36C26319Q0317-0001000.docx
DOCX document 24 KB Posted
- Attached to
- Spill Prevention Control and Countermeasure - NWI Base Year: 05/01/2019 to 04/30/2020 PO: 636C91137
- Solicitation number
- 36C26319Q0317
About this file
36C26319Q0317 0001 36C26319Q0317 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319C0100-000.docx | DOCX document | |
| 36C26319Q0317-001.docx | DOCX document | |
| 36C26319Q0317-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-25-2019 636-19-3-5046-0070 None Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
2501 W. 22nd St.
Sioux Falls SD 57105 Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
2501 W. 22nd St.
Sioux Falls SD 57105 To all Offerors/Bidders
36C26319Q0317 02-25-2019
X X X 03/04/2019 10:00am CST 636-3690162-5045-850300-3255 010040176 636-19-3-5046-0070 X
1 (ONE)
Solicitation 36C263-19-Q-0317 for Spill Prevention Control and Countermeasures for the Nebraska Western-Iowa VA Health Care System is hereby amended. The purpose of this amendment is correct the Statement of Work to change the requirement for "the final reports to be certified by a State licensed Professional Engineer" to "the final re ports to to be certified by a Professional Engineer."
Furthermore, the amendment is to provide answers and clarifications per requests received from potential contractors.
The questions and answers are provided below. Offerors are required to acknowledge this amendment by completeing blocks 15A, 15B, and 15C of this form and returning one copy along with their quote.
All other terms and conditions remain unchanged.
Doug Reed Contracting Officer
VA-VHA-SAOC-2016-AC23EC83
Solicitation 36C263-19-Q-0317 Amendment A00001 Questions and Answers
1 - Is the technical description required to be submitted given the evaluation factor is only based on price?
Price is the only thing required to be submitted.
2 - Just to confirm, past performance information is not required to be submitted?
Past performance information is not to be submitted.
3 - 40 CFR 112 does not mandate that the Professional Engineer certifying the SPCC Plan be registered in the State that the facility is located. Would you please modify this requirement to the plans being certified by a Registered Professional Engineer, omitting the need to be registered in Nebraska?
The solicitation has been amended to drop the “State licensed” requirement and only a Professional Engineer will be required to certify the plans.
4 - Can the Technical and Cost Proposal be submitted by email?
There is no requirement for a technical and cost proposal. The requirement is simple enough that price alone will be sufficient for this solicitation.
5 - Does training need to be conducted in person at each campus or is it possible to conduct the training remotely via an online virtual conferencing tool, such as “GotoMeeting”?
Training shall be held on-site for all three sites.
6 - What is the expected course length of the annual SPCC training?
All courses should be a minimum of 1.5 hours.
7 - Will the government please provide copies of the existing SPCCs for the three campuses for review?
The government will not provide copies of the existing plans for the solicitation. The government will provide copies of the current plans to whomever the contract is awarded to.
8 - We are planning on submitting our response to you via email, is that acceptable?
All quotes need to be submitted via email.
9 - Is this a GSA Schedule contract?
This is not being competed as a GSA contract.
10 - How thorough (with regards to all elements required) is the existing SSPC Plan?
All plans must meet Federal and State requirements. The existing plans meet all Federal and State requirements.
11 - How many tanks, containers, USTs, Oil Filled Equipment are at each site?
Omaha – 5 AST, 1 UST Lincoln – 2 AST, 5 UST Grand Island – 1 AST, 1 UST
Several transformers and oil containing items.
12 - The solicitation states that the contractor shall perform an annual evaluation of each campus's cathodic protection, valves, piping, metering devices and record keeping. Can you please clarify or provide any additional information regarding the extent, quantity, and parameters expected of this annual evaluation and what types of storage/pipeline application the cathodic protection are currently in use?
This requirement is for annual visual evaluations and records review.
13 - Page 6 of 77, Specific Requirements, states the following. “The contractor shall also perform an annual evaluation of each campus’s cathodic protection, valves, piping, metering devices and record keeping required by Federal, State and local agencies such as the EPA and OSHA.” Could you please provide any clarification as to what is exactly needed as part of the annual evaluation it could have an impact on our cost estimate – is it just a visual evaluations/records review only or is specific testing required for the cathodic protection, valves, piping, and metering devices that would require a specialized subcontractor?
A visual evaluation/record review is what is required.
No further questions will be entertained.