Single Source Justification for Design Professional Services
This is a Single Source Justification form for a Department of Veterans Affairs procurement under simplified acquisition procedures for an amount exceeding the micro-purchase threshold but not exceeding the simplified acquisition threshold. The Fargo VA Medical Center (VISN 23) is seeking a qualified and appropriately licensed/certified design professional or firm to review existing design documents and shop drawings, evaluate the floor-joist system, and determine the floor-loading capacity of a proposed training area. The estimated contract value is $25,000.00, with Acquisition Plan Action ID 36C263-27-AP-1124.
The justification for single-source procurement centers on urgent operational constraints imposed by the Oracle Electronic Health Record Modernization (EHRM) program's fixed implementation timeline and designated go-live date for the facility. The floor-load assessment must be completed immediately to support the required facility preparations for EHRM installation, configuration, and end-user training. Any delays in resolving these structural concerns could disrupt the established training schedule and jeopardize the go-live timeline, with potential adverse impacts on patient care including delayed test results, inaccurate documentation, and scheduling difficulties. Due to the compressed timeline that does not permit a competitive solicitation without risking installation and training delays, the facility requested approval to proceed on a sole-source basis. The procurement was approved by Contracting Officer Steven Ashby on November 10, 2026, in accordance with FAR 13.106-1(b).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26327P0073_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for MPT up to SAT
Revision: 02 Effective Date: 12/30/2025 Page 1 of 2 Acquisition ID#
DEPARTMENT OF VETERANS AFFAIRS
Justification for Single Source Awards IAW FAR 13.106-1 For
Over Micro-Purchase Threshold but Not Exceeding the Simplified Acquisition Threshold
Acquisition Plan Action ID: 36C263-27-AP-1124
1. Contracting Activity: Department of Veterans Affairs, VISN 23, 437 Fargo VA
Medical Center 2237: 437-27-1-6058-0176
2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount: $25,000.00 The Fargo VA Medical Center requires the services of a qualified and appropriately licensed/certified design professional or firm to review the existing design documents and shop drawings, evaluate the floor-joist system, and determine the floor-loading capacity of the proposed training area.
3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used: Oracle is the technology platform supporting the Electronic Health Record Modernization (EHRM) program and establishes the rollout schedule, including the facility’s designated go-live date.
This date determines the required installation, configuration, and end-user training schedule, which the facility must accommodate.
To meet these requirements, the facility must provide a safe and adequately sized training area. Any delay in completing the necessary facility preparations, including resolution of floor-load concerns, could disrupt the established training schedule and jeopardize the go-live timeline. Such delays may adversely affect patient care by contributing to delayed test results, inaccurate or incomplete documentation, and reduced patient engagement, including difficulty scheduling appointments.
The floor-load issues must therefore be addressed immediately to ensure that the Fargo facility can comply with the required EHRM installation and training schedule and avoid operational and patient-care impacts.
4. Description of market research conducted and results or statement why it was not conducted: Due to the urgent and compelling need to meet the schedule established by Oracle for the EHRM implementation, the facility is requesting approval to proceed with this procurement on a sole-source basis. The schedule requires the necessary work to be completed within a timeframe that does not allow https://www.acquisition.gov/?q=/browse/far/13
VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for MPT up to SAT
Revision: 02 Effective Date: 12/30/2025 Page 2 of 2 Acquisition ID# for a competitive solicitation without risking delays to installation, training, and the planned go-live date.
5. Contracting Officer's Certification: Purchase is approved in accordance with FAR
13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.
Name Date Title https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125466 https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125466
| 2026-11-10T11:00:39-0600 | |
| STEVEN ASHBY |
File details come from the government source that posted it. Updated .