36C26318Q0276-00001000.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C26318Q0276
About this file
36C26318Q0276 00001 36C26318Q0276 00001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26318Q0276-000.docx | DOCX document | |
| 36C26318Q0276-001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00001 04-09-2018 438-18-2-1115-0064 None Department of Veterans Affairs Network Contracting Office 23 (NCO 23) 2501 W. 22nd St.
Sioux Falls
SD
57105 Department of Veterans Affairs Network Contracting Office 23 (NCO 23) 2501 W. 22nd St.
Sioux Falls
SD
57105 To all Offerors/Bidders
36C26318Q0276 03-26-2018
X X X
04/12/2018 2:00PM CT
438-3680162-1115-850300-2580 0100501X3 438-18-2-1115-0064 X one Solicitation 36C26318Q0276 for Fire System Inspection and Assessment Services to support the Sioux Falls VA Health Care System is hereby amended. The purpose of this amendment is to provide answers to questions that have been received.
Contractors are required to acknowledge this amendment along with their quote.
The solicitation closing date and time are not extended as a result of this amendment.
All other terms and conditions of the solicitation remain unchanged.
Greg Johnson Contracting Officer
CONTINUATION PAGE
A.1 QUESTIONS, ANSWERS AND CLARIFICATIONS
Fire System Inspection and Assessment Services for the Sioux Falls VA Health Care System Solicitation 36C26318Q0276 Amendment A00001
Questions and Clarifications:
1. What is the brand of Control Panel?
a. The brand of Control Panels is Johnson Controls Notifier IFC2-3030.
2. How many Control Panels are there?
a. There are 4 control panels.
3. Can we do the sensitivity test from the panel?
a. Yes.
4. Do duct detectors have switches?
a. Most, but not all, of the duct smokes have remote test switches.
5. When was the last time the dry systems had 3-year full trip and do you require that?
a. The dry systems in W01, B70, and BLDG 15 are new from last year. The dry system in BLDG 1 tripped last year in 2017.
b. Yes.
6. Does the internal inspection have to be done by ultrasound or ultrasonic method?
a. Either of these methods or disconnecting the pipes and physical looking inside them is acceptable.
7. Do you have any hydrants that need inspection?
a. Yes, we have 12. The VA performs an annual flush. Also, the Chief Engineer has been in charge of flow tests on the hydrants since 2010.
8. What are your expectations for inspection of the sprinkler heads?
a. Inspect them for proper installation, obstructions, age, condition of the head, and leaks.
9. Do you have any flame detectors (special equipment needed for these tests)?
a. No.
10. How many fire doors?
a. There are 97 fire doors with door holders/closers.
11. How many pre-action sprinkler systems?
a. There are 4 pre-action sprinkler systems.
12. How many Anti-freeze systems?
a. None.
13. Are all the duct detectors accessible?
a. Most of them are but not all.
14. How many fire hydrants?
a. There are 12.
15. How many PIV’s?
a. There are 6.
16. How many fire RPZ’s?
a. There are 0.
17. Are the pre-actions tied to a Suppression gas system?
a. No.
18. Will the customer provide Heppa tents?
a. No.
19. How many smoke/fire dampers?
a. This is unknown as past inspections don’t show this information.
File details come from the government source that posted it.