This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office 22 for a water treatment services contract.

The amendment extends the Request for Quote (RFQ) due date to December 1, 2026, at 1:00 PM PST and modifies the Period of Performance to December 15, 2026 through December 14, 2027 for the base year, with four additional option years extending through December 14, 2031. The solicitation is for chemical water treatment services covering two VA facilities: Sepulveda Ambulatory Care Center (SACC) and Los Angeles Ambulatory Care Center (LAACC). Services include monthly maintenance visits, chemical treatment for boilers, chillers, and cooling towers, cooling tower cleaning, and quarterly Legionella testing. The contract requires contractor-provided safety training and testing documentation for the engineering team. Quotes must remain firm for 60 calendar days, and award will be based on price combined with special standards including testing capabilities and training provision. The Price/Cost Schedule includes five line items per contract period (base and four options): monthly chemical water treatment, monthly water treatment services, annual cooling tower cleaning, four quarterly Legionella tests, and undiscovered work. The delivery location is 16111 Plummer Street, North Hills, CA 91343. The amendment includes responses to 63 submitted questions clarifying equipment specifications, service frequencies, Legionella testing procedures, chemical storage requirements, and administrative details. All results must be submitted to the Contracting Officer as PDF files or via website access.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 16

0002 11-24-2026

36C262

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

36C262

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

To all Offerors/Bidders

36C26227Q0121

11-24-2026

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 12-01-2026 13:00 PST

See CONTINUATION Page

X 1

Please see below for changes and answers to questions asked.

Helena Roba Contracting Officer

CONTINUATION PAGE

The purpose of this amendment are as followed:

1. Extending the RFQ due date to 12/1/2026 at 1300 PST.

2. Period of Performance changed to 12/15/2026 – 12/14/2027 for the base year and options to years as per the schedule on this amendment.

3. Price breakdown changes as needed by the Department of Veterans Affairs. (SEE

BELOW)

4. Answer questions asked during solicitation period.

Questions with Answers:

1. SOW Part I 3.0 lists “(32) Pot Feeders (SACC) Contractor shall verify count,” and Part II

3.0 lists “(1) Pot Feeder (LAACC) Contractor shall verify count.” Please confirm the actual number of pot feeders at each site. Please also confirm the counts of boilers, chillers, cooling towers, and closed loops at each site.

16 Pot Feeders SACC and 1Pot Feeder at LACC.

2. The past performance evaluation asks for “2-3 contracts performed on similar preventive maintenance and repair on sterilizing equipment,” and the submission checklist says “sterilized equipment.” Please clarify what equipment this means. Does it mean water treatment for steam supplied to sterilizers or autoclaves, or the sterilization equipment itself? Does water treatment of boilers, chillers, and cooling towers in a healthcare facility satisfy this requirement?

Answer: Please disregards as it was for a previous solicitation and it was missed to remove the sterilizing part of it.

3. SOW section 4.1 says “Provide chemical storage tanks as required by facility operations.” Please state the chemical storage tank capacity in gallons and the number of tanks at each site, and describe delivery access to them.

There are three outdoor storage units for the chiller plant and three indoor tanks for the boilers. Chemicals must be transported to the storage area using a dolly or pallet jack.

4. Item (10) of the quote contents says past performance information “will not be considered,” but the evaluation requires 2-3 past performance contracts. Is past performance evaluated?

Answer: Yes, past performance is evaluated to determine if the company familiar with similar scope of work.

5. SOW section E says option years are “to be defined in the contract award,” but the Price/Cost Schedule has Option Years 1 through 4. Are the four priced option years the intended option periods?

Answer: Yes, we are looking for a base plus four (4) option years.

6. One provision says quotes must be held firm for 60 calendar days, and another says 30 calendar days. Which applies?

Answer: 60 calendar days.

7. The basis for award is “Price with Special Standards.” Please define “Special Standards.”

Answer: Price, Provide testing and safety training for Engineering team: cooling water systems.

8. Cooling towers and chillers (SOW Parts I and II, §3.0). Please provide the rated tonnage and design recirculation flow (GPM) for each cooling tower or cell, and the rated tonnage for each chiller. At Sepulveda, please include the three chiller-plant towers and the separate tower behind the diesel generator. At Los Angeles, please include all three rooftop towers. Please identify any towers that share a common loop or basin.

SACC has four cooling towers serving the chiller plant, not three as previously stated.

The separate tower behind the generator has a flow rate of 737 GPM. The four chiller-plant towers have a combined nominal capacity of 3,668 tons, and the three chillers have a combined capacity of 2,800 tons. LAACC’s three chillers have a combined capacity of 720 tons.

9. Boilers (Parts I and II, §§3.0–4.1). Please provide the rated boiler horsepower (BHP) and normal operating pressure for each of the three Sepulveda firetube boilers. For the three Los Angeles hot-water boilers, please provide rated capacity (BTU/hr or MMBtu/hr). Please confirm whether Los Angeles has any steam boilers or condensate-return systems in scope, as those services are referenced in §4.1 but the equipment list shows hot-water boilers.

SACC has 500-horsepower boilers operating at 90 psig and a capacity of 16.8 million BTU. LAACC has 1.7-million-BTU hot-water boilers only; the reference to steam was an error.

10. System volumes (Parts I and II, §§3.0–4.1). Please provide the estimated operating water volume in gallons for each independent condenser-water/cooling-tower circuit, chilled-water loop, heating-hot-water loop and boiler/feedwater/condensate system in scope, where available. Equipment schedules, nameplate data, or design estimates would be helpful if verified volumes are unavailable.

See question 8 for volume. Everything is N/A.

11. . Chemical usage and equipment (Parts I and II, §§4.1–4.2). If available, please provide the most recent 12 months of chemical consumption and makeup-water usage by system, along with operating seasons. Please identify the installed chemical-feed and control equipment and clarify which storage tanks or other feed equipment the contractor must furnish at startup.

Chemical usage data is unavailable. All existing equipment will remain in place; any vendor-requested changes will be made at the vendor’s expense.

12. Service and testing quantities (Parts I and II, §§4.2–4.3). Please confirm the minimum routine on-site service visits per month at each facility. For pricing the required laboratory work, please provide the number of routine sampling points per facility and identify any Los Angeles building-water sampling points in scope separately from the cooling towers. Please clarify whether corrective disinfection and repeat testing following an out-of-range result must be included in the monthly price and what quantities offerors should assume, if applicable.

Service is required once per month at Sepulveda and twice per month at LAACC.

Additional testing and hyperchlorination are not included and will be handled through a change order.

13. . Annual inspections (Parts I and II, §4.2). Please clarify whether the VA or its maintenance contractor will handle shutdown, opening, and reassembly of boilers and condensers, or whether the water treatment contractor should include that labor in its price.

The maintenance contractor will open the boilers for inspection.

14. System Capacity: Could you provide the nominal tonnage of the various systems requiring water treatment?

SACC has four cooling towers serving the chiller plant, not three as previously stated. The separate tower behind the generator has a flow rate of 737 GPM. The four chiller-plant towers have a combined nominal capacity of 3,668 tons, and the three chillers have a combined capacity of 2,800 tons. LAACC’s three chillers have a combined capacity of 720 tons.

15. Flow Rates: Could you provide the GPM (gallons per minute) flow rates for the various water loops equipped with chemical bypass feeders?

The system is not equipped with a flow meter.

16. Boiler Capacity: Could you provide the horsepower (HP) ratings of the steam boilers at each facility, where applicable?

SACC has 500-horsepower boilers operating at 90 psi and a capacity of 16.8 million BTU. LAACC has 1.7-million-BTU hot-water boilers only; the reference to steam was an error.

17. Part I and Part II, section 4.3, cooling tower Legionella validation testing. How many samples does VA require per cooling tower per quarter? Please confirm the total per quarter at SACC (4 towers) and at LAACC (3 towers).

The four count of the cooling tower was incorrect. SACC has five cooling towers: four serving the chiller plant and one serving the generator. Accordingly, collect five samples at SACC and three at LAACC per quarter.

18. Section 4.3 says testing is quarterly "during operation." Do the cooling towers at both sites operate year-round, so that four sampling events per year are required at each site?

Yes. The cooling towers at both sites operate year-round, requiring four quarterly sampling events annually at each site.

19. Part II, section 4.3, quarterly Legionella testing for building systems at LAACC. How many samples are required per quarter, and from which systems or outlets? Is there a current sampling plan or risk assessment that sets the locations? If so, please provide it.

Collect one sample from each tower per quarter unless Legionella is detected.

20. Who collects the Legionella samples: the contractor or VA staff?

The contractor, or a hired subcontractor, will collect the samples.

21. What are the laboratory requirements? Please confirm the required method (for example, culture by ISO 11731:2017), any accreditation or CDC ELITE Program membership requirement, the required detection limit and the required turnaround time for results.

Use a CDC ELITE-recognized laboratory; turnaround time will depend on the laboratory.

22. Section 7.0 gives action thresholds for cooling towers. What thresholds and required actions apply to the building system samples at LAACC?

Section 7 already specifies the applicable limits and required actions.

23. Section 7.0 requires a retest in 3 to 7 days after any result of 10 CFU/mL or higher, and disinfection at 1,000 CFU/mL or higher. Are these retests and remedial disinfections included in the fixed monthly price, or will VA order and pay for them separately? If they are included, please provide the number of results at or above 10 CFU/mL at each site over the last 24 months so quoters can price them.

Additional testing and hyperchlorination are not included and will be handled through a change order.

24. Section 4.4, WSMT reporting. Will the contractor be given access to enter results in WSMT directly, or does the contractor send results to the COR for entry? The SACC section says "Reports go to COR" and the LAACC section does not.

For both sites, submit all reports to the COR as PDF files or provide COR access to retrieve the results from the company’s website.

25. Addendum to 52.212-2, factor (2), Past Performance, asks for contracts on "preventive maintenance and repair on sterilizing equipment." Please confirm VA wants past performance on water treatment services

Answer: Yes, it is for water treatment, please disregard sterilizing language.

26. Addendum to 52.212-2, factor (3), Qualifications, asks for "proof of testing and safety training for Engineering team." What document does VA want with the quote to meet this factor?

Monthly reports will serve as proof of testing and signed attendance sheets will document training. Submit both to the COR.

27. Apart from controller calibration (monthly at SACC, twice a month at LAACC), is there a minimum number of on-site service visits per month at each site?

No additional minimum number of on-site service visits is required; however, visits must be scheduled for the annual boiler and chiller inspections.

28. The site visit is Friday 20 November 2026, after the question deadline of Wednesday 18 November 2026. Will VA accept questions that arise from the site visit, and by what date?

No. The site walkthrough has already occurred.

29. Performance begins 1 December 2026, one week after quotes are due. Will VA allow a transition period for a new contractor to deliver chemicals, equipment and the web-based reporting software?

Yes.

30. Equipment Sizing: Please provide the following for both sites:

- Chiller and cooling tower tonnage, including the SACC tower behind the diesel generator

- Boiler HP or BTU rating and operating pressure

- Approximate volume of the closed loops and heating hot water systems See question 9.

31. Water Usage: Is makeup water or blowdown data available for the cooling towers and boilers, along with current cycles of concentration?

No data is available.

32. Existing Equipment: Are the current controllers, feed pumps, and pot feeders Government-owned or owned by the incumbent?

Equipment onsite are Government owned.

33. Current Program: Can you share the current chemical products and approximate annual usage?

We do not track the usage. Boiler plant: Nalco 22352 NexGuard boiler treatment and Nalco BC1011 oxygen scavenger.

Chiller plant: Nalco 3DT465 corrosion and scale inhibitor, Nalco ST70 Stabrex, and Nalco 7330 biocide.

34. Site Visit: Will a site visit be held at SACC and LAACC before quotes are due?

Answer: Yes, invitation is posted.

35. LAACC Scope: Section 1.0 mentions steam boilers and condensate return, but the equipment list shows only (3) hot water boilers. Please confirm which applies.

The references to steam boilers and condensate return at LAACC were included in error.

36. Past Performance: The evaluation asks for contracts on sterilizing equipment. Will contracts for cooling tower, boiler, and closed-loop water treatment be accepted?

Answer: Please disregard the sterilizing language as it was a mistake.

37. Please clarify if this legionella requirement is for systems other than the Cooling Towers.

Cooling Tower testing is Quarterly?

The requirement applies only to cooling towers.

38. Please describe the acceptable form of “proof of testing and safety training for Engineering team: boiler and cooling water systems.” For example, is it a training syllabus, instructor credentials, or certifications such as Certified Water Technologist (CWT)? Are any specific technician certifications required under SOW?

Provide a trainer-signed attendance sheet identifying the training provided. Because the training covers basic facility operations, the instructor does not need to be certified.

39. Each period has a single CLIN covering both sites. Should offerors break out pricing by site (SACC and LAACC), or by recurring service versus annual tasks (tower cleanings, disinfections, inspections)?

Answer: Please break down by location.

40. Please provide the nominal tonnage, make, and model of each chiller (3 Trane at SACC; 3 York at LAACC).

SACC has four cooling towers serving the chiller plant; the previously stated count of three was incorrect. The cooling tower behind the generator is 737 GPM. The SACC cooling towers have a total nominal capacity of 3,668 tons, and the three chillers have a combined capacity of 2,800 tons. The LAACC chillers are being replaced, and specifications are not yet available.

41. For each cooling tower (4 at SACC, including the tower behind the diesel generator; 3 at LAACC), please provide the condenser water circulation rate (GPM), basin and system volume (gallons), and current target cycles of concentration.

SACC has four cooling towers serving the chiller plant, correcting the previously stated count of three. Each tower has its own basin, and the site uses one common sump. The standalone cooling tower behind the generator has a flow rate of 737 GPM. The SACC cooling towers have a combined nominal capacity of 3,668 tons, while the three chillers have a combined capacity of 2,800 tons. The LAACC chillers are being replaced, and their specifications are not yet available.

42. For each boiler (3 firetube at SACC; 3 hot water at LAACC), please provide: (a) boiler type (steam or hot water); (b) rated boiler horsepower; (c) operating pressure; and (d) for steam boilers, the approximate percentage of condensate returned.

SACC has 500-horsepower boilers operating at 90 psig and a capacity of 16.8 million BTU. LAACC has 1.7-million-BTU hot-water boilers only; the reference to steam was an error. and there is no flow meter on our condensate return.

43. Please provide the system volume (gallons) and flow rate (GPM) of each closed loop (chilled water and heating hot water) that has a bypass (pot) feeder.

SACC has 16 pot feeders, and LAACC has one. GPM flow data is unavailable because the systems do not have flow meters.

44. The SOW lists 32 pot feeders at SACC and 1 at LAACC, and states “Contractor shall verify count.” Please provide the location of each pot feeder and the system it serves.

SACC has 16 pot feeders, and LAACC has one. A list identifying the buildings and locations will be provided to the awarded vendor.

45. Please provide makeup water quality data, and the most recent 12 months of makeup and blowdown meter readings for the cooling towers and boilers, if available.

N/A.

46. Please identify the existing chemical controllers, feed pumps, and storage tanks by make and model. Are they Government-owned or owned by the current contractor? Will they remain in place at contract start?

All existing equipment is in place and will remain. Any vendor-requested replacements or modifications will be made at the vendor’s expense.

47. Please identify the current treatment chemistry and supplier, so that offerors can plan for chemical, reagent, and test equipment compatibility.

The current test equipment includes Nalco TRASAR 2 and 3 pens, an Ultrameter II, a Nalco sulfite test kit, and a trace hardness test kit.

48. Please provide the incumbent contract number and current annual contract value.

Answer: Please provide your best pricing.

49. Beyond controller calibration (monthly at SACC; twice monthly at LAACC), please confirm the expected frequency of site visits for testing and chemical top-off. Please also confirm allowable work hours, and any badging, escort, or background check requirements.

Service visits will follow the controller calibration schedule. Chemical top-offs should be ordered based on needs identified during those visits.

50. LAACC equipment is listed as hot water boilers, but the LAACC scope references steam boilers and condensate return. Please confirm whether any steam boilers or condensate systems exist at LAACC.

`LAACC has only hot-water boilers.

51. For the annual condenser tube inspections, will the VA or another contractor open and close the chiller heads? Or is that the water treatment contractor’s responsibility?

The maintenance contractor will open the boiler and chiller equipment for inspection.

52. SACC boiler inspections are to be completed alongside the site’s annual boiler maintenance. Please confirm that the boiler maintenance contractor or VA staff will open and close the boilers, and how scheduling will be coordinated.

The maintenance contractor will open the boiler and chiller equipment for inspection.

The COR will obtain and coordinate the schedule for each location.

53. At ≥1,000 CFU/mL, the SOW requires disinfection and retesting, repeated “until <10 CFU/mL.” Should offerors include an unlimited number of remediation events in the firm-fixed monthly price? Or will remediation beyond the scheduled disinfections be priced separately or handled by modification?

Additional testing and hyperchlorination are not included and will be handled through a change order.

54. LAACC requires quarterly Legionella testing for “building systems as required by risk assessment and local policy.” Please provide the number and type of sample points per quarter, and confirm whether this testing applies to potable water systems.

Each cooling tower has a dedicated basin for Legionella sampling. Water-treatment samples are collected near the cooling-tower controllers and at the boiler plant sampling station.

55. Must Legionella samples be analyzed by a CDC ELITE-certified or otherwise accredited laboratory? Please also confirm how the contractor will be granted access to report results in the VHA Water Safety Management Tool (WSMT), or whether results are reported through the COR.

Use a CDC ELITE-recognized laboratory and email the results to the COR.

56. “Provide chemical storage tanks as required by facility operations”: please state the quantity and size of tanks expected, or confirm that existing tanks will remain in place.

There are three outdoor storage units for the chiller plant and three indoor tanks for the boilers. Chemicals must be transported to the storage area using a dolly or pallet jack.

57. Closed loops are to be treated assuming up to 10% water loss per year. How should chemical consumption beyond that threshold (for example, from leaks or system draining) be handled?

Any chemicals required beyond the planned top-off allowance will be handled through a change order.

58. Please define the expected duration and number of “loaner pumps, controllers, and test meters” to be provided when VA equipment requires repair. Are repairs to Government-owned feed equipment outside this contract’s scope?

The vendor is not responsible for equipment repairs but must keep the pumps primed and provide temporary equipment until the VA’s equipment is repaired or replaced.

59. Is a California Department of Pesticide Regulation (DPR) Pest Control Business License and Qualified Applicator License required for cooling tower biocide application at these federal facilities? Are any other state or local licenses required?

Yes. All chemicals must comply with California requirements.

60. Can we ask how many cooling tower controllers they have? This will determine if they have 4 separate cooling towers or one tower with multiple basins.

Each site has one cooling tower controller that controls the sump.

61. Do we know the make and models of each cooling tower? This will give me a better idea on how to price the tower cleanings. Maybe they can give a rough estimate on size. For example, is it an 8ft x 10ft tower.

SACC Cooling Tower 11'-10" Length 21'-7" width 19'-1" height

SACC behind Generator Overall Diameter 12.36 ft Overall Height: 10.47 ft

62. Any limitation for chemicals? Can a 55-gallon drum be brought to the equipment (Towers and boilers)? Are there any stairs?

There are three outdoor storage units for the chiller plant and three indoor tanks for the boilers. Chemicals must be transported to the storage area using a dolly or pallet jack.

63. Is the legionella testing requirement for both sites only for the quarterly monitoring of Cooling Towers.

Yes.

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES

QUANTI

TY UNIT UNIT PRICE AMOUNT

0001 12.00 MO ___________ ___________

Chemical Water Treatment Contract Period: Base POP Begin: 12-15-2026 POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

0002 12.00 MO __________ ____________

Monthly Water Treatment Services Contract Period: Base POP Begin: 12-15-2026 POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

0003 1.00 YR _________ ___________

Cooling Tower Cleaning Services Contract Period: Base POP Begin: 12-15-2026 POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

0004 4.00 EA __________ ____________

Legionella Test for Water Treatment Contract Period: Base POP Begin: 12-15-2026 POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

0005 1.00 EA _________ _____________

Undiscovered work within the scope of work for Water Treatment.

Contract Period: Base

POP Begin: 12-15-2026 POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

1001 12.00 MO ________ __________

Chemical Water Treatment Contract Period: Option 1 POP Begin: 12-15-2027 POP End: 12-14-2028

1002 12.00 MO _________ ____________

Monthly Water Treatment Services Contract Period: Option 1 POP Begin: 12-15-2027 POP End: 12-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

1003 1.00 YR _________ ___________

Cooling Tower Cleaning Services Contract Period: Option 1 POP Begin: 12-15-2027 POP End: 12-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

1004 4.00 EA __________ __________

Legionella Test for Water Treatment Contract Period: Option 1 POP Begin: 12-15-2027 POP End: 12-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

1005 1.00 EA __________ ____________

Undiscovered work within the scope of work for Water Treatment.

Contract Period: Option 1 POP Begin: 12-15-2027 POP End: 12-14-2028

PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

2001 12.00 MO _________ ___________

Chemical Water Treatment Contract Period: Option 2 POP Begin: 12-15-2028 POP End: 12-14-2029

2002 12.00 MO _________ __________

Monthly Water Treatment Services Contract Period: Option 2 POP Begin: 12-15-2028 POP End: 12-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

2003 1.00 YR _________ __________

Cooling Tower Cleaning Services Contract Period: Option 2 POP Begin: 12-15-2028 POP End: 12-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

2004 4.00 EA ________ ___________

Legionella Test for Water Treatment Contract Period: Option 2 POP Begin: 12-15-2028 POP End: 12-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

2005 1.00 EA __________ ___________

Undiscovered work within the scope of work for Water Treatment.

Contract Period: Option 2 POP Begin: 12-15-2028 POP End: 12-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

3001 12.00 MO _________ ___________

Chemical Water Treatment Contract Period: Option 3 POP Begin: 12-15-2029 POP End: 12-14-2030

3002 12.00 MO _________ ____________

Monthly Water Treatment Services Contract Period: Option 3 POP Begin: 12-15-2029 POP End: 12-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

3003 1.00 YR _________ __________

Cooling Tower Cleaning Services Contract Period: Option 3 POP Begin: 12-15-2029 POP End: 12-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

3004 4.00 EA _________ __________

Legionella Test for Water Treatment Contract Period: Option 3 POP Begin: 12-15-2029 POP End: 12-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

3005 1.00 EA _________ ___________

Undiscovered work within the scope of work for Water Treatment.

Contract Period: Option 3 POP Begin: 12-15-2029 POP End: 12-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and

Sewage Treatment Equipment

4001 12.00 MO _________ ____________

Chemical Water Treatment Contract Period: Option 4 POP Begin: 12-15-2030 POP End: 12-14-2031

4002 12.00 MO _________ __________

Monthly Water Treatment Services Contract Period: Option 4 POP Begin: 12-15-2030 POP End: 12-14-2031 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

4003 1.00 YR _________ ___________

Cooling Tower Cleaning Services Contract Period: Option 4 POP Begin: 12-15-2030 POP End: 12-14-2031 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

4004 4.00 EA __________ ___________

Legionella Test for Water Treatment Contract Period: Option 4 POP Begin: 12-15-2030 POP End: 12-14-2031 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J046 - Maintenance, Repair, and Rebuilding of Equipment - Water Purification and Sewage Treatment Equipment

4005 1.00 EA _________ __________

Undiscovered work within the scope of work for Water Treatment.

Contract Period: Option 4 POP Begin: 12-15-2030 POP End: 12-14-2031

GRAND

TOTAL

A.2 DELIVERY SCHEDULE

ITEM

NUMBER SHIPPING INFORMATION QUANTITY

DELIVERY

DATE

0001 -

SHIP TO: 16111 Plummer Street North Hills, CA 91343

USA

12.00

MARK FOR: Donte Davis 818-987-3748 Donte.Davis@va.gov

FOB: DESTINATION

A.1 PRICE/COST SCHEDULE
ITEM INFORMATION

A.2 DELIVERY SCHEDULE

File details come from the government source that posted it. Updated .