Abstract of Offers - 3-11-26.pdf

PDF 130 KB Posted

Attached to
Z1DA--EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR Federal contract opportunity
Solicitation number
36C77625B0050
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is an Abstract of Offers for Construction (Optional Form 1419) documenting bid responses for a Department of Veterans Affairs construction project. The solicitation number is 36C77625B0050, issued on January 14, 2026, with bids opened on March 5, 2026. The issuing office is the Department of Veterans Affairs, Program Contracting Activity Central (PCAC) in Independence, Ohio, with Bridget May serving as the Contracting Officer.

The project is Construction Project 648-24-701: EHRM Infrastructure Upgrades Phase 2 at Portland VA Medical Center. The solicitation includes eight amendments, all acknowledged by all bidders. Two contract line items are offered: Item 0001 for Base Bid (General Construction) Vancouver and Item 0002 for Base Bid (General Construction) Portland, each for one lump-sum job. Nine offers were received from the following contractors: Strategic Industry, Inc. (Kingsburg, CA) with a total bid of $7,256,045.00; Angel Design Build Construction LLC (Richmond, VA) at $6,498,001.00; VC-GM JV LLC (Springfield, OR) at $5,154,000.00; Cantu Federal Services LLC (Camas, WA) at $6,173,132.00; Talion Construction, LLC (Murrieta, CA) at $5,242,052.00; Capex Construction LLC (American Fork, UT) at $6,173,132.00; Peak Performance JV 1, LLC (Tacoma, WA) at $12,895,389.00; BlueWay One JV, LLC (Naperville, IL) at $4,993,000.00; and Sawtooth Construction JV II LLC (Glenview, IL) at $7,841,567.00. All bids included SF24 bid security forms with 20% bid bonds from various insurance carriers. The government estimate totaled $8,125,518.00 with profit included as the reasonable contract amount.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR, newest first.
File Type Posted
36C77625B0050.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 3

DATE SIGNED

DATE SIGNED

7A.

ITEM

NO.

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

D. UNIT

PRICE

0001 1 JB $5,302,775 $4,355,849

0002 1 JB $0.00 $1,953,270 $2,142,152

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL: $8,125,518.00

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

36C77625B0050 1/14/26 3/5/26

RECORDER SIGNATURE

Kara Evert Contract Specialist

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

CERTIFYING OFFICIAL SIGNATURE

Department of Veterans Affairs Program Contracting Activity Central (PCAC) 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

Bridget May Contracting Officer

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

Construction Project 648-24-701 EHRM Infrastructure Upgrades Phase 2 Portland VA Medical Center

NO. 1 NO. 2

A. OFFEROR A. OFFEROR

A. HIRED LABOR Strategic Industry, Inc.

Kingsburg, CA

7B. DESCRIPTION OF OFFERED ITEM E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

Angel Design Build Construction LLC Richmond, VA

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount) SF24, 20%, Vigilant Ins. Co.

B. BID SECURITY (Type and amount) SF24, 20%/$3M, Endurance Assurance

C6. NUMBER OF AMENDMENTS ISSUED

EIGHT (8)

C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

Base Bid (General Construction) Vancouver $5,302,775.00 $4,355,849.00

Base Bid (General Construction) Portland $1,953,270.00 $2,142,152.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

$7,256,045.00 $6,498,001.00

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 1 JB $4,762,626 $4,762,626.00 $3,775,938 $3,775,938.00

0002 1 JB $2,214,430 $2,214,430.00 $1,466,114 $1,466,114.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$6,977,056.00 $5,242,052.00

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF PAGES

36C77625B0050 2

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE 4. OFFERS (Continued)

Construction Project 648-24-701 EHRM Infrastructure Upgrades Phase 2 Portland VA Medical Center

NO.: 3 NO.: 4 NO.: 5 NO.: 6

A. OFFEROR

VC-GM JV LLC

Springfield, OR

A. OFFEROR

Cantu Federal Services LLC Camas, WA

A. OFFEROR

Talion Construction, LLC Murrieta, CA

A. OFFEROR

Capex Construction LLC American Fork, UT

B. BID SECURITY (Type and amount) SF24, 20%/$3M, Old Republic Ins. Co.

B. BID SECURITY (Type and amount) SF24, 20%, Nationwide Mutual Ins. Co.

B. BID SECURITY (Type and amount) SF24, 20%, Nationwide Mutual Ins. Co.

B. BID SECURITY (Type and amount) SF24, 20%, Atlantic Specialty Ins. Co.

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

$1,627,000 $1,627,000.00 $2,065,833 $2,065,833.00

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

$3,527,000 $3,527,000.00 $4,107,299 $4,107,299.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

TOTAL: $5,154,000.00 $6,173,132.00

AUTHORIZED FOR LOCAL REPRODUCTION

OPTIONAL FORM 1419A (11-88)

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 1 JB $3,416,870 $3,416,870.00 $5,191,607 $5,191,607.00

0002 1 JB $1,576,130 $1,576,130.00 $2,649,960 $2,649,960.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$4,993,000.00 $7,841,567.00

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF PAGES

36C77625B0050 3

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE 4. OFFERS (Continued)

Construction Project 648-24-701 EHRM Infrastructure Upgrades Phase 2 Portland VA Medical Center

NO.: 7 NO.: 8 NO.: 9 NO.:

A. OFFEROR

Peak Performance JV 1, LLC Tacoma, WA

A. OFFEROR

BlueWay One JV, LLC Naperville, IL

A. OFFEROR

Sawtooth Construction JV II LLC Glenview, IL

A. OFFEROR

B. BID SECURITY (Type and amount) SF24, 20%/$3M, Market Ins. Co.

B. BID SECURITY (Type and amount) SF24, 20%, Developers Surety and Id it

B. BID SECURITY (Type and amount) SF24, 20%, Liberty Mutual Ins. Co.

B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

$4,386,735 $4,386,735.00 $0.00

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

$8,508,654 $8,508,654.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

TOTAL: $12,895,389.00 $0.00

AUTHORIZED FOR LOCAL REPRODUCTION

OPTIONAL FORM 1419A (11-88)

OF 1419 Pg 1
OF 1419 Pg 2
OF 1419 Pg 3

File details come from the government source that posted it. Updated .