00 01 10 VA-TABLE OF CONTENTS.pdf

PDF 112 KB Posted

Attached to
Y1BG--561A4-22-700 EHRM Infrastructure Upgrades Construction - Lyons, NJ VAMC
Solicitation number
36C77626R0001
Issued by

About this file

This document is a Table of Contents for the 100% Construction Documents for the Electronic Health Records Modernization (EHRM) Infrastructure project at the VA facility in Lyons, New Jersey (VA Project No. 561A4-22-700), dated January 21, 2025. The document serves as an organizational guide to the three-volume specification set organized by the Construction Specifications Institute (CSI) MasterFormat divisions.

Volume 1 encompasses Divisions 00-28, covering special sections, general requirements, existing conditions, and structural/building envelope work including concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, specialties, special construction, fire suppression systems, plumbing, HVAC, and electrical/communications infrastructure. Volume 2 details Divisions 22-26, focusing on plumbing systems, HVAC systems with controls and commissioning, and comprehensive electrical requirements including power distribution, lighting, generators, and surge protection. Volume 3 addresses Divisions 27-33, specifying communications systems, electronic safety and security systems (access control, intrusion detection, video surveillance, fire detection), earthwork, exterior improvements, and utility systems for water, sanitary sewer, and storm sewer. The specifications include extensive commissioning requirements across multiple building systems, quality control, testing laboratory services, construction waste management, and safety protocols. Divisions 11, 12, 14, 25, 34, and 48 are marked as "Not Used," indicating they are not applicable to this project.

View the file

Other files

File Type Posted
36C77626R0001 0005.docx DOCX document
Tech Questions Tracker - Lyons EHRM Infra Upgrades FINAL - REV 3-6-26.docx DOCX document
36C77626R0001 0004.docx DOCX document
Tech Questions Tracker - Lyons EHRM Infrastructure Upgrades - FINAL.docx DOCX document
01 91 00 General Commissioning Requirements.pdf PDF
36C77626R0001 0003.docx DOCX document
26 11 16 - SECONDARY UNIT SUBSTATIONS.pdf PDF
04_20_00_-_UNIT_MASONRY.pdf PDF
Site Visit Sign-In Sheet - 1-30-26.pdf PDF
36C77626R0001 0002.docx DOCX document
Attachment 9 - Site Visit Instructions - Revised 0001.docx DOCX document
36C77626R0001 0001.docx DOCX document
Attachment 10 - Key Subcontractors Information.docx DOCX document
Attachment 8 - Wage Determination - Somerset County - 1-2-2026.pdf PDF
Attachment 6 - Lyons MCR Building GeoReport - signed.pdf PDF
Attachment 5 - Lyons EHRM - Final Bid Doc - Drawings V2.pdf PDF
Attachment 7 - VHA PCRA EHRM Lyons Signed.pdf PDF
36C77626R0001.docx DOCX document
Attachment 9 - Site Visit Instructions.docx DOCX document
Attachment 3 - Lyons EHRM - 100 CD -Asbestos and Lead Inspection Report.pdf PDF
Attachment 1 - Lyons EHRM - 100 CD -Specs VOL 1.pdf PDF
Attachment 4 - Lyons EHRM - Final Bid Doc - Drawings V1.pdf PDF
Attachment 2 - Lyons EHRM - 100 CD -Specs VOL 2.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VANJHCS 100% CONSTRUCTION DOCUMENTS

Lyons, NJ 01/21/2025

Electronic Health Records Modernization (EHRM) Infrastructure Lyons, NJ VA Project No. 561A4-22-700

00 01 10 - 1 of 7

TABLE OF CONTENTS

SECTION 00 01 10

Volume 1

DIVISION 00 - SPECIAL SECTIONS # of Pages

00 01 10 Table of Contents………………………………………………………………….7

00 01 15 List of Drawing Sheets………………………………………………….16

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements……………………………………………………….34

01 32 16.15 Project Schedules……………………………………………………………….12

01 33 23 Shop Drawings, Product Data, and Samples…….8

01 35 26 Safety Requirements………………………………………………………….28

01 42 19 Reference Standards………………………………………………………….12

01 45 00 Quality Control…………………………………………………………………….16

01 45 29 Testing Laboratory Services…………………………………….16

01 57 19 Temporary Environmental Controls………………………….6

01 58 16 Temporary Interior Signage………………………………………….1

01 74 19 Construction Waste Management………………………………….6

01 91 00 General Commissioning Requirements………………….58

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Selective Demolition………………………………………………………….4

02 82 11 Traditional Asbestos Abatement ………………………….68

02 82 13.19 Asbestos Floor Tile and Mastic Abatement….68

02 83 33.13 LEAD PAINT REMOVAL AND DISPOSAL …………………………60

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete………………………………………………….32

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring………………………………………………………………….5

04 05 16 Masonry Grouting…………………………………………………………………….4

04 20 00 Unit Masonry…………………………………………………………………………….26

00 01 10 - 2 of 7

04 72 00 Cast Stone Masonry …………………………………………………………….8

DIVISION 05 – METALS

05 12 00 Structural Steel Framing…………………………………………….7

05 21 00 Steel Joist Framing………………………………………………………….5

05 31 00 Steel Decking………………………………………………………………………….8

05 40 00 Cold-Formed Metal Framing………………………………………….5

05 50 00 Metal Fabrications………………………………………………………….21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry………………………………………………………………………10

06 20 00 Finish Carpentry…………………………………………………………………….8

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 10 00 Damp proofing and Waterproofing………………………….4

07 14 16 Cold-Fluid Applied Waterproofing……………………….4

07 16 00 Cementitious and Reactive Waterproofing ….7

07 21 13 Thermal Insulation…………………………………………………………….6

07 22 00 Roof and Deck Insulation…………………………………………….7

07 26 16 Below Grade Vapor Retarders…………………………………….4

07 27 26 Fluid-Applied Membrane Air Barrier………………….7

07 50 05 Roof Systems…………………………………………………………………………….6

07 54 19 Polyvinyl Chloride (PVC) Roofing…………………….13

07 60 00 Flashing and Sheet Metal………………………………………….19

07 65 26 Self-Adhering Sheet Flashing………………………………….5

07 77 00 Wall Accessories………………………………………………………………….2

07 84 00 Firestopping…………………………………………………………………………….6

07 92 00 Joint Sealants……………………………………………………………………….12

DIVISION 08 – OPENINGS

08 11 13 Hollow Metal Doors and Frames……………………………….9

08 14 00 Interior Wood Doors………………………………………………………….6

08 31 13 Access Doors and Frames……………………………………………….6

08 33 00 Coiling Doors and Grilles………………………………………….9

00 01 10 - 3 of 7

08 71 00 Door Hardware…………………………………………………………………………17

08 90 00 Louvers and Vents……………………………………………………………06

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes.…4

09 22 16 Non-Structural Metal Framing…………………………………….6

09 29 00 Gypsum Board……………………………………………………………………………….9

09 51 00 Acoustical Ceiling Tile………………………………………………….8

09 65 13 Resilient Base……………………………………………………………………………4

09 65 36 Static Dissipative Resilient Flooring………………8

09 91 00 Painting………………………………………………………………………………………….8

DIVISION 10 – SPECIALTIES

10 14 00 Signage…………………………………………………………………………………………….4

10 44 13 Fire Extinguisher Cabinets………………………………………….3

10 44 19 Fire Extinguishers……………………………………………………………….3

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Req. for Non-Structural Components ………………………………………………………………………………….9

13 21 33 Hot Aisle Containment Systems ……………………………….3

DIVISION 14– CONVEYING EQUIPMENT (NOT USED)

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression Systems….4

21 13 13 Wet-Pipe Sprinkler Systems……………………………………….13

21 13 45 Sprinkler Guards…………………………………………………………………….2

21 22 00 Clean Agent Fir Suppression System ………….….19

Volume 2

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing…………………….38

00 01 10 - 4 of 7

22 05 23 General-Duty Valves for Plumbing Pipes…….16

22 07 11 Plumbing Insulation…………………………………………………...…16

22 08 00 Commissioning of Plumbning Systems……………….16

22 11 00 Domestic Water Distribution System……………..16

22 13 00 Facility Sanitary and Vent Piping………………...24

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC……………………………………41

23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment…………………………………………11

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment…………………………………………………………………………11

23 05 93 Testing, Adjusting, and Balancing for

HVAC……………………………………………………………………………………………………15

23 08 00 Commissioning of HVAC systems……………………………...5

23 09 23 Direct-Digital control system for HVAC……….81

23 09 27 Data Center Cooling Optimization System

23 23 00 Refrigerant Piping………………………………………………………………14

23 31 00 HVAC Ducts and Casings……………………………………………………21

23 34 00 HVAC Fans…………………………………………….…………………………………..14

23 36 00 Air Terminal Units……………….……………………………………………11

23 37 00 Air Outlets and Inlets……………………………………………………10

23 40 00 HVAC Air Cleaning Devices…………………….……………………23

23 81 23 Computer-Room Air Conditioners………………………………23

23 84 00 Humidity Control Equipment………………………………………………………………………….……..20

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations.12

26 05 13 Medium-Voltage Cables…………………………………………………….10

26 05 19 Low-Voltage Electrical Power Conductors and Cables……………………………………………………………………………………………….8

00 01 10 - 5 of 7

26 05 26 Grounding and Bonding for Electrical Systems………………………………………………………………………………………….10

26 05 33 Raceway and Boxes for Electrical Systems….14

26 05 39 Underfloor Raceways for Electrical Systems.6

26 05 41 Underground Electrical Construction……………….10

26 05 73 Overcurrent Protective Device Coordination Study………………………………………………………………………………………………….6

26 08 00 Commissioning of Electrical Systems……………………4

26 09 23 Lighting Controls………………………………………………………………….6

26 11 16 Secondary Unit Sustations………………………………………….04

26 22 00 Low-Voltage Transformers……………………………………………….6

26 24 13 Distribution Switchboards………………………………………….10

26 24 16 Panel Boards……………………………………………………………………………….6

26 27 26 Wiring Devices………………………………………………………………………….8

26 29 21 Enclosed Switches and Circuit Breakers………….6

26 32 13 Engine Generators………………………………………………………………….6

26 33 53 Static Uninterruptible Power Supply……………….12

26 36 23 Automatic Transfer Switches…………………………………….14

26 41 00 Facility Lightning Protection……………………………….12

26 43 13 Surge Protective Devices……………………………………………….4

26 51 00 Interior Lighting……………………………………………………………….10

26 56 00 Exterior Lighting………………………………………………………………….8

Volume 3

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations……………………………………………………………………………46

27 05 26 Grounding and Bonding for Communications Systems………………………………………………………………………………………………6

27 05 33 Conduits and Backboxes for Communications Systems……………………………………………………………………………………………12

27 05 36 Cable Trays for Communications Systems……………4

27 05 53 Identification for Communication Systems.….2

00 01 10 - 6 of 7

27 08 00 Commissioning of Communication Systems………….4

27 10 00 Structural Cabling……………………………………………………………….6

27 11 00 Telecommunications Room Fittings …………………….16

27 11 16 Communication Cabinet, Racks, Frames and Enclosures…………………………………………………………………………………….6

27 11 19 Communication Termination Blocks and Patch Panels……………………………………………………………………………………………….4

27 11 26 Communications Rack Mounted Power Protection and Power Strips…………………………………………………………………….4

27 13 13.13 Communications Copper Cable Splicing and Terminations……………………………………………………………………………….2

27 13 23 Communications Optical Fiber Backbone Cabling…………………………………………………………………………………………….6

27 13 23.13 Communications Optical Fiber Cable Splicing and Terminations…………………………………………………………………….2

27 15 13 Communications Copper Horizontal Cabling…….2

27 16 19 Communications Patch Cords, Station Cords, and Cross Connect Wire…………………………………………………….4

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security………………………………………………………………………………84

28 05 13 Conductors and Cables for Electronic Safety and Security………………………………………………………………………………20

28 05 26 Grounding and Bonding for Electronic Safety and Security…………………………………………………………………………………8

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security…………………………………………………………………………….16

28 08 00 Commissioning of Electronic Safety and Security Systems…………………………………………………………………….4

28 13 00 Physical Access Control System……………………………114

28 13 53.10 Video Intercom System…………………………………………………………8

28 13 16 Physical Access Control System and Database Management………………………………………………………………………………….20

28 16 00 Intrusion Detection System……………………………………….48

00 01 10 - 7 of 7

28 23 00 Video Surveillance…………………………………………………………….62

28 31 00 Fire Detection and Alarm…………………………………………….21

DIVISION 31 – EARTHWORK

31 20 00 Earthwork…………………………………………………………………………………….23

31 23 19 Dewatering…………………………………………………………………………………….6

32 05 23 Cement and Concrete for Exterior Improvements…………………………………………………………………………….17

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 16 Asphalt Paving………………………………………………………………………….6

32 17 23 Pavement Markings………………………………………………………………….6

32 90 00 Planting……………………………………………………………………………………….25

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems…………….4

33 10 00 Water Utilities…………………………………………………………………….18

33 30 00 Sanitary Sewer Utilities…………………………………………….17

33 40 00 Storm Sewer Utilities…………………………………………………….23

DIVISION 34 – TRANSPORTATION (NOT USED)

DIVISION 48 – ELECTRICAL POWER GENERATION (NOT USED)

- - - E N D - - -

File details come from the government source that posted it. Updated .