36C26227Q0146.docx

DOCX document 39 KB Posted

Attached to
J041--KITCHEN HOOD PMIR - Base +4 ($0.00) [605] | POP: 01/01/2027 - 12/31/2031
Solicitation number
36C26227Q0146
Issued by

About this file

This is a Sources Sought Notice issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 22 (VA Loma Linda Healthcare System) for kitchen hood preventive maintenance and inspection and repair services. The notice, solicitation number 36C26227Q0146, is for market research and acquisition planning purposes only and does not constitute a binding procurement or commitment to award a contract. Responses must be submitted in PDF format via email to Contracting Officer Norman Napper-Rogers at Norman.Napper-Rogers@va.gov by November 27, 2026 at 10:00 AM Mountain Time. The anticipated contract period of performance is January 1, 2027 through December 31, 2031 (base plus four option years), with the place of performance at Jerry L. Pettis VA Medical Center in Loma Linda, California. The Product Service Code is J041 (Maintenance and Repair Services) and the NAICS Code is 561790 (Other Professional, Scientific, and Technical Services).

The statement of work requires the contractor to provide all labor, materials, supplies, tools, equipment, qualified personnel, and supervision for monthly and quarterly inspection, certification, testing, and maintenance of hospital kitchen hoods, ductwork, and exhaust fans. Services include steam cleaning and degreasing operations performed during evening hours (6:00 PM to 5:00 AM) according to a specified monthly and quarterly schedule, with quarterly ductwork and exhaust fan cleaning in October, January, April, and July. The contractor must possess a 30-hour OSHA safety card and be National Air Duct Cleaners Association (NADCA) certified, comply with applicable safety standards including OSHA 29 CFR, NFPA 99, and EPA guidelines, and provide written reports within 30 days of work completion. Additional requirements include 24/7 emergency support with a maximum four-hour response time, coordination with VA facilities staff, valid Loma Linda PIV badges for all personnel, workers compensation and public liability insurance per California law and federal requirements, and compliance with VA smoking and security policies. The notice indicates this is not a small business set-aside, though responses will be used to evaluate small business participation opportunities.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sources Sought Notice Sources Sought Notice

SUBJECT*
KITCHEN HOOD PMIR - Base +4 ($0.00) [605] | POP: 01/01/2027 - 12/31/2031

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
90815
SOLICITATION NUMBER*
36C26227Q0146
RESPONSE DATE/TIME/ZONE
11-27-2026 10:00 MOUNTAIN TIME, DENVER, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
J041
NAICS CODE*
561790
CONTRACTING OFFICE ADDRESS
NCO 22

Department of Veterans Affairs Network Contracting Office (NCO) 22 4811 Airport Plaza Dr STE 600 Long Beach, CA 90815-1372

POINT OF CONTACT*

Contracting Officer Norman Napper-Rogers Norman.Napper-Rogers@va.gov

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

VA Loma Linda Healthcare System (VALLHCS)

Jerry L. Pettis VA Medical Center (VAMC)

11201 Benton Street

Loma Linda CA

POSTAL CODE
92357-1000
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

This Sources Sought Notice is issued solely for information gathering and acquisition planning purposes. This notice does not constitute a solicitation, Request for Proposal (RFP), Request for Quotation (RFQ), Invitation for Bid (IFB), or a commitment by the Government to award a contract.

The Department of Veterans Affairs is conducting market research to identify qualified sources capable of meeting the requirements described herein and to support acquisition planning activities. Responses to this notice will be used by the Government to assist in determining the appropriate acquisition strategy for a future competitive procurement. Based on information received, the Government may determine whether a set-aside is appropriate or may pursue another acquisition strategy.

The Government will not reimburse any costs incurred in responding to this notice.

Responses shall be submitted electronically in PDF format only. Discussions will not be conducted for this Sources Sought Notice.

Submit responses via email to:

Contracting Officer: Norman Napper-Rogers Email: Norman.Napper-Rogers@va.gov

Subject Line

Sources Sought Response – 36C26227Q0146 - KITCHEN HOOD PMIR – VALLHCS

MARKET RESEARCH PURPOSE

The Government intends to use responses to this notice to:

· Determine the availability of qualified sources capable of meeting the requirement.

· Assess industry capabilities and commercial practices.

· Identify potential acquisition risks and challenges.

· Support acquisition planning activities.

· Assist the Government in determining the most appropriate procurement strategy.

· Evaluate potential small business participation opportunities.

· Support development of the acquisition strategy for a competitive future procurement.

ADDITIONAL NOTICE

This Sources Sought Notice is issued solely for market research and acquisition planning purposes. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government does not intend to award a contract based solely on responses to this notice and will not reimburse any costs associated with preparing or submitting information in response to this request.

The Government reserves the right to determine the appropriate acquisition strategy based upon information received and any additional market research conducted.

A.1 STATEMENT OF WORK (SOW)

1. Contract Title

Kitchen Hood PMIR.

2. Background

The VA Loma Linda Healthcare System (VALLHCS) Facility Maintenance Services requires the award of a service contract for the cleaning of the hospital kitchen hoods, duct, and exhaust fans for the VALLHCS. provides high-quality care while ensuring the safety of its staff, patients, and visitors. A critical component of this commitment involves ensuring that all kitchen hoods within the VA facility are functioning optimally and meet applicable regulatory standards. Regular inspection and certification of this equipment are essential for supporting clinical and patient care operations while protecting personnel and the environment from hazards. The services shall comply with this Statement of Work (SOW), equipment manufacturer, and all applicable VA, local, state, and Federal policies, and regulations.

3. Objective

The objective of this service contract is to have a contractor to provide all labor, materials, supplies, tools, equipment, parts, software (needed for the general operation of the equipment), travel, supervisors, and qualified personnel to provide monthly and quarterly certification, testing and maintenance services for the existing hospital kitchen hoods, duct, and exhaust fans for the VALLHCS.

4. Scope

Service/Work to be Performed:

The Contractor shall provide all parts labor, transportation, tools, equipment, supervision, and certified personnel to perform on-site quarterly and monthly inspections and certifications of Kitchen Hoods.

Contractors shall steam-clean and degrease kitchen hoods, ductwork, and exhaust fans that support the Facility Dietetics and Canteen Services.

4.1. Contractors shall clean and remove cooking by-products from all hoods, ductwork, and fans using the following schedule:

4.1.1. Work shall begin at 6 pm on the days stated below and end NLT 5 am the following morning.

4.1.2. The Canteen Bistro Hood will be cleaned on the first and third Fridays of each month.

4.1.3. Two (2) large and two (2) small hoods located in Building 2’s Main Kitchen (Rm. 1C33) will be cleaned on the second Friday of each month.

4.1.4. Two (2) small hoods located in Building 2’s Canteen (Rm 2F30) will be cleaned on the second Friday of each month.

4.1.5. Ductwork fans and exhaust fans (located on roof) will be cleaned quarterly (October, January, April, and July) on the fourth Friday of the respective month.

4.2. The following guidelines shall be used for cleaning all Kitchen Exhaust Systems:

4.2.1. Electrical switches and system components shall be locked-out-tagout (LOTO) during service procedures.

4.2.2. Fire extinguishing systems shall be taken out of service for the duration of the cleaning process.

4.2.3. All ductwork, hoods, grills, louvers, dampers, filters, and exhaust fans shall be steam-cleaned/degreased using low pressure United States Department of Agriculture (USDA) or facility approved cleaning products to remove solidified or semi-solidified cooking by-products.

4.2.4. Wash/rinse process shall utilize high pressure hot water and/or high-pressure saturated steam.

4.2.5. When service is complete, all exhaust fans shall be re-started, and access doors shall be closed and latched. Dampers shall be positioned for proper exhaust flow.

4.2.6. Affix stickers to all hoods of each exhaust system cleaned showing date of completion (MM/DD/YYYY).

4.2.7. Contractors shall clean up and dispose of all residues and placed in an on-site refuse container.

5. Reports

Reports shall contain a section covering the procedure used to make necessary major repairs. Reports shall have a section containing a summary of all test results and the contractor shall make recommendations based on a component engineering analysis of the test data. Recommendations will include areas where immediate action is required and recommended areas where additional maintenance needs to be performed. Reports shall be submitted by email or contractor website to the COR, VA Loma Linda Healthcare, within 30 days of work completion

6. Emergency Service

The contractor shall provide the following 24/7 emergency support with a maximum 4-hour response time. The contractor shall notify COR when repairs are needed. The Contractor shall give their repair assessment in writing to the COR.

7. Over and Above Repair

Upon discovery of over and above repairs or unforeseen requirements, Contractor shall immediately notify the POC. Parts shall not be procured, nor installation or repairs be initiated until approval is obtained from the Contracting Officer and appropriate Facilities Staff/POC. Charges for repair, labor and parts shall originate only when required and upon prior approval being granted by the Contracting Officer.

8. Licensing Requirements

8.1. Offeror must possess a 30-hour Occupational Safety and Health Administration (OSHA) safety card.

8.2. National Air Duct Cleaners Association (NADCA) Certified

9. Specific Requirements

9.1. Contractor shall schedule start date with POC or designee five (5) business days in advance.

9.2. Contactor personnel shall have valid Loma Linda PIV badges before starting work.

9.3. Contractor shall coordinate energy source LOCK OUT /TAG OUT procedures with VALLHCS HVAC Supervisor before starting work. When work is complete, Contractor shall notify the VALLHCS HVAC Supervisor that energy sources will be restored and require verification.

9.4. Contractor’s supervisor or lead technician are to check in with VALLHCS HVAC Supervisor, or in their absence, with Graphics Control prior to work each day.

9.5. Contractor shall conform to the following standards, policies, regulations, governing agency, and any other local, state, or Federal guidelines that are not listed here.

9.5.1. OSHA 29CFR Regulations, www.osha.gov

9.5.2. NFPA 99, www.nfpa.org

9.5.3. National Fire Protection Association (NFPA)

9.5.3.1. Standard for Ventilation Control and Fire Protection of Commercial Cooling Operations

9.5.4. Environmental Protection Agency (EPA) guidelines

9.5.5. NADCA Standard Assessment Cleaning & Restoration (ACR)

10. Authorized Services

Only those services specified herein are authorized under this contract. Before permitting and/or performing any service of a non-contract nature, the Contractor shall advise the CO of the reason (s) for the additional work and/or service. The Contractor is cautioned that only the CO or his/her designee may authorize additional service that are within the scope of this contract and that reimbursement shall not be made unless prior authorization is obtained from the CO. All changes to the contract shall be issued through a contract modification in writing from the CO to the Contractor.

11. Delegation of Authority

No additional service shall be provided without the approval from the Contracting Officer (CO) or his/her designee of this contract. The Contractor shall not accept any instructions issued by any other person(s) other than the CO or his/her delegated representative acting within the limits of his/her authority.

12. Government-Furnished Equipment (GFE) Government-Furnished Information (GFI)

No Government equipment will be used by the Vendor.

13. Complaints

Contractor shall promptly and courteously respond to complaints within three (3) working days to the COR. Including complaints brought to the contractor’s attention by the CO. Contractor shall maintain a written record of all complaints, both written and oral showing the identity of the individual, the nature of the complaint, and contractor’s response. Contractor shall permit the Government to inspect the written records of complaints upon reasonable notice from the CO.

14. Performance

Base Plus four (Base +4 Option Years) from performance start date. Work may be scheduled during the day or night (Depending on load demand), Monday thru Friday and/or Saturday thru Sunday.

· Daytime hours: 0600 am to 1600 pm

· Evening hours: 1600 pm to 0600 am

Contractor shall initiate work within 2 weeks of being contacted by the designated Contracting Officer’s Point of Contact (POC) or designee. Work shall be scheduled through the POC or designee, who will coordinate with VALLHCS staff. Timelines are subject to change due to VALLHCS operational requirements.

15. Place of Performance

Department of Veterans Affairs VA Loma Linda Healthcare System (VALLHCS) Jerry L. Pettis VA Medical Center (VAMC) 11201 Benton Street Loma Linda, CA 92357-1000

16. Security Requirements

The C&A requirements do not apply, and Security Accreditation Package is not required.

This service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.

17. Period of Performance

Federal Holidays

New Year’s Day
January 01
Martin Luther King’s Birthday
Third Monday in January
President’s Day
Third Monday in February
Memorial Day
Last Monday in May
Juneteenth
June 19
Independence Day
July 04
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veterans Day
November 11
Thanksgiving Day
Fourth Thursday in November
Christmas Day
December 25

If the holiday falls on a Sunday, the following Monday will be observed as a national holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.

18. Identification, Check-in, Parking, and Smoking Regulations

Identification

Contractor personnel shall present a neat appearance and be easily recognized as Contractor employees. Examples: wearing of distinctive clothing such as uniform, badges, patches, etc.

The vendor's employees shall wear visible identification at all times while on VALLHCS premises. Contractor employees shall report to VA Police upon entry to the VALLHCS facility to get a visitor badge. Contractor shall be required to coordinate with the COR to obtain the VA provided I.D. badges for all staff. All VA provided I.D. badges shall be returned at the end of the contract or upon completion of service. Failure to wear ID badges may result in removal from any of the VA facilities and/or otherwise referred to Government property.

Contractor employees are required to be escorted by the COR or designee’s office once on campus prior to commencement of work. During emergencies contractor personnel shall check in with VALLHCS Police if the VALLHCS COR or designee is not available.

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

Parking

It is the responsibility of the contract personnel to park in the appropriate designated parking areas. Parking information is available from VA Police & Security Service Office. The Contractor assumes full responsibility for any parking violations.

Smoking & Vaping

Veterans Health Administration (VHA) Directive 1085, dated March 5, 2019, provides a comprehensive smoke-free policy for patients, visitors, contractors, volunteers, and vendors, at the Department of Veterans Affairs (VA), Veterans Health Administration (VHA) health care facilities. This updated VHA directive implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities, as defined in this directive, based on scientific evidence regarding the adverse health effects of secondhand and thirdhand smoke exposures.

The Assistant Deputy Under Secretary for Health for Administrative Operations (10NA) and the Assistant Deputy Under Secretary for Health for Clinical Operations (10NC) are responsible for the contents of this directive. Questions may be referred to VHA Smoke Free: vhasmokefree@va.gov.

This VHA directive is scheduled for recertification on or before the last working day of March 2024. This VHA directive will continue to serve as national VHA policy until it is recertified or rescinded.

Weapons and Contraband

Possession of weapons or contraband is prohibited and shall be subject to arrest and termination from future performance under this contract. Enclosed containers, including tool kits, shall be subject to search. Violations of VALLHCS regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

Safety

All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VALLHCS shall comply with applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract.

Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to Government equipment. Every effort shall be made to safeguard human life and property.

Contractor shall comply with all applicable Federal, State, and local requirements regarding workers’ health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.137.

Contractor shall provide all necessary tools, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely.

19. Contractor Personnel

Contractor’s Program Manager

The Contractor shall provide a contract program manager who shall be responsible for the performance of the work. The name of this person shall be designated in writing to the Contracting Officer. The Contractor’s Program Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

Contractor’s Employees

The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

Contract Personnel shall be subject to the same quality assurance standards or exceed current recognized national standards as established by the Joint Commission (JC).

20. Contractor Qualifications & Other Responsibilities

Contractor shall obtain all necessary licenses required to perform this work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees’ fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government.

The Government reserves the right to accept or reject Contractor’s employee for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct will be dealt with by the Contractor and COR with the final decision being made by the Contracting Officer.

21. Insurance Coverage

The Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee’s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.

The Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.

Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.

Contractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.

22. Invoicing and Payment

Overtime & Holiday Pay

Any overtime and/or holiday pay that may be entitled to the Contractor’s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.

Contractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for “availability” or “on-call” services unless otherwise provided herein.

Payments for leave, including sick leave or vacation time, are the sole responsibility of the contractor.

Invoices

Payment of services rendered under this contract shall be made in arrears upon satisfactory completion of each service and receipt of a properly prepared invoice and submitted by the Contractor to the payment address specified by Contracting. Invoices shall reference the Contract Number and Purchase Order Number, Manifest Number(s), provide a complete and accurate description of services/ supplies delivered/ rendered, including dates of performance, amounts, unit prices, extended totals and any other data relevant for payment purposes.

The Government shall not authorize payment until such time that the VALLHCS COR all properly executed and signed documentation.

No advance payments shall be authorized. Payment shall be made on a monthly arrears for services provided during the billing month in arrears in accordance with FAR 52.212-4, para. (i). Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.

Payment of invoices may be delayed if the appropriate invoices as specified in the contract are not completed and submitted as required.

**End of Statement of Work**

END OF SOURCES SOUGHT NOTICE

*= Required Field
Sources Sought Notice

Sources Sought Notice

File details come from the government source that posted it. Updated .