This is a Single Source Justification Form for a simplified acquisition procurement by the Department of Veterans Affairs (DVA).
The Fargo VA Medical Center (VISN 23) is procuring design professional services valued at $25,000.00 to review existing design documents and shop drawings, evaluate the floor-joist system, and determine the floor-loading capacity of a proposed training area. The acquisition plan action ID is 36C263-27-AP-1124, and the internal project code is 2237: 437-27-1-6058-0176. The justification for single-source procurement centers on the urgent timeline mandated by Oracle's Electronic Health Record Modernization (EHRM) program implementation schedule. The facility's designated go-live date establishes fixed installation, configuration, and end-user training schedules that cannot accommodate delays in facility preparation. The document asserts that any delay in resolving floor-load concerns could disrupt the training schedule and jeopardize the go-live timeline, with potential adverse effects on patient care including delayed test results, inaccurate documentation, and scheduling difficulties. Due to this urgent and compelling need, the facility waived market research and requested sole-source procurement authority. The contracting officer, Steven Ashby, certified approval of the purchase in accordance with FAR 13.106-1(b) on November 10, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26327P0073_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for MPT up to SAT
Revision: 02 Effective Date: 12/30/2025 Page 1 of 2 Acquisition ID#
DEPARTMENT OF VETERANS AFFAIRS
Justification for Single Source Awards IAW FAR 13.106-1 For
Over Micro-Purchase Threshold but Not Exceeding the Simplified Acquisition Threshold
Acquisition Plan Action ID: 36C263-27-AP-1124
1. Contracting Activity: Department of Veterans Affairs, VISN 23, 437 Fargo VA
Medical Center 2237: 437-27-1-6058-0176
2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount: $25,000.00 The Fargo VA Medical Center requires the services of a qualified and appropriately licensed/certified design professional or firm to review the existing design documents and shop drawings, evaluate the floor-joist system, and determine the floor-loading capacity of the proposed training area.
3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used: Oracle is the technology platform supporting the Electronic Health Record Modernization (EHRM) program and establishes the rollout schedule, including the facility’s designated go-live date.
This date determines the required installation, configuration, and end-user training schedule, which the facility must accommodate.
To meet these requirements, the facility must provide a safe and adequately sized training area. Any delay in completing the necessary facility preparations, including resolution of floor-load concerns, could disrupt the established training schedule and jeopardize the go-live timeline. Such delays may adversely affect patient care by contributing to delayed test results, inaccurate or incomplete documentation, and reduced patient engagement, including difficulty scheduling appointments.
The floor-load issues must therefore be addressed immediately to ensure that the Fargo facility can comply with the required EHRM installation and training schedule and avoid operational and patient-care impacts.
4. Description of market research conducted and results or statement why it was not conducted: Due to the urgent and compelling need to meet the schedule established by Oracle for the EHRM implementation, the facility is requesting approval to proceed with this procurement on a sole-source basis. The schedule requires the necessary work to be completed within a timeframe that does not allow https://www.acquisition.gov/?q=/browse/far/13
VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for MPT up to SAT
Revision: 02 Effective Date: 12/30/2025 Page 2 of 2 Acquisition ID# for a competitive solicitation without risking delays to installation, training, and the planned go-live date.
5. Contracting Officer's Certification: Purchase is approved in accordance with FAR
13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.
Name Date Title https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125466 https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125466
| 2026-11-10T11:00:39-0600 | |
| STEVEN ASHBY |
File details come from the government source that posted it. Updated .