Technical Questions-542-401-Coatesville PA.pdf
PDF 104 KB Posted
- Attached to
- C1DZ--Construct New CLC Phase 1-Coatesville, PA
- Solicitation number
- 36C77624R0033
About this file
This document contains technical questions and responses related to solicitation number 36C77624R0033 for the construction of a new Community Living Center (CLC) in Coatesville, Pennsylvania. The first phase of the project will provide the first CLC unit and extend underground utilities for the full community of CLC units and associated neighborhood center, with the potential to include the neighborhood center if budget allows. Questions addressed the lack of a Statement of Work, confirmation that the number of beds per unit will follow the VA Small House Model Design Guide of 10 to 14 beds, and clarification that the heating system must comply with the VA HVAC Design Manual and can utilize the campus central steam boiler plant.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION # 36C77624R0033
PROJECT NAME: CONSTRUCT NEW CLC COATESVILLE, PA
TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET
ITEM
NO.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
1. 12/6/2023 Section 4, under Factor 1: Specialization Experience and Technical Competence, of the solicitation document references the “Statement of Work” for this project. We did not see a Statement of Work (SOW) attachment on SAM.gov. Are you able to post/provide one ahead of the December 29th submission due date?
The Statement of Work will be added to SAM.gov via an amendment.
2. 12/4/2023 A SOW document was not provided as an attachment. We request that a SOW for this project be provided.
The Statement of Work will be added to SAM.gov via an amendment.
3. 12/4/2023 How many beds will be in this new CLC?
Per the VA Small House Model Design Guide, there are to be 10, 12 or 14 beds per unit. The first phase would provide first CLC unit and extend underground utilities for the full community of CLC units and associated community center. Note: The neighborhood center (an interconnecting structure between CLC units) could be included if budget allows.
ITEM
NO.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
4. 12/4/2023 What is the proposed heating source for the new CLC Building?
The heating must comply with the VA HVAC Design Manual. The Coatesville VAMC campus has a central steam boiler plant.
5.