This document is a detailed electrical power plan drawing for the Women's Health Clinic 2nd Floor renovation project at Jesse Brown VA Medical Center in Chicago, Illinois. The architectural engineering drawing (EP102) is prepared by Toland Mizer Miller and sealed by Professional Engineer Scott Parker Schwerin, depicting a comprehensive electrical power distribution layout with numerous power outlets, switches, and electrical circuitry annotations. The drawing is part of the bid documents for the VA Office of Construction and Facilities Management, with a scale of 1/8" = 1'-0" and includes multiple reference codes (WNL1, WNL2, WCRL, WLSL) indicating specific electrical zones and circuit designations. The floor plan shows intricate electrical routing throughout the space, with multiple grid lines, room numbers, and technical notations providing precise electrical infrastructure details for the medical facility renovation project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CG
CG
CG
CG CG
CG CG
CG CG CG CG
C
G CG
CG CG
C G
CG
CG
CG
C G
CG
C G
CG
CG
CG
CG
CG
CG
C G
CG
C G
CG
CG
CGCGCGCGCGCGCGCGCGCG
CG CG
C G
CG
C G
P
E M
E M
E M
E M
E M E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E M E M E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E
E M
E M
E M
E M
E M
E M
E M
E M
E ME M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E M
E
E E
E
E
E
E
E
E
E
E E
EE
E M
C R
C R
E M E M
C R
C R
J
JJ
C R
C R
C R
C R
CR CR
C R
CR
BLDG 30
NOT TO SCALE
KEY PLAN
TRUE
NORTH
PLAN
NORTH
252321201916141310.110
V.5
U
S
N
G
C
J.1
N.1
C2702
C2703
2704 2703 2701 2702
C 2701
2-17
C2704
2745 2746
27602757
2738 2756
2738A
2741A 2751
C2707
27232722
C2706
2726A 2727A
C2705
WNL2
WEQLIT1
1 1
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI GFI
GFI
GFI
GFI
GFI GFI
GFI
GFI
GFI
GFI
GFI
EWC
GFI
E,GFI
GFI GFI
GFI
GFI
GFI
GFI
GFIGFI
GFI
GFI
E,GFI
E,GFIE,GFI
E
E E
E
GFI
GFI GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
EWC
GFI
WNL2-2
GFI
GFI
GFI
GFI
GFI
GFIGFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFIGFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
EP401
WNL2-3
WNL2-26
WNL2-5
WNL2-7
WNL2-9
WNL2-16
WNL2-18
WNL2-11
WNL2-13
WNL2-15
GFI
WNL2-20
WNL2-22
WNL2-24
GFI
GFI WNL2-25
WNL2-23
WNL2-29
WNL2-27 WNL2-21
WNL2-31
WNL2-19
WNL2-17 WNL2-34
WNL2-33
WNL2-35 WNL2-37
WNL2-39
WNL2-36
WNL2-32
WNL2-38
WNL2-30
WNL2-40
WNL2-28
WCRL-1
WNL1-1
WNL1-25
WNL1-3
WNL1-5
WNL1-7
WNL1-9
WNL1-14
WNL1-27
WNL1-29 GFI
WNL1-16
GFI
GFI
WNL1-24
WNL1-19
WCRL-5
WNL1-26
WNL1-11
WNL1-13
WNL1-15
WNL1-17
WNL1-31
WNL1-21
WNL1-35
WNL1-28
GFI
WNL1-22
WNL2-4
WNL1-37
2 2
WNL1-20
WNL1-18
2 2
WNL2-50
WNL1-39
WNL1-2
2WNL1-8
WNL1-12
WNL2-14
WNL2-12
C2705
4 4
WNL2-42
WNL2-43
WNL2-44
EP401
T-WEQL
WNL2-10
WNL2-6
WNL2-8
WNL1-6
WNL1-4
WNL1-10
WNL1-30,32
WNL1-34,36
WCRL-3
WLSL-1
MED GAS
WEQL
WNH
DOOR
DOOR
WLSL-4
WLSL-2
ROOM SCHEDULE
ROOM NO ROOM NAME
2-17 STAIR
2701 WAITING AREA
2702 RECEPTION
2703 SHARED/GROUP
2703A STOR.
2704 SHARED/GROUP
2704A STOR.
2705 ELECT ROOM
2706 TELECOM
2707 MH EXAM 4
2708 EXAM 10
2709 MH EXAM 3
2710 SOILED
2711 MH EXAM 2
2712 PAT. TLT
2713 MH EXAM 1
2714 EXAM 11
2715 PHYSICAL THERAPY /EXAM 14
2716 EXAM 12
2717 PHYSICAL THERAPY /EXAM 13
2718 RESIDENTS
2719 CONFERENCE
2720 PACT SPACE
2720A CLOS.
2721 CLEAN LINEN
2722 EXAM 6
2723 EXAM 5
2724 EXAM 7
2725 BARIATRIC PAT. TLT
2726 PROCEDURE ROOM 4
2726A PAT. TLT
2727 PROCEDURE ROOM 3
2727A PAT. TLT
2728 EXAM 8
2729 EXAM 9
2730 STAFF TLT
2731 KITCHEN /STAFF LOUNGE
2732 STAFF TLT
2733 CONFERENCE
2734 PACT SPACE
2735 CLEAN LINEN
2736 EXAM 2
2737 EXAM 1
2738 PROCEDURE ROOM 1
2738A PAT. TLT
2739 SOILED
2740 PAT. TLT
2741 PROCEDURE ROOM 2
2741A PAT. TLT
2742 EXAM 3
2743 EXAM 4
2744 WHCC
2745 WHMD
2746 WHCC
2747 WHCC
2748 CONFERENCE ROOM
2749 LOCKERS
2750 STORAGE
2751 STORAGE
2752 MEDICAL EQUIPMENT STORAGE
2754 SOILED UTILITY
2755 HAC
2756 ELECT ROOM
2757 CLEAN UTILITY
2758 PAT. TLT
2759 PAT. TLT
2760 VEST.
2761 LACT. RM.
3548 CLOS.
C2702 CORRIDOR
C2703 CORRIDOR
C2704 PAT. CORR.
C2705 CORRIDOR
C2706 PAT. CORR.
C2707 PAT. CORR.
C 2701 CORRIDOR
C O M M O N
W
EA
LTH OF
V
IR
G I N I A
P R O F
E
SSI ONAL EN
G
IN
E E R
SCOTT PARKER SCHWERIN
Lic. No. 37431
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SECOND FLOOR PLAN - POWER WOMEN'S HEALTH, 2ND FLOOR,
DESIGN
JESSE BROWN VAMC CHICAGO, IL
EP102
537-327
BSP BSP05-09-2025
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1/8" = 1' - 0" 0 5' 10' 15' 30'
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN - POWER
1 COMBINATION RECEPTACLE/DATA OUTLET FLOOR BOX. COORDINATE
LOCATION OF FLOOR BOX WITH OWNER/ARCHITECT AND FURNITURE
PROVIDER PRIOR TO ROUGH-IN.
2 INFRARED PLUMBING CONTROLS.
3 HVAC CONTROL TRANSFORMER. TYPICAL FOR ALL EQUIPMENT
CONNECTIONS WITH A SWITCH DISCONNECT ON THIS PLAN WITHOUT AN
EQUIPMENT TAG OR NOTED OTHERWISE.
4 PROVIDE 2#10, 1#10G., 3/4"C TO PANEL WNL2 FOR HEAT TRACE. SWITCH
SHALL BE 20A, 1-POLE, 120V HEAVY DUTY. COORDINATE WITH MECHANICAL
CONTRACTOR FOR SWITCH AND CONNECTIONS LOCATION
5 PROVIDE DEVICE BOX AND 3/4"C WITH PULL STRING FROM DOOR OPERATOR
TO DEVICE BOX FOR PUSH PLATE OR WAVE PLATE.
sjeffries Snapshot sjeffries Snapshot sjeffries Cloud sjeffries Arrow sjeffries Arrow sjeffries Text Box Two combination receptacle/data outlet floor boxes be added to conference room 2748. Refer to Key Note 1 on this sheet and floor slab penetration detail on E501 for additional instructions. Connect floor boxes to circuit WNL1-17.