Attachment 2 - PRS r1.docx
DOCX document 15 KB Posted
- Attached to
- Q517--Staffing Service - Leavenworth CMOP
- Solicitation number
- 36C77022R0009
About this file
This document appears to be an attachment to a Performance Requirements Summary (PRS) for a federal contract opportunity related to staffing services for the Leavenworth CMOP. The PRS outlines key performance objectives, standards, and methods of surveillance for the contract, including requirements for contracted position fill rates, employee training, timely reporting, productivity standards for pharmacy technicians and shippers/packers, and overall compliance surveillance.
The related federal contract opportunity is Solicitation Number 36C77022R0009, a requirement for Leavenworth CMOP Staffing Services issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 15. The PRS provides details on the specific performance metrics and monitoring methods the government will use to assess the contractor's performance on this contract.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 Leavenworth CMOP Staffing Service Performance Objective (Include PWS Ref)
| Performance Standard |
| Performance |
Threshold Method of Surveillance
| 8.3 |
| Contracted numbers of positions filled. |
| A minimum of |
97% per shift for each CLIN 100% inspection of contractor records; visual surveillance of production floor.
| 8.6 |
| All Employees have a current training file. |
| 100% |
| Periodic inspection of current personnel; 100% inspection of new personnel |
| 8.8, 8.15, 9, 14.1 |
| Provide timely reporting as per performance work statement. |
| 100% |
| 100% inspection of contractor reports and records. |
| 10.3.1 |
| Contract pharmacy technicians and pharmacists must meet VA employee standards of productivity. |
| 100% |
Periodic inspection of contractor records; visual surveillance of production floor.
| 10.3.2 |
| Shipper/Packer performance standards will be based on the expected productivity in each assigned area (auto packing, semi-auto packing and manual packing). |
| 80% |
| Periodic inspection of contractor records; visual surveillance of production floor. |
Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.
Performance Requirements Summary
File details come from the government source that posted it. Updated .