36C77624B0001.docx

DOCX document 20 KB Posted

Attached to
Y1DA--590-220 Construct Rehab Medicine Facility Minor Construction - Hampton, VA (VA-23-00024211)
Solicitation number
36C77624B0001
Issued by

About this file

This document outlines a federal contract opportunity for minor construction services at the Hampton VA Medical Center in Virginia. The scope of work involves demolishing an existing building and constructing a new Rehab Medicine Facility, with light renovations to existing areas being vacated. Services required include general construction, alterations, electrical work, concrete work, and masonry work. The project is to be completed within 910 calendar days of the notice to proceed and must be phased to avoid interrupting current healthcare services. The solicitation number is 36C77624B0001 and responses are due by September 18, 2023 at 12:00 PM Eastern Time. The estimated value is between $5-10M and the set-aside is for SDVOSBC firms.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

590-220 Construct Rehab Medicine Facility Minor Construction - Hampton, VA (VA-23-00024211)

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
44131
SOLICITATION NUMBER*
36C77624B0001
RESPONSE DATE/TIME/ZONE
09-18-2023 12:00 PM EASTERN TIME, NEW YORK, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
Y1DA
NAICS CODE*
236220
PLACE OF PERFORMANCE
Hampton VA Medical Center

100 Emancipation Drive

Hampton Virginia

POSTAL CODE
23667-0001

COUNTRY

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Boulevard, Suite 490 Independence OH 44131

POINT OF CONTACT*

Contract Specialist Arianne De Los Reyes Arianne.DeLosReyes@va.gov 216-447-8300, x3344

ADDITIONAL INFORMATION

AGENCY’S URL
http://www.va.gov/
URL DESCRIPTION
Department of Veterans Affairs Homepage

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

Presolicitation Notice Presolicitation Notice

DESCRIPTION

*=Required Field
Presolicitation Notice

Presolicitation Notice

Project 590-220 Construct Rehab Medicine Facility – Hampton, Virginia Construction Scope of Work Project Background:

This scope of work is for the minor construction Project 590-220 for the construction of the Rehab Medicine Facility and the demolition of the existing Building 52 located at the Hampton VA Medical Center. Complete demolition of the existing Building 52 as indicated in the construction documents. The work must be performed in a careful manner protecting.

from damage those items not to be removed.

Careful coordination of all demolition work on Building 52 site and areas in Building 110B shall be completed with COR prior to beginning work. The new construction consists of, but is not limited to, construction of Building 46 and light renovation of Rehab Medicine areas being vacated from Building 110B.

Statement of Work:

The Contractor shall provide all labor, materials, and equipment to accomplish the project per construction drawings and specifications. The contractor shall provide all tools, labor, materials, equipment, supervision, professional services, and expertise required to perform general construction, alterations, electrical work, concrete work, masonry work, grading, grubbing, seeding, necessary removal and disposal of existing trees, structures, and certain other items as indicated in the construction documents. The contractor shall manage and perform Construction Period Services (CPS) as further defined in the contract to include, but not limited to, permitting, demolition, construction, construction management, submittals, equipment, scheduling, inspection and testing, environmental protection, recording of (As-Built) drawings and project closeout. The contractor shall also develop a schedule demonstrating fulfillment of the contract requirements such as: Project Schedule, Contractor Quality Control, Work Breakdown Structure (WBS) Plan, Environmental Plan and all other plans listed within this document to include deliverables. The Contractor shall keep the project schedule up to date in accordance with the requirements of the contract and shall utilize the plan for scheduling, coordinating, and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). This work includes, but is not limited to:

Demolition:

a. Complete demolition of the existing Building 52 as indicated in the construction documents.

b. Work must be performed in a careful manner protecting from damage those items not to be removed.

c. Careful coordination of all demolition work on Building 52 site and areas in Building 110B shall be completed with COR prior to beginning work.

New construction consists of, but is not limited to:

a. Construction of Building 46.

b. Light renovation of Rehab Medicine areas being vacated from Building 110B.

Additional project specific notes:

a. Items not noted as to be demolished shall be protected from damage. Any damage not caused by the owner or deemed to be normal wear shall be corrected by the contractor with no additional time and/or money.

b. Temporary construction items such as dust walls, safety barriers, etc. shall be the responsibility of the contractor. Obtain approval from VA staff prior to the installation of such temporary construction.

c. Coordinate with the VA COR prior to performing shutdowns of electrical power systems, HVAC equipment, chilled water systems, and fire suppression systems for modifications and tie-ins.

d. Phasing: Refer to drawings for phasing information.

As a working hospital the adjacent spaces and functions will need to be maintained and a high degree of coordination and scheduling will be required to allow the continuation of the existing hospital services during the entire construction project.

All work to be completed at the Hampton VA Medical Center – 100 Emancipation Drive; Hampton, Virginia 23667.

Work is to be completed within 910 calendar days from Notice to Proceed (NTP).

Construction Phasing Project to be phased to not interrupt current health care services provided throughout the existing facility. Plans to be developed by the Contractor and approved by the VA to eliminate interruptions or kept to an absolute minimum.

Emergency egress shall not be compromised during construction. Contractor parking and staging areas have not been identified. Staging for construction materials will be available as close as possible to affected building, if necessary, during construction.

Contractor is responsible for building construction/demolition remediation throughout construction process until the work is accepted by the VA. Contractor to coordinate with VA COR prior to all construction phasing and staging while on station.

The Contractor will only be afforded access to the VAMC from the exterior ‘work side’ and no access will be afforded the Contractor in or through VAMC spaces.

Justification for this Project:

This Project is required to provide to the VAMC the space and facilities to provide updated rehabilitation services to the veteran population in this community. Additionally, this project has been determined to be a Bona Fide need by the Hampton VAMC, the VISN 6 Capital Asset Manager, and the VHA Healthcare Environment and Facilities Programs (HEFP).

*****END OF SCOPE*****