657-101 100PCT Combined Specs_rev1 (3).pdf
PDF 32 MB Posted
- Solicitation number
- 36C77623R0194
About this file
This is a summary of a federal contract opportunity to construct an addition to an Urgent Care Clinic building for the Department of Veterans Affairs. Solicitation number 36C77623R0194 calls for offers to construct a new building addition for the VA-24-00003283 Urgent Care Clinic. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency. Offerors should submit responses by the deadline to provide construction services for a new Urgent Care Clinic building addition. The summary provides key details about the products and services required, the awarding agency, and response deadline for interested contractors to construct this new VA healthcare facility building project.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs Jefferson Barracks
St. Louis, MO
Project Number 657-101
(VEG 21.02)
Construct Urgent Care Clinic Building Addition
100% Not For Construction Submittal
Specifications
December 1, 2022
750 W. HAMPDEN AVE. #300
ENGLEWOOD, CO 80110
Ph (720) 550-6307
05/12/2022
M
OSE JS ACOBS
56381 12/01/22
05-01-21
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 03-20
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 03-19
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 01-21
01 81 13 Sustainable Construction Requirements 10-17
01 83 16.01 Blast Performance Requirements -
01 91 00 General Commissioning Requirements 10-15
01 91 00A Commissioning Plan Appendix -
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 15 13 PVC Water Stops -
03 30 00 Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17
04 20 00 Unit Masonry 08-17
04 72 00 Cast Stone Masonry 01-21
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 21 00 Steel Joist Framing 11-18
05 31 00 Steel Decking 01-21
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022 100% Bid Documents
657-101JB
00 01 10 - 2
05 40 00 Cold-Formed Metal Framing 01-21
05 50 00 Metal Fabrications 08-18
05 51 50 Roof Access Ladders -
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 10 00 Geocomposite Drainage Mat -
07 11 13 Bituminous Dampproofing 01-21
07 21 13 Thermal Insulation 01-21
07 22 00 Roof and Deck Insulation 01-21
07 22 70 Fall Protection Devices -
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21
07 60 00 Flashing and Sheet Metal 01-21
07 71 00 Roof Specialties 01-21
07 72 00 Roof Accessories 01-21
07 72 33 Roof Hatches -
07 72 33.1 Roof Hatch Rail System -
07 81 00 Applied Fireproofing (UNDER DEVELOPMENT) 10-17
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 10-17
07 95 13 Expansion Joint Cover Assemblies (UNDER DEVELOPMENT) 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 14 23 Impact Resistant Interior Doors 06-20
08 17 10 Integrated Door Assemblies 01-21
08 31 13 Access Doors and Frames 01-21
08 41 13 Aluminum-Framed Entrances and Storefronts 01-21
08 44 13 Glazed Aluminum Curtain Walls (UNDER DEVELOPMENT) 04-20
08 45 23 Insulated Translucent Fiberglass Sandwich Panel
Skylight System
02-15
08 71 00 Door Hardware 01-21
08 80 00 Glazing 01-21
08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 30 13 Ceramic/Porcelain Tiling 01-21
09 51 00 Acoustical Ceilings 12-18
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 10 - 3
09 65 13 Resilient Base and Accessories 01-21
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring 05-18
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21
10 21 23 Cubicle Curtain Tracks 01-21
10 26 00 Wall and Door Protection 01-21
10 28 00 Toilet, Bath, and Laundry Accessories 01-21
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System 08-20
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 09-15
12 36 00 Countertops 12-18
12 48 13 Entrance Floor Mats and Frames CUSTOM
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-14
13 49 00 Radiation Protection 02-16
DIVISION 14 – CONVEYING EQUIPEMENT (CUSTOM) (NOT USED)
DIVISION 21 - FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
22 05 12 General Motor Requirements for Plumbing Equipment 09-20
22 05 19 Meters and Gages for Plumbing Piping 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 05 33 Heat Tracing for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 11-19
22 11 23 Domestic Water Pumps 09-15
22 13 00 Facility Sanitary and Vent Piping 09-20
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 10 - 4
22 14 00 Facility Storm Drainage 09-15
22 40 00 Plumbing Fixtures 09-15
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15
22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-20
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 10 00 Facility Fuel Oil Systems 04-20
23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20
23 22 13 Steam and Condensate Heating Piping 02-20
23 23 00 Refrigerant Piping 02-20
23 25 00 HVAC Water Treatment 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 36 00 Air Terminal Units 02-20
23 37 00 Air Outlets and Inlets 02-20
23 40 00 HVAC Air Cleaning Devices 03-20
23 73 00 Indoor Central-Station Air-Handling Units 03-20
23 81 00 Decentralized Unitary HVAC Equipment 03-20
23 82 00 Convection Heating and Cooling Units 03-20
23 82 16 Air Coils 03-20
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 39 Underfloor Raceways for Electrical Systems 01-18
26 05 41 Underground Electrical Construction 01-17
26 05 73 Overcurrent Protective Device Coordination Study 01-18
26 08 00 Commissioning of Electrical Systems 11-16
26 09 23 Lighting Controls 01-18
26 22 00 Low-Voltage Transformers 01-18
26 24 16 Panelboards 01-18
26 24 19 Motor Control Centers 01-18
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 10 - 5
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-17
26 41 00 Facility Lightning Protection 01-17
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 11-21
27 05 33 Conduits and Backboxes for Communications Systems 11-21
27 05 36 Cable Trays for Communications Systems 11-21
27 10 00 Structured Cabling 11-21
27 11 00 Communications Equipment Room Fittings 06-15
27 11 16 Communications Cabinets, Racks, Frames and Enclosures 11-21
27 11 19 Communications Termination Blocks and Patch Panels 11-21
27 11 26 Communications Rack Mounted Power Protection and Power
Strips
11-21
27 13 13 Communications Copper Backbone Cabling 11-21
27 13 13.13 Communications Copper Cable Splicing and Terminations 11-21
27 13 23 Communications Optical Fiber Backbone Cabling 11-21
27 15 13 Communications Copper Horizontal Cabling 11-21
27 15 13.13 Communications Optical Fiber Cable Splicing and
Terminations
11-21
27 41 31 Master Antenna Television Equipment and Systems 06-15
27 51 16 Public Address and Mass Notification Systems 10-18
27 52 23 Nurse Call and Code Blue Systems 12-20
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11
28 26 00 Electronic Personal Protection System 09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 07-16
DIVISION 32 – EXTERIOR IMPROVEMENTS
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 10 - 6
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 13 16 Special Finish Concrete Paving custom
32 13 73 Concrete Paving Joint Sealants custom
32 14 13.19 Permeable Interlocking Concrete Unit Paving custom
32 14 40 Stone Unit Paving custom
32 17 23 Pavement Markings 08-16
32 17 26 Tactile Warning Surfacing custom
32 90 00 Planting 08-16
32 90 00 Bio-Retention -
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 11-16
33 10 00 Water Utilities 03-17
33 30 00 Sanitary Sewer Utilities 06-13
33 40 00 Storm Sewer Utilities 12-17
33 44 19.13 In-line Utility Storm Water Filters custom
33 46 13 Foundation Drainage 10-11
33 51 00 Natural Gas Distribution 10-11
DIVISION 34 – TRANSPORTATION
34 71 13 Passive Vehicle Barriers 04-18
DIVISION 48 – Electrical Power Generation (NOT USED)
Construct Urgent Care St. Louis, MO
December 1, 2022
05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
SHEET
NUMBER SHEET NAME
GENERAL
GI001 COVER - VOLUME 1
GI003 GENERAL INFORMATION AND ABBREVIATIONS
GI004 ACCESSIBILITY STANDARDS
GI005 FIRST FLOOR DEPARTMENTAL PLAN
GI110 CODE DATA SHEET
GI111 FIRST FLOOR LIFE SAFETY PLAN
CIVIL
VF101 TOPOGRAPHIC AND IMPROVEMENT SURVEY
C100 CIVIL GENERAL NOTES AND LEGENDS
CD101 CIVIL - DEMOLITION PLAN
CG101 OVERLOT GRADING PLAN
CG102 EXISTING CONDITIONS MAJOR DRAINAGE BASINS
CG103 EXISTING CONDITION STORMWATER DRAINAGE PLAN
CG104 DEVELOPED STORMWATER DRAINAGE PLAN
CG105 EROSION CONTROL PLAN INITIAL BMPS
CG106 EROSION CONTROL PLAN INTERIM BMPS
CG107 EROSION CONTROL PLAN FINAL BMPS
CG401 DETAILED GRADING PLAN
CG402 DETAILED GRADING PLAN
CG501 EROSION CONTROL BMP DETAILS
CG502 EROSION CONTROL BMP DETAILS
CG601 COORDINATE POINT SCHEDULE
CG602 DEVELOPED STORMWATER RUNOFF CALCULATIONS
CS101 CIVIL - SITE PLAN
CS301 CIVIL SITE DETAILS CONCRETE RETAINING WALL
CS501 CIVIL SITE DETAILS CURB & SIDEWALK
CS502 CIVIL SITE DETAILS POST, POLE BASE, DOME PANEL
CS503 CIVIL SITE DETAILS - WATER QUALITY CONTROL DETAILS
CS504 CIVIL SITE DETAILS - CONCRETE RETAINING AND STONE WALLS
CU101 CIVIL - OVERALL UTILITY PLAN
CU301 SANITARY SEWER PLAN AND PROFILE
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 15 - 2
CU302 STORM SEWER PLAN AND PROFILE - 1
CU303 STORM SEWER PLAN AND PROFILE - 2
CU304 STORM SEWER PLAN AND PROFILE - 3
CU305 STORM DRAINAGE SWALE PLAN AND PROFILE
CU306 CIVIL - HYDRANT/WATER SERVICE MODIFICATION PLAN & PROFILE
CU501 CIVIL UTILITY DETAILS WATER DISTRIBUTION SYSTEM
CU502 CIVIL UTILITY DETAILS WATER DISTRIBUTION SYSTEM
CU503 CIVIL UTILITY DETAILS - STORM AND SANITARY SEWER
CU504 CIVIL UTILITY DETAILS STORM DRAIN BASINS
CU505 CIVIL UTILITY DETAILS STORM SEWER INLET DETAILS
CU506 CIVIL UTILITY DETAILS DOWNSPOUTS AND UNDERDRAINS
CU507 CIVIL UTILITY DETAILS FUEL OIL SUPPLY LINE
CU508 CIVIL UTILITY DETAILS DETENTION STRUCTURE
CU509 CIVIL UTILITY DETAILS DETENTION STRUCTURE
LANDSCAPE
L-001 LANDSCAPE GENERAL NOTES AND ABBREVIATIONS
LD101 LANDSCAPE DEMOLITION PLAN
LS101 SITE PLAN
LS401 ENLARGED HARDSCAPE PLANS
LS501 SITE HARDSCAPE DETAILS
LP101 OVERALL PLANTING PLAN
LP401 ENLARGED PLANTING PLANS
LP402 ENLARGED PLANTING PLANS
LP403 ENLARGED PLANTING PLANS
LP501 PLANTING DETAILS
STRUCTURAL
S-001 STRUCTURAL NOTES
S-002 STRUCTURAL ABBREVATIONS, NOTES, AND SYMBOLS
S-003 SPECIAL INSPECTIONS
S-004 LOAD KEY PLAN
SB109 CAISSON PLAN
SB110 GRADE BEAM PLAN
SB111 SLAB PLAN - FIRST FLOOR
SB511 FOUNDATION DETAILS
SB512 FOUNDATION DETAILS
SB513 FOUNDATION DETAILS
SB514 FOUNDATION DETAILS
SF110 FRAMING PLAN - OVERALL
SF111 FRAMING PLAN - ENTRANCE ROOF & CORRIDOR ROOF
SF112 FRAMING PLAN - MAIN ROOF
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 15 - 3
SF113 FRAMING PLAN - IMAGING ROOF & HIGH ROOF AND ENTRANCE SAIL
SF211 FRAMING ELEVATIONS
SF212 FRAMING ELEVATIONS
SF311 FRAMING SECTIONS
SF312 FRAMING SECTIONS
SF313 FRAMING SECTIONS
SF314 FRAMING SECTIONS
SF315 FRAMING SECTIONS
SF320 WALL SECTIONS
SF321 WALL SECTIONS
SF411 ENLARGED FRAMING PLANS
SF511 STEEL FRAMING DETAILS
SF512 STEEL FRAMING DETAILS
SF513 COLD FORM STEEL FRAMING DETAILS
SF514 STEEL FRAMING DETAILS
SF515 STEEL FRAMING DETAILS
SF516 STEEL FRAMING DETAILS
SF521 BRACED FRAME DETAILS
SF531 ROOF AND ENVELOPE DETAILS
SK901 ISOMETRIC VIEWS
GENERAL
GI002 COVER - VOLUME 2
ARCHITECTURAL
AD111 FIRST FLOOR DEMOLITION PLAN
A-110 FIRST FLOOR DIMENSION PLAN
A-111 FIRST FLOOR ANNOTATION PLAN
A-121 FIRST FLOOR REFLECTED CEILING PLAN
A-131 ROOF PLAN
A-141 FIRST FLOOR FINISH PLAN
A-151 EQUIPMENT FLOOR PLAN
A-210 EXTERIOR ELEVATIONS
A-220 INTERIOR ELEVATIONS
A-221 INTERIOR ELEVATIONS
A-222 INTERIOR ELEVATIONS
A-310 BUILDING SECTIONS
A-311 BUILDING SECTIONS
A-320 WALL SECTIONS
A-321 WALL SECTIONS
A-322 WALL SECTIONS
A-323 WALL SECTIONS
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 15 - 4
A-324 WALL SECTIONS
A-325 WALL SECTIONS
A-410 ENLARGED PLANS
A-412 ENLARGED REFLECTED CEILING PLAN
A-420 ENLARGED ELEVATIONS
A-430 CASEWORK SECTIONS
A-431 CASEWORK SECTIONS
A-510 PLAN DETAILS
A-511 PLAN DETAILS
A-520 CEILING DETAILS
A-530 SECTION DETAILS
A-531 SECTION DETAILS
A-532 SECTION DETAILS
A-533 SECTION DETAILS
A-540 PROFILE DETAILS
A-610 WALL TYPE SCHEDULE AND DETAILS
A-620 DOOR SCHEDULE AND TYPICAL DOOR/WINDOW DETAILS
A-640 FINISH SCHEDULE, LEGEND AND TYPICAL FINISH DETAILS
A-641 FINISH MATERIALS PALETTE
A-910 INTERIOR PERSPECTIVES
A-911 EXTERIOR PERSPECTIVES
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOLS AND LEGENDS
FA111 FIRE ALARM PLAN - FIRST FLOOR
FIRE PROTECTION
FX001 FIRE SUPPRESSION GENERAL NOTES, SYMBOLS AND LEGENDS
FX111 FIRE SUPPRESSION HAZARD PLAN - FIRST FLOOR
FX121 FIRE SUPPRESSION RCP - FIRST FLOOR
PLUMBING
P-001 PLUMBING ABBREVIATIONS, SYMBOLS, AND LEGENDS
P-601 PLUMBING SCHEDULES AND DETAILS
PP111 PLUMBING PIPING PLAN - FIRST FLOOR
PW110 PLUMBING SANITARY PLAN - BELOW GRADE
PW111 PLUMBING SANITARY PLAN - FIRST FLOOR
PW112 PLUMBING SANITARY PLAN - ROOF
PG111 PLUMBING MEDICAL GAS PLAN - FIRST FLOOR
PP501 PLUMBING DOMESTIC WATER DIAGRAM
PP901 PLUMBING DOMESTIC WATER ISOMETRIC
PW901 PLUMBING SANITARY AND STORM ISOMETRIC
PG901 PLUMBING MEDICAL GAS ISOMETRIC
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 15 - 5
MECHANICAL
M-001 MECHANICAL ABBREVIATIONS AND GENERAL NOTES
M-002 MECHANICAL SYMBOLS AND LEGENDS
M-601 MECHANICAL EQUIPMENT SCHEDULES
MH111 MECHANICAL HVAC PLAN - FIRST FLOOR
MH112 MECHANICAL HVAC PLAN - ROOF
MH901 MECHANICAL DUCTWORK ISOMETRIC DIAGRAM
MP111 MECHANICAL PIPING PLAN - FIRST FLOOR
MP901 MECHANICAL PIPING ISOMETRIC DIAGRAM
M-301 MECHANICAL SECTIONS
M-401 MECHANICAL ENLARGED PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DETAILS
M-507 MECHANICAL DETAILS
M-701 MECHANICAL CONTROLS
M-702 MECHANICAL CONTROLS
ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
E-002 ELECTRICAL SYMBOLS
ED101 ELECTRICAL LIGHTING SITE DEMOLITION PLAN
EL111 ELECTRICAL LIGHTING SITE PLAN
EL121 FIRST FLOOR ELECTRICAL LIGHTING PLAN
EL122 FIRST FLOOR ELECTRICAL LIGHTING CONTROL PLAN
EL123 UPPER CEILING ELEC. LIGHTING AND LIGHTING CONTROL PLAN
EP111 FIRST FLOOR ELECTRICAL POWER PLAN
EP112 ROOF ELECTRICAL POWER PLAN
EP121 LIGHTNING PROTECTION ROOF PLAN
EP131 POWER MAIN FEEDER ROUTING PLAN
EP411 FIRST FLOOR ELECTRICAL ENLARGED PLANS
ET111 FIRST FLOOR ELECTRICAL TELECOM PLAN
ET411 FIRST FLOOR ELECTRICAL TELECOM ENLARGED PLANS
ET412 FIRST FLOOR TELECOM ELEVATIONS
ET413 FIRST FLOOR TELECOM ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
00 01 15 - 6
E-504 ELECTRICAL DETAILS
E-601 ELECTRICAL EQUIPMENT SCHEDULE
E-602 ELECTRICAL ONE-LINE DIAGRAM
E-603 ELECTRICAL TELCOM BACKBONE RISER
E-604 ELECTRICAL PANEL SCHEDULES
E-605 ELECTRICAL PANEL SCHEDULES
E-606 ELECTRICAL PANEL SCHEDULES
E-609 ELECTRICAL LUMINAIRE SCHEDULE
E-610 LIGHTING CONTROL SCHEDULES
E-611 LIGHTING CONTROL WIRING DIAGRAMS
E-612 LIGHTING CONTROL WIRING DIAGRAMS
- - - END - - -
St. Louis, MO
December 1, 2022
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish equipment, testing, labor and materials and perform work for Construct
Urgent Care Clinic Addition at the Jefferson Barracks VAMC as required by drawings and specifications.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting
Officer.
C. Offices of Valhalla Engineering Group, LLC., as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the
Government without affirmations by Contracting Officer/COR or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by the Contractor, the Contractor shall notify the
COR in sufficient time to enable the COR to be present at the site in time to observe proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR. Provide COR with copies of all testing results and reports.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. Any reference to “Resident Engineer” or “Project Engineer” are synonymous with “COR”.
G. Contractor Work Hours:
1. Normal working hours for this contract will be from 7:00AM to 4:30PM
(local time) Monday through Friday except for weekends and established Federal Holidays.
2. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -2 submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID Work includes general construction, alterations, roads, walks, grading, drainage, and as necessary removal of existing structures and construction and certain other items as depicted on the construction drawings.
B. DEDUCT ALTERNATE NO. 1: Delete the raised landscape planter boxes on the north and south sides of the main entrance, including structural foundations. Landscape material to be maintained and planted in a planter bed at grade. Provide brick veneer construction on exterior walls where planters are removed. Period of performance to be reduced by (0) days.
C. DEDUCT ALTERNATE NO. 2: Deduct Alternate No. 1 scope and, delete new paved north parking lot including all sidewalks, retaining walls, storm sewer, site lighting, etc. Main east-west drive and southern-most accessible parking stalls to be maintained. Period of performance to be reduced by (0) days.
D. DEDUCT ALTERNATE NO. 3: Deduct Alternate No. 2 scope and, delete the fiberglass sandwich panel skylight and roof curbs in TEAM WORKROOM 139.
Add structural joists, roof assembly and suspended acoustic tile ceiling (installed as high as possible) in place of skylight. Period of performance to be reduced by (0) days.
E. DEDUCT ALTERNATE NO. 4: Deduct Alternate No. 3 scope and, delete
Medical Oxygen and Medical Vacuum from all exam rooms except for
PROCEDURE ROOM 132. Period of performance to be reduced by (0) days.
F. DEDUCT ALTERNATE NO. 5: Deduct Alternate No. 4 scope and, delete suspended acoustic ceiling clouds above CHECK-IN 102. Provide additional recessed can lighting in high ceiling in lieu of ceiling cloud lighting. Period of performance to be reduced by (0) days.
G. DEDUCT ALTERNATE NO. 6: Deduct Alternate No. 5 scope and, delete all interior partitions and interior finishes between Grid Lines 1 & 6 and between Grid Lines C9 & D3. Rough in all mechanical, plumbing, and electrical and maintain a minimum amount of mechanical supply and return air and lighting as required by code for storage areas. Period of performance to be reduced by (0) days.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -3
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge and documentation of flu shot and
Attestation of Covid-19 vaccination. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer/COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer/COR. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting
Officer/COR.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -4
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer/COR upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer/COR.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer/COR and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer/COR. The Contractor shall hold and save the
Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer/COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer/COR, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer/COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -5
Officer/COR. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as shown on the drawings. and as approved by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas. Provide unobstructed access to Medical
Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
H. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -6 intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR (3) three weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor, as indicated on Drawings.
I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.
Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm
(one inch) above grade. Remove the fence when directed by COR.
J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -7
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 21 days in advance of proposed interruption.
Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center . Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 21 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped, or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of buildings in which alterations occur and areas which are anticipated
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -8 routes of access, and furnish a report, signed by both, to the
Contracting Officer/COR. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.
Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -9 floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center .
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer/COR.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer/COR may have the necessary work performed and charge the cost to the Contractor.
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -10
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils, and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge
Elimination System (NPDES) permit is required for this project. The
Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.
Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the
Contractor's method of operations and operations planning and the
Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
1. Designating areas for equipment maintenance and repair.
2. Providing waste receptacles at convenient locations and provide regular collection of wastes.
3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters.
4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
5. Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -11
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA – SOIL CONDITIONS
A. Data and information furnished or referred to below is for the
Contractor's information. The Government shall not be responsible for any interpretation of, or conclusion drawn from the data or information by the Contractor.
1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by SCI
Engineering, Inc. 130 Point West Boulevard, St. Charles, MO 63301.
(FAR 52.236-4)
B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.
C. A copy of the soil report will be made available for inspection by bidders upon request to the COR at the VA Medical Center, Jefferson
Barracks, St. Louis, MO, and shall be considered part of the contract documents.
D. Government does not guarantee that other materials will not be encountered, nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of
Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.
The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -12
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and benchmarks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The
Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer/COR. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer/COR until authorized to remove them. If such marks are destroyed by the Contractor or through
Contractor's negligence before their removal is authorized, the
Contracting Officer/COR may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish, and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work.
Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities, and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities, and other major controlling features) is placed.
D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.
Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall furnish to the
COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.
1. Lines of each building and/or addition.
Jefferson Barracks VA Medical Center Construct Urgent Care St. Louis, MO
December 1, 2022
01 00 00 -13
2. Elevations of bottoms of footings and tops of floors of each building and/or addition.
3. Lines and elevations of sewers and of all outside distribution systems.
4. Lines of elevations of all swales and interment areas.
5. Lines and elevations of roads, streets and parking lots.
E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
F. Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty-foot stationing along new road centerlines. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.
G. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of
Article "Professional Surveying Services".
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications, and clarifications.
B. All variations shall be shown in the same general detail as used in the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .