36C26227Q0085 0002.docx
DOCX document 50 KB Posted
- Solicitation number
- 36C26227Q0085
About this file
This file is an Amendment/Modification (Standard Form 30) to Solicitation 36C26227Q0085, issued by the Department of Veterans Affairs Network Contracting Office in Long Beach, California. The amendment extends the proposal submission deadline to Thursday, November 26, 2026, at 10:00 AM Pacific Standard Time, and comprises a comprehensive Questions and Answers section addressing clarifications on solicitation requirements for furniture installation, moving, storage, and inventory management services at the Southern Arizona VA Healthcare System (SAVAHCS).
The core requirement is for an Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract with a base period from December 31, 2026, through December 30, 2027, plus four option years, with performance extending through December 30, 2031. Services include furniture installation, relocation, disassembly/reconfiguration, warehousing, inventory management, and related labor across multiple VA facilities in Southern Arizona, including clinics in Tucson, Yuma, Sierra Vista, Safford, Green Valley, and Fort Huachuca. The solicitation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Pricing shall be submitted as hourly labor rates for specified categories (Lead Installer, Installer, Laborer, Off-Hours Labor), destination-specific trip charges, and monthly storage rates expressed per occupied square foot. The Government estimates approximately 6,200 square feet of existing inventory requiring transfer and storage but does not guarantee minimum workload, quantities, or annual expenditures. Contractors must provide warehouse facilities within 50 miles of the Tucson VA Medical Center (though additional regional storage is permissible), possess or subcontract for manufacturer certifications (Herman Miller, Steelcase, Knoll, Haworth, Allsteel), meet emergency response requirements (three hours for urgent/off-duty requests; two business days for routine urgent work), and comply with applicable Service Contract Labor Standards wage determinations by county. The incumbent contractor is Facilities Company LLC under contract number 36C25822D0002 (expiring December 31, 2026). The Government will not provide detailed inventory listings, current warehouse locations, historical workload data, or site visits prior to proposal submission; all transition activities and initial inventory relocation shall be priced within the standard CLIN structure without separate startup charges.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26227Q0085 0001.docx | DOCX document | |
| D.1 STATEMENT OF WORK.pdf | ||
| D.3 FMS Vendor File Update Request Form.pdf | ||
| D.4 VA10091 Vendor Request Form.pdf | ||
| 36C26227Q0085_1.docx | DOCX document | |
| D.2 WAGE DETERMINATION.pdf | ||
| D.5 W9 Request for Taxpayer Identification Number and Certification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 11-23-2026 678-27-1-625-0001
VA-27-00004343
36C262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach
CA
90815 36C262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach
CA
90815 To all Offerors/Bidders
36C26227Q0085
X X
RFQ 36C26227Q0085_1 – Furniture Installation, Moving, Storage, and Inventory Services
SCHEDULE, DATES, AND PRICING STRUCTURE
1. (Amendment 0001; E.1 Addendum) The revised due date, Thursday, November 26, 2026, is Thanksgiving Day, a federal holiday. Please confirm that offers are due at 10:00 AM PST on that date or provide a revised date.
Government Response: Yes.
2. (B.3 vs. SOW §3) B.3 shows each period ending November 30 (e.g., 12/31/2026 – 11/30/2027), but SOW §3. A show each ordering period ending December 30 (e.g., 12/31/2026 – 12/30/2027). Which dates govern?
Government Response: Corrected date is 12/31/2026 – 12/30/2027.
3. (B.3; SOW §6. A, §6. E.2) Every CLIN is listed as quantity 1, unit "EA," but SOW §6. A says services are priced per hour, and §6. E.2 bills storage by square footage measured monthly. Should offerors enter an hourly rate (labor), a monthly per-square-foot rate (warehouse), and a per-trip rate, or a total annual lump sum per CLIN?
Government Response: For purposes of proposal submission, the "1 EA" quantity shown on the Price/Cost Schedule represents a pricing item only and does not alter the pricing basis identified in the Statement of Work (SOW).
Offerors shall provide: Hourly Labor Rates for each labor category identified in the SOW (e.g., Lead Installer, Installer, Laborer, and Off-Hours Labor), expressed as a fully guaranteed hourly rate. Destination-Specific Trip Charges as fixed prices for each applicable destination, route, or trip category identified in the solicitation. Monthly Storage Rates expressed on a per occupied square foot, per month basis, as required by the SOW. Offerors should include a detailed pricing worksheet or supporting schedule showing all proposed labor rates, trip charges, and storage rates. The Government will evaluate proposed pricing based on the submitted unit rates and charges identified above and will use those rates to determine the overall evaluated price in accordance with the solicitation's price evaluation methodology. The "1 EA" designation is for administrative schedule purposes only and should not be interpreted as requiring offerors to propose a single lump-sum price in lieu of the required labor, trip, and storage rates.
4. (B.3; E.2(b)) If unit rates are expected, please give the estimated annual quantities VA will use to evaluate price: labor hours, average stored square footage (SOW §5.A cites about 6,000 sq ft), and number of trips.
Government Response: The Government does not intend to provide a detailed inventory listing or the current warehouse location as part of this solicitation. The information provided in the Statement of Work, including the estimated storage requirement of approximately 6,200 square feet and the general categories of items to be stored and managed, is considered sufficient for proposal preparation. Offerors shall develop their technical and pricing proposals based on the information provided in the solicitation and their own professional experience and assumptions. Inventory quantities, item types, and storage requirements may fluctuate during contract performance based on the needs of the Government. The successful contractor will be provided with access to the information necessary to facilitate transition and performance after award. Any inventory records, storage location details, and turnover information required for contract execution will be coordinated by the Contracting Officer's Representative (COR) during the transition period.
5. (B.3 CLIN 0004 "Yuma") CLIN 0004 has no description and appears only in the base period. Please describe the work it covers (e.g., the 2027 Yuma Clinic relocation), its unit of measure, and whether Yuma work in option periods falls under the Labor and Trip Charges CLINs.
Government Response: The solicitation currently identifies the applicable base and option periods; however, offerors shall rely on the dates stated in the Schedule of Supplies/Services and Prices. If there is any discrepancy between sections of the solicitation regarding the period of performance, the Government will issue an amendment to clarify the start and end dates for the base period and each option period. Regarding services at the Yuma Community-Based Outpatient Clinic (CBOC), offerors shall include all costs associated with performance at all required locations, including travel, labor, transportation, equipment, and related expenses, within their proposed pricing. The current schedule structure does not contemplate a separate line item for routine trips to the Yuma CBOC. Offerors shall propose pricing based on the anticipated requirements and geographic locations identified in the solicitation. The "1 EA" designation represents the estimated quantity for pricing purposes and does not authorize separate reimbursement for individual trips unless specifically provided elsewhere in the solicitation. Any changes to the pricing structure or establishment of separate CLINs for travel-related costs will be addressed through a solicitation amendment, if deemed necessary by the Government.
6. (B.3 CLINs x003 "Trip Charges") Please define "Trip Charges." Are they billed per trip, per crew, per vehicle, or by mileage? Which locations trigger them? Is travel time billable under Labor?
Government Response: A separate trip rate is required only if expressly identified in the pricing schedule or contract CLIN structure. If the solicitation does not provide a separate CLIN or line item for travel, offerors shall incorporate all anticipated travel and transportation costs associated with servicing the Yuma location into their proposed pricing. Offerors are responsible for reviewing the solicitation and pricing schedule and proposing rates that adequately account for performance at all locations identified in the Statement of Work, including any associated travel, labor, equipment, and transportation costs. Unless specifically provided for in the contract, the Government does not intend to separately reimburse travel costs beyond the awarded contract pricing.
7. (SOW §3. B) Should off-duty, weekend, and holiday labor be priced at a separate premium rate, or included in the Labor CLIN rate?
Government Response: included in the Labor CLIN rate.
8. (SOW §3; C.4) Please provide historical workload data for the current contract: annual hours, number of projects, average stored square footage, number of trips, and annual spend. Please also give the current contract number and incumbent.
Government Response: New requirement. Previous contract Number is 36C25822D0002. Incumbent: FACILITIES COMPANY LLC.
TECHNICAL AND PERFORMANCE REQUIREMENTS
9. (SOW §5. E) Must the warehouse within 50 miles of SAVAHCS be under lease or ownership when the offer is submitted, or will a letter of intent or lease commitment effective by contract start date be acceptable?
Government Response: a letter of intent or lease commitment effective by contract start date will be acceptable.
10. (SOW §5. G) Where is the current VA inventory (about 6,200 sq ft) stored? Is moving it to the successor's warehouse billable under the Labor/Trip Charges CLINs, or should offerors absorb it in their pricing? Will the incumbent's inventory list be provided at award?
Government Response: The Government will not disclose the current warehouse location prior to award. The successful contractor will coordinate the transition of Government inventory following contract award. The initial transfer of inventory from the incumbent contractor's warehouse to the successor contractor's warehouse shall be priced using the applicable contract CLINs, including labor and trip charges, as appropriate. Offerors should not assume that this effort will be compensated outside of the awarded contract pricing structure. To the extent available and appropriate, the Government will provide the successful contractor with the incumbent inventory records and item listings after award to facilitate transition and performance. Any information provided will be subject to Government review and availability.
11. (SOW §4. A) May the required installation certifications (Herman Miller, Steelcase, Knoll, Haworth, All steel) be held by a member of a joint venture offeror, or by that member's installers, rather than by the joint venture entity itself?
Government Response: Yes. For a joint venture offeror, the required installation certifications may be held by an individual joint venture member or by the installers who will perform the work on behalf of the joint venture, provided the offeror clearly identifies the certified entity and/or personnel in its proposal. The proposal must demonstrate that certified personnel will be available and responsible for performing the applicable installation services throughout contract performance. Documentation supporting the required certifications shall be submitted with the offer and will be evaluated as part of responsibility and technical evaluation, as applicable.
12. (SOW vs. §8. A) §1 requires at least 3 years of experience with multi-manufacturer furniture systems, and §8. A requires 2 years for the Project Manager and Lead Installer. Does the 3-year requirement apply to the offeror firm, its personnel, or both?
Government Response: The 3-year experience requirement in SOW §1 applies to the offeror's demonstrated experience as a firm performing work involving multi-manufacturer systems furniture. The 2-year experience requirement in SOW §8. A applies specifically to key personnel, including the Project Manager and Lead Installer. Accordingly, offerors must demonstrate that their firm meets the minimum 3-year experience requirement, while proposed key personnel must meet the applicable minimum qualifications identified in §8. A.
13. (SOW §4. O) Is VA's current web-based inventory platform SnapTracker? If so, will VA or the incumbent provide a data export for migration at transition?
Government Response: The Government anticipates that SnapTracker software, inventory administration services, and annual physical inventory counts will be provided as part of the overall inventory management requirements described in the solicitation. Offerors shall propose pricing in accordance with the CLIN structure provided in the Schedule of Supplies/Services and Prices. Under the current solicitation structure, the Government does not intend to establish separate CLINs for SnapTracker software licensing, ongoing inventory administration, or annual physical inventory counts unless specifically identified elsewhere in the solicitation. Offerors shall include all costs necessary to fulfil these requirements, including software access, data management, inventory tracking, reporting, and required annual inventories, within their proposed pricing. If an offeror's pricing approach relies on distinct billing assumptions for these services, those assumptions should be clearly identified in the proposal. Any revisions to the CLIN structure, including the addition of separate labor, monthly service, or lump-sum inventory count line items, will be addressed through a solicitation amendment if determined necessary by the Government.
14. (SOW §2.B.8) For the Fort Huachuca Clinic on a military installation, will VA sponsor base access, or must contractor personnel get installation passes on their own? Are there additional vetting requirements?
Government Response: The Government will coordinate access requirements for contractor personnel requiring entry to the Fort Huachuca Clinic. However, contractors are responsible for ensuring their personnel comply with all installation access procedures, credentialing requirements, and security protocols established by the installation. Any required installation passes, background checks, or vetting processes will be administered in accordance with Fort Huachuca access policies in effect at the time of performance. Offerors should account for compliance with applicable installation access requirements in their proposed approach. Information regarding any additional access or vetting requirements will be provided to the successful contractor after award, as necessary.
15. (SOW §9; B.2) Positions are low risk (NACI) and no access to VA systems is expected beyond the contractor-hosted inventory website. Please confirm which B.2 IT Contract Security requirements apply to this contract, if any.
Government Response: Based on the requirements described in the solicitation, contractor personnel are designated as Low Risk (NACI) and are not expected to require access to VA information systems beyond the contractor-hosted inventory management website. Therefore, only those B.2 IT Contract Security requirements applicable to low-risk contractor personnel and the protection of VA information, if any is handled under the contract, apply. Contractors are not required to obtain access to VA networks, VA-issued accounts, or VA-owned information systems unless specifically directed by the Contracting Officer during contract performance. Should contract requirements change and necessitate access to VA systems, the applicable VA IT security and access requirements would be addressed at that time. Offerors should comply with all solicitation provisions as written and ensure the security of any information collected, stored, transmitted, or processed in performance of the contract.
PROPOSAL PREPARATION AND REQUIRED DOCUMENTS
16. (E.1 Addendum Factor 3(d); C.16) Factor 3(d) requires VAAR 852.219-75 and 852.219-76 certifications, but only 852.219-75 (services) is in the solicitation. Please confirm that 852.219-76 does not apply.
Government Response: Confirmed. VAAR 852.219-76, Subcontracting Commitments Monitoring and Compliance for Supply Contracts, does not apply to this solicitation. This requirement is for services, and the applicable certification is VAAR 852.219-75, Subcontracting Commitments Monitoring and Compliance for Service Contracts. Offerors are only required to complete and submit the certifications that are included in and applicable to this solicitation.
17. (E.1 Addendum Factor 3(a)) VA Form 10091 and the W-9 are now submitted through the FSC Customer Engagement Portal. Is a CEP submission confirmation acceptable as the required "verification," instead of a fax confirmation?
Government Response: Yes. Concerning successful submission through the FSC Customer Engagement Portal (CEP) is acceptable as verification that the VA Form 10091 and W-9 have been submitted. Offerors may provide the CEP submission confirmation in lieu of a fax confirmation. The verification should clearly demonstrate that the required forms were submitted and received through the FSC Customer Engagement Portal.
18. (E.1 Addendum, Labeling) Should submissions reference "36C26227Q0085_1" (as in the labeling instructions) or "36C26227Q0085" (as on the SF 30)?
Government Response: Offerors should reference Solicitation No. 36C26227Q0085_1 in their submission labeling, as this reflects the current solicitation version incorporating the amendment. Use 36C26227Q0085_1 on all proposal files and correspondence related to this solicitation to ensure proper identification and processing. SF 30 references the underlying solicitation number, while the "_1" suffix identifies the amended version currently being solicited.
19. (E.1 Addendum, Offer Format) Is there a page limit, font size, or margin requirement for the Technical Approach and Experience submissions?
Government Response: No. The solicitation does not establish a page limit, minimum font size, or margin requirement for the Technical Approach or Experience submissions. Offerors are encouraged to provide clear, concise, and complete responses that adequately demonstrate their understanding of the requirement and their capability to successfully perform the work. Excessive or unnecessarily lengthy submissions are discouraged.
20. (E.1 Addendum, Redacted/Unredacted) Redacted and unredacted versions are required for the technical proposal and previous experience (including certificates/licenses). Please confirm that the Required Documents and Price submissions need only one version each.
Government Response: Yes. The requirement to submit both redacted and unredacted versions applies only to the Technical Proposal and Previous Experience documentation, including any applicable certificates and licenses. For the Required Documents submission and the Price Proposal, offerors need only submit one version, unless otherwise specifically stated elsewhere in the solicitation or an amendment.
21. (E.1 Addendum Factor 2) Must the experience references have been performed in the past three years, or does a contract that started earlier but was active within the past three years qualify? Is there a minimum or maximum number of references?
Government Response: Contracts that began earlier are acceptable provided they were actively performed within the past three years and are relevant to the work required under this solicitation. Offerors should provide at least one relevant reference. There is no maximum number of references unless otherwise specified in the solicitation; however, offerors should limit submissions to those most relevant to demonstrating successful performance of similar requirements.
22. Solicitation Documents: Where can we obtain the complete solicitation package, including the Statement of Work, performance requirements, and applicable contract terms?
Government Response: Attached and you may find it in SAM.gov, under Solicitation 36C26227Q0085_1
23. Scope of Services: Will additional information be provided regarding anticipated furniture installation quantities, labor requirements, storage volumes, service locations, and estimated frequency of services?
Government Response: You will find the SOW in the attachment named S02. 36C26227Q0085_1 – Solicitation and in the body of this email tagged as D.1 STATEMENT OF WORK.
24. Pricing Requirements: Will the VA provide a pricing schedule, Contract Line-Item Number (CLIN) structure, or other required pricing template covering the base year and four option years?
Government Response: You will find the pricing schedule, Contract Line-Item Number (CLIN) structure, or other required pricing template covering the base year and four option years in the attachment named S02. 36C26227Q0085_1 – Solicitation.
25. Questions and Proposal Deadlines: The notice identifies November 26, 2026, at 10:00 AM Pacific Time as the response deadline. Is this the actual proposal submission deadline, or will a separate solicitation and response period follow? What is the deadline for submitting questions?
Government Response: According to the SAM.gov announcement, the bid/offers due date is November 26, 2026, at 10:00 AM Pacific Standard Time. According to the SAM.gov announcement, answers to questions/clarification will be provided on the spot or via email not later than November 23, 2026, at 10:00 AM Pacific Standard Time.
26. Site Visit: Will a site visit or preproposal conference be scheduled?
Government Response: No site visits.
27. Subcontracting Opportunities: Can you confirm whether an eligible SDVOSB prime contractor may subcontract portions of the furniture installation, moving, warehousing, and storage requirements to a qualified Large Business Concern, subject to applicable subcontracting limitations?
Government Response: Yes, as long the contractor complies with FAR 52.219-14, Limitations on Subcontracting.
28. Additional Information: Is there another procurement portal, solicitation reference, or contracting office resource where the complete project documentation can be accessed?
Government Response: You may use SAM.gov search tool, or https://www.highergov.com/
29. The Table of Contents, SECTION A, page 2 of 70 is showing an error in the bookmark.
Please see attached solicitation with no errors.
30. Please clarify the error notice and any impact on bid preparation.
None whatsoever.
31. The telephone number listed is not a working number.
To protect the integrity of the solicitation, I do not answer calls, all communication must done via email (black and white).
32. May installer and working-lead labor be priced separately, and may crew travel time from the compliant Tucson-area warehouse be billed at the applicable hourly labor rate in addition to the trip charge? Does the four-hour minimum apply to each crew member or to the crew/call as a whole?
Government Response:
Offerors may propose separate labor rates for working lead personnel and installers, provided the proposed rates are consistent with the labor categories and requirements identified in the solicitation. Pricing shall clearly identify each labor category and associated rate.
Travel time from the contractor's facility or warehouse to the work site shall not be billed separately unless specifically authorized by the solicitation. Any travel-related costs should be incorporated into the offeror's proposed pricing structure, including any applicable trip charges.
The four-hour minimum applies on a per service call basis, not on a per-employee basis. Offerors should propose staffing levels appropriate to accomplish the required work within the performance requirements of the contract. The Government will evaluate proposals in accordance with the terms of the solicitation.
Offerors are responsible for ensuring their pricing methodology adequately captures all labor, travel, transportation, overhead, and other costs necessary to perform the requirements described in the Statement of Work.
33. Should the initial relocation of the existing inventory and database setup be priced through the scheduled labor, trip, and storage rates, or is a separate startup amount permitted?
Government Response:
The initial relocation of existing inventory and establishment of the inventory database shall be included within the offeror's proposed pricing using the applicable labor, trip, storage, and other contract CLINs identified in the solicitation. A separate startup or mobilization charge is not contemplated unless specifically provided for elsewhere in the solicitation.
Offerors shall account for all costs associated with transition, inventory transfer, database setup, inventory validation, and commencement of services in their proposed pricing. The Government will not separately reimburse startup activities outside the contract pricing structure established by the solicitation.
34. The SOW requires urgent/off-duty work to start within three hours, while another paragraph requires availability within two days for urgent moves/installations. Please clarify which response standard applies in each circumstance and whether it applies at every listed clinic.
Government Response:
The response requirements identified in the Statement of Work apply to different circumstances.
The three-hour response requirement applies to urgent, emergency, or off-duty hours requests requiring immediate contractor action to support facility operations.
The two-business-day response requirement applies to routine urgent moves, installations, reconfigurations, or other non-emergency services that do not require immediate response.
Unless otherwise specified by the COR, this response requirements apply to all locations identified in the solicitation's performance area. Response times shall be measured from the time the Government issues the request to the Contractor.
The COR will identify the priority level of each task when issuing service requests. In the event of a conflict between response requirements, the more stringent requirement shall apply for emergency or mission-critical situations. Contractors are expected to maintain sufficient staffing and resources to meet the applicable response standards throughout the contract performance period.
35. Please confirm whether a separate Yuma trip rate is required for each ordering period or only where expressly listed in the price schedule.
Government Response:
A separate Yuma trip rate is required only if expressly identified in the pricing schedule or contract CLIN structure. If the solicitation does not provide a separate CLIN or line item for Yuma travel, offerors shall incorporate all anticipated travel and transportation costs associated with servicing the Yuma location into their proposed pricing.
Offerors are responsible for reviewing the solicitation and pricing schedule and proposing rates that adequately account for performance at all locations identified in the Statement of Work, including any associated travel, labor, equipment, and transportation costs. Unless specifically provided for in the contract, the Government does not intend to separately reimburse travel costs beyond the awarded contract pricing.
36. Does the Government require the performing subcontractor to hold an Arizona ROC license, USDOT number, or MC operating authority? If so, which credentials are required with the offer versus before performance?
Government Response:
The Contractor shall be responsible for obtaining and maintaining all licenses, registrations, permits, certifications, and operating authorities required by federal, state, and local laws and regulations necessary to perform the work under this contract.
The Government does not require offerors to possess a specific Arizona Registrar of Contractors (ROC) license, USDOT number, or Motor Carrier (MC) operating authority as a condition of proposal submission unless otherwise expressly stated in the solicitation. However, any contractor or subcontractor performing services that require such credentials under applicable law shall possess and maintain them prior to the commencement of performance.
Offerors are not required to submit evidence of these credentials with their proposal unless specifically requested by the solicitation. The successful contractor shall ensure that all required licenses, registrations, and authorities are obtained and remain valid throughout contract performance and shall provide documentation to the Government upon request.
Failure to obtain or maintain any required credentials shall not relieve the Contractor of its obligation to perform and may constitute grounds for contract remedies as permitted under the terms and conditions of the contract.
37. Is a current inventory list and the present warehouse/pickup address available? The SOW provides an estimated 6,200 square feet and general item categories but no detailed list or pickup address.
Government Response:
The Government does not intend to provide a detailed inventory listing or the current warehouse location as part of this solicitation. The information provided in the Statement of Work, including the estimated storage requirement of approximately 6,200 square feet and the general categories of items to be stored and managed, is considered sufficient for proposal preparation.
Offerors shall develop their technical and pricing proposals based on the information provided in the solicitation and their own professional experience and assumptions. Inventory quantities, item types, and storage requirements may fluctuate during contract performance based on the needs of the Government.
The successful contractor will be provided access to the information necessary to facilitate transition and performance after award. Any inventory records, storage location details, and turnover information required for contract execution will be coordinated by the Contracting Officer's Representative (COR) during the transition period.
38. The Government has reviewed the request for an extension of the proposal due date. Currently, the proposal due date of November 26 remains unchanged. The Government has determined that sufficient time has been provided for offerors to prepare and submit proposals based on the information contained in the solicitation.
Offerors are encouraged to submit any questions as early as possible to allow adequate time for Government review and response. Any changes to the solicitation, including an extension of the proposal due date, will be communicated through a formal amendment if deemed necessary by the Government. Accordingly, no extension of the proposal due date is being granted currently.
39. Please note that the newly issued solicitation, 36C26227Q0085_1, is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside and is not open to small businesses that do not possess SDVOSB certification.
If you an eligible Service-Disabled Veteran-Owned Small Business (SDVOSB), please submit your official before or on the close date of 11/26/2026 at 10:00 AM PST.
40. Reference: Statement of Work. Section D, Contractor General Requirements.
Comment: Furnishings replacements and new installations often require utility (electrical, water, and communications ) line rerouting and/or initial service connections. These services are not listed in the SOW Question: Would the VA consider adding a CLIN, for utility work, with a NTE dollar limit, based on historical costs charged to the VA for similar tasks on past projects?
Government Response:
The Government has considered the request; however, a separate CLIN for utility-related work will not be added at this time. Offerors shall propose pricing based on the requirements identified in the solicitation and Statement of Work. To the extent utility relocation, reconnection, or coordination activities are necessary to accomplish furniture installation, relocation, storage, or related services, offerors should account for such efforts in their proposed pricing. The Government does not intend to establish a Not-to-Exceed (NTE) CLIN based on historical utility costs, as future requirements may vary in scope, complexity, and frequency from prior projects. Any unforeseen work outside the scope of the awarded contract will be addressed in accordance with applicable contract terms and conditions.
Question: For staffing cost estimating purposes, could you provide historical operations magnitude for:
Government Response:
The Government does not maintain or guarantee historical workload data in the format requested. Offerors are advised to develop their proposals based on the requirements, performance standards, and scope outlined in the solicitation and Statement of Work.
a. Inventory Line Items Stored: Historical inventory quantities are not available. Inventory levels may fluctuate based on facility requirements and mission needs.
b. Projects Completed Annually: Historical project volume is not available. The number and size of projects may vary significantly from year to year based on funding availability and operational requirements.
c. Special Storage Requirements for Durable Medical Equipment (DME): Contractors shall provide storage facilities and handling procedures that protect Government property from loss, damage, deterioration, contamination, and environmental conditions in accordance with applicable industry standards and the requirements of the solicitation.
d. Bed Mattresses Stored: Historical mattress inventory levels are not available. Quantities may vary throughout the contract period based on facility operations and storage needs.
Offerors shall use their professional judgment and experience in developing staffing plans, storage capacity assumptions, and pricing necessary to successfully perform the requirements of the contract.
41. According to the SAM.gov announcement, the bid due date is 26 November. That gave vendors 10 days to Prepare responses and compute pricing estimates without any historical information to validate submission information Question: Please consider a bid due date extension to 3 December. This will give you time to respond to any questions you receive and allow bidders time to evaluate its responses.
Government Response:
The Government has reviewed the request for an extension of the proposal due date. Currently, the proposal due date of November 26 remains unchanged. The Government has determined that sufficient time has been provided for offerors to prepare and submit proposals based on the information contained in the solicitation.
Offerors are encouraged to submit any questions as early as possible to allow adequate time for Government review and response. Any changes to the solicitation, including an extension of the proposal due date, will be communicated through a formal amendment if deemed necessary by the Government. Accordingly, no extension of the proposal due date is being granted currently.
42. Schedule unit vs SOW pricing drivers. The Price/Cost Schedule lists each CLIN as "1 EA," while the SOW describes hourly labor categories (lead installer, installer, laborer, off-hours labor) and monthly occupied-square-foot storage. Please confirm how offerors should enter and have rates evaluated for hourly labor, destination-specific trip charges, and monthly storage under the "1 EA" schedule format.
Government Response:
For purposes of proposal submission, the "1 EA" quantity shown on the Price/Cost Schedule represents a pricing line item only and does not alter the pricing basis identified in the Statement of Work (SOW).
Offerors shall provide:
Hourly Labor Rates for each labor category identified in the SOW (e.g., Lead Installer, Installer, Laborer, and Off-Hours Labor), expressed as a fully burdened hourly rate.
Destination-Specific Trip Charges as fixed prices for each applicable destination, route, or trip category identified in the solicitation.
Monthly Storage Rates expressed on a per occupied square foot, per month basis, as required by the SOW.
Offerors should include a detailed pricing worksheet or supporting schedule showing all proposed labor rates, trip charges, and storage rates. The Government will evaluate proposed pricing based on the submitted unit rates and charges identified above and will use those rates to determine the overall evaluated price in accordance with the solicitation's price evaluation methodology.
The "1 EA" designation is for administrative schedule purposes only and should not be interpreted as requiring offerors to propose a single lump-sum price in lieu of the required labor, trip, and storage rates.
43. Startup effort. Can the initial warehouse transfer from the incumbent and the inventory setup effort be priced and billed under authorized labor hours and truck trips, or does the Government expect a separate lump-sum CLIN for startup?
Government Response:
The Government does not anticipate establishing a separate lump-sum CLIN for startup activities. Offerors should include all costs associated with the initial transition, warehouse transfer from the incumbent contractor, inventory setup, and related startup efforts within the proposed pricing structure for authorized labor hours and truck trips, as applicable. No separate reimbursement for startup activities is contemplated unless otherwise identified by solicitation amendment. Offerors are responsible for ensuring their proposed pricing adequately accounts for all costs necessary to achieve full operational capability at contract commencement.
44. Response time requirement. The SOW cites both a 3-hour start for urgent/off-hours work and a 2-day urgent response timeframe. Please confirm which requirement controls the Contractor's standing staffing and response-time commitment for pricing purposes.
Government Response:
For pricing and staffing purposes, the 3-hour response requirement controls for urgent and off-hours service requests. The Contractor shall have the capability to mobilize and begin performance within three (3) hours of notification for urgent requirements occurring outside normal business hours.
The 2-day response timeframe applies to non-emergency urgent work that does not require immediate mobilization and should be interpreted as the maximum allowable response period for those routine priority requests. Offerors shall base their staffing, scheduling, and pricing assumptions on meeting both requirements, with the 3-hour response standard governing emergency and after-hours support.
45. Performance period and Yuma trip pricing. Please confirm the base period and each option period's start and end dates. In addition, please clarify how trips to the Yuma CBOC (approximately 240 miles one-way from the SAVAHCS main campus) are to be priced during the base and option years under the current "1 EA" schedule.
Government Response:
The solicitation currently identifies the applicable base and option periods; however, offerors shall rely on the dates stated in the Schedule of Supplies/Services and Prices. If there is any discrepancy between sections of the solicitation regarding the period of performance, the Government will issue an amendment to clarify the start and end dates for the base period and each option period.
Regarding services at the Yuma Community-Based Outpatient Clinic (CBOC), offerors shall include all costs associated with performance at all required locations, including travel, labor, transportation, equipment, and related expenses, within their proposed pricing. The current schedule structure does not contemplate a separate line item for routine trips to the Yuma CBOC. Offerors shall propose pricing based on the anticipated requirements and geographic locations identified in the solicitation.
The "1 EA" designation represents the estimated quantity for pricing purposes and does not authorize separate reimbursement for individual trips unless specifically provided for elsewhere in the solicitation. Any changes to the pricing structure or establishment of separate CLINs for travel-related costs will be addressed through a solicitation amendment, if deemed necessary by the Government.
46. Inventory services billing treatment. Please confirm the accepted billing treatment for SnapTracker software, ongoing inventory administration, and annual physical counts, specifically whether these are hourly labor, a monthly rate, per-count lump sums, or a combination.
Government Response:
The Government anticipates that SnapTracker software, inventory administration services, and annual physical inventory counts will be provided as part of the overall inventory management requirements described in the solicitation. Offerors shall propose pricing in accordance with the CLIN structure provided in the Schedule of Supplies/Services and Prices.
Under the current solicitation structure, the Government does not intend to establish separate CLINs for SnapTracker software licensing, ongoing inventory administration, or annual physical inventory counts unless specifically identified elsewhere in the solicitation. Offerors shall include all costs necessary to perform these requirements, including software access, data management, inventory tracking, reporting, and required annual inventories, within their proposed pricing.
If an offeror's pricing approach relies on distinct billing assumptions for these services, those assumptions should be clearly identified in the proposal. Any revisions to the CLIN structure, including the addition of separate labor, monthly service, or lump-sum inventory count line items, will be addressed through a solicitation amendment if determined necessary by the Government.
47. Regarding your question, “Which department will be handling this internally?”, I am not at liberty to disclose that information in order to protect the integrity of the solicitation.
48. Please note that the newly issued solicitation, 36C26227Q0085_1, is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside and is not open to small businesses that do not possess SDVOSB certification.
Regarding the manufacturer installation certification requirement, the prime contractor may satisfy this requirement through qualified subcontractors, provided the contractor complies with FAR 52.219-14, Limitations on Subcontracting.
CONTINUATION OF QUESTIONS AND ANSWERS
A. Solicitation Documents and Contract History
1. Complete Solicitation Package. Please confirm that all applicable solicitation attachments have been posted, including the complete Statement of Work, Price/Cost Schedule, required forms, and any additional technical specifications.
Government response: The Government has reviewed the solicitation package and intends that all documents necessary for proposal preparation have been posted with the solicitation, including the Statement of Work (SOW), Price/Cost Schedule, applicable clauses and provisions, wage determination(s), and required proposal submission forms. It is the responsibility of offerors to review the solicitation and all posted attachments in their entirety and to monitor SAM.gov for any amendments, revisions, or additional information issued during the solicitation period. If an offeror believes a required attachment is missing, corrupted, or otherwise unavailable, the offeror should submit a question identifying the specific document at issue. The Government will review the matter and, if necessary, provide clarification or issue a solicitation amendment. Currently, the Government is not aware of any omitted solicitation attachments.
2. Contract History. Is this a new requirement or a competing of an existing contract? If currently contracted, please identify the incumbent contractor, contract number, and previous contract value.
Government Response: New requirement. Previous contract Number is 36C25822D0002. Incumbent: FACILITIES COMPANY LLC.
3. Current Contractor / Incumbent Vendor. Who is the current contractor providing furniture moving, installation, warehousing, storage, and inventory management services for SAVAHCS? Please provide the contractor’s name, current contract number, and Government Response: Contract expiration date – 12/31/2026. contract Number is 36C25822D0002. Incumbent: FACILITIES COMPANY LLC.
B. Warehouse, Inventory, and Transition Requirements
4. Warehouse Capacity. Please confirm the required square footage and whether this capacity must be dedicated exclusively to VA furniture or may be maintained within a larger shared commercial warehouse.
Government Response: The Government's current estimate is approximately 6,200 square feet of storage space for Government-owned furniture, equipment, and related inventory, as identified in the Statement of Work. This estimate is provided for proposal preparation purposes only and does not constitute a guaranteed quantity of storage requirements. The Government does not require that the proposed warehouse space be dedicated exclusively to VA inventory. Offerors may utilize a larger shared commercial warehouse facility, provided sufficient space, controls, security, inventory accountability, and accessibility are maintained to support contract performance and to ensure Government property is properly segregated, identified, managed, and protected in accordance with the requirements of the Statement of Work. Offerors remain responsible for providing adequate warehouse capacity throughout contract performance to accommodate Government storage requirements and any fluctuations in inventory volume. The Government does not guarantee any specific quantity of inventory, storage space, or warehouse utilization under the resulting contract.
5. Warehouse Location. Must all VA furniture be stored at a single warehouse within 50 miles of the Tucson VA Medical Center, or may the contractor utilize additional warehouse facilities elsewhere in Arizona?
Government Response: The solicitation requires the contractor to provide warehouse facilities that meet the requirements of the Statement of Work, including any applicable location requirements. The Government does not require that all VA furniture be stored in a single warehouse unless expressly stated in the solicitation. Offerors may utilize additional warehouse facilities, including facilities located elsewhere in Arizona, provided the proposed approach enables compliance with all contract requirements, including response times, inventory accountability, accessibility, transportation, and service performance standards. The contractor remains responsible for ensuring that all Government property is properly tracked, safeguarded, and made available to support mission requirements. Any warehouse facilities proposed for contract performance shall be clearly identified in the contractor's proposal and must support performance in accordance with the terms and conditions of the solicitation. Offerors should ensure their proposed solution can meet all required service levels regardless of the number or location of warehouse facilities utilized.
6. Existing Inventory. Please provide an inventory listing, approximate cubic footage, furniture quantities, and current storage location for the furniture to be transferred at contract commencement.
Government Response: The Government does not have a comprehensive inventory listing, furniture count, cubic footage estimate, or detailed itemized inventory available for release as part of this solicitation. The information provided in the Statement of Work, including the estimated storage requirement of approximately 6,200 square feet, represents the Government's best available estimate for proposal preparation purposes. The current storage location and detailed inventory records are not being provided under this solicitation. Specific inventory information, transfer requirements, pickup locations, and transition details will be coordinated with the successful contractor after award, as necessary to facilitate contract performance. Offerors shall prepare proposals based on the information provided in the solicitation and should not rely on any assumptions regarding exact inventory quantities, furniture types, cubic footage, storage configuration, or workload volume beyond what is expressly stated in the solicitation. The Government does not guarantee any specific quantity of inventory, storage space utilization, or furniture items under the resulting contract.
7. Initial Transfer. Will the contractor be required to relocate all existing furniture inventory within 30 calendar days of award? Will the VA provide access, loading assistance, or other support during the initial transfer?
Government Response: No. The solicitation does not require the contractor to relocate all existing furniture inventory within 30 calendar days of award. Transition and inventory transfer requirements will be coordinated between the Government and the successful contractor after contract award and in accordance with the Statement of Work and any applicable transition plan requirements.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .