This is a Statement of Work (SOW) for the Electronic Health Records Modernization (EHRM) Infrastructure Project at the VA Pittsburgh Healthcare System University Drive campus. The project involves construction work to upgrade infrastructure across multiple existing buildings (Buildings 1, 5, 8, 29, 30, 33) to support the new EHRM system, encompassing approximately 3,030 square feet of existing space and 11,600 square feet of new tower additions. The work includes general construction, structural modifications, mechanical and HVAC systems, plumbing, fire protection, electrical systems, information technology infrastructure, and civil work, with all design based on AWEN Solutions' drawings and specifications dated June 13, 2025, and compliance with VA Infrastructure Standard for Telecommunications Spaces (ISTS) V4.0 and the VA Physical Security Design and Resiliency Manual (PDRSM).
The project will be solicited as a Request for Proposals (RFP) with a completion timeline of 730 calendar days from the Notice to Proceed. All work must include equipment installation, Testing & Balancing, and Commissioning as detailed in the drawings and specifications. Due to occupied staff and patient areas during construction, phased work is required. The scope is managed by Scott Branscome, PE, Healthcare Engineer, Facilities Maintenance Services at VAPHS, with Mike Dwyer serving as Project Section Chief, and both are available for inquiries at the Pittsburgh, Pennsylvania location (4100 Allequippa Street).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P01 - SOW.docx | DOCX document | |
| P02 - Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: December 10, 2025
From: Scott Branscome, P.E., Healthcare Engineer, Facilities Maintenance Services; VAPHS UD
Subj: Scope of Work EHRM Infrastructure Project – Project # 646-22-700
To: Contracting Officer
1. The scope of work shall generally consist of but is not limited to the following: construction work to facilitate all modifications at multiple existing buildings on the VAPHS University Drive VA campus to upgrade the infrastructure to support the new Electronic Health Records Modernization (EHRM) system.
The upgrade to the infrastructure will be campus wide buildings impacted to include Buildings 1, 5, 8, 29, 30, 33, and site. The architectural total existing space square footage affected is approximately 3,030 SF with new tower addition square footage of 11,600 SF. Upgrades for these buildings will include the construction of new towers, existing rooms and telecommunication closets and include relocation, reconfiguration, expansion, and renovation involving new walls, doors and finishes, etc. throughout each space.
Bid work will be based on “EHRM Infrastructure Upgrades” Drawings and Specifications prepared by AWEN Solutions, dated 13 June 2025. Construction work shall also comply with VA “Infrastructure Standard for Telecommunications Spaces (ISTS) V4.0, June 1, 2023. Bid work will include General Construction (and associated trades), Structural, Mechanical and HVAC, Plumbing and Fire Protection, Electric, and Information Technology, Civil. The VA Physical Security Design and Resiliency Manual (PDRSM) requirements will need to be incorporated into the construction of the project.
2. The areas of disturbance will be occupied by staff or patients during construction, so phasing shall be required.
3. This project shall be solicited as an RFP to complete all Work, including the installation of equipment, Testing & Balancing and Commissioning as identified in the drawings and specifications. All work shall be completed within 730 calendar days from receipt of Notice to Proceed.
4. If you have any questions, please feel free to contact me at (412) 360-3824 or Mike Dwyer at (412) 360-3825.
cc:
SCOPE OF WORK
| VAPHS, 4100 Allequippa Street • Pittsburgh, Pennsylvania, 15240 |
| 1 |
Mike Dwyer – Project Section Chief, FMS, VAPHS file
Andrew Walbeck – VP/Chief Engineer, FMS, VAPHS image1.jpeg