101 - SECURITY DEMOLITION PLAN LEVEL 1 |
| SE.102 - SECURITY DEMOLITION PLAN LEVEL 2 |
| SE.201 - SECURITY PLAN LEVEL 1 |
| SE.202 - SECURITY PLAN LEVEL 2 |
| SE.700 - SECURITY DETAILS |
| SE.701 - SECURITY DETAILS |
| T.000 - COMMUNICATIONS LEGEND |
| T.102 - COMMUNICATIONS DEMOLITION PLAN LEVEL 2 |
| T.202 - COMMUNICATIONS PLAN LEVEL 2 |
| T.302 - COMMUNICATIONS SPEAKER PLAN LEVEL 2 |
| T.700 - COMMUNICATIONS DETAILS |
| T.701 - COMMUNICATIONS DETAILS |
| SE-701 - SECURITY DETAILS |
| Sheets |
| NC.000 - NURSE CALL LEGEND |
| NC.102 - NURSE CALL DEMOLITION PLAN LEVEL 2 |
| NC.202 - NURSE CALL PLAN LEVEL 2 |
| NC.700 - NURSE CALL DETAILS |
| NC.701 - NURSE CALL DETAILS |
| SE.000 - SECURITY LEGEND |
| SE.101 - SECURITY DEMOLITION PLAN LEVEL 1 |
| SE.102 - SECURITY DEMOLITION PLAN LEVEL 2 |
| SE.201 - SECURITY PLAN LEVEL 1 |
| SE.202 - SECURITY PLAN LEVEL 2 |
| SE.700 - SECURITY DETAILS |
| SE.701 - SECURITY DETAILS |
| T.000 - COMMUNICATIONS LEGEND |
| T.102 - COMMUNICATIONS DEMOLITION PLAN LEVEL 2 |
| T.202 - COMMUNICATIONS PLAN LEVEL 2 |
| T.302 - COMMUNICATIONS SPEAKER PLAN LEVEL 2 |
| T.700 - COMMUNICATIONS DETAILS |
| T.701 - COMMUNICATIONS DETAILS |
File details come from the government source that posted it. Updated .