36C26319B0012-A00001001.pdf

PDF 67 KB Posted

Attached to
Knoxville Waste Water Plant Diversion
Solicitation number
36C26319B0012
Issued by

About this file

36C26319B0012 A00001 Knoxville Waste Water Plant Diversion Site Visit Questions.pdf

View the file

Other files

File Type Posted
36C26319B0012-A00002000.docx DOCX document
36C26319B0012-A00002001.pdf PDF
36C26319B0012-A00001000.docx DOCX document
36C26319B0012-A00001002.pdf PDF
36C26319B0012-003.docx DOCX document
36C26319B0012-002.docx DOCX document
36C26319B0012-001.docx DOCX document
36C26319B0012-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08/01/2019 Knoxville Waste Water Plant Diversion Site Visit Questions

#1 Section 2.3 > is compaction and density test going to be required for this project?

NOT REQUIRED

#2 Section 3.2.2.1 > is an air test going to be required for this project?

NOT REQUIRED

# 3 > additional fittings needed for the abandonment of the pipe coming from plant is the contractor to provide? or will the VA provide? This is not a major cost just want to know.

NO ADDITIONAL FITTINGS REQUIRED. PLUG THE PIPE COMING FROM THE PUMP HOUSE WITH

CONCRETE AT THE OUTPUT FROM THE PLANT. DO NOT FILL THE PIPE WITH CONCRETE, JUST PLUG THE

END OF THE PIPE AT THE OUTPUT OF THE PLANT.