ATTACHMENT_9--SOW_568-15-225_Canteen_Entry_Upgrades_(1page).docx

DOCX document 15 KB Posted

Attached to
Greenstone--ND/SD CONSTRUCTION MATOC
Solicitation number
36C26318R0063
Issued by

About this file

This document includes an attachment outlining the scope of work for upgrades to the exterior entrance of the Canteen building at the Hot Springs, South Dakota VA Medical Center, as well as a pre-solicitation notice for a multiple award task order contract for construction services.

The scope of work attachment describes planned alterations to the existing canopy and addition of a vestibule at the Canteen entrance, along with concrete, earthwork and electrical work. The completion period is 120 days. The pre-solicitation notice indicates Veterans Integrated Services Network 23 will issue a request for proposal to make multiple indefinite delivery indefinite quantity contract awards for maintenance, repair, construction and new construction services for VA facilities in North and South Dakota. The contract ceiling is $70 million over five years. This is designated as a 100% set-aside for service-disabled veteran-owned small businesses. The solicitation posting site and registration requirements are provided.

36C26318R0063 ATTACHMENT 9--SOW 568-15-225 Canteen Entry Upgrades (1page).docx

View the file

Other files

File Type Posted
36C26319D0069-000.docx DOCX document
36C26319D0068-000.docx DOCX document
36C26319D0067-000.docx DOCX document
36C26319D0066-000.docx DOCX document
36C26319D0065-001.docx DOCX document
36C26318R0063-0004001.pdf PDF
36C26318R0063-0004000.docx DOCX document
36C26318R0063-0003003.docx DOCX document
36C26318R0063-0003002.docx DOCX document
36C26318R0063-0003001.pdf PDF
36C26318R0063-0003000.docx DOCX document
36C26318R0063-0002000.docx DOCX document
36C26318R0063-0002001.pdf PDF
36C26318R0063-0001000.docx DOCX document
ATTACHMENT_3--Contractor_Safety_and_EMR_(2_pages).docx DOCX document
ATTACHMENT_13--FOR_INFORMATIONAL_PURPOSES_ONLY_Wage_Determination_Fargo_ND_(6_pages).pdf PDF
ATTACHMENT_5--Contractor_Financial_Disclosure_Questionaire_(1_page).docx DOCX document
ATTACHMENT_14--FOR_INFORMATIONAL_PURPOSES_ONLY_Wage_Determination_Ft._Meade_SD_(5_pages).pdf PDF
ATTACHMENT_1--Subcontractor_Information_and_Consent_Form_(2_pages).docx DOCX document
ATTACHMENT_15--FOR_INFORMATIONAL_PURPOSES_ONLY_Wage_Determination_Sioux_Falls_SD_(5_pages).pdf PDF
ATTACHMENT_7--Price_Schedule_Sheet_(1_page).docx DOCX document
ATTACHMENT_12--Wage_Determination_Hot_Springs_SD_568-15-225_Canteen_Entry_Upgrades_(5_pages).pdf PDF
ATTACHMENT_4--Contractor_General_Information_(1_page).docx DOCX document
ATTACHMENT_2--Contractor_Surety_Limitations_(1_page).docx DOCX document
36C26318R0063_1.docx DOCX document
ATTACHMENT_10--Specifications_568-15-225_Canteen_Entry_Upgrades_(264_pages).pdf PDF
ATTACHMENT_11--Drawings_568-15-225_Canteen_Entry_Upgrades_(5_pages).pdf PDF
ATTACHMENT_8--Cost_Breakdown_Spreadsheet_-_For_Modifications.xls XLS spreadsheet
ATTACHMENT_7a--Price_Schedule_Breakdown_(1_page).docx DOCX document
ATTACHMENT_6--Contractor_Past_Performance_Questionaire_(5_pages).docx DOCX document
36C26318R0063-004.docx DOCX document
36C26318R0063-003.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indefinite Delivery Indefinite Quantity (IDIQ) Contracts Solicitation 36C26318R0063

ATTACHMENT 9

Scope of Work

Project Number: 568-15-225 Project Title: Canteen Entry Upgrades

Description of Work: Work shall include, but shall not be limited to providing all labor, materials, equipment, etc. necessary to make upgrades to the exterior entrance to the Canteen, Building 5 at the Hot Springs, South Dakota VA Medical Center in accordance with this Scope of Work, the contract documents, all applicable federal, state and local codes.

Work shall include, but shall not be limited to making alterations of the existing canopy to the Canteen and an addition of a vestibule to the Canteen exterior entrance. Work will include concrete demolition, new concrete work, earthwork, and electrical work.

Durations of Work: 120 days

File details come from the government source that posted it. Updated .