36E77619R0086-009.pdf
PDF 20 MB Posted
- Attached to
- Replace Hemodialysis Unit Federal contract opportunity
- Solicitation number
- 36E77619R0086
About this file
36E77619R0086 Attachment 8 - Arch.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Replace Hemodialysis Unit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHARMACY
BUILDING 14
PTSD CLINIC
REMOVE (1) LOADING BAY
EXISTING PATIO STRUCTURE
AND PERIMETER WALLS
TO REMAIN
EXISTING GINKGO TREE TO
REMAIN; APPROXIMATE
DRIPLINE SHOWN
V.I.F.
15' - 4"
DEMOLISH PAVING AND
CURBING FROM EXISTING
DRIVE AREA; SEE CIVIL
EXISTING AREAWAY
TO REMAIN
EXISTING AREAWAY
TO REMAIN
EXISTING MAILROOM
TO REMAIN
EXISTING AMBULANCE
ENTRANCE TO REMAIN
TUBE STEEL STRUCTURE TO REMAIN
TUBE STEEL STRUCTURE TO
REMAIN, TYP.
OVERHEAD CANOPY
STRUCTURE TO BE REMOVED;
SEE LEVEL 2 NOTES
90' - 5 1/4" V.I.F.
EXISTING STAIR AND
UTILITY LIFT TO
REMAIN
REMOVE PAVING AND
SIDEWALK LANDSCAPE
SEE CIVIL
REMOVE AND RETAIN DOCK LIFT FOR
REINSTALLATION
DEMOLISH TUBE STEEL STRUCTURE
AT (1) BAY ONLY
4' - 0"
V.I.F.
6' - 2" 24' - 6"
V .I.
F
7'
EXISTING FIRE
PUMP BLDG. 27
EXISTING
MECHANICAL
EQUIPMENT AND PAD
TO REMAIN
CUT PORTION OF EXISTING SLAB
TO ACCOMODATE RELOCATION OF
DOCK LIFT
CUT MASONRY WALL TO
LIMIT LINE AS SHOWN
DEMO ETR
DEMO ETR
DEMOLISH PLANTINGS
FOR NEW WORK
EXISTING STEPS TO
REMAIN
7' - 0"
REMOVE EXISTING PATIO
STRUCTURE AS REQUIRED
BY NEW WORK; SEE
LANDSCAPE PLANS
REMOVE AND RETAIN LIFT
FOR REINSTALLATION
V.I.F.
41' - 6"
NOT IN DEMOLITION SCOPE
EXISTING TO BE DEMOLISHED
EXISTING WALLS TO REMAIN
DEMOLITION GENERAL NOTES
1. PHASING OF AMBULANCE AND LOADING DOCK PARTIAL DEMOLITION TO
BE DISCUSSED WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR TO
ASSUME OFF-HOURS WORK WILL BE REQUIRED.
2. CONTRACTOR TO MAINTAIN ALL VA HOSPITAL STANDARDS OF
CLEANLINESS DURING ALL PHASES OF CONSTRUCTION. FOLLOW ALL
SPECIFICATION STANDARDS SET FORTH BY VA INFECTION CONTROL.
3. ALL EXISTING PIPING TO REMAIN ON SECOND FLOOR AREA OF WORK TO
BE REINSULATED POST-ASBESTOS AND HAZMAT ABATEMENT.
4. DOORS AND WINDOWS WITHOUT TAGS ARE TO BE CONSIDERED EXISTING
TO REMAIN.
5. PROTECT EXISTING WIRING AND DEVICES IN ADJACENT SPACES; REVIEW
AND STORE DEVICES IN AREA OF WORK WITH VAMC REPRESENTATIVE.
6. IDENTIFY ANY FURTHER DEMOLITION WITH VAMC REPRESENTATIVE
PRIOR TO COMMENCEMENT OF WORK. G.C. TO SCHEDULE DEMOLITION
WALK-THROUGH WITH OWNER'S PROJECT REPRESENTATIVE PRIOR TO
THE START OF DEMOLITION.
7. REFER TO HAZARDOUS MATERIALS REPORT FOR HAZARDOUS
DEMOLITION SCOPE.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :3
P
M
AD.100
FIRST FLOOR DEMOLITION PLAN
06/15/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR - DEMOLITION PLAN
DEMO LEGEND
1 REMOVE ASSEMBLY AND ALL ASSOCIATED WALL MOUNTED DEVICES,
SHOWN DASHED, TYP.
2 REMOVE DOOR, FRAME, HARDWARE, AND TRANSOMS WHERE
APPLICABLE.
3 REMOVE FINISH FLOORING MATERIALS AND BASE, STRIP TO CONCRETE
STRUCTURE, EXCEPT AT AREAS SPECIFICALLY NOTED TO REMAIN.
4 REMOVE FINISHED CEILING ASSEMBLY, INCLUDING SUSPENDED CEILING
TILES, GYP CEILING, SOFFITS, CEILING MTD ITEMS INCLUDING
FIXTURES, DIFFUSER REGISTERS, GAS COLUMNS, OR LIGHTS, AND
EMERGENCY LIGHTS. REFER TO OWNER FOR ITEMS TO BE SALVAGED.
5 SALVAGE CEILING TILES, GRID AND DEVICES AS REQUIRED FOR
INSTALLATION OF MEP. SALVAGE AND REINSTALL TO RETURN TO
ORIGINAL CONDITION. WORK TO BE COMPLETED DURING OFF HOURS.
COORDINATE WITH VAMC REPRESENTATIVE.
6 REMOVE MED-GAS PLUMBING, FITTINGS, PLATES, AND FINISHES FROM
ROOM PRIOR TO THE START OF DEMOLITION.
7 REMOVE ALL INTERIOR FIT OUT AND FINISHES INCLUDING SHELVING,
CASEWORK, COUNTERS, SINKS, MARKER BOARDS, TILES, HANDRAILS,
SIGNAGE, CHARTING, ETC. REFER TO OWNER FOR ITEMS TO BE
SALVAGED.
8 REMOVE INTERIOR PERIMETER WALL FINISH, INCLUDING GYPSUM,
PLASTER, OR OTHER WALLBOARD, AND STRIP TO EXISTING
STUDS/MASONRY TO ALLOW FOR NEW CHANNEL-FURRED GYPSUM
BOARD PARTITION TYPE. SEE ARCHITECTURAL PLANS FOR MODIFIED
WALLTYPE.
9 WALLS TO BE PATCHED AND REPAIRED ON ALL SIDES TO RECEIVE NEW
PAINT. CREATE SMOOTH FINISH PER SPEC.
10 REMOVE PLUMBING FIXTURES. ALL CONNECTIONS TO EXISTING PIPES
AND VENTS TO BE REDIRECTED AS REQUIRED. CUT AND CAP AS
REQUIRED.
11 REMOVE EXTERIOR WALL ASSEMBLY FROM FLOOR TO FLOOR TO
EXTENTS SHOWN. REFER TO ARCHITECTURAL DETAILS.
12 CUT SLAB ABOVE OR BELOW TO ALLOW FOR NEW OR RELOCATED
PIPING AND NEW DUCTWORK. VERIFY QUANTITY, SIZE, AND LOCATION
OF PENETRATIONS TO LAND BETWEEN RIBS UNLESS NOTED
OTHERWISE. COORDINATE WORK WITH OWNER. CORES/PENETRATIONS
NEEDED FOR DRAINS, VENTS ETC. REFER TO MEP DRAWINGS FOR
MORE INFO.
13 REMOVE (1) BAY OF EXISTING LOADING DOCK.
14 REMOVE WINDOW UNIT AND STORE AT OWNER'S DISCRETION.
17 REMOVE WINDOW UNIT AND SWAP WITH INFILL WITH MATCHING UNIT
FROM ELSEWHERE WITHIN SCOPE OF WORK.
19 OPEN WALL AND CEILING AS REQUIRED FOR NEW MEP CONNECTIONS.
SEAL WALL AND CEILING TO CREATE SMOOTH SURFACE, ALIGN WITH
EXISTING.
20 PROTECT ALL OCCUPIED AREAS, FURNITURE, ETC. COORDINATE W/ VA
REP.
22 REMOVE PORTION OF COVERED RAMP, INCLUDING ALL CONCRETE,
HANDRAILS, STOREFRONT, ROOFING DEVICES, AND MEPFP
COMPONENTS.
23 DEMOLISH STAIRS, HANDRAILS AND ASSOCIATED EQUIPMENT, TYP.
24 REMOVE WINDOW UNIT AND CUT SILL TO FLOOR FOR ADDITION OF NEW
DOOR.
25 REMOVE COLUMN COVERS AND ALL INTERNAL ELECTRICAL, TEL/DATA,
PLUMBING AND MED/GAS PIPING. G.C. TO FIELD VERIFY CHASE
LOCATIONS.
26 GRIND CONCRETE RAMP FOR NEW FLUSH LANDING AT PROPOSED
DOOR. REFER TO ARCH. PLANS.
27 RELOCATE SITE FURNISHINGS AT VAMC DISCRETION.
28 REMOVE PORTIONS OF AREAWAY RETAINING WALLS AS REQUIRED FOR
CONSTRUCTION OF NEW FOOTINGS; REBUILD AND REPLACE AS
REQUIRED BY FOOTING WORK.
29 REMOVE STEAM RADIATOR BELOW WINDOW; REFER TO ASBESTOS AND
HAZMAT TESTING REPORT FOR NOTES.
N
Number: Revisions: Date:
ICU BUILDING
2 2
DIALYSIS UNIT
TOILET
222A
PATIENTS
LOCKER RM
NURSES
STATION
DIALYSIS
PREPARATION RM-2
JANITOR
CORRIDOR
C2-DC-1
CONFERENCE RM
RENAL PHY OFFICE
OFFICE
CORRIDOR
C2-DC-1A
ROOF OF
AMBULANCE
ENTRANCE TO
REMAIN
EXISTING STAIR
TO REMAIN
RELOCATE EXISTING
CROSS-CORRIDOR DOOR
PORTION OF
ROOF TO BE
REMOVED
CREATE OPENING
FOR NEW BUILDING
CONNECTION
CREATE OPENING
FOR NEW STAIR DOOR
REMOVE FINISHES AT
EXTERIOR FACE OF EXISTING
STAIR AT SECOND-FLOOR
AREA OF WORK ONLY
PHASE HATCHED
COORIDOR TO
MAINTAIN
PEDESTRIAN ACCESS
TO ICU BUILDING
DEMOLISH CANOPY BELOW
NEW
OPENING
7' - 0"
3 4
3 4
NEW
OPENING
9' - 10"
TYP.
3 4
SALVAGE
MARBLE TOILET
PARTITION WALL
PANELS
PENETRATE EXISTING
CONCRETE PERIMETER BEAM
FOR MEPFP CONNECTIONS
SEE STRUCT. FOR
CUT BEAM
CONDITION AT
CONCRETE
PERIMETER BEAM
ABV. CLG.
SEE STRUCT. FOR CUT
BEAM CONDITION AT
CONCRETE PERIMETER
BEAM ABV. CLG.
3 4 7
3 4
3 4
3 4
3 4 7
NEW
OPENING
8' - 1 1/2"
1"
V .I.F
20' - 1 1/4" (+/_) V.I.F
WATER TREATMENT
STORAGE
NOT IN DEMOLITION SCOPE
EXISTING TO BE DEMOLISHED
EXISTING WALLS TO REMAIN
DEMOLITION GENERAL NOTES
1. PHASING OF AMBULANCE AND LOADING DOCK PARTIAL DEMOLITION TO
BE DISCUSSED WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR TO
ASSUME OFF-HOURS WORK WILL BE REQUIRED.
2. CONTRACTOR TO MAINTAIN ALL VA HOSPITAL STANDARDS OF
CLEANLINESS DURING ALL PHASES OF CONSTRUCTION. FOLLOW ALL
SPECIFICATION STANDARDS SET FORTH BY VA INFECTION CONTROL.
3. ALL EXISTING PIPING TO REMAIN ON SECOND FLOOR AREA OF WORK TO
BE REINSULATED POST-ASBESTOS AND HAZMAT ABATEMENT.
4. DOORS AND WINDOWS WITHOUT TAGS ARE TO BE CONSIDERED EXISTING
TO REMAIN.
5. PROTECT EXISTING WIRING AND DEVICES IN ADJACENT SPACES; REVIEW
AND STORE DEVICES IN AREA OF WORK WITH VAMC REPRESENTATIVE.
6. IDENTIFY ANY FURTHER DEMOLITION WITH VAMC REPRESENTATIVE
PRIOR TO COMMENCEMENT OF WORK. G.C. TO SCHEDULE DEMOLITION
WALK-THROUGH WITH OWNER'S PROJECT REPRESENTATIVE PRIOR TO
THE START OF DEMOLITION.
7. REFER TO HAZARDOUS MATERIALS REPORT FOR HAZARDOUS
DEMOLITION SCOPE.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :4
P
M
AD.101
SECOND FLOOR DEMOLITION PLAN
06/15/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 3/16" = 1'-0"
1 SECOND FLOOR - DEMOLITION PLAN
DEMOLITION NOTES
1 REMOVE ASSEMBLY AND ALL ASSOCIATED WALL MOUNTED DEVICES,
SHOWN DASHED, TYP.
2 REMOVE DOOR, FRAME, HARDWARE, AND TRANSOMS WHERE
APPLICABLE.
3 REMOVE FINISH FLOORING MATERIALS AND BASE, STRIP TO CONCRETE
STRUCTURE, EXCEPT AT AREAS SPECIFICALLY NOTED TO REMAIN.
4 REMOVE FINISHED CEILING ASSEMBLY, INCLUDING SUSPENDED CEILING
TILES, GYP CEILING, SOFFITS, CEILING MTD ITEMS INCLUDING FIXTURES,
DIFFUSER REGISTERS, GAS COLUMNS, OR LIGHTS, AND EMERGENCY
LIGHTS. REFER TO OWNER FOR ITEMS TO BE SALVAGED.
5 SALVAGE CEILING TILES, GRID AND DEVICES AS REQUIRED FOR
INSTALLATION OF MEP. SALVAGE AND REINSTALL TO RETURN TO
ORIGINAL CONDITION. WORK TO BE COMPLETED DURING OFF HOURS.
COORDINATE WITH VAMC REPRESENTATIVE.
6 REMOVE MED-GAS PLUMBING, FITTINGS, PLATES, AND FINISHES FROM
ROOM PRIOR TO THE START OF DEMOLITION.
7 REMOVE ALL INTERIOR FIT OUT AND FINISHES INCLUDING SHELVING,
CASEWORK, COUNTERS, SINKS, MARKER BOARDS, TILES, HANDRAILS,
SIGNAGE, CHARTING, ETC. REFER TO OWNER FOR ITEMS TO BE
SALVAGED.
8 REMOVE INTERIOR PERIMETER WALL FINISH, INCLUDING GYPSUM,
PLASTER, OR OTHER WALLBOARD, AND STRIP TO EXISTING
STUDS/MASONRY TO ALLOW FOR NEW CHANNEL-FURRED GYPSUM
BOARD PARTITION TYPE. SEE ARCHITECTURAL PLANS FOR MODIFIED
WALLTYPE.
9 WALLS TO BE PATCHED AND REPAIRED ON ALL SIDES TO RECEIVE NEW
PAINT. CREATE SMOOTH FINISH PER SPEC.
10 REMOVE PLUMBING FIXTURES. ALL CONNECTIONS TO EXISTING PIPES
AND VENTS TO BE REDIRECTED AS REQUIRED. CUT AND CAP AS
REQUIRED.
11 REMOVE EXTERIOR WALL ASSEMBLY FROM FLOOR TO FLOOR TO
EXTENTS SHOWN. REFER TO ARCHITECTURAL DETAILS.
12 CUT SLAB ABOVE OR BELOW TO ALLOW FOR NEW OR RELOCATED PIPING
AND NEW DUCTWORK. VERIFY QUANTITY, SIZE, AND LOCATION OF
PENETRATIONS TO LAND BETWEEN RIBS UNLESS NOTED OTHERWISE.
COORDINATE WORK WITH OWNER. CORES/PENETRATIONS NEEDED FOR
DRAINS, VENTS ETC. REFER TO MEP DRAWINGS FOR MORE INFO.
13 REMOVE (1) BAY OF EXISTING LOADING DOCK.
14 REMOVE WINDOW UNIT AND STORE AT OWNER'S DISCRETION.
17 REMOVE WINDOW UNIT AND SWAP WITH INFILL WITH MATCHING UNIT
FROM ELSEWHERE WITHIN SCOPE OF WORK.
19 OPEN WALL AND CEILING AS REQUIRED FOR NEW MEP CONNECTIONS.
SEAL WALL AND CEILING TO CREATE SMOOTH SURFACE, ALIGN WITH
EXISTING.
20 PROTECT ALL OCCUPIED AREAS, FURNITURE, ETC. COORDINATE W/ VA
REP.
22 REMOVE PORTION OF COVERED RAMP, INCLUDING ALL CONCRETE,
HANDRAILS, STOREFRONT, ROOFING DEVICES, AND MEPFP
COMPONENTS.
23 DEMOLISH STAIRS, HANDRAILS AND ASSOCIATED EQUIPMENT, TYP.
24 REMOVE WINDOW UNIT AND CUT SILL TO FLOOR FOR ADDITION OF NEW
DOOR.
25 REMOVE COLUMN COVERS AND ALL INTERNAL ELECTRICAL, TEL/DATA,
PLUMBING AND MED/GAS PIPING. G.C. TO FIELD VERIFY CHASE
LOCATIONS.
26 GRIND CONCRETE RAMP FOR NEW FLUSH LANDING AT PROPOSED DOOR.
REFER TO ARCH. PLANS.
27 RELOCATE SITE FURNISHINGS AT VAMC DISCRETION.
28 REMOVE PORTIONS OF AREAWAY RETAINING WALLS AS REQUIRED FOR
CONSTRUCTION OF NEW FOOTINGS; REBUILD AND REPLACE AS
REQUIRED BY FOOTING WORK.
29 REMOVE STEAM RADIATOR BELOW WINDOW; REFER TO ASBESTOS AND
HAZMAT TESTING REPORT FOR NOTES.
ICU BUILDING
DISUSED DIALYSIS UNIT
TOILET
222A
PATIENTS LOCKER RM
NURSES STATION
DIALYSIS PREPARATION RM-2
JANITOR
CORRIDOR
C2-DC-1
CONFERENCE RM
RENAL PHY OFFICE
OFFICE
CORRIDOR
C2-DC-1A
ROOF OF AMBULANCE ENTRANCE TO
REMAIN
EXISTING STAIR
TO REMAIN
PORTION OF ROOF TO BE REMOVED
SCOPE OF WORK TO
BE ABATED
ASBESTOS CONTAINING
LINOLEUM AND BACKING
PER ECM REPORT
ASBESTOS CONTAINING
LINOLEUM AND BACKING
UNDER EXISTING FLOOR
TILE PER ECM REPORT
ASBESTOS CONTAINING
LINOLEUM AND BACKING
UNDER EXISTING FLOOR
TILE PER ECM REPORT
ASBESTOS CONTAINING
TRANSITE PANELS FOUND
BEHIND HEATING UNITS
THROUGHOUT AREA OF
SCOPE PER ECM REPORT
ASBESTOS CONTAINING
9X9 TILES PER ECM
REPORT
HAZARDOUS MATERIALS
AT EXISTING ROOF OF
LOADING DOCK; REFER
TO ECM REPORT FOR
SPECIFIC LOCATIONS
ASBESTOS CONTAINING PIPE INSULATION AND
PIPE FITTINGS IDENTIFIED BY ECM THROUGHOUT
PROJECT AREA. REFER TO PD1202 FOR EXTENT
OF PIPING DEMOLITION. ALL PIPE, PIPE FITTINGS
AND PIPE INSULATION REQUIRING DEMOLITION OR
AFFECTED BY WORK REQUIRING DEMOLITION
SHALL BE ASSUMED TO INCLUDE ASBESTOS
CONTAINING MATERIAL.
HAZARDOUS MATERIALS
FOUND WITHIN WINDOW
SEALANTS. REFER TO
OWNER'S SEPARATE
REPORT IN PROJECT
MANUAL
HAZARDOUS MATERIALS NOTES
1. ASBESTOS CONTAINING MATERIALS ARE KNOWN TO EXISTING IN THE AREAS
REQUIRING DEMOLITION. THE HAZARDOUS MATERIALS REPORT DOCUMENTING
THE TYPES AND LOCATIONS OF KNOWN ASBESTOS CONTAINING MATERIALS IS
INCLUDED IN THE PROJECT SPECIFICATIONS. THE CONTRACTOR IS
RESPONSIBLE FOR THE PROPER REMOVAL OF ALL ASBESTOS CONTAINING
MATERIALS FOUND WITHIN THE PROJECT AREA. THE CONTRACTOR IS
ADDITIONALLY RESPONSIBLE FOR REQUESTING APPROPRIATE TESTING FOR ANY
MATERIALS FOUND WITHIN THE PROJECT AREA THAT ARE SUSPECTED TO BE
ASBESTOS CONTAINING MATERIAL AND WHICH ARE NOT IDENTIFIED IN THE
HAZARDOUS MATERIALS REPORT. SUSPECT MATERIALS SHALL NOT BE
DISTURBED UNTIL THE RESULTS OF TESTING ARE AVAILABLE.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :4
P
M
AD.102
HAZARDOUS MATERIALS SCOPING PLAN
06/15/18 KS AD,SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 3/16" = 1'-0"
1 SECOND FLOOR - HAZARDOUS MATERIALS SCOPE OF WORK PLAN
G
H
4.5
F5
13' - 2" 12' - 2" 13' - 6 1/4" 8' - 5 3/4" 13' - 6 1/4" 8' - 5 3/4" 18' - 0"
8'
/2
/2
/2
8'
/4
/4
8'
/4
5'
/4
BUILDING 14
PTSD CLINIC
PHARMACY
ICU (ABOVE)
(N) UPLIGHTING AT
EXISTING TREE
EXISTING PATIO
AREA TO REMAIN
DECORATIVE
BOLLARDS (TYP.) SEE
LANDSCAPE DRAWINGS
CONCRETE-EDGED
PLANTING BERM
EXIST. LOADING
DOCK
REINSTALL DOCK LIFT
CONCRETE PLANTING BERM
NEW STOREFRONT
DOOR INFILL
EXISTING RAMP
STOREFRONT
TO REMAIN
F E6
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
SCOPE OF WORK
SCOPE OF WORK
S C O P E O F W
O R K
EXIST. MAIL OUT
EXIST. PHARM.
RECEIVING AREA
EXIST. MAIL
SUPPLIES
EXIST. CLEAN
STORAGE
121A
EXIST. RESEARCH
DRUG STORAGE
(EXISTING)
6' - 0" 6' - 0"
4'
5'
EXISTING FIRE
PUMP BLDG. 27
BUILDING PERIMETER
ABOVE
NEW SLOPED SIDEWALKS -
SEE LANDSCAPE
DRAWINGS
89' - 3 3/8" +/-
RECONSTRUCT
PORTIONS OF RETAINING
WALL DISTURBED BY
WORK
ALIGN
NEW CONCRETE
EGRESS STAIRS
EXISTING PATIO
AREA TO REMAIN
ASPHALT
LOADING ZONE
I E D
X
Y
AA
AE.402
PHARMACY
MANAGER
FILLING AND
ASSEMBLY
NEW STEAM RISER
SEE ENLARGED
PLAN
EXIST. SOUTH
STAIR
90.00°
RECONSTRUCT PORTIONS
OF RETAINING WALL
DISTURBED BY WORK;
SEE STRUCTURAL
DETAILS
X.5
AE.804
SEE LANDSCAPE
DRAWINGS FOR
PAVING AND SURFACE
MATERIAL DIMENSIONS
CONCRETE ENCASED 'V' -
SHAPE COLUMNS; SEE
STRUCTURAL
NEW SIDEWALKS - SEE
LANDSCAPE
DRAWINGS
REINSTALL PLATFORM LIFT AT 90
DEGREES TO EXISTING POSITION
EXISTING METAL
STEPS TO REMAIN
SEE LANDSCAPE
DRAWINGS FOR
PAVING AND SURFACE
MATERIAL DIMENSIONS
7' - 0"
NEW LANDING IN EXISTING
RAMP FOR DOOR
ALIGN
NEW GUARD RAIL - SEE
LANDSCAPE DRAWINGS
NEW SIDEWALKS - SEE
LANDSCAPE DRAWINGS
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :4
P
M
AE.200
FIRST FLOOR PLAN
11/09/18 KS AML,EC,SB,DR
CONFORMED CONSTRUCTION
DOCUMENTS
N
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR - FLOOR PLAN
H
4.5
3' - 7 1/4" 13' - 2" 12' - 2" 13' - 6 1/4" 8' - 5 3/4" 13' - 6 1/4" 8' - 5 3/4" 18' - 0" 3' - 9 3/4"
9'
/4
/2
/2
/2
8'
/4
/4
8'
/4
5'
/4
2'
TEAM SPACE
TREATMENT #7
214I
BARI. TREATMENT
#2
214H
BARI. TREATMENT
#1
214G
TREATMENT #1
214A
TREATMENT #2
214B
TREATMENT #3
214C
TREATMENT #4
214D
TREATMENT #5
214E
TREATMENT #6
214F
TREATMENT #8
214J
TREATMENT #9
214K
TREATMENT #10
214L
TREATMENT #11
214M
ISO TREATMENT #1
PRIVATE
TREATMENT #1
EXIST.
SOUTH STAIR
EXIST.
EAST STAIR
EXIST.
NORTH STAIR
OFFICE, MD
OFFICE, DIRECTOR
MD.
OFFICE, PD
TRAINING
OFFICE, SOCIAL
WORKER
CORRIDOR A
C200A
CLEAN
UTILITY/SUPPLY
EXAM ROOM
STAFF CORRIDOR
C200D
STAFF LOCKER
EMERG. ELECT.
TREATMENT ROOM
CORRIDOR
SOILED UTILITY
CORRIDOR C
C200C
WATER TREATMENT
STORAGE
F5
HT/WT
STERILE SUPPLY
EQUIPMENT
STORAGE
STAFF TLT
STAFF TLT
PATIENT LOCKERS
OFFICE, DIETITIAN
CONFERENCE
STAFF LOUNGE
F E6
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
MATCHLINE MATCHLINE
ELECT.
EQUIPMENT
PROCESSING,
CLEAN PREP/STORE
EXIST. VESTIBULE
CORRIDOR B
C200B-2
OFFICE, FELLOW /
RN PD
NOURISHMENT
OFFICE, NURSE
MGR.
EQUIPMENT
PROCESSING,
SOILED
DIALYSATE PREP
WATER TREATMENT
EQUIPMENT REPAIR
MEDICATION
53 SF
EXIST. IT
SECUR. ROOM
229A
29 SF
EXIST. LINEN CHUTE
ALCOVE
CHASE
2C2C
I E D
X
Y
PATIENT TOILET
9'
/4
AA
WAITING
5.
90.00°
X.5
AE.401A
AE.401B
X.5
PLAN NOTES
1. DOORS ARE PLACED 6" FROM NEAREST PERPENDICULAR
PARTITION, U.O.N.
2. INTERIOR PARTITIONS TO BE ACOUSTIC TYPE 'B' U.O.N.
3. DOORS AND WINDOWS WITHOUT LABELS ARE TO BE
CONSIDERED EXISTING TO REMAIN.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :5
P
M
AE.201
SECOND FLOOR PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
1 SECOND FLOOR - FLOOR PLAN
H
4.5
PREFAB.
SKYLIGHTS
(30 S.F.
AREA)
F5
5" C
LR
APPROX MECH. UNIT
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
AE.402
PENTHOUSE
VESTIBULE
MECHANICAL
PENTHOUSE
ELECT. ROOM
1/ 4"
1'
-0
1/ 4"
1'
-0
APPROX MECH. UNIT
ON DUNNAGE
NON-SLIP WALKING
SURFACE
TYP.
3' - 0"
I E D
X
Y
AA
6' - 0"
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PRIMARY CARE
OFFICE
VEST
ELECTRICAL
CLOSET
JAN. CLOSET
STORAGE
SOCIAL WORKER
OFFICE
PSYCH OFFICE
CHARTING
STAFF LOUNGE
GROUP ROOM
OTP DIRECTOR
OFFICE
AE.402
1/ 4" / 1
'-0
1/4" / 1'-0"
1/4" / 1'-0"
X.5
3'
- 0
" T
YP
3'
- 0
CHILLER
EQUIPMENT ON
DUNNAGE
1/ 4"
1'
-0
1/ 4"
1' -0
1/4" / 1'-0"
RD RD RD
RD
RD
UP
AE.805
TIE OFF ANCHOR
TIE OFF ANCHOR
TIE OFF ANCHOR
6'
6'
AE.804
AE.804
2'
/2
AE.804
AE.804
9"
6" ROOF SCUPPER OPENING,
TYP.
AE.805
AE.805
PLAN NOTES
1. DOORS ARE PLACED 6" FROM NEAREST PERPENDICULAR
PARTITION, U.O.N.
2. INTERIOR PARTITIONS TO BE ACOUSTIC TYPE 'B' U.O.N.
3. DOORS AND WINDOWS WITHOUT LABELS ARE TO BE
CONSIDERED EXISTING TO REMAIN.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :5
P
M
AE.202
PENTHOUSE PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
1 PENTHOUSE PLAN
H
4.5
BLDG.
C WING
NEW ROOF
BELOW
PENTHOUSE
ROOF BELOW
ICU
BUILDING
BLDG.
FIRE PUMP
LOADING DOCK
A WING
APPROX.
MECH.
EQUIP.
F5
BLDG. 14
SKY-
LIGHT
SKY-
LIGHT
W
Z
F E6
D1
E1
E2
E3
E4
EA
EB
EC
ED
EE
CC
APPROX.
MECH.
EQUIP.
I E D
X
Y
E-1.3
E-1.5
E-F
E-E
E-1 E-1.6
AA
X.5
ROOF HATCH
CHILLER
CHILLER
1/ 4"
/ 1
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :0
P
M
AE.203
ROOF PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
1 ROOF PLAN - FLOOR PLAN
FIRST FLOOR
90' - 5 1/4"
SECOND FLOOR
102' - 4 1/4"
EXISTING LEVEL 3
114' - 3 1/4"
STAIR EXIT LANDING
86' - 5 13/32"
PENTHOUSE LEVEL
115' - 8 1/4"
INSULATED METAL PANEL
COLOR: LIGHT GRAY
STOREFRONT RIBBON
WINDOW
LINEAR REVEAL PANEL
ACCENT BAND (TYP)
CONCRETE-ENCASED
COLUMNS (BEYOND)
EXISTING CAST STONE
WATER TABLE BAND
RECESSED WINDOW WALL
ALIGN
FACE OF EXISTING
BUILDING
ROOF T.O.STL
115' - 2"
IMP PANEL
DARK GRAY
EXISTING CAST
STONE STRING
COURSE
PANEL JOINTS, TYP.
3 1/2"
EXPANSION JOINT
AE.800
AE.801
/2
8'
IG-1
6" OVERFLOW SCUPPER;
ALIGN WITH PANEL JOINT
6" OVERFLOW
SCUPPER
FIRST FLOOR
90' - 5 1/4"
SECOND FLOOR
102' - 4 1/4"
STAIR EXIT LANDING
86' - 5 13/32"
LOADING ROOF (LOW)
100' - 11 1/4"
PENTHOUSE LEVEL
115' - 8 1/4"
PENTHOUSE ROOF
127' - 9 1/4"
LINEAR INSULATED METAL PANEL
COLOR: LIGHT GRAY. TYP.
STOREFRONT RIBBON WINDOW
RECESSED WINDOW WALL
MECHANICAL
UNIT
BOLLARDS (TYP)
INSULATED METAL PANEL AT
PENTHOUSE
COLOR: LIGHT GRAY
APPROX. EXTERIOR MECHANICAL EQUIPMENT
LOADING
DOCK
AE.800 AE.803
PANEL JOINTS, TYP.
AE.800
AE.300
IG-1
AE.805
AE.805
REMOVE AND REINSTALL
BRICK FOR EXPANSION
JOINT COVER
INSULATED METAL PANEL AT
PENTHOUSE
COLOR: LIGHT GRAY
NEW EXTERIOR DOOR
SEE ARCH PLANS
ANGLED
AE.801
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :1
P
M
AE.300
EXTERIOR ELEVATIONS
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
2 WEST ELEVATION
SCALE: 1/4" = 1'-0"
3 WEST ELEVATION - PENT HOUSE
FIRST FLOOR
90' - 5 1/4"
SECOND FLOOR
102' - 4 1/4"
EXISTING LEVEL 3
114' - 3 1/4"
FOURTH FLOOR
126' - 2 1/4"
LOADING ROOF (LOW)
100' - 11 1/4"
PENTHOUSE LEVEL
115' - 8 1/4"
PENTHOUSE ROOF
127' - 9 1/4"
INSULATED METAL PANEL
COLOR: LIGHT GRAY, IMP. TYP.
LINEAR INSULATED METAL PANELING
OVER MECHANICAL PENTHOUSE
ENCLOSURE
STOREFRONT RIBBON
WINDOW W/CLEAR GLASS.
TYP.
APPROX. EXTERIOR
MECH. EQUIPMENT
1'
9'
/2
/2
1'
1"
1'
2'
AE.800
ROOF T.O.STL
115' - 2"
FRAMED BAY WINDOW
CLEAR INSULATED
GLAZING
SPANDREL GLASS
LARGE IMP PANEL
DARK GRAY
AE.801
5'
/2
7'
5'
3 1/2"
EXPANSION JOINT
SLOPED RECESSED WINDOW
41' - 8 5/8"
NEW DOOR WITH 2X6 LOUVER
VERTICAL PANELS.IMP
8'
AE.804
AE.804
IG-1IG-2
6" ROOF SCUPPER; ALIGN
WITH PANEL JOINT
6" ROOF SCUPPER; ALIGN
WITH PANEL JOINT
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :1
P
M
AE.301
EXTERIOR ELEVATIONS
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 NORTH ELEVATION
SECOND FLOOR
102' - 4 1/4"
SCULPTED SKYLIGHT FEATURE
PENTHOUSE LEVEL
115' - 8 1/4"
INSULATED SOFFIT
ENCLOSURE R-30 MIN.
ALIGN
ALUM. RIBBON WINDOW
TREATMENT BAY, TYP.
PREFAB. TRANSLUCENT SKYLIGHT
EXTERIOR MECH. EQUIPMENT
ROOF T.O.STL
115' - 2"
3'
CONCRETE-CLAD
STRUCTURAL COLUMNS-
SEE STRUCT.
AE.800
FIRST FLOOR
90' - 5 1/4"
SECOND FLOOR
102' - 4 1/4"
TRUE GRADE AVG.
85' - 2 1/16"
AE.302
PENTHOUSE LEVEL
115' - 8 1/4"
PENTHOUSE ROOF
127' - 9 1/4"
F
LO
O R
-T O
-F
LO
O R
MECHANICAL
UNIT
INSULATED METAL PANEL AT
PENTHOUSE
EXISTING AMBULANCE
ENTRY TO REMAIN
ROOF T.O.STL
115' - 2"
V .I.
F
5'
/1
6"
1"
/4
1/ 4"
AE.910
AE.910
AE.805
AE.300
AE.800
8'
MECHANICAL SPACE
SKYLIGHT FEATURE
NEW GUARD RAILINGS
SEE LANDSCAPE
PLANS
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :2
P
M
AE.302
BUILDING SECTIONS
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 WEST - EAST SECTION
SCALE: 1/4" = 1'-0"
2 NORTH - SOUTH SECTION
PLAN NOTES
1. DOORS ARE PLACED 6" FROM NEAREST PERPENDICULAR
PARTITION, U.O.N.
2. INTERIOR PARTITIONS TO BE ACOUSTIC TYPE 'B' U.O.N.
3. DOORS AND WINDOWS WITHOUT LABELS ARE TO BE
CONSIDERED EXISTING TO REMAIN.
AE.300
AE.300
AE.302
G 1
AE.302
AE.502
H
4.5
F5
AE.3011
9'
/4
2'
6'
1"
1'
6'
6'
1'
7'
1'
/2
0" 14' - 0" 6 1/8" 9' - 4 1/2" 6 1/8" 7' - 3" 4 7/8" 9' - 3"
4 7/8" 3 1/8" CLEAR
6' - 0" 3 1/8" 4 7/8" 10' - 5 3/4"
6' - 0"
TEAM SPACE
NSTA1
TREATMENT #7
214I
RDC01
BARI.
TREATMENT #2
214H
XXYYC
BARI.
TREATMENT #1
214G
XXYYC
TREATMENT #1
214A
RDC01
TREATMENT #2
214B
RDC01
TREATMENT #3
214C
RDC01
TREATMENT #4
214D
RDC01
TREATMENT #5
214E
RDC01
TREATMENT #6
214F
RDC01
TREATMENT #8
214J
RDC01
TREATMENT #9
214K
RDC01
TREATMENT
#10 214L
RDC01
TREATMENT
#11
214M
RDC01
ISO
TREATMENT #1
RDC02
PRIVATE
TREATMENT #1
RDC01
HT/WT
TRGM1
CORRIDOR A
C200A
CLEAN
UTILITY/SUPPLY
UCCL1
EXAM ROOM
TRGM1
STAFF
CORRIDOR
C200D
EMERG. ELECT.
STERILE
SUPPLY
SRSE1
EQUIPMENT
STORAGE
SRSE1
E1
H2
H2 E1
B
E1 C1
C1
C1
B4
B
B4
E1
B
H2
E1
SEISMIC JOINT
OVERHEAD CURTAIN
TRACKS (TYP.)
CUSTOM MILLWORK
NURSE STATION (TYP.)
AE.504
AE.505
OFFICE,
DIRECTOR MD.
OFA09
1'
7/
8"
7'
7/ 8"
7/
8"
7/ 8"
7/
8" 6'
/2
7/
8"
8'
7/ 8"
C
LE
A R
6'
7/
8"
/8
9'
/4
8'
/2
/2
/2
8'
/4
AE.503
AE.501
28AE.507
30AE.508
4 AE.507
34AE.508
AE.508
AE.507
AE.502
AE.507
AE.507
AE.507
F E6
AE.510
E2 E3 E4
EA
EB EC
MEDICATION
MEDP1NOURISHMENT
MEDP1
ALCOVE,
CRASH CART
218A
RCA01
16 AE.507
TREATMENT
ROOM
CORRIDOR
C1
C1 B4 222224
F
H2
B
E1
B3
E1E1
B
B4 B4
C1
AE.401A
AE.401B
/2
/2
8'
/4
PATIENT
TOILET
TPG01
3' - 7 1/4" 13' - 2" 12' - 2" 13' - 6 1/4" 8' - 5 3/4" 13' - 6 1/4" 8' - 5 3/4" 18' - 0" 3' - 9 3/4"
I E D
X
Y
E1
E1
E1
E1
AE.505 3
AE.507
AE.507
ISO TLT #1
216A
TPG02
4 2
ANTE-ROOM
ISO
TREATMENT #1
RDC02
216A
B
X.5
AE.506
TREATMENT ROOM
CORRIDOR
CORRIDOR B
C200B-2
216B
E1
B3
AE.804
SIM.
7' - 0 3/4" 4 7/8" 7' - 1" 4 1/4" 3 1/8"
CLEAR
6' - 0" 4 7/8" 3' - 0" ± 1' - 2 1/8" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 2' - 3 3/4" 6' - 0" 8" 6' - 6" 3' - 11 3/4"
/8
4 7/8" 2 1/2"
10' - 7" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 10' - 3" 9' - 2 1/2"± 15' - 5 1/2"
± 7' - 1 1/8" 1' - 4" 7' - 0 1/2"
7'
" 4 7/
8"
8'
7/
8"
/8
7/
8"
3'
/2
/2
1"
E1
E1
E1
B
6"
EQ
EQ
3'
- 6
6"
3' - 6" 6" 3' - 6" 6" 3' - 6" 6"
3' - 6"
5'
- 2
AE.940
AE.941
TYP.
3' - 0" 6"
3'
- 0
1'
- 6
PATIENT
LOCKERS
LR001
B4
AE.502
C200D
E1
B
B4
B4
B4
1'
3'
2'
3'
6"
6" 5'
6"
6" 4'
C200A
D
B43' - 0" 6" 6" 3' - 0"
4 7/8" 7' - 0" 1' - 4" 7' - 0" 4 7/8"
B
B
1'
/2
7'
/2
1'
/2
7'
/2
1'
/2
4'
1'
/2
D
B
1' - 0"
17' - 11 1/4" 6' - 8 1/2"
2'
/4
3'
6'
/2
8'
8'
6'
/2
3' - 0 1/8"
3 3/4"
8"
4 1/4"
X.5
AE.941
AE.941
OPH.
AE.941
FEC
FEC
FEC
2' - 6"
7'
1/
2"
3'
6"
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :2
P
M
AE.401A
SECOND FLOOR ENLARGED FLOOR PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 SECOND FLOOR - ENLARGED FLOOR PLAN - AREA A
PLAN NOTES
1. DOORS ARE PLACED 6" FROM NEAREST PERPENDICULAR
PARTITION, U.O.N.
2. INTERIOR PARTITIONS TO BE ACOUSTIC TYPE 'B' U.O.N.
3. DOORS AND WINDOWS WITHOUT LABELS ARE TO BE
CONSIDERED EXISTING TO REMAIN.
G
H
4.5
F5
CORRIDOR A
C200A
CLEAN
UTILITY/SUPPLY
UCCL1
EXAM ROOM
TRGM1
STAFF
CORRIDOR
C200D
EMERG. ELECT.
STERILE
SUPPLY
SRSE1
EQUIPMENT
STORAGE
SRSE1
SEISMIC JOINT
STAFF LOCKER
LR001
SOILED UTILITY
USCL1
STAFF TLT
TNPG1
STAFF TLT
TNPG1
WATER
TREATMENT
STORAGE
OFFICE, PD
TRAINING
OFA07
OFFICE,
SOCIAL
WORKER
OFA07
OFFICE,
DIETITIAN
OFA07
OFFICE, MD
OFA07
OFFICE,
DIRECTOR MD.
OFA09
EXIST.
SOUTH STAIR
A-2-S
CORRIDOR C
C200C
CONFERENCE
CRA02
STAFF LOUNGE
SL001
1'
7/
8"
7'
7/ 8"
7/
8"
7/ 8"
7'
/8
3'
/8
7/ 8"
5'
7/ 8"
6'
/2
7/
8"
8'
7/ 8"
C
LE
A R
6'
7/
8"
/8
4 7/8"
8' - 2"
4 7/8"
7' - 10"
4 7/8"
± 9' - 4 1/16"
4 7/8"
8' - 1 3/4"
4 7/8"
12' - 7 5/8"
4 7/8"
± 11' - 11 1/2"
8' - 7 3/8"
6 1/8"
2' - 4 3/4"
10' - 0"
4 7/8"
± 19' - 5 5/8"
4 7/8"
CLEAR
6' - 0"
4 7/8"
± 13' - 7 5/8"
4 7/8"
8' - 8 1/4"
4 1/4"
6 1/8"
CLEAR
6' - 0"
6 1/8"
± 11' - 10 1/4"
0"
1/4
8"
1'
- 0
/4"
8'
- 9
/4"
1'
- 3
/2"
1'
- 1
1 1 /2"
CL
EA
R6'
- 0
1'
- 4
/2"
6 1 /4"
SEISMIC JOINT
2-HR DOOR
SEISMIC JOINT
B4
H3
H1
F
E1
E1
E1
E1
E1
E1
B4
E1
E1
B4
E1
E1 E1
B4
B
B4
AE.501
AE.501
AE.502 1
AE.507
H2
AE.508
AE.508
AE.508
AE.508
AE.508
AE.502
AE.502
AE.501
AE.501
AE.3011
F E6
AE.510
AE.510
AE.510
AE.510
AE.509
AE.509
AE.509
AE.509
AE.509
AE.508
AE.508
E1
E2
E3
E4
EA
EB
EC
ED
EE
ELECT.
EQUIPMENT
PROCESSING,
CLEAN
PREP/STORE
CSIA1
EQUIPMENT
REPAIR
CSIA1
DIALYSATE
PREP
MEDP1
WATER
TREATMENT
RDWT1
EQUIPMENT
PROCESSING,
SOILED
BMER1
OFFICE,
FELLOW / RN
PD
OFA07
AE.509
OFFICE, NURSE
MGR.
OFA09
AE.508
E1
B4
E1
E1
B4B
B
E1
F
B
B
E1
B
E1
H2
H1
E1
E1
B1
E1
B
E1
B
E1
E1 E1
E1
E1
E1
E1
AE.401A
/2
/2
8'
/4
/4
8'
/4
5'
/4
2'
PATIENT
TOILET
TPG01
EXIST. IT
SECUR. ROOM
229A
EXIST.
EAST STAIR
I E D
X
Y
E1
E1
E1
E1
E-E
C1
B
E1
B
E1
B
C200C B
E1
AA
AE.501 10
H1
WOMEN'S
PUBLIC
201B
TPG01
H1
AE.501
MEN'S PUBLIC
201A
TPG01
B4
B4 B4
AE.501
7' - 4" 4 7/8" 5' - 0" 4 7/8" 7' - 4" 1' - 3"
WAITING
WTG15
201B
201A A
X.5
C1
B4 B4
C1
A-2-S
AE.501
CORRIDOR C
C1AA
CORRIDOR B
C200B-2
C200C A
C200C C
A
A
AE.804
5' -7
/4
5'
-7
/4
4' -0
O .D
9' -5
/8
4'
-0
5' -3
/2
SIM.
6"
6'-10 7/8" 5'-0" 10'-5 3/8"
16' - 4 21/32"
9'
- 2
1'
- 9
5'
- 6
9/
4' - 0"
1' - 0"
4' - 0"
6"
3' - 0"
6"
3' - 0"
6"
3' - 0"
6"
3' - 0"
6"
6"
3'
- 0
EQ
EQ
6"
3' - 0"
EQ
EQ
3 3 /4"
2'
- 9
1/ 8"
2' - 4 1/2"
8' - 2 1/4"
3' - 11 9/32"
7' - 4 3/32"
1' - 9"
8' - 3"
9'
- 0
/4"
5'
- 0
5'
- 0
'-3
4'- 3"
3 3/4"
CLEAR
6' - 0"
6 1/8"
8' - 6"
6 1/8"
9' - 6"
4 7/8"
E1
E1
C1
H2
C1
B4
B4
6"
3'
- 6
" 8' - 8 1/2"
4 7/8"
4 1/4"
3'
- 6
6"
4'
- 1
0"
7' - 4 3/4"
5' - 0"
AE.941
3' - 0" 6"
3' - 0"
6"
3'
- 0
1'
- 6
PATIENT
LOCKERS
LR001
B4
AE.502
201D
E1
B
B4
B4
B4
3' - 6" 1' - 4"
1'
3'
2'
3'
3'
6"
6" 5'
6"
6" 4'
D
B43' - 0" 6" 6" 3' - 0"
4 7/8" 7' - 0" 1' - 4" 7' - 0" 4 7/8"
3' - 0 1/8"
3 3/4"
8"
4 1/4"
X.5
AE.804
AE.941
AE.941
OPH.
AE.941
ALIGN
AE.931
202A
FEC
FEC
FEC
FEC
B
3'
6"
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :3
P
M
AE.401B
SECOND FLOOR ENLARGED FLOOR PLAN
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 SECOND FLOOR - ENLARGED FLOOR PLAN - AREA B
D1
E4
5'
/4
V.I.F.
1' - 4 3/32"
B2
B2
H1
EXIST. STAIRHALL
A-3
EXPANSION
JOINT
PENTHOUSE
VESTIBULE
E D
16' - 8 1/2"
AE.804
NEW HANDRAILS
X.5
EXISTING OFFICE
14A
EXISTING PT CHIEF
OFFICE
2'
- 3
3'
- 7
/8"
PERIM
ETER BEAM
ABOVE (DASHED)
2' - 0"
AL
IG
N
NEW 2-HOUR
STEAM CHASE
ALL EXISTING
FINISHES TO
REMAIN
C1
E6
E3
E4
EC
ED
EE
CC
AE.801
E
Y
E-1.5E-F E-1.6
2'
- 3
AL
IG
N
NEW 2-HOUR
STEAM CHASE
PERIM
ETER BEAM
ABOVE (DASHED)
1' - 6"
FILLING AND
ASSEMBLY
PHARMACY
MANAGER
EXISTING EXTERIOR LIGHT
WELLS TO REMAIN, TYP.
RECONSTRUCT CONCRETE
RETAINING WALL. REFER TO
STRUCTURAL DRAWINGS
FOR DETAIL
NEW EXTERIOR CONCRETE
COLUMNS, TYP.
CUT EXISTING
COUNTER AT NEW
CHASE WALL
ALL EXISTING FINISHES
AND FIXTURES TO
REMAIN
AE.801
NEW PLUMBING
CHASE
C1
Z
E4
EE
CC
4' - 11" V.I.F.
AL
IG
N
STEAM
CHASE
OFFICE
FUR ADJACENT
WALL TO FLUSH
CHASE
NEW 2-HOUR
STEAM CHASE
MECHANICAL
PENTHOUSE
ALL EXISTING
FINISHES TO
REMAIN
C1
E1
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :3
P
M
AE.402
FIRST & PENTHOUSE PARTIAL ENLARGED
PLANS
11/09/18 KS SB/MM/AML
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 ENLARGED PLAN - STAIR AT PENTHOUSE
SCALE: 1/4" = 1'-0"
4 BASEMENT - PARTIAL FLOOR PLAN
SCALE: 1/4" = 1'-0"
2 ENLARGED PLAN - STEAM RISER AND PIPE CHASE LEVEL 1
SCALE: 1/2" = 1'-0"
5 ENLARGED PLAN - STEAM RISER LEVEL 3
FIRE ALARM
AUDIOVISUAL ALARMS
SANI WIPES HOLDER
4'
BUMPER RAIL
NOTE:
BUMPER RAIL TO TERMINATE 2" FROM
ADJACENT WALL MOUNTED ITEMS AS
INDICATED IN ELEVATIONS
6" M
IN
7'
MIRROR
WALL MOUNTED SINK
ACCESSIBLE SINK
2'
0" M
A X
3'
1' - 3" MIN.
LC
EXIT
WALL MOUNTED EXIT SIGN
EQ EQ
4"
CORNER GUARD
6'
0" 4"
7'
GAS SHUT-OFF VALVES BOX
4'
4'
O V
MEDICAL GASES
4'
THERMOSTAT
4'
FIRE ALARM
PULL STATION
4'
FIRE EXTINGUISHER CABINET
4'
CARD READER
4'
DATA OUTLET
1'
ELECTRICAL OUTLET
1'
LIGHT SWITCH
4'
TELEPHONE OUTLET
1'
WALL PHONE
3'
CHAIR RAIL
3'
4"
HAND RAIL
3'
/2
1/
2" M
A X
ACCESSIBLE COAT HOOKS
4'
COUNTER/BENCH
TELEPHONE OUTLET
DATA OUTLET
ELECTRICAL OUTLET
RACEWAY (@ TOP OF
BACKSPLASH, TYP.)
3'
3'
DESK/WORKSURFACE
RACEWAY (@ TOP OF
BACKSPLASH, TYP.)
TELEPHONE OUTLET
DATA OUTLET
ELECTRICAL OUTLET
2'
3'
4'
PERSONAL PROTECTION CABINET
3'
BULLETIN BOARD
(SEE ELEVATION FOR DIMENSION)
WATERLESS SANITIZER
4'
GLOVE BOX HOLDER
4'
CUP DISPENSER
4'
SHARPS CONTAINER
4'
BATHROOM SHELF
3'
TOILET PAPER DISPENSER
2'
SANITARY NAPKIN DISPOSAL
2'
MOP AND BROOM HOLDER
4'
ACCESS PANEL
2'
2'
"4'
VIEW BOX
4'
LEAD APRON RACK
4'
OTOSCOPE/ OPHTHALMOSCOPE/
SPECULA DISPENSER
GRAB BAR
ACCESSIBLE TOILET
TOILET PAPER
DISPENSER
PLUMBING
ACCESS PANEL
1'
3' - 6"
1' - 6" 1' - 8"
1' - 0"
ACCESSIBLE TOILET
HI/LOW NURSE
CALLS
GRAB BAR
3'
1'
2' - 10"
8" 2'
" 4'
1' - 0" 3' - 6" 4"
4"
SANITARY
NAPKIN
DISPOSAL
TPD
MIRROR MOUNTED BEHIND DOOR
MIRROR
2'
0" 3'
2' - 0"
EQ EQ
DIAPER CHANGING STATION
4'
M
A X
HAND DRYER
3'
PAPER TOWEL DISPENSER
4'
SOAP DISPENSER
4'
UNDER CASEWORK MOUNTING
4'
2'
0"
TYP.
1' - 3"
CASEWORK AS
SCHEDULED
EQUIPMENT AS
SCHEDULED
SINK AS SCHEDULED
1" T
Y P
6"
3'
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :3
P
M
AE.500
TYPICAL MOUNTING HEIGHTS
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 MOUNTING HEIGHT SCHEDULE
D
ACCENT WALL
OPEN TO
RECEPTION
COLUMNSCHEDULED BASE, TYP.
AE.941
SCHEDULED BASECOLUMN
EQEQ
AE.941
EP
OPEN TO
CORRIDOR
HEMODIALYSIS
MAIN ENTRANCE
2' - 0" 2' - 0"
EQ EQ
1' - 0"
SPEAKER STROBE
CLOCK
SCHEDULED BASE CHAIR RAIL
EP EP
SCHEDULED BASECHAIR RAIL
OPEN TO
CORRIDOR
WALL EXPANSION JOINT
EQEQ
RECESSED ALCOVE
RESIN
PANEL
(RP)2'
EP
1"
SPEAKER
STROBE
8"
SCHEDULED BASE
LS
OPEN TO
CORRIDOR
ACCENT WALLEXPANSION JOIN
SCHEDULED BASE
X.5
PUSH BUTTON
1' - 6"
5'
STEEL POST FOR POST
MOUNTED MONITOR
4'-1 1/4"
5'
COORDINATE MOUNTING
HEIGHTS IN FIELD FOR OUTLETS
EP TD
6'
1/ 2"
2'
/2
EQ EQ EQ
PRINTER
EQEQ
AE.940
AE.940
T/D
QUAD
PLAM CABINETS (PL-2)
PLAM COUNTERTOP (PL-2)
SCHEDULED BASE, TYP.
COLUMN COVER
EP EP
6' - 0"
D
AE.940
AE.940
T/DQUAD
4' - 6"
DRCB
T/DQUAD
SOLID SURFACE
COUNTERTOP (SS)
3' - 10" 2' - 11"
PLAM COUNTERTOP (PL-2)
ANGLED RECESSED EQ EQ
ACCENT
WALL
DOUBLE
LS
CLOCK
AE.940
EQ EQ
CHAIR
P
SCHEDULED
BASE, TYP.
4' - 0"
P
6' - 0"
5'
3'
0"
3'
PTDSD
SD
PTD
PRINTER
SUPPLY
CART
2' - 6"EQEQ2' - 6"
AE.94010
AE.940
AE.940
2' - 6"
AE.940
2'
0"QUADT/D
PLAM WALL
CABINET
PLAM BASE CABINET
SOLID SURFACES
COUNTERTOP
CLOCK
1' - 3"
LS
P
MIRROR
PTD
SD
GRAB BAR
CERAMIC
TILE (CT)
GLASS
TILE (GT)
2' - 6" 2' - 0"
1' - 6"
4'
GLASS TILE
(GT)
GRAB BAR
TPD SND NURSE
CALL
CERAMIC
TILE (CT)
GLASS TILE
(GT)
CERAMIC
TILE (CT)
STROBE
GFILS
6"
DRINKING FOUNTAIN
SCHEDULED BASE
CERAMIC
TILE (CT)
8"
4'
T Y
P
STROBE
LS
MIRROR
CERAMIC TILE (CT)
SP
GRAB BARS
1' - 6"
SEE TYPICAL
MOUNTING HEIGHTS
FOR ALL LAVATORY
FIXTURE HEIGHTS, TYP.
GLASS TILE (GT)
GRAB BAR
TPD NURSE
CALL
TOILET PAPER
DISPENSER
CERAMIC TILE
(CT)
1' - 10"
4'
CERAMIC TILE (CT)
4'
T Y
P
PTD
EP
2' - 0"
GLASS TILE (GT)
1' - 6"2' - 0"
PTD
4'
EP CERAMIC
TILE (CT)
10"
STROBE
4'
LS
GRAB BAR
TPDSNDNURSE
CALL
4'
1' - 10"
GRAB BAR
SD
MIRROR
CERAMIC
TILE (CT)
GLASS
TILE (GT)
1' - 6"
RECESSED
1' - 3"
CARD READER
CARD READER
SPEAKER STROBE
SCHEDULED BASE, TYP.
1' - 3"
BUMPER RAIL
2" TYP.
CORNER GUARD, TYP. DOOR HOLDER
AE.941
SEE AE.500 FOR
TYPICAL MOUNTING
HEIGHTS
PUSH BUTTON
10" 6"
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :4
P
M
AE.501
INTERIOR ELEVATIONS
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
201 - WAITING
SCALE: 1/4" = 1'-0"
201 - WAITING
SCALE: 1/4" = 1'-0"
201 - WAITING
SCALE: 1/4" = 1'-0"
201 - WAITING
SCALE: 1/4" = 1'-0"
201 - WAITING
SCALE: 1/4" = 1'-0"
201 - WAITING
SCALE: 1/4" = 1'-0"
205 - RECEPTION
SCALE: 1/4" = 1'-0"
205 - RECEPTION
SCALE: 1/4" = 1'-0"
205 - RECEPTION
SCALE: 1/4" = 1'-0"
205 - RECEPTION
SCALE: 1/4" = 1'-0"
207 - OFFICE, PD TRAINING
SCALE: 1/4" = 1'-0"
207 - OFFICE, PD TRAINING
SCALE: 1/4" = 1'-0"
207 - OFFICE, PD TRAINING
SCALE: 1/4" = 1'-0"
207 - OFFICE, PD TRAINING
SCALE: 1/4" = 1'-0"
211 - PATIENT TOILET
SCALE: 1/4" = 1'-0"
211 - PATIENT TOILET
SCALE: 1/4" = 1'-0"
211 - PATIENT TOILET
SCALE: 1/4" = 1'-0"
211 - PATIENT TOILET
SCALE: 1/4" = 1'-0"
201A - DRINKING FOUNTAIN
ALCOVE
SCALE: 1/4" = 1'-0"
201A - MEN'S PUBLIC
SCALE: 1/4" = 1'-0"
201A - MEN'S PUBLIC
SCALE: 1/4" = 1'-0"
201A - MEN'S PUBLIC
SCALE: 1/4" = 1'-0"
201A - MEN'S PUBLIC
SCALE: 1/4" = 1'-0"
201A - MEN'S PUBLIC
SCALE: 1/4" = 1'-0"
201A - MEN'S PUBLIC
SCALE: 1/4" = 1'-0"
201A - MEN'S PUBLIC
SCALE: 1/4" = 1'-0"
201A - MEN'S PUBLIC
SCALE: 1/4" = 1'-0"
C1AA - CORRIDOR - ENTRANCE
MAIN HEMODIALYSIS SUITE
NOTE:
PROVIDE BLOCKING FOR ALL WALL-
MOUNTED DEVICES AND EQUIPMENT
SPEAKER STROBE SPEAKER STROBE
HAND RAILSCHEDULED BASE, TYP.
AE.941
4"
LS
DOUBLE
LS
P
1' - 0"
EQ EQ
SEE AE.500 FOR
TYPICAL MOUNTING
HEIGHTS
DOOR HOLDER
4 3
CARD READER
FEC
OPEN TO
EQUIPMENT
PROCESSING,
CLEAN
PREP/STORE
OPEN TO
TREATMENT AREA
OPEN TO
TREATMENT
AREA
HAND RAIL
COLUMN
EP EP
EQ EQ
DOOR HOLDER ANGLED CORNER GUARD, TYP.
P
RECESSED ANGLED
4'
CORNER GUARD, TYP.
SCHEDULED BASE, TYP.
HSD
8" 1' - 6"
LS
P P P
RIGID VINYL WALL
PROTECTION, TYP.
SEE FINISH SCHEDULE
Y
2' - 0"4' - 6" EQEQ
RECESSEDANGLED
4'
CORNER GUARD, TYP.
AE.940
P P P T/DQUAD
X.5
EQEQ
SPEAKER
STROBE
P
1' - 2" 8" 1' - 6" 3' - 6" 2' - 0"
ANGLED
SD
PTD
LS
P P
X.5
G F E D
4'
2"
1'
4"
2'
COLUMN PANELIZED MEDICAL WALL
AE.803
LSTD
QUAD
EP LSTD
QUAD
EPLSTD
QUAD
EPLSTD
QUAD
EPLSTD
QUAD
EPLSTD
QUAD
EPLSTD
QUAD
EP
PLAM CABINETS
(PL-1)
1 3
PLAM CABINETS
(PL-1)
COLUMN
PANELIZED MEDICAL WALLSCHEDULED BASE, TYP.
OVERHEAD LIFT OFCI
LSTD
QUAD
EP LSTD
QUAD
EP
GFED
8'
PTD
SD
RECESSED
PTD
SD
PANELIZED MEDICAL WALL
PLAM UPPER CABINETS
(PL-1)
HANDWASH SINK
4"
AE.940
TD
LSTD
QUAD
EPLSTD
QUAD
EPLSTD
QUAD
EPLSTD
QUAD
EP
EPQUAD
SCHEDULED BASE, TYP.
3' - 0"3' - 0"3' - 6"
1' - 11"
PLAM UPPER CABINETS
(PL-1)
W-2 W-2
ACCENT WALLCOVERINGACCENT WALLCOVERING
1' - 0"
1' - 8" 1' - 4"
ANGLED
RECESSED WALL
SCHEDULED BASE, TYP.
CORNER GUARD, TYP.
ICU DOOR ICU DOOR
FEC
4"
EPEP
EQ EQ
SPEAKER STROBE
MIRROR
EQEQ
P
LS
8"
STROBE
SCHEDULED
BASE, TYP.
Project TitleDrawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CIVIL:
Pare Corporation 8 Blackstone Valley Place Lincoln, RI 02865
Phone: 401-334-4100 Facsimile: 401-334-4108
CONFORMED CONSTRUCTION DOCUMENTS
290 Congress St., 5th Floor Boston, MA 02210
Phone: 617-895-1000
VA Medical Center Providence, RI Expand Bldg. 1 to Replace Hemodialysis Phase 1
Providence, RI
650-342
Project Director
FULLY SPRINKLERED
STRUCTURAL:
Odeh Engineers 1223 Mineral Springs Ave.
Providence, RI 02904
Phone: 401-724-1771 Facsimile: 401-724-1981
MEP/FP:
BR+A Consulting Engineers, LLC 10 Guest St. 4th Floor Boston, MA 02135
Phone: 617-254-0016 Facsimile: 617-924-9339
COST:
DG Jones International, Inc.
3 Baldwin Green Common, Suite 202 Woburn, MA 01801
Phone: 781-982-3131 Facsimile: 781-932-3199
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
C R e v it P ro je c ts
\V A
P ro v id e n c e H e m o d ia ly s is
-R d ru s s o n ie llo .r v t
/1
/2
:5 :5
P
M
AE.502
INTERIOR ELEVATIONS
11/09/18 KS AML/EC/MM/SB
CONFORMED CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
C200A - CORRIDOR A
SCALE: 1/4" = 1'-0"
C200A - CORRIDOR A
SCALE: 1/4" = 1'-0"
C200A - CORRIDOR A
SCALE: 1/4" = 1'-0"
204 - EQUIP PROCESSING,
CLEAN PREP / STORE
SCALE: 1/4" = 1'-0"
204 - EQUIP PROCESSING,
CLEAN PREP / STORE
SCALE: 1/4" = 1'-0"
204 - EQUIP PROCESSING,
CLEAN PREP / STORE
SCALE: 1/4" = 1'-0"
204 - EQUIP PROCESSING,
CLEAN PREP / STORE
SCALE: 1/4" = 1'-0"
204 - EQUIP PROCESSING,
CLEAN PREP / STORE
SCALE: 1/4" = 1'-0"
213 - TREATMENT ROOM
CORRIDOR
SCALE: 1/4" = 1'-0"
213 - TREATMENT ROOM
CORRIDOR
SCALE: 1/4" = 1'-0"
213 - TREATMENT ROOM
CORRIDOR
SCALE: 1/4" = 1'-0"
213 - TREATMENT ROOM
CORRIDOR
SCALE: 1/4" = 1'-0"
206 - PATIENT LOCKERS
SCALE: 1/4" = 1'-0"
206 - PATIENT LOCKERS
SCALE: 1/4" = 1'-0"
206 - PATIENT LOCKERS
SCA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.