36C26319R0041-004.pdf

PDF 276 KB Posted

Attached to
Locums Psychiatry Two Psychiatrists
Solicitation number
36C26319R0041
Issued by

About this file

36C26319R0041 D.3 - Attachment 3 - QASP.pdf

View the file

Other files

File Type Posted
36C26319R0041-0001000.docx DOCX document
36C26319R0041-008.pdf PDF
36C26319R0041-001.docx DOCX document
36C26319R0041-005.pdf PDF
36C26319R0041-006.pdf PDF
36C26319R0041-003.pdf PDF
36C26319R0041-002.pdf PDF
36C26319R0041-007.pdf PDF
36C26319R0041-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP)

Page 1 of 8 version 0006 Dated 12/1/2016

The contractor will be evaluated in accordance with the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How monitoring will take place.

• Who will conduct the monitoring?

• How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.

The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Daniel Vagts, Contracting Officer, NCO23

Assigned Contracting Specialist: Steve Porwoll, NCO23

Organization or Agency: Department of Veteran Affairs

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Rhonda Lamke Organization or Agency: VA Central Iowa, Des Moines, Iowa

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.

Primary:

Alternate:

Page 2 of 8 version 0006 Dated 12/1/2016

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. 100% surveillance: This method will not be used.

b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. Inspections scheduled and report quarterly per COR delegation or as needed.

All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.

Encounters and Uniques will be pulled by report per month Peer reviews will be pulled quarterly and completion reports tracked.

Time sheets for attendance to be kept and tracked for payment and timely invoices.

TMS tracking for mandatory trainings.

c. VALIDATED USER/CUSTOMER COMPLAINTS. Reports from staff working in the area and PATS reports will be pulled or polled quarterly and reviewed by the Clinical Coordinator for Mental Health.

d. RANDOM SAMPLING. No applicable

e. Verification and/or documentation provided by Contractor. Not applicable.

Page 3 of 8 version 0006 Dated 12/1/2016

6. QASP PERFORMANCE REPORT

Measures PWS Reference

Performance Requirement

Standard Acceptable Quality Level

Surveillance Method

Met AQL/DID NOT

MEET AQL-

CPAR RATING/ADD

COMMENTS

1-Key Personnel 2.7; 2.7.1 –

2.7.2 2.8 4.6.2;

4.6.2.1

Provide required psychiatric services specified in the requirements.

Qualified personnel are available and in location as needed to properly perform tasks as specified.

95% Time and Attendance Sheets; Staff Observation

2 – Quality Assurance Documentation

4.5.2.1.2.5 4.6.1;

4.6.2;

4.6.2.2

Reviewable records of device quality assurance shall be maintained

Encounter and Uniques reviews.

Approximately 78 encounters and 39 uniques per month should be completed by locums.

Commitment reports to be done on time.

90% Monthly VA workload reports review.

Commitment report tracker.

3 – Quality Assurance Documentation

4.5.3.1.1 4.6.1 4.6.1.1.2 4.6.2;

4.6.2.3

Peer Reviews At least 2 peer reviews per month to be completed on time.

95% Peer Review tracking report.

4- Mandatory Trainings 2.1.6;

2.1.6.1;

2.1.6.2 2.1.6.3;

2.1.6.4 4.6.2;

4.6.2.4

Contractor will complete all required training per VAMC policy.

Contractor will complete all required training per VAMC policy

95% TMS reports or contractor provided documented evidence.

5 – Timely Invoices 4.6.2;

4.6.2.5;

6.2 6.3

The vendor shall provide itemized invoicing by the 10th of the following month that services were provided.

All itemized invoices provided by the 10th day of the following month the services were provided.

95% Inspection of invoices dates and payments.

Page 4 of 8 version 0006 Dated 12/1/2016

Measures PWS Reference

Performance Requirement

Standard Acceptable Quality Level

Surveillance Method

Met AQL/DID NOT

MEET AQL-

CPAR RATING/ADD

COMMENTS

6 – Patient Satisfaction 4.6.2;

4.6.2.6

Contractor shall provide satisfactory care to patients

All contractor psychiatrists provide quality care with excellent customer service that demonstrates respect, understanding and patience

90% Patient feedback or PATS data.

Staff interviews.

Frequency;

quarterly.

Page 5 of 8 version 0006 Dated 12/1/2016

The table below is a sample that can be tailored – note that the table must identify where in the PWS the standards are found for monitoring performance. Check the MSO Customer Resource Center for approved mandatory QASPs.

7. CPAR RATINGS ASSIGNED TO QASP ITEMS:

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/pdfs/CPARS-Guidance.pdf p. A2-1):

EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.

VERY GOOD:

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.

SATISFACTORY:

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.

MARGINAL:

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTO

RY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).

https://www.cpars.gov/pdfs/CPARS-Guidance.pdf

Page 6 of 8 version 0006 Dated 12/1/2016

8. DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR

PERFORMANCE ASSESSMENT REPORT (CPAR).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

See Sample CR on the following page.

9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

COR NAME/TITLE DATE

SIGNED:

CONTRACTOR NAME/TITLE DATE

Page 7 of 8 version 0006 Dated 12/1/2016

CONTRACT REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS ISSUE

3. TO: (Contracting Officer) 4. FROM: (Name of COR)

5. DATES

a. CR PREPARED

b. RETURNED BY

CONTRACTOR:

c. ACTION COMPLETE

6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR Date:

8. SIGNATURE OF CONTRACTING OFFICER Date:

9a. TO (Contracting Officer) 9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE.

(Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:

12. GOVERNMENT EVALUATION.

13. GOVERNMENT ACTIONS

14. CLOSE OUT

NAME TITLE SIGNATURE DATE

CONTRACTOR

NOTIFIED

COR

CONTRACTING

OFFICER

Page 8 of 8 version 0006 Dated 12/1/2016

Binder1
P11 - QASP
P11 - QASP
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: This method will not be used.
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
Alternate:
EXCEPTIONAL:
VERY GOOD:
SATISFACTORY:
MARGINAL:
UNSATISFACTO RY:
DATE: 11/21/18
DATE_2:
Text1:
1 CONTRACT NUMBER:
2 REPORT NUMBER FOR THIS ISSUE:
3 TO Contracting Officer:
4 FROM Name of COR:
5 DATES:
a CR PREPARED:
b RETURNED BY CONTRACTOR:
c ACTION COMPLETE:
6 Issue Identified Describe in detail Include reference to PWS Directive attach continuation sheet if necessary:
7 SIGNATURE OF COR:
Date:
8 SIGNATURE OF CONTRACTING OFFICER:
Date_2:
9a TO Contracting Officer:
9a FROM Contractor:
10 CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE Cite applicable quality control program procedures or new procedures Attach continuation sheets if necessary:
11 SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12 GOVERNMENT EVALUATION:
13 GOVERNMENT ACTIONS:
14 CLOSE OUTRow1:
NAMECONTRACTOR NOTIFIED:
TITLECONTRACTOR NOTIFIED:
SIGNATURECONTRACTOR NOTIFIED:
DATECONTRACTOR NOTIFIED:
NAMECOR:
TITLECOR:
SIGNATURECOR:
DATECOR:
NAMECONTRACTING OFFICER:
TITLECONTRACTING OFFICER:
SIGNATURECONTRACTING OFFICER:
DATECONTRACTING OFFICER:

File details come from the government source that posted it.