36E77619R0086-009.pdf

PDF 20 MB Posted

Attached to
Replace Hemodialysis Unit Federal contract opportunity
Solicitation number
36E77619R0086
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77619R0086 Attachment 8 - Arch.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Hemodialysis Unit, newest first.
File Type Posted
36E77619R0086-0002001.pdf PDF
36E77619R0086-0002002.pdf PDF
36E77619R0086-0002000.docx DOCX document
36E77619R0086-0002002.pdf PDF
36E77619R0086-0002001.pdf PDF
36E77619R0086-0001001.pdf PDF
36E77619R0086-0001000.docx DOCX document
36E77619R0086-0001001.pdf PDF
36E77619R0086-0001000.docx DOCX document
36E77619R0086-014.pdf PDF
36E77619R0086-018.pdf PDF
36E77619R0086-003.pdf PDF
36E77619R0086-001.docx DOCX document
36E77619R0086-016.pdf PDF
36E77619R0086-005.pdf PDF
36E77619R0086-002.pdf PDF
36E77619R0086-006.pdf PDF
36E77619R0086-015.pdf PDF
36E77619R0086-007.pdf PDF
36E77619R0086-010.pdf PDF
36E77619R0086-020.docx DOCX document
36E77619R0086-012.pdf PDF
36E77619R0086-017.pdf PDF
36E77619R0086-004.pdf PDF
36E77619R0086-021.pdf PDF
36E77619R0086-019.docx DOCX document
36E77619R0086-009.pdf PDF
36E77619R0086-013.pdf PDF
36E77619R0086-002.pdf PDF
36E77619R0086-011.pdf PDF
36E77619R0086-016.pdf PDF
36E77619R0086-017.pdf PDF
36E77619R0086-021.pdf PDF
36E77619R0086-008.pdf PDF
36E77619R0086-012.pdf PDF
36E77619R0086-019.docx DOCX document
36E77619R0086-020.docx DOCX document
36E77619R0086-004.pdf PDF
36E77619R0086-006.pdf PDF
36E77619R0086-014.pdf PDF
36E77619R0086-013.pdf PDF
36E77619R0086-001.docx DOCX document
36E77619R0086-018.pdf PDF
36E77619R0086-005.pdf PDF
36E77619R0086-010.pdf PDF
36E77619R0086-015.pdf PDF
36E77619R0086-003.pdf PDF
36E77619R0086-007.pdf PDF
36E77619R0086-000.docx DOCX document
36E77619R0086-000.docx DOCX document
Show all 50

Replace Hemodialysis Unit has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHARMACY

BUILDING 14

PTSD CLINIC

REMOVE (1) LOADING BAY

EXISTING PATIO STRUCTURE

AND PERIMETER WALLS

TO REMAIN

EXISTING GINKGO TREE TO

REMAIN; APPROXIMATE

DRIPLINE SHOWN

V.I.F.

15' - 4"

DEMOLISH PAVING AND

CURBING FROM EXISTING

DRIVE AREA; SEE CIVIL

EXISTING AREAWAY

TO REMAIN

EXISTING AREAWAY

TO REMAIN

EXISTING MAILROOM

TO REMAIN

EXISTING AMBULANCE

ENTRANCE TO REMAIN

TUBE STEEL STRUCTURE TO REMAIN

TUBE STEEL STRUCTURE TO

REMAIN, TYP.

OVERHEAD CANOPY

STRUCTURE TO BE REMOVED;

SEE LEVEL 2 NOTES

90' - 5 1/4" V.I.F.

EXISTING STAIR AND

UTILITY LIFT TO

REMAIN

REMOVE PAVING AND

SIDEWALK LANDSCAPE

SEE CIVIL

REMOVE AND RETAIN DOCK LIFT FOR

REINSTALLATION

DEMOLISH TUBE STEEL STRUCTURE

AT (1) BAY ONLY

4' - 0"

V.I.F.

6' - 2" 24' - 6"

V .I.

F

7'

EXISTING FIRE

PUMP BLDG. 27

EXISTING

MECHANICAL

EQUIPMENT AND PAD

TO REMAIN

CUT PORTION OF EXISTING SLAB

TO ACCOMODATE RELOCATION OF

DOCK LIFT

CUT MASONRY WALL TO

LIMIT LINE AS SHOWN

DEMO ETR

DEMO ETR

DEMOLISH PLANTINGS

FOR NEW WORK

EXISTING STEPS TO

REMAIN

7' - 0"

REMOVE EXISTING PATIO

STRUCTURE AS REQUIRED

BY NEW WORK; SEE

LANDSCAPE PLANS

REMOVE AND RETAIN LIFT

FOR REINSTALLATION

V.I.F.

41' - 6"

NOT IN DEMOLITION SCOPE

EXISTING TO BE DEMOLISHED

EXISTING WALLS TO REMAIN

DEMOLITION GENERAL NOTES

1. PHASING OF AMBULANCE AND LOADING DOCK PARTIAL DEMOLITION TO

BE DISCUSSED WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR TO

ASSUME OFF-HOURS WORK WILL BE REQUIRED.

2. CONTRACTOR TO MAINTAIN ALL VA HOSPITAL STANDARDS OF

CLEANLINESS DURING ALL PHASES OF CONSTRUCTION. FOLLOW ALL

SPECIFICATION STANDARDS SET FORTH BY VA INFECTION CONTROL.

3. ALL EXISTING PIPING TO REMAIN ON SECOND FLOOR AREA OF WORK TO

BE REINSULATED POST-ASBESTOS AND HAZMAT ABATEMENT.

4. DOORS AND WINDOWS WITHOUT TAGS ARE TO BE CONSIDERED EXISTING

TO REMAIN.

5. PROTECT EXISTING WIRING AND DEVICES IN ADJACENT SPACES; REVIEW

AND STORE DEVICES IN AREA OF WORK WITH VAMC REPRESENTATIVE.

6. IDENTIFY ANY FURTHER DEMOLITION WITH VAMC REPRESENTATIVE

PRIOR TO COMMENCEMENT OF WORK. G.C. TO SCHEDULE DEMOLITION

WALK-THROUGH WITH OWNER'S PROJECT REPRESENTATIVE PRIOR TO

THE START OF DEMOLITION.

7. REFER TO HAZARDOUS MATERIALS REPORT FOR HAZARDOUS

DEMOLITION SCOPE.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :3

P

M

AD.100

FIRST FLOOR DEMOLITION PLAN

06/15/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"

1 FIRST FLOOR - DEMOLITION PLAN

DEMO LEGEND

1 REMOVE ASSEMBLY AND ALL ASSOCIATED WALL MOUNTED DEVICES,

SHOWN DASHED, TYP.

2 REMOVE DOOR, FRAME, HARDWARE, AND TRANSOMS WHERE

APPLICABLE.

3 REMOVE FINISH FLOORING MATERIALS AND BASE, STRIP TO CONCRETE

STRUCTURE, EXCEPT AT AREAS SPECIFICALLY NOTED TO REMAIN.

4 REMOVE FINISHED CEILING ASSEMBLY, INCLUDING SUSPENDED CEILING

TILES, GYP CEILING, SOFFITS, CEILING MTD ITEMS INCLUDING

FIXTURES, DIFFUSER REGISTERS, GAS COLUMNS, OR LIGHTS, AND

EMERGENCY LIGHTS. REFER TO OWNER FOR ITEMS TO BE SALVAGED.

5 SALVAGE CEILING TILES, GRID AND DEVICES AS REQUIRED FOR

INSTALLATION OF MEP. SALVAGE AND REINSTALL TO RETURN TO

ORIGINAL CONDITION. WORK TO BE COMPLETED DURING OFF HOURS.

COORDINATE WITH VAMC REPRESENTATIVE.

6 REMOVE MED-GAS PLUMBING, FITTINGS, PLATES, AND FINISHES FROM

ROOM PRIOR TO THE START OF DEMOLITION.

7 REMOVE ALL INTERIOR FIT OUT AND FINISHES INCLUDING SHELVING,

CASEWORK, COUNTERS, SINKS, MARKER BOARDS, TILES, HANDRAILS,

SIGNAGE, CHARTING, ETC. REFER TO OWNER FOR ITEMS TO BE

SALVAGED.

8 REMOVE INTERIOR PERIMETER WALL FINISH, INCLUDING GYPSUM,

PLASTER, OR OTHER WALLBOARD, AND STRIP TO EXISTING

STUDS/MASONRY TO ALLOW FOR NEW CHANNEL-FURRED GYPSUM

BOARD PARTITION TYPE. SEE ARCHITECTURAL PLANS FOR MODIFIED

WALLTYPE.

9 WALLS TO BE PATCHED AND REPAIRED ON ALL SIDES TO RECEIVE NEW

PAINT. CREATE SMOOTH FINISH PER SPEC.

10 REMOVE PLUMBING FIXTURES. ALL CONNECTIONS TO EXISTING PIPES

AND VENTS TO BE REDIRECTED AS REQUIRED. CUT AND CAP AS

REQUIRED.

11 REMOVE EXTERIOR WALL ASSEMBLY FROM FLOOR TO FLOOR TO

EXTENTS SHOWN. REFER TO ARCHITECTURAL DETAILS.

12 CUT SLAB ABOVE OR BELOW TO ALLOW FOR NEW OR RELOCATED

PIPING AND NEW DUCTWORK. VERIFY QUANTITY, SIZE, AND LOCATION

OF PENETRATIONS TO LAND BETWEEN RIBS UNLESS NOTED

OTHERWISE. COORDINATE WORK WITH OWNER. CORES/PENETRATIONS

NEEDED FOR DRAINS, VENTS ETC. REFER TO MEP DRAWINGS FOR

MORE INFO.

13 REMOVE (1) BAY OF EXISTING LOADING DOCK.

14 REMOVE WINDOW UNIT AND STORE AT OWNER'S DISCRETION.

17 REMOVE WINDOW UNIT AND SWAP WITH INFILL WITH MATCHING UNIT

FROM ELSEWHERE WITHIN SCOPE OF WORK.

19 OPEN WALL AND CEILING AS REQUIRED FOR NEW MEP CONNECTIONS.

SEAL WALL AND CEILING TO CREATE SMOOTH SURFACE, ALIGN WITH

EXISTING.

20 PROTECT ALL OCCUPIED AREAS, FURNITURE, ETC. COORDINATE W/ VA

REP.

22 REMOVE PORTION OF COVERED RAMP, INCLUDING ALL CONCRETE,

HANDRAILS, STOREFRONT, ROOFING DEVICES, AND MEPFP

COMPONENTS.

23 DEMOLISH STAIRS, HANDRAILS AND ASSOCIATED EQUIPMENT, TYP.

24 REMOVE WINDOW UNIT AND CUT SILL TO FLOOR FOR ADDITION OF NEW

DOOR.

25 REMOVE COLUMN COVERS AND ALL INTERNAL ELECTRICAL, TEL/DATA,

PLUMBING AND MED/GAS PIPING. G.C. TO FIELD VERIFY CHASE

LOCATIONS.

26 GRIND CONCRETE RAMP FOR NEW FLUSH LANDING AT PROPOSED

DOOR. REFER TO ARCH. PLANS.

27 RELOCATE SITE FURNISHINGS AT VAMC DISCRETION.

28 REMOVE PORTIONS OF AREAWAY RETAINING WALLS AS REQUIRED FOR

CONSTRUCTION OF NEW FOOTINGS; REBUILD AND REPLACE AS

REQUIRED BY FOOTING WORK.

29 REMOVE STEAM RADIATOR BELOW WINDOW; REFER TO ASBESTOS AND

HAZMAT TESTING REPORT FOR NOTES.

N

Number: Revisions: Date:

ICU BUILDING

2 2

DIALYSIS UNIT

TOILET

222A

PATIENTS

LOCKER RM

NURSES

STATION

DIALYSIS

PREPARATION RM-2

JANITOR

CORRIDOR

C2-DC-1

CONFERENCE RM

RENAL PHY OFFICE

OFFICE

CORRIDOR

C2-DC-1A

ROOF OF

AMBULANCE

ENTRANCE TO

REMAIN

EXISTING STAIR

TO REMAIN

RELOCATE EXISTING

CROSS-CORRIDOR DOOR

PORTION OF

ROOF TO BE

REMOVED

CREATE OPENING

FOR NEW BUILDING

CONNECTION

CREATE OPENING

FOR NEW STAIR DOOR

REMOVE FINISHES AT

EXTERIOR FACE OF EXISTING

STAIR AT SECOND-FLOOR

AREA OF WORK ONLY

PHASE HATCHED

COORIDOR TO

MAINTAIN

PEDESTRIAN ACCESS

TO ICU BUILDING

DEMOLISH CANOPY BELOW

NEW

OPENING

7' - 0"

3 4

3 4

NEW

OPENING

9' - 10"

TYP.

3 4

SALVAGE

MARBLE TOILET

PARTITION WALL

PANELS

PENETRATE EXISTING

CONCRETE PERIMETER BEAM

FOR MEPFP CONNECTIONS

SEE STRUCT. FOR

CUT BEAM

CONDITION AT

CONCRETE

PERIMETER BEAM

ABV. CLG.

SEE STRUCT. FOR CUT

BEAM CONDITION AT

CONCRETE PERIMETER

BEAM ABV. CLG.

3 4 7

3 4

3 4

3 4

3 4 7

NEW

OPENING

8' - 1 1/2"

1"

V .I.F

20' - 1 1/4" (+/_) V.I.F

WATER TREATMENT

STORAGE

NOT IN DEMOLITION SCOPE

EXISTING TO BE DEMOLISHED

EXISTING WALLS TO REMAIN

DEMOLITION GENERAL NOTES

1. PHASING OF AMBULANCE AND LOADING DOCK PARTIAL DEMOLITION TO

BE DISCUSSED WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR TO

ASSUME OFF-HOURS WORK WILL BE REQUIRED.

2. CONTRACTOR TO MAINTAIN ALL VA HOSPITAL STANDARDS OF

CLEANLINESS DURING ALL PHASES OF CONSTRUCTION. FOLLOW ALL

SPECIFICATION STANDARDS SET FORTH BY VA INFECTION CONTROL.

3. ALL EXISTING PIPING TO REMAIN ON SECOND FLOOR AREA OF WORK TO

BE REINSULATED POST-ASBESTOS AND HAZMAT ABATEMENT.

4. DOORS AND WINDOWS WITHOUT TAGS ARE TO BE CONSIDERED EXISTING

TO REMAIN.

5. PROTECT EXISTING WIRING AND DEVICES IN ADJACENT SPACES; REVIEW

AND STORE DEVICES IN AREA OF WORK WITH VAMC REPRESENTATIVE.

6. IDENTIFY ANY FURTHER DEMOLITION WITH VAMC REPRESENTATIVE

PRIOR TO COMMENCEMENT OF WORK. G.C. TO SCHEDULE DEMOLITION

WALK-THROUGH WITH OWNER'S PROJECT REPRESENTATIVE PRIOR TO

THE START OF DEMOLITION.

7. REFER TO HAZARDOUS MATERIALS REPORT FOR HAZARDOUS

DEMOLITION SCOPE.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :4

P

M

AD.101

SECOND FLOOR DEMOLITION PLAN

06/15/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 3/16" = 1'-0"

1 SECOND FLOOR - DEMOLITION PLAN

DEMOLITION NOTES

1 REMOVE ASSEMBLY AND ALL ASSOCIATED WALL MOUNTED DEVICES,

SHOWN DASHED, TYP.

2 REMOVE DOOR, FRAME, HARDWARE, AND TRANSOMS WHERE

APPLICABLE.

3 REMOVE FINISH FLOORING MATERIALS AND BASE, STRIP TO CONCRETE

STRUCTURE, EXCEPT AT AREAS SPECIFICALLY NOTED TO REMAIN.

4 REMOVE FINISHED CEILING ASSEMBLY, INCLUDING SUSPENDED CEILING

TILES, GYP CEILING, SOFFITS, CEILING MTD ITEMS INCLUDING FIXTURES,

DIFFUSER REGISTERS, GAS COLUMNS, OR LIGHTS, AND EMERGENCY

LIGHTS. REFER TO OWNER FOR ITEMS TO BE SALVAGED.

5 SALVAGE CEILING TILES, GRID AND DEVICES AS REQUIRED FOR

INSTALLATION OF MEP. SALVAGE AND REINSTALL TO RETURN TO

ORIGINAL CONDITION. WORK TO BE COMPLETED DURING OFF HOURS.

COORDINATE WITH VAMC REPRESENTATIVE.

6 REMOVE MED-GAS PLUMBING, FITTINGS, PLATES, AND FINISHES FROM

ROOM PRIOR TO THE START OF DEMOLITION.

7 REMOVE ALL INTERIOR FIT OUT AND FINISHES INCLUDING SHELVING,

CASEWORK, COUNTERS, SINKS, MARKER BOARDS, TILES, HANDRAILS,

SIGNAGE, CHARTING, ETC. REFER TO OWNER FOR ITEMS TO BE

SALVAGED.

8 REMOVE INTERIOR PERIMETER WALL FINISH, INCLUDING GYPSUM,

PLASTER, OR OTHER WALLBOARD, AND STRIP TO EXISTING

STUDS/MASONRY TO ALLOW FOR NEW CHANNEL-FURRED GYPSUM

BOARD PARTITION TYPE. SEE ARCHITECTURAL PLANS FOR MODIFIED

WALLTYPE.

9 WALLS TO BE PATCHED AND REPAIRED ON ALL SIDES TO RECEIVE NEW

PAINT. CREATE SMOOTH FINISH PER SPEC.

10 REMOVE PLUMBING FIXTURES. ALL CONNECTIONS TO EXISTING PIPES

AND VENTS TO BE REDIRECTED AS REQUIRED. CUT AND CAP AS

REQUIRED.

11 REMOVE EXTERIOR WALL ASSEMBLY FROM FLOOR TO FLOOR TO

EXTENTS SHOWN. REFER TO ARCHITECTURAL DETAILS.

12 CUT SLAB ABOVE OR BELOW TO ALLOW FOR NEW OR RELOCATED PIPING

AND NEW DUCTWORK. VERIFY QUANTITY, SIZE, AND LOCATION OF

PENETRATIONS TO LAND BETWEEN RIBS UNLESS NOTED OTHERWISE.

COORDINATE WORK WITH OWNER. CORES/PENETRATIONS NEEDED FOR

DRAINS, VENTS ETC. REFER TO MEP DRAWINGS FOR MORE INFO.

13 REMOVE (1) BAY OF EXISTING LOADING DOCK.

14 REMOVE WINDOW UNIT AND STORE AT OWNER'S DISCRETION.

17 REMOVE WINDOW UNIT AND SWAP WITH INFILL WITH MATCHING UNIT

FROM ELSEWHERE WITHIN SCOPE OF WORK.

19 OPEN WALL AND CEILING AS REQUIRED FOR NEW MEP CONNECTIONS.

SEAL WALL AND CEILING TO CREATE SMOOTH SURFACE, ALIGN WITH

EXISTING.

20 PROTECT ALL OCCUPIED AREAS, FURNITURE, ETC. COORDINATE W/ VA

REP.

22 REMOVE PORTION OF COVERED RAMP, INCLUDING ALL CONCRETE,

HANDRAILS, STOREFRONT, ROOFING DEVICES, AND MEPFP

COMPONENTS.

23 DEMOLISH STAIRS, HANDRAILS AND ASSOCIATED EQUIPMENT, TYP.

24 REMOVE WINDOW UNIT AND CUT SILL TO FLOOR FOR ADDITION OF NEW

DOOR.

25 REMOVE COLUMN COVERS AND ALL INTERNAL ELECTRICAL, TEL/DATA,

PLUMBING AND MED/GAS PIPING. G.C. TO FIELD VERIFY CHASE

LOCATIONS.

26 GRIND CONCRETE RAMP FOR NEW FLUSH LANDING AT PROPOSED DOOR.

REFER TO ARCH. PLANS.

27 RELOCATE SITE FURNISHINGS AT VAMC DISCRETION.

28 REMOVE PORTIONS OF AREAWAY RETAINING WALLS AS REQUIRED FOR

CONSTRUCTION OF NEW FOOTINGS; REBUILD AND REPLACE AS

REQUIRED BY FOOTING WORK.

29 REMOVE STEAM RADIATOR BELOW WINDOW; REFER TO ASBESTOS AND

HAZMAT TESTING REPORT FOR NOTES.

ICU BUILDING

DISUSED DIALYSIS UNIT

TOILET

222A

PATIENTS LOCKER RM

NURSES STATION

DIALYSIS PREPARATION RM-2

JANITOR

CORRIDOR

C2-DC-1

CONFERENCE RM

RENAL PHY OFFICE

OFFICE

CORRIDOR

C2-DC-1A

ROOF OF AMBULANCE ENTRANCE TO

REMAIN

EXISTING STAIR

TO REMAIN

PORTION OF ROOF TO BE REMOVED

SCOPE OF WORK TO

BE ABATED

ASBESTOS CONTAINING

LINOLEUM AND BACKING

PER ECM REPORT

ASBESTOS CONTAINING

LINOLEUM AND BACKING

UNDER EXISTING FLOOR

TILE PER ECM REPORT

ASBESTOS CONTAINING

LINOLEUM AND BACKING

UNDER EXISTING FLOOR

TILE PER ECM REPORT

ASBESTOS CONTAINING

TRANSITE PANELS FOUND

BEHIND HEATING UNITS

THROUGHOUT AREA OF

SCOPE PER ECM REPORT

ASBESTOS CONTAINING

9X9 TILES PER ECM

REPORT

HAZARDOUS MATERIALS

AT EXISTING ROOF OF

LOADING DOCK; REFER

TO ECM REPORT FOR

SPECIFIC LOCATIONS

ASBESTOS CONTAINING PIPE INSULATION AND

PIPE FITTINGS IDENTIFIED BY ECM THROUGHOUT

PROJECT AREA. REFER TO PD1202 FOR EXTENT

OF PIPING DEMOLITION. ALL PIPE, PIPE FITTINGS

AND PIPE INSULATION REQUIRING DEMOLITION OR

AFFECTED BY WORK REQUIRING DEMOLITION

SHALL BE ASSUMED TO INCLUDE ASBESTOS

CONTAINING MATERIAL.

HAZARDOUS MATERIALS

FOUND WITHIN WINDOW

SEALANTS. REFER TO

OWNER'S SEPARATE

REPORT IN PROJECT

MANUAL

HAZARDOUS MATERIALS NOTES

1. ASBESTOS CONTAINING MATERIALS ARE KNOWN TO EXISTING IN THE AREAS

REQUIRING DEMOLITION. THE HAZARDOUS MATERIALS REPORT DOCUMENTING

THE TYPES AND LOCATIONS OF KNOWN ASBESTOS CONTAINING MATERIALS IS

INCLUDED IN THE PROJECT SPECIFICATIONS. THE CONTRACTOR IS

RESPONSIBLE FOR THE PROPER REMOVAL OF ALL ASBESTOS CONTAINING

MATERIALS FOUND WITHIN THE PROJECT AREA. THE CONTRACTOR IS

ADDITIONALLY RESPONSIBLE FOR REQUESTING APPROPRIATE TESTING FOR ANY

MATERIALS FOUND WITHIN THE PROJECT AREA THAT ARE SUSPECTED TO BE

ASBESTOS CONTAINING MATERIAL AND WHICH ARE NOT IDENTIFIED IN THE

HAZARDOUS MATERIALS REPORT. SUSPECT MATERIALS SHALL NOT BE

DISTURBED UNTIL THE RESULTS OF TESTING ARE AVAILABLE.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :4

P

M

AD.102

HAZARDOUS MATERIALS SCOPING PLAN

06/15/18 KS AD,SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 3/16" = 1'-0"

1 SECOND FLOOR - HAZARDOUS MATERIALS SCOPE OF WORK PLAN

G

H

4.5

F5

13' - 2" 12' - 2" 13' - 6 1/4" 8' - 5 3/4" 13' - 6 1/4" 8' - 5 3/4" 18' - 0"

8'

/2

/2

/2

8'

/4

/4

8'

/4

5'

/4

BUILDING 14

PTSD CLINIC

PHARMACY

ICU (ABOVE)

(N) UPLIGHTING AT

EXISTING TREE

EXISTING PATIO

AREA TO REMAIN

DECORATIVE

BOLLARDS (TYP.) SEE

LANDSCAPE DRAWINGS

CONCRETE-EDGED

PLANTING BERM

EXIST. LOADING

DOCK

REINSTALL DOCK LIFT

CONCRETE PLANTING BERM

NEW STOREFRONT

DOOR INFILL

EXISTING RAMP

STOREFRONT

TO REMAIN

F E6

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

SCOPE OF WORK

SCOPE OF WORK

S C O P E O F W

O R K

EXIST. MAIL OUT

EXIST. PHARM.

RECEIVING AREA

EXIST. MAIL

SUPPLIES

EXIST. CLEAN

STORAGE

121A

EXIST. RESEARCH

DRUG STORAGE

(EXISTING)

6' - 0" 6' - 0"

4'

5'

EXISTING FIRE

PUMP BLDG. 27

BUILDING PERIMETER

ABOVE

NEW SLOPED SIDEWALKS -

SEE LANDSCAPE

DRAWINGS

89' - 3 3/8" +/-

RECONSTRUCT

PORTIONS OF RETAINING

WALL DISTURBED BY

WORK

ALIGN

NEW CONCRETE

EGRESS STAIRS

EXISTING PATIO

AREA TO REMAIN

ASPHALT

LOADING ZONE

I E D

X

Y

AA

AE.402

PHARMACY

MANAGER

FILLING AND

ASSEMBLY

NEW STEAM RISER

SEE ENLARGED

PLAN

EXIST. SOUTH

STAIR

90.00°

RECONSTRUCT PORTIONS

OF RETAINING WALL

DISTURBED BY WORK;

SEE STRUCTURAL

DETAILS

X.5

AE.804

SEE LANDSCAPE

DRAWINGS FOR

PAVING AND SURFACE

MATERIAL DIMENSIONS

CONCRETE ENCASED 'V' -

SHAPE COLUMNS; SEE

STRUCTURAL

NEW SIDEWALKS - SEE

LANDSCAPE

DRAWINGS

REINSTALL PLATFORM LIFT AT 90

DEGREES TO EXISTING POSITION

EXISTING METAL

STEPS TO REMAIN

SEE LANDSCAPE

DRAWINGS FOR

PAVING AND SURFACE

MATERIAL DIMENSIONS

7' - 0"

NEW LANDING IN EXISTING

RAMP FOR DOOR

ALIGN

NEW GUARD RAIL - SEE

LANDSCAPE DRAWINGS

NEW SIDEWALKS - SEE

LANDSCAPE DRAWINGS

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :4

P

M

AE.200

FIRST FLOOR PLAN

11/09/18 KS AML,EC,SB,DR

CONFORMED CONSTRUCTION

DOCUMENTS

N

SCALE: 1/8" = 1'-0"

1 FIRST FLOOR - FLOOR PLAN

H

4.5

3' - 7 1/4" 13' - 2" 12' - 2" 13' - 6 1/4" 8' - 5 3/4" 13' - 6 1/4" 8' - 5 3/4" 18' - 0" 3' - 9 3/4"

9'

/4

/2

/2

/2

8'

/4

/4

8'

/4

5'

/4

2'

TEAM SPACE

TREATMENT #7

214I

BARI. TREATMENT

#2

214H

BARI. TREATMENT

#1

214G

TREATMENT #1

214A

TREATMENT #2

214B

TREATMENT #3

214C

TREATMENT #4

214D

TREATMENT #5

214E

TREATMENT #6

214F

TREATMENT #8

214J

TREATMENT #9

214K

TREATMENT #10

214L

TREATMENT #11

214M

ISO TREATMENT #1

PRIVATE

TREATMENT #1

EXIST.

SOUTH STAIR

EXIST.

EAST STAIR

EXIST.

NORTH STAIR

OFFICE, MD

OFFICE, DIRECTOR

MD.

OFFICE, PD

TRAINING

OFFICE, SOCIAL

WORKER

CORRIDOR A

C200A

CLEAN

UTILITY/SUPPLY

EXAM ROOM

STAFF CORRIDOR

C200D

STAFF LOCKER

EMERG. ELECT.

TREATMENT ROOM

CORRIDOR

SOILED UTILITY

CORRIDOR C

C200C

WATER TREATMENT

STORAGE

F5

HT/WT

STERILE SUPPLY

EQUIPMENT

STORAGE

STAFF TLT

STAFF TLT

PATIENT LOCKERS

OFFICE, DIETITIAN

CONFERENCE

STAFF LOUNGE

F E6

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

MATCHLINE MATCHLINE

ELECT.

EQUIPMENT

PROCESSING,

CLEAN PREP/STORE

EXIST. VESTIBULE

CORRIDOR B

C200B-2

OFFICE, FELLOW /

RN PD

NOURISHMENT

OFFICE, NURSE

MGR.

EQUIPMENT

PROCESSING,

SOILED

DIALYSATE PREP

WATER TREATMENT

EQUIPMENT REPAIR

MEDICATION

53 SF

EXIST. IT

SECUR. ROOM

229A

29 SF

EXIST. LINEN CHUTE

ALCOVE

CHASE

2C2C

I E D

X

Y

PATIENT TOILET

9'

/4

AA

WAITING

5.

90.00°

X.5

AE.401A

AE.401B

X.5

PLAN NOTES

1. DOORS ARE PLACED 6" FROM NEAREST PERPENDICULAR

PARTITION, U.O.N.

2. INTERIOR PARTITIONS TO BE ACOUSTIC TYPE 'B' U.O.N.

3. DOORS AND WINDOWS WITHOUT LABELS ARE TO BE

CONSIDERED EXISTING TO REMAIN.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :5

P

M

AE.201

SECOND FLOOR PLAN

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"

1 SECOND FLOOR - FLOOR PLAN

H

4.5

PREFAB.

SKYLIGHTS

(30 S.F.

AREA)

F5

5" C

LR

APPROX MECH. UNIT

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

AE.402

PENTHOUSE

VESTIBULE

MECHANICAL

PENTHOUSE

ELECT. ROOM

1/ 4"

1'

-0

1/ 4"

1'

-0

APPROX MECH. UNIT

ON DUNNAGE

NON-SLIP WALKING

SURFACE

TYP.

3' - 0"

I E D

X

Y

AA

6' - 0"

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PRIMARY CARE

OFFICE

VEST

ELECTRICAL

CLOSET

JAN. CLOSET

STORAGE

SOCIAL WORKER

OFFICE

PSYCH OFFICE

CHARTING

STAFF LOUNGE

GROUP ROOM

OTP DIRECTOR

OFFICE

AE.402

1/ 4" / 1

'-0

1/4" / 1'-0"

1/4" / 1'-0"

X.5

3'

- 0

" T

YP

3'

- 0

CHILLER

EQUIPMENT ON

DUNNAGE

1/ 4"

1'

-0

1/ 4"

1' -0

1/4" / 1'-0"

RD RD RD

RD

RD

UP

AE.805

TIE OFF ANCHOR

TIE OFF ANCHOR

TIE OFF ANCHOR

6'

6'

AE.804

AE.804

2'

/2

AE.804

AE.804

9"

6" ROOF SCUPPER OPENING,

TYP.

AE.805

AE.805

PLAN NOTES

1. DOORS ARE PLACED 6" FROM NEAREST PERPENDICULAR

PARTITION, U.O.N.

2. INTERIOR PARTITIONS TO BE ACOUSTIC TYPE 'B' U.O.N.

3. DOORS AND WINDOWS WITHOUT LABELS ARE TO BE

CONSIDERED EXISTING TO REMAIN.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :5

P

M

AE.202

PENTHOUSE PLAN

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"

1 PENTHOUSE PLAN

H

4.5

BLDG.

C WING

NEW ROOF

BELOW

PENTHOUSE

ROOF BELOW

ICU

BUILDING

BLDG.

FIRE PUMP

LOADING DOCK

A WING

APPROX.

MECH.

EQUIP.

F5

BLDG. 14

SKY-

LIGHT

SKY-

LIGHT

W

Z

F E6

D1

E1

E2

E3

E4

EA

EB

EC

ED

EE

CC

APPROX.

MECH.

EQUIP.

I E D

X

Y

E-1.3

E-1.5

E-F

E-E

E-1 E-1.6

AA

X.5

ROOF HATCH

CHILLER

CHILLER

1/ 4"

/ 1

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :0

P

M

AE.203

ROOF PLAN

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"

1 ROOF PLAN - FLOOR PLAN

FIRST FLOOR

90' - 5 1/4"

SECOND FLOOR

102' - 4 1/4"

EXISTING LEVEL 3

114' - 3 1/4"

STAIR EXIT LANDING

86' - 5 13/32"

PENTHOUSE LEVEL

115' - 8 1/4"

INSULATED METAL PANEL

COLOR: LIGHT GRAY

STOREFRONT RIBBON

WINDOW

LINEAR REVEAL PANEL

ACCENT BAND (TYP)

CONCRETE-ENCASED

COLUMNS (BEYOND)

EXISTING CAST STONE

WATER TABLE BAND

RECESSED WINDOW WALL

ALIGN

FACE OF EXISTING

BUILDING

ROOF T.O.STL

115' - 2"

IMP PANEL

DARK GRAY

EXISTING CAST

STONE STRING

COURSE

PANEL JOINTS, TYP.

3 1/2"

EXPANSION JOINT

AE.800

AE.801

/2

8'

IG-1

6" OVERFLOW SCUPPER;

ALIGN WITH PANEL JOINT

6" OVERFLOW

SCUPPER

FIRST FLOOR

90' - 5 1/4"

SECOND FLOOR

102' - 4 1/4"

STAIR EXIT LANDING

86' - 5 13/32"

LOADING ROOF (LOW)

100' - 11 1/4"

PENTHOUSE LEVEL

115' - 8 1/4"

PENTHOUSE ROOF

127' - 9 1/4"

LINEAR INSULATED METAL PANEL

COLOR: LIGHT GRAY. TYP.

STOREFRONT RIBBON WINDOW

RECESSED WINDOW WALL

MECHANICAL

UNIT

BOLLARDS (TYP)

INSULATED METAL PANEL AT

PENTHOUSE

COLOR: LIGHT GRAY

APPROX. EXTERIOR MECHANICAL EQUIPMENT

LOADING

DOCK

AE.800 AE.803

PANEL JOINTS, TYP.

AE.800

AE.300

IG-1

AE.805

AE.805

REMOVE AND REINSTALL

BRICK FOR EXPANSION

JOINT COVER

INSULATED METAL PANEL AT

PENTHOUSE

COLOR: LIGHT GRAY

NEW EXTERIOR DOOR

SEE ARCH PLANS

ANGLED

AE.801

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :1

P

M

AE.300

EXTERIOR ELEVATIONS

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

1 SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

2 WEST ELEVATION

SCALE: 1/4" = 1'-0"

3 WEST ELEVATION - PENT HOUSE

FIRST FLOOR

90' - 5 1/4"

SECOND FLOOR

102' - 4 1/4"

EXISTING LEVEL 3

114' - 3 1/4"

FOURTH FLOOR

126' - 2 1/4"

LOADING ROOF (LOW)

100' - 11 1/4"

PENTHOUSE LEVEL

115' - 8 1/4"

PENTHOUSE ROOF

127' - 9 1/4"

INSULATED METAL PANEL

COLOR: LIGHT GRAY, IMP. TYP.

LINEAR INSULATED METAL PANELING

OVER MECHANICAL PENTHOUSE

ENCLOSURE

STOREFRONT RIBBON

WINDOW W/CLEAR GLASS.

TYP.

APPROX. EXTERIOR

MECH. EQUIPMENT

1'

9'

/2

/2

1'

1"

1'

2'

AE.800

ROOF T.O.STL

115' - 2"

FRAMED BAY WINDOW

CLEAR INSULATED

GLAZING

SPANDREL GLASS

LARGE IMP PANEL

DARK GRAY

AE.801

5'

/2

7'

5'

3 1/2"

EXPANSION JOINT

SLOPED RECESSED WINDOW

41' - 8 5/8"

NEW DOOR WITH 2X6 LOUVER

VERTICAL PANELS.IMP

8'

AE.804

AE.804

IG-1IG-2

6" ROOF SCUPPER; ALIGN

WITH PANEL JOINT

6" ROOF SCUPPER; ALIGN

WITH PANEL JOINT

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :1

P

M

AE.301

EXTERIOR ELEVATIONS

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

1 NORTH ELEVATION

SECOND FLOOR

102' - 4 1/4"

SCULPTED SKYLIGHT FEATURE

PENTHOUSE LEVEL

115' - 8 1/4"

INSULATED SOFFIT

ENCLOSURE R-30 MIN.

ALIGN

ALUM. RIBBON WINDOW

TREATMENT BAY, TYP.

PREFAB. TRANSLUCENT SKYLIGHT

EXTERIOR MECH. EQUIPMENT

ROOF T.O.STL

115' - 2"

3'

CONCRETE-CLAD

STRUCTURAL COLUMNS-

SEE STRUCT.

AE.800

FIRST FLOOR

90' - 5 1/4"

SECOND FLOOR

102' - 4 1/4"

TRUE GRADE AVG.

85' - 2 1/16"

AE.302

PENTHOUSE LEVEL

115' - 8 1/4"

PENTHOUSE ROOF

127' - 9 1/4"

F

LO

O R

-T O

-F

LO

O R

MECHANICAL

UNIT

INSULATED METAL PANEL AT

PENTHOUSE

EXISTING AMBULANCE

ENTRY TO REMAIN

ROOF T.O.STL

115' - 2"

V .I.

F

5'

/1

6"

1"

/4

1/ 4"

AE.910

AE.910

AE.805

AE.300

AE.800

8'

MECHANICAL SPACE

SKYLIGHT FEATURE

NEW GUARD RAILINGS

SEE LANDSCAPE

PLANS

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :2

P

M

AE.302

BUILDING SECTIONS

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

1 WEST - EAST SECTION

SCALE: 1/4" = 1'-0"

2 NORTH - SOUTH SECTION

PLAN NOTES

1. DOORS ARE PLACED 6" FROM NEAREST PERPENDICULAR

PARTITION, U.O.N.

2. INTERIOR PARTITIONS TO BE ACOUSTIC TYPE 'B' U.O.N.

3. DOORS AND WINDOWS WITHOUT LABELS ARE TO BE

CONSIDERED EXISTING TO REMAIN.

AE.300

AE.300

AE.302

G 1

AE.302

AE.502

H

4.5

F5

AE.3011

9'

/4

2'

6'

1"

1'

6'

6'

1'

7'

1'

/2

0" 14' - 0" 6 1/8" 9' - 4 1/2" 6 1/8" 7' - 3" 4 7/8" 9' - 3"

4 7/8" 3 1/8" CLEAR

6' - 0" 3 1/8" 4 7/8" 10' - 5 3/4"

6' - 0"

TEAM SPACE

NSTA1

TREATMENT #7

214I

RDC01

BARI.

TREATMENT #2

214H

XXYYC

BARI.

TREATMENT #1

214G

XXYYC

TREATMENT #1

214A

RDC01

TREATMENT #2

214B

RDC01

TREATMENT #3

214C

RDC01

TREATMENT #4

214D

RDC01

TREATMENT #5

214E

RDC01

TREATMENT #6

214F

RDC01

TREATMENT #8

214J

RDC01

TREATMENT #9

214K

RDC01

TREATMENT

#10 214L

RDC01

TREATMENT

#11

214M

RDC01

ISO

TREATMENT #1

RDC02

PRIVATE

TREATMENT #1

RDC01

HT/WT

TRGM1

CORRIDOR A

C200A

CLEAN

UTILITY/SUPPLY

UCCL1

EXAM ROOM

TRGM1

STAFF

CORRIDOR

C200D

EMERG. ELECT.

STERILE

SUPPLY

SRSE1

EQUIPMENT

STORAGE

SRSE1

E1

H2

H2 E1

B

E1 C1

C1

C1

B4

B

B4

E1

B

H2

E1

SEISMIC JOINT

OVERHEAD CURTAIN

TRACKS (TYP.)

CUSTOM MILLWORK

NURSE STATION (TYP.)

AE.504

AE.505

OFFICE,

DIRECTOR MD.

OFA09

1'

7/

8"

7'

7/ 8"

7/

8"

7/ 8"

7/

8" 6'

/2

7/

8"

8'

7/ 8"

C

LE

A R

6'

7/

8"

/8

9'

/4

8'

/2

/2

/2

8'

/4

AE.503

AE.501

28AE.507

30AE.508

4 AE.507

34AE.508

AE.508

AE.507

AE.502

AE.507

AE.507

AE.507

F E6

AE.510

E2 E3 E4

EA

EB EC

MEDICATION

MEDP1NOURISHMENT

MEDP1

ALCOVE,

CRASH CART

218A

RCA01

16 AE.507

TREATMENT

ROOM

CORRIDOR

C1

C1 B4 222224

F

H2

B

E1

B3

E1E1

B

B4 B4

C1

AE.401A

AE.401B

/2

/2

8'

/4

PATIENT

TOILET

TPG01

3' - 7 1/4" 13' - 2" 12' - 2" 13' - 6 1/4" 8' - 5 3/4" 13' - 6 1/4" 8' - 5 3/4" 18' - 0" 3' - 9 3/4"

I E D

X

Y

E1

E1

E1

E1

AE.505 3

AE.507

AE.507

ISO TLT #1

216A

TPG02

4 2

ANTE-ROOM

ISO

TREATMENT #1

RDC02

216A

B

X.5

AE.506

TREATMENT ROOM

CORRIDOR

CORRIDOR B

C200B-2

216B

E1

B3

AE.804

SIM.

7' - 0 3/4" 4 7/8" 7' - 1" 4 1/4" 3 1/8"

CLEAR

6' - 0" 4 7/8" 3' - 0" ± 1' - 2 1/8" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 2' - 3 3/4" 6' - 0" 8" 6' - 6" 3' - 11 3/4"

/8

4 7/8" 2 1/2"

10' - 7" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 10' - 3" 9' - 2 1/2"± 15' - 5 1/2"

± 7' - 1 1/8" 1' - 4" 7' - 0 1/2"

7'

" 4 7/

8"

8'

7/

8"

/8

7/

8"

3'

/2

/2

1"

E1

E1

E1

B

6"

EQ

EQ

3'

- 6

6"

3' - 6" 6" 3' - 6" 6" 3' - 6" 6"

3' - 6"

5'

- 2

AE.940

AE.941

TYP.

3' - 0" 6"

3'

- 0

1'

- 6

PATIENT

LOCKERS

LR001

B4

AE.502

C200D

E1

B

B4

B4

B4

1'

3'

2'

3'

6"

6" 5'

6"

6" 4'

C200A

D

B43' - 0" 6" 6" 3' - 0"

4 7/8" 7' - 0" 1' - 4" 7' - 0" 4 7/8"

B

B

1'

/2

7'

/2

1'

/2

7'

/2

1'

/2

4'

1'

/2

D

B

1' - 0"

17' - 11 1/4" 6' - 8 1/2"

2'

/4

3'

6'

/2

8'

8'

6'

/2

3' - 0 1/8"

3 3/4"

8"

4 1/4"

X.5

AE.941

AE.941

OPH.

AE.941

FEC

FEC

FEC

2' - 6"

7'

1/

2"

3'

6"

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :2

P

M

AE.401A

SECOND FLOOR ENLARGED FLOOR PLAN

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

1 SECOND FLOOR - ENLARGED FLOOR PLAN - AREA A

PLAN NOTES

1. DOORS ARE PLACED 6" FROM NEAREST PERPENDICULAR

PARTITION, U.O.N.

2. INTERIOR PARTITIONS TO BE ACOUSTIC TYPE 'B' U.O.N.

3. DOORS AND WINDOWS WITHOUT LABELS ARE TO BE

CONSIDERED EXISTING TO REMAIN.

G

H

4.5

F5

CORRIDOR A

C200A

CLEAN

UTILITY/SUPPLY

UCCL1

EXAM ROOM

TRGM1

STAFF

CORRIDOR

C200D

EMERG. ELECT.

STERILE

SUPPLY

SRSE1

EQUIPMENT

STORAGE

SRSE1

SEISMIC JOINT

STAFF LOCKER

LR001

SOILED UTILITY

USCL1

STAFF TLT

TNPG1

STAFF TLT

TNPG1

WATER

TREATMENT

STORAGE

OFFICE, PD

TRAINING

OFA07

OFFICE,

SOCIAL

WORKER

OFA07

OFFICE,

DIETITIAN

OFA07

OFFICE, MD

OFA07

OFFICE,

DIRECTOR MD.

OFA09

EXIST.

SOUTH STAIR

A-2-S

CORRIDOR C

C200C

CONFERENCE

CRA02

STAFF LOUNGE

SL001

1'

7/

8"

7'

7/ 8"

7/

8"

7/ 8"

7'

/8

3'

/8

7/ 8"

5'

7/ 8"

6'

/2

7/

8"

8'

7/ 8"

C

LE

A R

6'

7/

8"

/8

4 7/8"

8' - 2"

4 7/8"

7' - 10"

4 7/8"

± 9' - 4 1/16"

4 7/8"

8' - 1 3/4"

4 7/8"

12' - 7 5/8"

4 7/8"

± 11' - 11 1/2"

8' - 7 3/8"

6 1/8"

2' - 4 3/4"

10' - 0"

4 7/8"

± 19' - 5 5/8"

4 7/8"

CLEAR

6' - 0"

4 7/8"

± 13' - 7 5/8"

4 7/8"

8' - 8 1/4"

4 1/4"

6 1/8"

CLEAR

6' - 0"

6 1/8"

± 11' - 10 1/4"

0"

1/4

8"

1'

- 0

/4"

8'

- 9

/4"

1'

- 3

/2"

1'

- 1

1 1 /2"

CL

EA

R6'

- 0

1'

- 4

/2"

6 1 /4"

SEISMIC JOINT

2-HR DOOR

SEISMIC JOINT

B4

H3

H1

F

E1

E1

E1

E1

E1

E1

B4

E1

E1

B4

E1

E1 E1

B4

B

B4

AE.501

AE.501

AE.502 1

AE.507

H2

AE.508

AE.508

AE.508

AE.508

AE.508

AE.502

AE.502

AE.501

AE.501

AE.3011

F E6

AE.510

AE.510

AE.510

AE.510

AE.509

AE.509

AE.509

AE.509

AE.509

AE.508

AE.508

E1

E2

E3

E4

EA

EB

EC

ED

EE

ELECT.

EQUIPMENT

PROCESSING,

CLEAN

PREP/STORE

CSIA1

EQUIPMENT

REPAIR

CSIA1

DIALYSATE

PREP

MEDP1

WATER

TREATMENT

RDWT1

EQUIPMENT

PROCESSING,

SOILED

BMER1

OFFICE,

FELLOW / RN

PD

OFA07

AE.509

OFFICE, NURSE

MGR.

OFA09

AE.508

E1

B4

E1

E1

B4B

B

E1

F

B

B

E1

B

E1

H2

H1

E1

E1

B1

E1

B

E1

B

E1

E1 E1

E1

E1

E1

E1

AE.401A

/2

/2

8'

/4

/4

8'

/4

5'

/4

2'

PATIENT

TOILET

TPG01

EXIST. IT

SECUR. ROOM

229A

EXIST.

EAST STAIR

I E D

X

Y

E1

E1

E1

E1

E-E

C1

B

E1

B

E1

B

C200C B

E1

AA

AE.501 10

H1

WOMEN'S

PUBLIC

201B

TPG01

H1

AE.501

MEN'S PUBLIC

201A

TPG01

B4

B4 B4

AE.501

7' - 4" 4 7/8" 5' - 0" 4 7/8" 7' - 4" 1' - 3"

WAITING

WTG15

201B

201A A

X.5

C1

B4 B4

C1

A-2-S

AE.501

CORRIDOR C

C1AA

CORRIDOR B

C200B-2

C200C A

C200C C

A

A

AE.804

5' -7

/4

5'

-7

/4

4' -0

O .D

9' -5

/8

4'

-0

5' -3

/2

SIM.

6"

6'-10 7/8" 5'-0" 10'-5 3/8"

16' - 4 21/32"

9'

- 2

1'

- 9

5'

- 6

9/

4' - 0"

1' - 0"

4' - 0"

6"

3' - 0"

6"

3' - 0"

6"

3' - 0"

6"

3' - 0"

6"

6"

3'

- 0

EQ

EQ

6"

3' - 0"

EQ

EQ

3 3 /4"

2'

- 9

1/ 8"

2' - 4 1/2"

8' - 2 1/4"

3' - 11 9/32"

7' - 4 3/32"

1' - 9"

8' - 3"

9'

- 0

/4"

5'

- 0

5'

- 0

'-3

4'- 3"

3 3/4"

CLEAR

6' - 0"

6 1/8"

8' - 6"

6 1/8"

9' - 6"

4 7/8"

E1

E1

C1

H2

C1

B4

B4

6"

3'

- 6

" 8' - 8 1/2"

4 7/8"

4 1/4"

3'

- 6

6"

4'

- 1

0"

7' - 4 3/4"

5' - 0"

AE.941

3' - 0" 6"

3' - 0"

6"

3'

- 0

1'

- 6

PATIENT

LOCKERS

LR001

B4

AE.502

201D

E1

B

B4

B4

B4

3' - 6" 1' - 4"

1'

3'

2'

3'

3'

6"

6" 5'

6"

6" 4'

D

B43' - 0" 6" 6" 3' - 0"

4 7/8" 7' - 0" 1' - 4" 7' - 0" 4 7/8"

3' - 0 1/8"

3 3/4"

8"

4 1/4"

X.5

AE.804

AE.941

AE.941

OPH.

AE.941

ALIGN

AE.931

202A

FEC

FEC

FEC

FEC

B

3'

6"

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :3

P

M

AE.401B

SECOND FLOOR ENLARGED FLOOR PLAN

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

1 SECOND FLOOR - ENLARGED FLOOR PLAN - AREA B

D1

E4

5'

/4

V.I.F.

1' - 4 3/32"

B2

B2

H1

EXIST. STAIRHALL

A-3

EXPANSION

JOINT

PENTHOUSE

VESTIBULE

E D

16' - 8 1/2"

AE.804

NEW HANDRAILS

X.5

EXISTING OFFICE

14A

EXISTING PT CHIEF

OFFICE

2'

- 3

3'

- 7

/8"

PERIM

ETER BEAM

ABOVE (DASHED)

2' - 0"

AL

IG

N

NEW 2-HOUR

STEAM CHASE

ALL EXISTING

FINISHES TO

REMAIN

C1

E6

E3

E4

EC

ED

EE

CC

AE.801

E

Y

E-1.5E-F E-1.6

2'

- 3

AL

IG

N

NEW 2-HOUR

STEAM CHASE

PERIM

ETER BEAM

ABOVE (DASHED)

1' - 6"

FILLING AND

ASSEMBLY

PHARMACY

MANAGER

EXISTING EXTERIOR LIGHT

WELLS TO REMAIN, TYP.

RECONSTRUCT CONCRETE

RETAINING WALL. REFER TO

STRUCTURAL DRAWINGS

FOR DETAIL

NEW EXTERIOR CONCRETE

COLUMNS, TYP.

CUT EXISTING

COUNTER AT NEW

CHASE WALL

ALL EXISTING FINISHES

AND FIXTURES TO

REMAIN

AE.801

NEW PLUMBING

CHASE

C1

Z

E4

EE

CC

4' - 11" V.I.F.

AL

IG

N

STEAM

CHASE

OFFICE

FUR ADJACENT

WALL TO FLUSH

CHASE

NEW 2-HOUR

STEAM CHASE

MECHANICAL

PENTHOUSE

ALL EXISTING

FINISHES TO

REMAIN

C1

E1

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :3

P

M

AE.402

FIRST & PENTHOUSE PARTIAL ENLARGED

PLANS

11/09/18 KS SB/MM/AML

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

1 ENLARGED PLAN - STAIR AT PENTHOUSE

SCALE: 1/4" = 1'-0"

4 BASEMENT - PARTIAL FLOOR PLAN

SCALE: 1/4" = 1'-0"

2 ENLARGED PLAN - STEAM RISER AND PIPE CHASE LEVEL 1

SCALE: 1/2" = 1'-0"

5 ENLARGED PLAN - STEAM RISER LEVEL 3

FIRE ALARM

AUDIOVISUAL ALARMS

SANI WIPES HOLDER

4'

BUMPER RAIL

NOTE:

BUMPER RAIL TO TERMINATE 2" FROM

ADJACENT WALL MOUNTED ITEMS AS

INDICATED IN ELEVATIONS

6" M

IN

7'

MIRROR

WALL MOUNTED SINK

ACCESSIBLE SINK

2'

0" M

A X

3'

1' - 3" MIN.

LC

EXIT

WALL MOUNTED EXIT SIGN

EQ EQ

4"

CORNER GUARD

6'

0" 4"

7'

GAS SHUT-OFF VALVES BOX

4'

4'

O V

MEDICAL GASES

4'

THERMOSTAT

4'

FIRE ALARM

PULL STATION

4'

FIRE EXTINGUISHER CABINET

4'

CARD READER

4'

DATA OUTLET

1'

ELECTRICAL OUTLET

1'

LIGHT SWITCH

4'

TELEPHONE OUTLET

1'

WALL PHONE

3'

CHAIR RAIL

3'

4"

HAND RAIL

3'

/2

1/

2" M

A X

ACCESSIBLE COAT HOOKS

4'

COUNTER/BENCH

TELEPHONE OUTLET

DATA OUTLET

ELECTRICAL OUTLET

RACEWAY (@ TOP OF

BACKSPLASH, TYP.)

3'

3'

DESK/WORKSURFACE

RACEWAY (@ TOP OF

BACKSPLASH, TYP.)

TELEPHONE OUTLET

DATA OUTLET

ELECTRICAL OUTLET

2'

3'

4'

PERSONAL PROTECTION CABINET

3'

BULLETIN BOARD

(SEE ELEVATION FOR DIMENSION)

WATERLESS SANITIZER

4'

GLOVE BOX HOLDER

4'

CUP DISPENSER

4'

SHARPS CONTAINER

4'

BATHROOM SHELF

3'

TOILET PAPER DISPENSER

2'

SANITARY NAPKIN DISPOSAL

2'

MOP AND BROOM HOLDER

4'

ACCESS PANEL

2'

2'

"4'

VIEW BOX

4'

LEAD APRON RACK

4'

OTOSCOPE/ OPHTHALMOSCOPE/

SPECULA DISPENSER

GRAB BAR

ACCESSIBLE TOILET

TOILET PAPER

DISPENSER

PLUMBING

ACCESS PANEL

1'

3' - 6"

1' - 6" 1' - 8"

1' - 0"

ACCESSIBLE TOILET

HI/LOW NURSE

CALLS

GRAB BAR

3'

1'

2' - 10"

8" 2'

" 4'

1' - 0" 3' - 6" 4"

4"

SANITARY

NAPKIN

DISPOSAL

TPD

MIRROR MOUNTED BEHIND DOOR

MIRROR

2'

0" 3'

2' - 0"

EQ EQ

DIAPER CHANGING STATION

4'

M

A X

HAND DRYER

3'

PAPER TOWEL DISPENSER

4'

SOAP DISPENSER

4'

UNDER CASEWORK MOUNTING

4'

2'

0"

TYP.

1' - 3"

CASEWORK AS

SCHEDULED

EQUIPMENT AS

SCHEDULED

SINK AS SCHEDULED

1" T

Y P

6"

3'

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :3

P

M

AE.500

TYPICAL MOUNTING HEIGHTS

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

1 MOUNTING HEIGHT SCHEDULE

D

ACCENT WALL

OPEN TO

RECEPTION

COLUMNSCHEDULED BASE, TYP.

AE.941

SCHEDULED BASECOLUMN

EQEQ

AE.941

EP

OPEN TO

CORRIDOR

HEMODIALYSIS

MAIN ENTRANCE

2' - 0" 2' - 0"

EQ EQ

1' - 0"

SPEAKER STROBE

CLOCK

SCHEDULED BASE CHAIR RAIL

EP EP

SCHEDULED BASECHAIR RAIL

OPEN TO

CORRIDOR

WALL EXPANSION JOINT

EQEQ

RECESSED ALCOVE

RESIN

PANEL

(RP)2'

EP

1"

SPEAKER

STROBE

8"

SCHEDULED BASE

LS

OPEN TO

CORRIDOR

ACCENT WALLEXPANSION JOIN

SCHEDULED BASE

X.5

PUSH BUTTON

1' - 6"

5'

STEEL POST FOR POST

MOUNTED MONITOR

4'-1 1/4"

5'

COORDINATE MOUNTING

HEIGHTS IN FIELD FOR OUTLETS

EP TD

6'

1/ 2"

2'

/2

EQ EQ EQ

PRINTER

EQEQ

AE.940

AE.940

T/D

QUAD

PLAM CABINETS (PL-2)

PLAM COUNTERTOP (PL-2)

SCHEDULED BASE, TYP.

COLUMN COVER

EP EP

6' - 0"

D

AE.940

AE.940

T/DQUAD

4' - 6"

DRCB

T/DQUAD

SOLID SURFACE

COUNTERTOP (SS)

3' - 10" 2' - 11"

PLAM COUNTERTOP (PL-2)

ANGLED RECESSED EQ EQ

ACCENT

WALL

DOUBLE

LS

CLOCK

AE.940

EQ EQ

CHAIR

P

SCHEDULED

BASE, TYP.

4' - 0"

P

6' - 0"

5'

3'

0"

3'

PTDSD

SD

PTD

PRINTER

SUPPLY

CART

2' - 6"EQEQ2' - 6"

AE.94010

AE.940

AE.940

2' - 6"

AE.940

2'

0"QUADT/D

PLAM WALL

CABINET

PLAM BASE CABINET

SOLID SURFACES

COUNTERTOP

CLOCK

1' - 3"

LS

P

MIRROR

PTD

SD

GRAB BAR

CERAMIC

TILE (CT)

GLASS

TILE (GT)

2' - 6" 2' - 0"

1' - 6"

4'

GLASS TILE

(GT)

GRAB BAR

TPD SND NURSE

CALL

CERAMIC

TILE (CT)

GLASS TILE

(GT)

CERAMIC

TILE (CT)

STROBE

GFILS

6"

DRINKING FOUNTAIN

SCHEDULED BASE

CERAMIC

TILE (CT)

8"

4'

T Y

P

STROBE

LS

MIRROR

CERAMIC TILE (CT)

SP

GRAB BARS

1' - 6"

SEE TYPICAL

MOUNTING HEIGHTS

FOR ALL LAVATORY

FIXTURE HEIGHTS, TYP.

GLASS TILE (GT)

GRAB BAR

TPD NURSE

CALL

TOILET PAPER

DISPENSER

CERAMIC TILE

(CT)

1' - 10"

4'

CERAMIC TILE (CT)

4'

T Y

P

PTD

EP

2' - 0"

GLASS TILE (GT)

1' - 6"2' - 0"

PTD

4'

EP CERAMIC

TILE (CT)

10"

STROBE

4'

LS

GRAB BAR

TPDSNDNURSE

CALL

4'

1' - 10"

GRAB BAR

SD

MIRROR

CERAMIC

TILE (CT)

GLASS

TILE (GT)

1' - 6"

RECESSED

1' - 3"

CARD READER

CARD READER

SPEAKER STROBE

SCHEDULED BASE, TYP.

1' - 3"

BUMPER RAIL

2" TYP.

CORNER GUARD, TYP. DOOR HOLDER

AE.941

SEE AE.500 FOR

TYPICAL MOUNTING

HEIGHTS

PUSH BUTTON

10" 6"

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :4

P

M

AE.501

INTERIOR ELEVATIONS

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

201 - WAITING

SCALE: 1/4" = 1'-0"

201 - WAITING

SCALE: 1/4" = 1'-0"

201 - WAITING

SCALE: 1/4" = 1'-0"

201 - WAITING

SCALE: 1/4" = 1'-0"

201 - WAITING

SCALE: 1/4" = 1'-0"

201 - WAITING

SCALE: 1/4" = 1'-0"

205 - RECEPTION

SCALE: 1/4" = 1'-0"

205 - RECEPTION

SCALE: 1/4" = 1'-0"

205 - RECEPTION

SCALE: 1/4" = 1'-0"

205 - RECEPTION

SCALE: 1/4" = 1'-0"

207 - OFFICE, PD TRAINING

SCALE: 1/4" = 1'-0"

207 - OFFICE, PD TRAINING

SCALE: 1/4" = 1'-0"

207 - OFFICE, PD TRAINING

SCALE: 1/4" = 1'-0"

207 - OFFICE, PD TRAINING

SCALE: 1/4" = 1'-0"

211 - PATIENT TOILET

SCALE: 1/4" = 1'-0"

211 - PATIENT TOILET

SCALE: 1/4" = 1'-0"

211 - PATIENT TOILET

SCALE: 1/4" = 1'-0"

211 - PATIENT TOILET

SCALE: 1/4" = 1'-0"

201A - DRINKING FOUNTAIN

ALCOVE

SCALE: 1/4" = 1'-0"

201A - MEN'S PUBLIC

SCALE: 1/4" = 1'-0"

201A - MEN'S PUBLIC

SCALE: 1/4" = 1'-0"

201A - MEN'S PUBLIC

SCALE: 1/4" = 1'-0"

201A - MEN'S PUBLIC

SCALE: 1/4" = 1'-0"

201A - MEN'S PUBLIC

SCALE: 1/4" = 1'-0"

201A - MEN'S PUBLIC

SCALE: 1/4" = 1'-0"

201A - MEN'S PUBLIC

SCALE: 1/4" = 1'-0"

201A - MEN'S PUBLIC

SCALE: 1/4" = 1'-0"

C1AA - CORRIDOR - ENTRANCE

MAIN HEMODIALYSIS SUITE

NOTE:

PROVIDE BLOCKING FOR ALL WALL-

MOUNTED DEVICES AND EQUIPMENT

SPEAKER STROBE SPEAKER STROBE

HAND RAILSCHEDULED BASE, TYP.

AE.941

4"

LS

DOUBLE

LS

P

1' - 0"

EQ EQ

SEE AE.500 FOR

TYPICAL MOUNTING

HEIGHTS

DOOR HOLDER

4 3

CARD READER

FEC

OPEN TO

EQUIPMENT

PROCESSING,

CLEAN

PREP/STORE

OPEN TO

TREATMENT AREA

OPEN TO

TREATMENT

AREA

HAND RAIL

COLUMN

EP EP

EQ EQ

DOOR HOLDER ANGLED CORNER GUARD, TYP.

P

RECESSED ANGLED

4'

CORNER GUARD, TYP.

SCHEDULED BASE, TYP.

HSD

8" 1' - 6"

LS

P P P

RIGID VINYL WALL

PROTECTION, TYP.

SEE FINISH SCHEDULE

Y

2' - 0"4' - 6" EQEQ

RECESSEDANGLED

4'

CORNER GUARD, TYP.

AE.940

P P P T/DQUAD

X.5

EQEQ

SPEAKER

STROBE

P

1' - 2" 8" 1' - 6" 3' - 6" 2' - 0"

ANGLED

SD

PTD

LS

P P

X.5

G F E D

4'

2"

1'

4"

2'

COLUMN PANELIZED MEDICAL WALL

AE.803

LSTD

QUAD

EP LSTD

QUAD

EPLSTD

QUAD

EPLSTD

QUAD

EPLSTD

QUAD

EPLSTD

QUAD

EPLSTD

QUAD

EP

PLAM CABINETS

(PL-1)

1 3

PLAM CABINETS

(PL-1)

COLUMN

PANELIZED MEDICAL WALLSCHEDULED BASE, TYP.

OVERHEAD LIFT OFCI

LSTD

QUAD

EP LSTD

QUAD

EP

GFED

8'

PTD

SD

RECESSED

PTD

SD

PANELIZED MEDICAL WALL

PLAM UPPER CABINETS

(PL-1)

HANDWASH SINK

4"

AE.940

TD

LSTD

QUAD

EPLSTD

QUAD

EPLSTD

QUAD

EPLSTD

QUAD

EP

EPQUAD

SCHEDULED BASE, TYP.

3' - 0"3' - 0"3' - 6"

1' - 11"

PLAM UPPER CABINETS

(PL-1)

W-2 W-2

ACCENT WALLCOVERINGACCENT WALLCOVERING

1' - 0"

1' - 8" 1' - 4"

ANGLED

RECESSED WALL

SCHEDULED BASE, TYP.

CORNER GUARD, TYP.

ICU DOOR ICU DOOR

FEC

4"

EPEP

EQ EQ

SPEAKER STROBE

MIRROR

EQEQ

P

LS

8"

STROBE

SCHEDULED

BASE, TYP.

Project TitleDrawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPCONSULTANTS

321 4 5 6 7 8 9 10

CIVIL:

Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865

Phone: 401-334-4100 Facsimile: 401-334-4108

CONFORMED CONSTRUCTION DOCUMENTS

290 Congress St., 5th Floor Boston, MA 02210

Phone: 617-895-1000

VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1

Providence, RI

650-342

Project Director

FULLY SPRINKLERED

STRUCTURAL:

Odeh Engineers 1223 Mineral Springs Ave.

Providence, RI 02904

Phone: 401-724-1771 Facsimile: 401-724-1981

MEP/FP:

BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135

Phone: 617-254-0016 Facsimile: 617-924-9339

COST:

DG Jones International, Inc.

3 Baldwin Green Common, Suite 202 Woburn, MA 01801

Phone: 781-982-3131 Facsimile: 781-932-3199

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

C R e v it P ro je c ts

\V A

P ro v id e n c e H e m o d ia ly s is

-R d ru s s o n ie llo .r v t

/1

/2

:5 :5

P

M

AE.502

INTERIOR ELEVATIONS

11/09/18 KS AML/EC/MM/SB

CONFORMED CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"

C200A - CORRIDOR A

SCALE: 1/4" = 1'-0"

C200A - CORRIDOR A

SCALE: 1/4" = 1'-0"

C200A - CORRIDOR A

SCALE: 1/4" = 1'-0"

204 - EQUIP PROCESSING,

CLEAN PREP / STORE

SCALE: 1/4" = 1'-0"

204 - EQUIP PROCESSING,

CLEAN PREP / STORE

SCALE: 1/4" = 1'-0"

204 - EQUIP PROCESSING,

CLEAN PREP / STORE

SCALE: 1/4" = 1'-0"

204 - EQUIP PROCESSING,

CLEAN PREP / STORE

SCALE: 1/4" = 1'-0"

204 - EQUIP PROCESSING,

CLEAN PREP / STORE

SCALE: 1/4" = 1'-0"

213 - TREATMENT ROOM

CORRIDOR

SCALE: 1/4" = 1'-0"

213 - TREATMENT ROOM

CORRIDOR

SCALE: 1/4" = 1'-0"

213 - TREATMENT ROOM

CORRIDOR

SCALE: 1/4" = 1'-0"

213 - TREATMENT ROOM

CORRIDOR

SCALE: 1/4" = 1'-0"

206 - PATIENT LOCKERS

SCALE: 1/4" = 1'-0"

206 - PATIENT LOCKERS

SCALE: 1/4" = 1'-0"

206 - PATIENT LOCKERS

SCA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.