36E77619R0021 ATTACHMENT 2 SECTION 01 00 00 - GENERAL REQUIRMENTS.docx

View the file

Other files

File Type Posted
36E77619C0051-000.docx DOCX document
36E77619R0021-0006001.pdf PDF
36E77619R0021-0006000.docx DOCX document
36E77619R0021-0003001.doc DOC document
36E77619R0021-0003000.docx DOCX document
36E77619R0021-0002000.docx DOCX document
36E77619R0021-0002001.docx DOCX document
36E77619R0021-0001002.docx DOCX document
36E77619R0021-017.pdf PDF
36E77619R0021-019.pdf PDF
36E77619R0021-020.pdf PDF
36E77619R0021-016.pdf PDF
36E77619R0021-021.pdf PDF
36E77619R0021-007.doc DOC document
36E77619R0021-006.docx DOCX document
36E77619R0021-009.doc DOC document
36E77619R0021-013.pdf PDF
36E77619R0021-010.docx DOCX document
36E77619R0021-014.pdf PDF
36E77619R0021-003.doc DOC document
36E77619R0021-002.docx DOCX document
36E77619R0021-005.docx DOCX document
36E77619R0021-011.docx DOCX document
36E77619R0021-008.docx DOCX document
36E77619R0021-001.docx DOCX document
36E77619R0021-012.pdf PDF
36E77619R0021-015.docx DOCX document
36E77619R0021-018.pdf PDF
36E77619R0021-000.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11-01-15

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS1
1.2 GENERAL INTENTION1
1.3 STATEMENT OF BID ITEM(S)1
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR1
1.5 CONSTRUCTION SECURITY REQUIREMENTS2
1.6 OPERATIONS AND STORAGE AREAS6
1.7 ALTERATIONS11
1.8 DISPOSAL AND RETENTION12
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS13
1.10 RESTORATION13
1.11 PHYSICAL DATA14
1.12 PROFESSIONAL SURVEYING SERVICES14
1.13 LAYOUT OF WORK14
1.14 AS-BUILT DRAWINGS14
1.15 USE OF ROADWAYS14
1.16 RESIDENT ENGINEER'S FIELD OFFICE14
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT14
1.18 TEMPORARY USE OF EXISTING ELEVATORS16
1.19 TEMPORARY USE OF NEW ELEVATORS16
1.20 TEMPORARY TOILETS16
1.21 AVAILABILITY AND USE OF UTILITY SERVICES16
1.22 NEW TELEPHONE EQUIPMENT17
1.23 TESTS17
1.24 INSTRUCTIONS17
1.25 GOVERNMENTFURNISHED PROPERTY19
1.26 RELOCATED EQUIPMENT20
1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT20
1.28 CONSTRUCTION SIGN20
1.29 SAFETY SIGN20
1.30 PHOTOGRAPHIC DOCUMENTATION20
1.31 FINAL ELEVATION Digital Images20
1.32 HISTORIC PRESERVATION20
1.33 VA TRIRIGA CPMS20

11-01-15 i

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 safety requirements Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A.Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for project 636-CSI-500, Site Prep for RF Equipment at the Omaha, Lincoln and Grand Island VAMC, as required by drawings and specifications.
B.Visits to the site by Bidders may be made only by appointment with the Contracting Officer’s Representative (COR).
C.NOT USED
D.NOT USED
E.All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, Site Prep for RF Equipment, Omaha: Work includes general construction, alterations, architectural, mechanical, electrical, structural, plumbing, room finishes and casework, necessary removal of existing structures and construction and certain other items, as required.

B. ITEM 2, Site Prep for RF Equipment, Lincoln: Work includes general construction, alterations, architectural, mechanical, electrical, structural, plumbing, room finishes and casework, necessary removal of existing structures and construction and certain other items, as required.

C. ITEM 3, Site Prep for RF Equipment, Grand Island: Work includes general construction, alterations, architectural, mechanical, electrical, structural, plumbing, room finishes and casework, necessary removal of existing structures and construction and certain other items, as required.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A.Security Plan:
1.The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2.The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B.Security Procedures:
1.Badge Requirements: General Contractor’s employees shall not enter the project site without an appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
a. Flash Pass (Minimum ID Requirement for All Employees Performing Work): All employees of the contractor and subcontractor(s) must display a VA issued badge (Flash Pass), with photograph, at all times on Medical Center property. Flash Passes allow employees access to public areas of the medical center and the construction area only.
(1) Employees of the contractor and subcontractor(s) requiring a Flash Pass shall provide the COR with the personal information requested on the VA Police Fingerprint Request Form (http://www.nebraska.va.gov/Documents/NWIHCS_VA_Police_Service_Fingerprint_Request_Form.pdf) to complete the sponsorship process. After being sponsored by the COR, employees shall login to the PIV Appointment Scheduling Tool (http://va-piv.com) to schedule an appointment for issuance of a Flash Pass. Contractor employees shall not be allowed to work on Medical Center property until a Flash Pass has been issued.

b. Non-PIV Identity Card (Required for Employees Acting in a Supervisory Capacity and/or Requiring Access to a Secure Area or a VA Issued Key): Employees of the contractor and subcontractors acting in a supervisory capacity and maintaining a sustained presence on site shall be designated “responsible persons” and shall require a VA issued Non-PIV Identity Card, which shall be displayed at all times when on Medical Center property. If the job requires access to a secure area within the Medical Center, the contractor shall submit the name(s) of the responsible person(s) who shall be issued government key(s).

(1)Employee(s) of the contractor or subcontractor(s) designated as responsible person(s) shall have a local agency background check (“Special Agreement Check”) conducted by the NWIHCS Human Resources Department prior to being issued an NWIHCS Non-PIV Identity Card.
(2)Designated employee(s) requiring a VA issued Non-PIV Identity Card shall schedule an appointment with the COR to be sponsored and shall be required to provide the COR with personal identifying information requested on the VA Police Fingerprint Request Form (http://www.nebraska.va.gov/Documents/NWIHCS_VA_Police_Service_Fingerprint_Request_Form.pdf).
(3)After designated employees have been sponsored by the COR, separate appointments to be fingerprinted and to have a Non-PIV Identity Card issued must be scheduled. Employees shall login to the PIV Appointment Scheduling Tool (http://va-piv.com) to schedule both appointments. Employees must bring a completed NWIHCS Police Service Fingerprint Request form and two forms of acceptable ID to their fingerprint appointment.
(a)All documents shall be submitted to the COR and employees shall be fingerprinted by the NWIHCS Police Service not less than 30 calendar days prior to starting work at the NWIHCS Omaha campus. Employees shall not be allowed to work on NWIHCS property until the background check has been completed and a Non-PIV Identity Card has been issued.
(b)Designated employee(s) requiring a VA issued Non-PIV Identity card shall agree to have their fingerprints captured by the NWIHCS Police Service, have their fingerprints forwarded to and maintained on file by the VA Office of Personnel Management, have their name and fingerprints shared with local law enforcement agencies, and undergo a background investigation conducted by the VA Human Resources department.
(4)At least one responsible person designated by the contractor and approved by the COR or KO shall be present at all times when employees of the contractor or subcontractor(s) are working on NWIHCS property.
c.Flash Passes and Non-PIV Identity Cards shall be valid for the duration of the contract, not to exceed two years. The contractor shall be responsible for ensuring all employees requiring access beyond the valid period renew badges and identification cards before they expire. Badge/ID card renewal shall be scheduled with the VA NWIHCS Police Service through the COR not less than 15 calendar days prior to the ID card expiration. Failure to renew badges/ID cards before the end of their valid period may result in employees losing access to the Medical Center campus until a new badge/ID card application has been completed and approved and a new badge/ID card issued. Costs and liabilities associated with delays caused by failure of the contractor’s and subcontractor’(s) employees to maintain a current badge/ID card shall be born solely by the contractor.
d.All employee information provided to the VA to meet the requirements of this section is protected by the Privacy Act of 1974. The VA follows the requirements of the Privacy Act, which protects personal information that the VA maintains in “systems of records”. Information provided to the VA may not be disclosed unless permitted pursuant to 38 CFR 1.500 – 1.599. Records provided to and maintained by the VA may not be altered or destroyed, except as authorized by 38 CFR 1.579.
e.Keys and identification cards shall remain the property of the government, and shall be returned to the government at contract completion, when the employee’s presence is no longer required on Medical Center property, or when requested by the COR or KO. Contractor shall reimburse the government for the replacement cost of any keys or government issued identification cards lost or damaged as a result of negligence or malicious act by employees of the contractor or subcontractor(s).
2.For working outside the “regular hours” as defined in the contract, the General Contractor shall give one (1) week notice to the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3.No photography of VA premises is allowed without written permission of the Contracting Officer.
4.VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C.Guards: (NOT USED)
D.Key Control:
1.The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2.The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.
E.Document Control:
1.Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2.The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3.Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4.These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5.All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6.Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7.All electronic information shall be stored in a specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a.Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b.“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F.Motor Vehicle Restrictions: (NOT USED)

1.6 OPERATIONS AND STORAGE AREAS

A.The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B.Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C.The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D.Working space and space available for storing materials shall be as determined by the COR.
E.Workmen are subject to rules of Medical Center applicable to their conduct.
F.Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1.Do not store materials and equipment in other than assigned areas.
2.Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3.Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment may be permitted subject to fire and safety requirements.
G.Phasing:
The Medical Center must maintain its operation 24 hours a day, 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the Interim Life Safety Measure (ILSM) to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of the site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of the site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to COR and Contractor.
H.Building No. 1 will be occupied during performance of work; but immediate areas of alterations will be vacated.
1.Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes, whether access or egress, shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
I.Construction Fence: (NOT USED)
J.When a building and/or construction site is turned over to the Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1.Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2.Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for preinspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
K.Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1.No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
2.Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time, and approximate duration of such interruption.
3.Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause the least inconvenience to operations of Medical Center . Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4.Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5.In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6.Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L.Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M.To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1.Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
N.Coordinate the work for this contract with other construction operations as directed by COR.

1.7 ALTERATIONS

A.Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1.Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2.Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3.Shall note any discrepancies between drawings and existing conditions at site.
4.Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B.Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" and "CHANGES”.
C.Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1.Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D.Protection: Provide the following protective measures:
1.Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2.Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3.Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A.Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1.Reserved items which are to remain property of the Government are noted on drawings or in specifications. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.
2.Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3.Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4.PCB Transformers: (NOT USED)

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS: (NOT USED)

1.10 RESTORATION

A.Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B.Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C.At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D.Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" and "DIFFERING SITE CONDITIONS”.

1.11 PHYSICAL DATA: (NOT USED)

1.12 PROFESSIONAL SURVEYING SERVICES: (NOT USED)

1.13 LAYOUT OF WORK: (NOT USED)

1.14 AS-BUILT DRAWINGS

A.The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B.All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR’s review, as often as requested.
C.Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D.Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical Center property and, when authorized by the COR , such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.16 COR’S FIELD OFFICE: (NOT USED)

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A.Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1.Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.
2.Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3.Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.
4.Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freezeup damage.
5.The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6.All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.
B.Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C.This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.18 TEMPORARY USE OF EXISTING ELEVATORS

A.Use of existing elevator for handling building materials and Contractor's personnel will be permitted subject to following provisions:
1.Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Contractor may use elevator Nos. 5 in Building Nos. 1. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.
2.Contractor covers and provides maximum protection of following elevator components:
a.Entrance jambs, heads, soffits, and threshold plates.
b.Entrance columns, canopy, return panels, and inside surfaces of car enclosure walls.
c.Finish flooring.

1.19 TEMPORARY USE OF NEW ELEVATORS: (NOT USED)

1.20 TEMPORARY TOILETS: (NOT USED)

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

A.The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract.
B.NOT USED
C.NOT USED
D.Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:
1.Obtain heat by connecting to Medical Center heating distribution system.
E.Electricity (for Construction and Testing): Furnish all temporary electric services.
1.Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.
F.Water (for Construction and Testing): Furnish temporary water service.
1.Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor.
2.Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation, at COR’s discretion, of use of water from Medical Center's system.

1.22 NEW TELEPHONE EQUIPMENT: (NOT USED)

1.23 TESTS: (NOT USED)

1.24 INSTRUCTIONS

A.Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B.Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and subassembly components. Manuals shall include an index covering all component parts clearly crossreferenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to, but of a different model, style, and size than that furnished will not be accepted.
C.Instructions: Contractor shall provide qualified, factorytrained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.

1.25 GOVERNMENT-FURNISHED PROPERTY

A.The Government shall deliver to the Contractor, the Governmentfurnished property shown on the drawings.
B.Equipment furnished by Government to be installed by Contractor will be furnished to Contractor at the Medical Center.
C.Storage space for equipment will be provided by the Government and the Contractor shall be prepared to unload and store such equipment therein upon its receipt at the Medical Center.
D.Notify Contracting Officer in writing, 60 days in advance, of date on which Contractor will be prepared to receive equipment furnished by Government. Arrangements will then be made by the Government for delivery of equipment.
1.Immediately upon delivery of equipment, Contractor shall arrange for a joint inspection thereof with a representative of the Government. At such time the Contractor shall acknowledge receipt of equipment described, make notations, and immediately furnish the Government representative with a written statement as to its condition or shortages.
2.Contractor thereafter is responsible for such equipment until such time as acceptance of contract work is made by the Government.
E.Equipment furnished by the Government will be delivered in a partially assembled (knock down) condition in accordance with existing standard commercial practices, complete with all fittings, fastenings, and appliances necessary for connections to respective services installed under contract. All fittings and appliances (i.e., couplings, ells, tees, nipples, piping, conduits, cables, and the like) necessary to make the connection between the Government furnished equipment item and the utility stubup shall be furnished and installed by the contractor at no additional cost to the Government.
F.Completely assemble and install the Government furnished equipment in place ready for proper operation in accordance with specifications and drawings.
G.Furnish supervision of installation of equipment at construction site by qualified factory trained technicians regularly employed by the equipment manufacturer.

1.26 RELOCATED EQUIPMENT: (NOT USED)

1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT: (NOT USED)

1.28 CONSTRUCTION SIGN: (NOT USED)

1.29 SAFETY SIGN: (NOT USED)

1.30 PHOTOGRAPHIC DOCUMENTATION: (NOT USED)

1.31 FINAL ELEVATION Digital Images: (NOT USED)

1.32 HISTORIC PRESERVATION

Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.

1.33 VA TRIRIGA CPMS

1.33 project closeout – contractor submittals A. Phased Projects: Within 30 calendar days of the completion (beneficial occupancy by the Government) of each project phase, and prior to requesting final payment for that contract phase, the Contractor shall submit a single printed copy of all installation, equipment, material, system, warranty, testing, and certification documents as required by the various sections of these specifications.

1. Each phase submittal shall be organized into three major divisions

a. Manufacturer Data and O&M Manuals

b. Test and Certification Reports

c. Warranties Documents in each division shall be collated by specification section (Master Format 2004 (MF04)).

2. In addition, the contractor shall provide a comprehensive list, in table form, of all installed equipment and controls, that shall include the following information for each piece of installed equipment:

a. Equipment Category

b. Equipment Name

c. Equipment Manufacturer

d. Date of Manufacture

e. Date of Installation

f. Model Number

g. Serial Number

h. Location Installed (e.g., room number (or closest room number for equipment installed in corridors), floor mounted, wall mounted, ceiling mounted, above ceiling, etc.)

3. The phase submittal shall also include a comprehensive list of all sub-contractors involved in that phase of the project, a summary of the work each sub-contractor completed, and a contact name, phone number, e-mail, and street address for the contractor and each sub-contractor.

4. Each phase submittal shall be provided in an indexed (with index tab dividers) three-ring binder or binders. Binders shall be white, not less than 1” and not greater than 3” spine width, appropriately sized for the documents provided, and labeled with the VA Project Number and Name, Contract Number, Phase Number, and Date on the front cover and spine.

B. Electronic Submittal: Within 30 calendar days of project completion (beneficial occupancy by the Government of all contract phases) and prior to requesting final payment, the Contractor shall provide to the COR two (2) copies of a single, indexed (by specification section, Master Format 2004 (MF04)), searchable, electronic PDF document containing all installation, equipment, material, system, warranty, testing, and certification documents as required by the various sections of these specifications.

1. Electronic document shall be organized into three major divisions:

a. Manufacturer Data and O&M Manuals

b. Test and Certification Reports

c. Warranties Information in each division shall be collated and indexed by specification section (Master Format 2004 (MF04)).

2. The electronic submittal shall include a comprehensive list, in table form, of all installed equipment and controls, that shall include the following information for each piece of installed equipment:

a. Equipment Category

b. Equipment Name

c. Equipment Manufacturer

d. Date of Manufacture

e. Date of Installation

f. Model Number

g. Serial Number

h. Location Installed (e.g., room number (or closest room number for equipment installed in corridors), floor mounted, wall mounted, ceiling mounted, above ceiling, etc.)

3. Electronic submittal shall include PDF floor plans with annotated locations of all installed equipment and controls.

4. Electronic submittal shall include a list of all sub-contractors involved in the project, a summary of the work completed by each sub-contractor, and a contact name, phone number, e-mail, and street address for the contractor and each sub-contractor.

5. Electronic submittal shall include a list of training required by the various specification sections, the date training was provided, the name of the company employing the trainer, and the trainer’s name and position title.

a. Training certificates shall be provided for all training provided by the Contractor and Subcontractors and shall include:

(1) A brief description of training provided, including the equipment or system that was the subject of training.

(2) The name of the company/companies employing individual providing training.

(3) The name and position title of the individuals providing training.

(4) A list of training attendees.

All training certificates shall be signed by the Contractor’s Representative (Project Superintendent or Project Manager) and the COR prior to submittal.

6. Electronic submittal shall be provide on CD or DVD media, with case, and labeled with the VA Project Number and Title, Contractor Business Name, and Address.

C. Printed Submittal: Within 30 calendar days of project completion (beneficial occupancy by the Government) the contractor shall provide three (3) printed copies of all the information provided in the electronic submittal. Printed copies shall be provided in an indexed (with index tab dividers) three-ring binders, and shall be organized in the same manner as the electronic submittal. Binders shall be white, not less than 1” and not greater than 3” spine width, appropriately sized for the documents provided, and labeled with the VA Project Number and Name, Contract Number, Phase Number, and Date on the front cover and spine.

APPENDIX A TO SECTION 01 00 00

INSTRUCTIONS TO CONTRACTORS

The information in this addendum summarizes key requirements necessary for successful project completion, and clarifies the government’s expectation on when such requirements must be provided. This addendum provides supplemental information and does replace or supersede the requirements in the specifications.

In accordance with the requirements of these specifications, the contractor shall provide the following documents, documentation, and services to the government by the time indicated:

Required Before Notice to Proceed: Issuance of a Notice to Proceed by the government is conditioned on the receipt, review, and acceptance of the following.

Safety Plan: The contractor shall provide a written safety plan, approved by the CO and COR. The plan shall designate a Safety Manager for the work, along with their qualifications, and shall include, but is not limited to, the frequency and format of regular Safety Meetings, the identification of risks specific to the work being performed, and a risk mitigation plan for all identified risks. The safety plan shall include measures that will be taken by the contractor to ensure the safety of contractor and sub-contractor employees, VA staff, patients, and members of the public.

Security Plan: The contractor shall provide, and have approved by the COR and CO, a written plan for safeguarding the informational and physical security of government assets. The plan shall include a list of individuals that will require government keys during the performance of work, the secured areas of the Medical Center (e.g., mechanical rooms) that the contractor will need to access during work, and the method the contractor will employ to ensure that all government keys are returned to the COR when they are no longer needed or at the completion of work. The security plan shall also address the security of the work site, government owned equipment in areas under the contractor’s control, and of contractor owned material, supplies, tools, and equipment.

Infectious Control Plan: In accordance with the Infectious Control Risk Assessment conducted by the government and provided to the contractor, the contractor shall provide a written plan, and have it approved by the COR and the VA Infectious Control Coordinator, of the methods that will be used to ensure effective infectious control processes at all times during the performance of work.

Material and Debris Management Plan: In accordance with these specifications, the contractor is required to maintain a work site that is free of debris and clutter. The contractor shall provide, and have approved by the CO and COR, a written plan for the delivery and storage of material required for the performance of work. Additionally, the contractor shall provide a written Debris Management Plan providing the method and frequency that debris will be removed from the work site, whether an on-site dumpster will be required, method for preventing blowing debris for any debris temporarily placed in a dumpster, and the estimated schedule for removing debris from government property.

Note: The Safety Plan, Security Plan, Infectious Control Plan, and Material and Debris Management Plan may be submitted as a single document.

Key Personnel Contact Information for the Contractor and Subcontractors: The contractor shall provide a list of key contacts for the project, and shall include office numbers for the contractor and all subcontractors, as well as names, mobile phone numbers, and e-mail addresses for all supervisory contractor and sub-contractor personnel (Project Managers and Site Superintendents).

Cost Loaded Critical Path Method (CPM) Construction Schedule: The contractor shall provide, and have approved by the CO and COR, a construction schedule in accordance with the specification requirements. The schedule will be developed using CPM software (e.g., Microsoft Project) and identify links of dependency between work tasks (i.e., tasks that must be completed before follow-on tasks can be accomplished) so that the critical path for project execution is clearly identified and actual progress against the schedule can be evaluated. The schedule shall correlate line item values in the Schedule of Values to the project schedule.

An acceptable CPM schedule will:

Organize the schedule into tasks and sub-tasks for clarity.

Avoid combining multiple tasks into a single task, especially when dependencies exist between tasks that the contractor is considering combining into a single task. In general, tasks which are scheduled for one or more days, or which combine multiple trades or subcontractors, should be divided into separate tasks in the schedule.

Include sub-contractor work as separate tasks or sub-tasks in the schedule.

Identify float associated with the performance of schedule tasks (i.e., early/late start and finish).

Approved Submittals: The contractor shall have approved submittals for all material, installation methods, shop drawings, etc., required for the first 30 days of the contract performance period before the government will issue a Notice to Proceed. Additionally, the contractor shall provide submittals required for the first 60 days of the contract performance period and provide, and have approved by the CO and COR, a schedule for all future submittals before the government will issue a notice to proceed.

Employee IDs: In accordance with the requirements of the specifications, the contractor shall obtain appropriate VA IDs for all employees before the government will issue a Notice to Proceed. Additionally, the contractor shall provide the employee information required by the specifications to the COR not less than 2 weeks prior to new employees or sub-contractor employees starting work on site, and shall obtain appropriate IDs prior to those employees being permitted to work on VA property.

Required Before Starting Work on Site:

Permits: When state or local government permits are required by the specifications or drawings, the contractor shall obtain such permits and provide a copy to the COR prior to starting work on site.

Inspect Area of Work: The contractor shall conduct a thorough survey of existing structures, finishes, installations, government owned equipment, and grounds in the area of the work with the COR and document any existing damage prior to starting work on site.

Key Issue: Responsible personnel identified by the contractor shall obtain a Non-PIV ID and government-issued keys before the…