36E77618B0090-022.pdf

PDF 6 MB Posted

Attached to
Water Leak Damage Remediation 2nd Floor - San Diego VAMC
Solicitation number
36E77618B0090
Issued by

About this file

36E77618B0090 ATTACHMENT 2 - FP.pdf

View the file

Other files

File Type Posted
36E77618C0038-000.docx DOCX document
36E77618B0090-0006001.pdf PDF
36E77618B0090-0006000.docx DOCX document
36E77618B0090-0005001.pdf PDF
36E77618B0090-0005004.pdf PDF
36E77618B0090-0005003.pdf PDF
36E77618B0090-0005006.pdf PDF
36E77618B0090-0005007.pdf PDF
36E77618B0090-0005005.pdf PDF
36E77618B0090-0005000.docx DOCX document
36E77618B0090-0005002.pdf PDF
36E77618B0090-0004002.pdf PDF
36E77618B0090-0004000.docx DOCX document
36E77618B0090-0004001.pdf PDF
36E77618B0090-0003002.pdf PDF
36E77618B0090-0003004.pdf PDF
36E77618B0090-0003003.pdf PDF
36E77618B0090-0003001.docx DOCX document
36E77618B0090-0003000.docx DOCX document
36E77618B0090-0002002.pdf PDF
36E77618B0090-0002004.pdf PDF
36E77618B0090-0002001.pdf PDF
36E77618B0090-0002005.pdf PDF
36E77618B0090-0002006.pdf PDF
36E77618B0090-0002003.pdf PDF
36E77618B0090-0002000.docx DOCX document
36E77618B0090-0001000.docx DOCX document
36E77618B0090-019.pdf PDF
36E77618B0090-011.pdf PDF
36E77618B0090-016.pdf PDF
36E77618B0090-021.pdf PDF
36E77618B0090-014.pdf PDF
36E77618B0090-013.pdf PDF
36E77618B0090-020.pdf PDF
36E77618B0090-009.docx DOCX document
36E77618B0090-018.pdf PDF
36E77618B0090-023.pdf PDF
36E77618B0090-012.pdf PDF
36E77618B0090-010.pdf PDF
36E77618B0090-015.pdf PDF
36E77618B0090-017.pdf PDF
36E77618B0090-024.docx DOCX document
36E77618B0090-000.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200

San Diego, CA 92111

858.344.8900

11770 BERNARDO PLAZA COURT

SUITE 116

SAN DIEGO, CA 92128

+1 619.488.9810

WWW.JENSENHUGHES.COM

PROJECT NO. 1QTD17007.000.000

DESIGN AND INSTALLATION IN ACCORDANCE WITH THE FOLLOWING CODES AND STANDARDS:

VA FIRE PROTECTION DESIGN MANUAL, DECEMBER 2015

2016 NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED AS A LIGHT HAZARD OCCUPANCY IN

ACCORDANCE WITH NFPA 13 WITH A MINIMUM DENSITY OF 0.10 GPM/SQ. FT. OVER THE MOST

REMOTE 1,500 SQ. FT. AND A HOSE STREAM ALLOWANCE OF 100 GPM. MAXIMUM SPRINKLER

SPACING SHALL BE 225 SQ. FT. FOR STANDARD COVERAGE SPRINKLERS. .

THE REMODEL AREA IS CONSIDERED TO BE A LIGHT HAZARD OCCUPANCY IN ACCORDANCE WITH

NFPA 13.

ALL NEW SPRINKLER SYSTEM PIPING SHALL BE SCHEDULE 40 BLACK STEEL.

ALL SPRINKLER SYSTEM EQUIPMENT SHALL BE UL LISTED FOR FIRE PROTECTION USE.

ALL HANGERS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13.

FIRE PROTECTION CONTRACTOR IS TO FIELD VERIFY ALL DIMENSIONS AND COORDINATE WITH

OTHER TRADES PRIOR TO INSTALLATION.

REFERENCE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION NOT SHOWN ON THE

DRAWINGS.

GENERAL NOTES

WHERE EXISTING SPRINKLERS ARE TO BE REMOVED AND NO NEW SPRINKLERS ARE TO BE

SUPPLIED FROM THAT PIPE, DEMOLISH ALL PIPING BACK TO THE BRANCH LINE AND PROVIDE A

CAP AT THE OUTLET ON THE BRANCH LINE.

UNDER NO CIRCUMSTANCES CAN SMALLER PIPE BE INSTALLED TO REPLACE LARGER PIPE BEING

REMOVED. REPLACE SPRINKLERS ONE FOR ONE.

DEMOLISH ARMOVERS BACK TO BRANCH LINE. INSTALL NEW 1" ARMOVER TO NEW SPRINKLER

LOCATION.

THE CONTRACTOR TO VERIFY EXISTING CONDITIONS. THE LOCATION AND ELEVATIONS OF

EXISTING EQUIPMENT AND PIPING INDICATED ON THE DRAWINGS HAVE BEEN TAKEN FROM

AVAILABLE DRAWINGS AND / OR FIELD SURVEY, BUT MAY VARY. CONTRACTOR TO VERIFY TRUE

SIZES, LOCATIONS AND ELEVATIONS OF EQUIPMENT AND PIPING IN THE FIELD PRIOR TO BID AND

INSTALLATION.

SCOPE OF WORK

1.

3.

4.

10.

11.

5.

6.

7.

8.

9.

NTS

SYMBOL =

TYPICAL HANGER AT CONCRETE SLAB

HANGER ROD SIZES

PIPE SIZE DIAMETER OF ROD

UP TO

INCLUDING 4"

3/8"

1 CONNECT ARM OVER INTO EXISTING 1

" BRANCH LINE

SHEET NOTES

KEY PLAN

NTS

PROVIDE AUTOMATIC SPRINKLER PROTECTION IN THE REMODELED AREA OF THE SECOND FLOOR

WEST WING OF THE MAIN BUILDING.

FP-1 GENERAL NOTES, DETAILS, AND KEY PLAN

FP-2 2ND FLOOR SPRINKLER DEMOLITION PLAN

FP-3 2ND FLOOR SPRINKLER PIPING PLAN

SHEET INDEX

1. DURING WORK IN ANY ONE PHASE, THE SPRINKLER SYSTEM AND FIRE ALARM SYSTEM OF ALL

PREVIOUS AND FORTHCOMING PHASES AND AREAS NOT WITHIN CONSTRUCTION BOUNDARIES,

SHALL BE FULLY OPERATIONAL AND CODE COMPLIANT. TEMPORARY FIRE MAINS AND CONTROL

VALVES SHALL BE INSTALLED TO KEEP THE SPRINKLER SYSTEM FULLY OPERATIONAL IN THE

AREAS NOT WITHIN CONSTRUCTION BOUNDARIES.

ALL CONTRACTOR'S BIDDING AND WORK SCHEDULES SHALL TAKE INTO ACCOUNT TIME FOR ALL

REQUIRED ABATEMENT EACH PHASE OF THE WORK.

ALL CONTRACTOR'S BIDDING AND WORK SCHEDULES SHALL TAKE INTO ACCOUNT TIME FOR ALL

REQUIRED MULTIPLE VA SAN DIEGO INSPECTIONS DURING AND AFTER EACH PHASE.

RELOCATE EXISTING SPRINKLER PIPING AROUND RE-DIRECTED MECHANICAL DUCT WORK.

2.

3.

4.

PHASING GENERAL NOTES

12.

2.

MAIN BUILDING

ARMOVER DETAIL

NTS

SPRINKLER BRANCHLINE

PENDENT SPRINKLER WITH

ESCUTCHEON ASSEMBLY

1" X 1/2" REDUCING COUPLING

1" DROP

SUSPENDED CEILING

1" ARMOVER

1" 90 ELBOW

NTS

NOTE:

INSTALL 401 CANOPY WHERE SURFACE MOUNTED LIGHTS

ARE USED. DROP TO CENTER OR QUARTER POINT OF TILE.

PROVIDE 2" OVERSIZE RING OR ADAPTER FOR

SPRINKLER HEADS THROUGH THE CEILING TILE

TO ALLOW FOR FREE MOVEMENT OF AT LEAST

1" IN ALL DIRECTIONS PER ASCE 7-10 SECTION

13.5.6.2.2(e)

SYMBOL =

LONGITUDINAL BRACE AT CONCRETE SLAB

NTSNTS

SYMBOL =

RESTRAINT OF BRANCH LINE AT CONCRETE SLAB

NTSNTS

TOLCO

HANGER ROD

4" MAX.

FROM BRACE

1/2" x 2" EMBEDMENT

HILTI KWIK BOLT TZ (ESR-1917)

SWIVEL SWAY BRACE

FITTING TOLCO FIG. 909

``FAST CLAMP'' SWAY

BRACE ATTACHMENT TOLCO

FIG. 1000

1" SCH. 40 PIPE

R

CONCRETE SLAB

TOLCO

HANGER ROD

4" MAX.

FROM BRACE

1/2" x 2" EMBEDMENT HILTI

KWIK BOLT TZ (ESR-1917)

PIPE TO BE BRACED

PIPE CLAMP FOR SWAY BRACE

TOLCO FIG. 4L

SWIVEL SWAY BRACE FITTING

TOLCO FIG. 909

1" SCH 40 PIPE

4"

MAX.

CONCRETE SLAB

TOLCO

" ALL THREAD ROD

PIPE RING TOLCO FIG. 100

ADJUSTABLE RING HANGER

TOLCO FIG. 200

SPRINKLER PIPE

COUPLING

" x 2" EMBEDMENT HILTI

KWIK BOLT TZ (ESR-1917)

SURGE RESTRAINER

TOLCO FIG. 25

CONCRETE SLAB

COUPLING

COUPLING

1/2" x 2" EMBEDMENT HILTI

KWIK BOLT TZ (ESR-1917)

1/2" x 2" EMBEDMENT HILTI

KWIK BOLT TZ (ESR-1917)

PLUMBING CHASE

G

H

J

G.1

J.1

J.5

K

L

J.4

M

N

L.1

R

R

R

R

RR

R

R

R R

R R

R

R

R

RR

R

R

R

R

R

R

R R

R R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R R

R R

R R

R

R

R

R

R

R

R R R

R

R

R

R

R

R

RR

R R

R R

R

R

R

R

R

R R

R

R

R

R

R R R

R

R

R R

RR

R

R

R R

R

R

R

R

R

R

R R

R

R

RR

R

R

R

R

R

R

R

RR

R

R

R

R

R

R

R

R

R

R

R R

R

R

R

R

RR

R

R

R

R

R

R

R

R R

R R

R

R

R

R

R

R

R

R

RR

R

E E

EE

E

E

EE

E

E

E

E

E

E

E

E

E

E

E

E

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200

San Diego, CA 92111

858.344.8900

11770 BERNARDO PLAZA COURT

SUITE 116

SAN DIEGO, CA 92128

+1 619.488.9810

WWW.JENSENHUGHES.COM

PROJECT NO. 1QTD17007.000.000

E

EXISTING SPRINKLER TO REMAIN

SPRINKLER DESCRIPTIONSYMBOL

R

EXISTING SPRINKLER TO BE REMOVED

2ND FLOOR, WEST WING OF BUILDING 1

(PHASE I - SARRTP)

PROJECT AREA

NTS

2SW ROOF

2SW DECK

2NW DECK

2NW ROOF

2NE SKY

2NE DECK

STAIR

STAIR

CORRIDOR

ELEVATORELEVATORELEVATORELEVATOR

ELEVATORELEVATORELEVATOR

ELEVATORELEVATORELEVATOR

HSK

2NE ROOF

2SE DECK

W D

(E)

MECHANICAL

COURTYARD

KEY PLAN

SPRINKLER LEGEND

N.I.C. (PHASE II)

CORRIDOR

W/D W/DW/D

CORRIDOR

W/D W/DW/D

CORRIDOR

W/D W/DW/D

E E

EE

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

3 X 2 THREADED

MECHANICAL TEE

ADD A TEMPORARY ISOLATION VALVE FOR PHASING.

REFER TO PHASING GENERAL NOTES ON SHEET FP-1.

REMOVE THIS VALVE AND RECONNECT PIPING WHEN

PHASING IS COMPLETE.

SRR

3" 3" 3" 3"

3"

3"

3" 3"

TO RISER IN STAIR #9

NOT IN SCOPE

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200

San Diego, CA 92111

858.344.8900

11770 BERNARDO PLAZA COURT

SUITE 116

SAN DIEGO, CA 92128

+1 619.488.9810

WWW.JENSENHUGHES.COM

PROJECT NO. 1QTD17007.000.000

F

G

H

J

G.1

J.1

J.5

K

L

J.4

M

N

L.1

1 2.12 3.1 3.23 4 4.2 5 5.1 6 7.17 8 9 9.1

NEW PIPE

EXISTING PIPE

2ND FLOOR, WEST WING OF BUILDING 1

(PHASE I - SARRTP)

PROJECT AREA

NTS

2SW ROOF

2SW DECK

2NW DECK

2NW ROOF

2NE SKY

2NE DECK

STAIR

STAIR

CORRIDOR

ELEVATORELEVATORELEVATORELEVATOR

ELEVATORELEVATORELEVATOR

ELEVATORELEVATORELEVATOR

HSK

2NE ROOF

2SE DECK

W D

(E)

MECHANICAL

COURTYARD

KEY PLAN

(E) NON-RATED PARTITION

WALL LEGEND

(E) SMOKE BARRIER WALL

ONE-HOUR RATED WALL

SMOKE COMPARTMENT BARRIER WALL TO

MATCH (E) SMOKE COMPARTMENT BARRIER

(E) FENCE

(E) 2-HOUR FIRE PARTITION

(E) 1-HOUR FIRE PARTITION

DEPARTMENT BOUNDARY LINE

WALL TYPE. SEE A4.101

H E

A D

C

B

T

W

R E

N C

H E

S

P

R O

V I D

E D

T O

T A

L

C

O U

N

Y

P E

S Y

M B

O L

N O

T E

S

W

H E

E

S

U R

F A

C E

D

M

O U

N T

L

I G

H T

S

O

C C

U R

S

U

N

O P

Y

S

T Y

L E

U

M A

O O

M

R

U L

E

S

R R

I

C

O R

D A

N C

E

W

I T

H

N

F P

A

E

D I T

I O

N

S

E C

T I O

N

P

E N

D E

P R

I N

K L

E R

S

S

H A

B

L

O C

A T

C

E N

T E

R

O

R

Q

U A

R T

P

O I N

T

O

F

T

I L

E

F I N

I S

H T

E M

P

K F

A C

T O

R S

I N

F

W H

I T

E

T Y

S E

R I E

S M

F G

T Y

C O

T Y

F

R B

S P

R I N

K L

G

E N

D

Q R

S E

M I R

E C

P E

N D

E N

T

T O

T A

L

PIPE LEGEND

OUTLET CONNECTION

HANGER

PLUG AND CAP

N.I.C. (PHASE II)

File details come from the government source that posted it.