S06 36C26227Q0010 0002 Amendment.pdf
PDF 320 KB Posted
- Attached to
- J042--Fire Alarm, Suppression Systems, and Hood Testing, Inspection, and Certification Services - SAVAHCS
- Solicitation number
- 36C26227Q0010
About this file
This is Amendment 0001 to a federal solicitation (36C26227Q0010) issued by the Department of Veterans Affairs, NCO 22 - Network Contracting, located in Tucson, Arizona. The amendment responds to offeror questions regarding a fire protection systems maintenance and inspection contract covering 54 buildings at what appears to be a VA facility. The base period runs January 1 through September 30, 2027, with four one-year option periods.
Key clarifications include: FDC hydrostatic testing of 34 units occurs over the contract life (7 in the first year, 6 each subsequent year); battery replacements (206 battery sets) occur every 2 years and are contractor-supplied; sprinkler internal inspections total 7 units in year one and 6 units in years two through five; extinguisher hydrostatic testing is 120 units annually; exit light inspections require 1,500 lights tested each month; semi-annual sprinkler inspections are clarified as quarterly inspections; and 24/7 offsite monitoring should be priced in CLIN 0016. The fire protection engineer (FPE) must be a direct employee on staff, preferably Arizona-licensed, and must attend quarterly contractor/owner meetings in person at the facility within 50 miles. Work hours are 0700-1630 for non-kitchen work. The Government does not have accurate device counts or specific building breakdowns and is bidding based on buildings rather than individual devices. Emergency response labor will be ordered and compensated under a separate purchase order. No further questions will be answered, and responses from Amendment 0003 to the cancelled solicitation 36C26227Q0002 do not apply to this solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26227Q0010_3.docx | DOCX document | |
| 36C26227Q0010_2.docx | DOCX document | |
| S06 36C26227Q0010 0001 Amendment.pdf | ||
| 36C26227Q0010_1.docx | DOCX document | |
| S02 36C26227Q0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 9
0002 11-06-2026
36C262
Department of Veterans Affairs
NCO 22 - Network Contracting
3601 S. 6th Avenue
Tucson AZ 85723
36C262
Department of Veterans Affairs
NCO 22 - Network Contracting
3601 S. 6th Avenue
Tucson AZ 85723
To all Offerors/Bidders
36C26227Q0010
10-23-2026
X
X X
X 1
1. The purpose of this amendment is to respond to the questions asked related to this solicitation on pages 2-9 of this amendment.
No further questions will be answered.
Norman-Napper Rogers
Contracting Officer
36C26227Q0010
Q: Respectfully request if there are any drawings or pictures of the fire windows/doors? As well as the number of glass panels, door panels, and their measurements.
A: Not currently.
Q: I wanted to ask if you happen to have the most recent fire alarm inspection reports for all buildings covered under this project. If available, could you kindly share copies with us?
A: No.
Q: Respectfully request if there are any drawings or pictures of the fire windows/doors? As well as the number of glass panels, door panels, and their measurements.
A: Not currently.
Q: FDC hydrostatic testing: CLINs 0008/1008/2008/3008/4008 each list 34 five-year FDC hydrostatic tests. Should testing be priced and performed in every period, or only in
Option Year 4?
A: Over the course of the contract.
Q: Battery replacement: CLINs 0015/1015/2015/3015/4015 include campus-wide battery replacement. Please confirm whether replacement is required in every period or only in the
Base Period, Option Year 2, and Option Year 4. If only those three periods apply, how should offerors price CLINs 1015 and 3015?
A: 1st and 3rd year.
Q: Sprinkler internal inspections: The SOW identifies 33 systems to be inspected over five years, including five systems in Option Year 4. However, the pricing schedule lists 25 inspections in the Base Period and 28 in Option Year 4, plus quantities in the intervening options. Please confirm the required quantity for each period.
A: 8 1-2-3 years 9 4th year.
Q: Extinguisher hydrostatic testing: The SOW identifies 120 units during Option Year 4, while the pricing schedule lists 140 units in each period. Please confirm the required quantities and timing.
A: 120 each year.
Q: Nine-month Base Period: The Base Period runs January 1–September 30, 2027, but certain CLINs list quantities of 12 and full annual inspection cycles. Should offerors price all quantities exactly as listed, or will the schedule be revised to reflect the nine-month period?
A: As listed.
Q: Engineering scope: The engineering CLINs reference SOW paragraphs 3.m and 3.o–3.r, which we could not locate in the supplied SOW. Please provide the referenced requirements or confirm that the CLIN descriptions and supplied SOW contain the complete engineering scope.
A: Not currently.
Q: Can the Government provide the quantities for the following items broken out by building:
- Wet Sprinkler Risers
- Dry Sprinkler Risers
- Tamper Switches
- Waterflow Switches
- Pre-Action Systems (computer rooms)
- Manual Pull Stations
- Smoke Detectors
- Heat Detector
- Duct Smoke Detectors
- Fire & Smoke Dampers
- Fire Extinguishers
- Backflow Preventers (Fire & Domestic)
- Fire Pumps
- Kitchen Hood Suppression Systems
- Special Hazards Suppression (FM-200, Halon Systems, etc.)
A: The Government does not have an accurate count. This is a bid based off buildings not devices.
Q: Can the Government provide the make/model of the fire alarm control panel?
A: The SOW has this listed.
Q: If fire alarm monitoring is a requirement under this solicitation, how many accounts need monitoring? What kind of dialers are being used onsite?
A: One (1) account/cellular.
Q: Will the Fire Extinguishers be required to have a 6-year maintenance test performed? If so, when was the last time the Fire Extinguishers had their 6-year maintenance test performed?
A: At different time frames.
Q: Will the Fire Extinguishers be required to have a 12-year hydrostatic test performed? If so, when was the last time the Fire Extinguishers had a hydrostatic test?
A: At different time frames.
Q: When was the last time the fire & smoke dampers were tested?
A: Unknown.
Q: Will the Fire Sprinkler System be required to have a 5-year internal obstruction test performed? If so, when was the last time there was a 5-year internal obstruction test performed on the Fire Sprinkler System?
A: Yes/unknown.
Q: Extinguisher hydrostatic testing: The price schedule (CLIN 0012) lists 140 per year, while the SOW lists 120 to be done during option year 4. Which quantity and timing should we price?
A: 120.
Q: Interim coverage: Contract 36C26222C0077 ended 9/30/2026 and the new base period begins 1/1/2027. Is the current work being covered by an extension or interim award until then, and who is the current provider?
A: No.
Q: Five-year internal sprinkler inspections: CLIN 0003 lists 25 per year, while the SOW lists 33 over five years with 5 in option year 4. Please confirm the intended quantity per period.
A: 7, 1st year, 6 ea other year.
Q: Semi-annual sprinkler inspections: The SOW references 130 units, while the schedule shows 4 EA. Please clarify how this should be priced.
A: Quarterly inspections.
Q: Line items 0019, 1019, 2019, 3019 and 4019, together with the language on page 48, call for Fire Protection Engineer (FPE) services from TriCord Engineering, a third-party firm.
To confirm our understanding, does the requirement call for a TriCord staff member to attend quarterly meetings, update the red-lined drawings in AutoCAD, and provide the updated drawings in both paper and electronic form? If so, must that person be a licensed
Fire Protection Engineer? Or is the intent that a licensed FPE certifies the updated drawings, while a non-engineer TriCord representative may attend the meetings?
A: FPE with in 50 miles of the VA must attend all meetings.
Q: Are the quarterly meetings expected to be held as a contractor/owner meeting with the awarded contractor & VA staff
A: Yes.
Q: And is the TriCord representative expected to attend those same meetings?
A: Yes.
Q: Does the 1,500 EA for exit light inspections mean 1,500 lights must be tested each month, or does it mean 1,500 tests total for the year?
A: Each month.
Q: Can VA provide the number of fire alarm devices per system and the size of each building so we can estimate inspection time?
A: No, VA doesn’t have accurate counts.
Q: What battery sizes are required for the 206 fire alarm battery replacements?
A: Various.
Q: How many monitoring radios and accounts are required? Does each fire alarm system have its own account, or are accounts shared?
A: Yes.
Q: What is included in the TriCord fire protection engineering requirement? Is the fire protection engineer responsible for the drawings for all 54 buildings? Can the engineer attend quarterly meetings remotely, or is in-person attendance required?
A: Required to draw all 54 buildings/must attend in person.
Q: When an inspection identifies a deficiency or failed part, what repair or replacement costs must the contractor cover under the fixed price? Is there a dollar limit, and should additional repairs be quoted individually or billed at agreed time-and-materials rates?
A: Additional quotes.
Q: Does the 34 EA for fire department connection (FDC) hydrostatic testing mean all 34 must be tested each year? Which FDCs require hydrostatic testing based on their installed configuration, and how many are subject to quarterly inspection?
A: Over the life of the contract.
Q: Can VA provide a list of buildings and the number of sprinkler systems in each? Which systems are due for five-year internal inspection in each contract year?
A: VA doesn’t have an accurate count.
Q: What are the dimensions of the kitchen hoods included in the quarterly cleaning requirement?
A: VA doesn’t have this information.
Q: What Notifier device additions or removals does VA anticipate? Is the contractor expected to perform those changes or update the redline drawings after the changes are made?
A: Update drawing as needed.
Q: What are the permitted daily work hours? Can crews work longer days to complete multiple inspections during the same visit?
A: 0700-330 for everything but kitchen work.
Q: Amendment 0003 to cancelled Solicitation 36C26227Q0002. Amendment 0003 to
36C26227Q0002, dated August 10, 2026, answered offeror questions on badging, emergency labor, repair and parts funding, monitoring billing, the VA-supplied dialer, training duration, CLIN units of measure, and other scope items. Those responses are not incorporated into 36C26227Q0010. Will the Government incorporate the Amendment 0003 responses into this solicitation by reference, or identify which responses remain applicable?
A: No.
Q: Amendment 0001, site visit. Will the Government publish the November 6, 2026 site visit attendee list with Amendment 0002?
A: No.
Q: Section E.1, Content Organization; Section C.10. Section E.1 requires two files and states that deviating from this requirement may exclude an offer. Which file should contain the VAAR 852.240-70 certification at Section C.10 and the confirmation of CEP 10091 registration?
A: Either file will work.
Q: CLIN 0019. What does the parenthetical “(TriCord)” in the CLIN 0019 description refer to (for example, a specific firm, an existing contract, or a reference document)?
A: Firm.
Q: CLIN 0019. Does “FPE on staff” require the fire protection engineer to be a direct employee of the prime contractor?
A: Yes.
Q: CLIN 0019. If Professional Engineer licensure is required, is an active license in any
U.S. state acceptable, or is Arizona registration required?
A: Preferably Arizona/Tucson but not required.
Q: CLIN 0019. May the quarterly meetings be held virtually, or must they be held in person at SAVAHCS?
A: Must be in person at SAVAHCS.
Q: CLIN 0019. What content and format does the Government expect in the “annual fire systems summary” (for example, system status, open deficiencies and impairments, NFPA and Joint Commission compliance status, and recommended corrective actions)?
A: Yes.
Q: CLIN 0019. Whose reports does “report review” cover (for example, this contract’s inspection and testing reports, reports from other VA contractors, or design and construction submittals)?
A: Anything to do with this SOW.
Q: CLINs 0002 and 0007. CLIN 0002 includes FDC inspection, and CLIN 0007 separately prices quarterly inspection of 34 FDCs. Should FDC inspection be priced only in CLIN
0007?
A: Separately.
Q: CLIN 0003; Section D.1. CLIN 0003 quantities are 25, 25, 25, 25, and 28 EA (128 total), while the SOW states “33 units inspected over 5 years” with 5 systems in Option Year 4, and Amendment 0003 to 36C26227Q0002 answered “6 per year.” Do the CLIN quantities control?
A: 7, 1st year, 6 other years.
Q: CLIN 0008. CLIN 0008 lists 34 EA in every period (170 tests over the contract term) for a test performed once every five years. What quantity of FDC hydrostatic tests should be priced in each period?
A: 7, 1st year, 6 other years.
Q: CLIN 0008; Section D.1. CLIN 0008 does not appear in the SOW. Can the Government confirm the scope is the NFPA 25 five-year hydrostatic test of FDC piping from the connection to the fire department check valve?
A: As Per NFPA 25 2026.
Q: CLIN 0015. CLIN 0015 lists 206 EA in every period. Is the intent that all 206 batteries be replaced every year, or that each battery be replaced once during the contract term?
A: Every 2 years.
Q: CLIN 0015. Does one EA under CLIN 0015 represent an individual battery or a battery set (for example, two 12-volt batteries serving a 24-volt panel)?
A: Battery set.
Q: CLIN 0015. Can the Government provide the CLIN 0015 battery quantities by voltage and amp-hour rating?
A: No, VA doesn’t have accurate information.
Q: CLIN 0015. Are CLIN 0015 replacement batteries contractor-furnished and included in the unit price, given that Amendment 0003 to 36C26227Q0002 stated repair parts are
“Purchased as needed by the VA”? This is contradictory direction and can materially affect pricing.
A: Supplied by contractor.
Q: CLIN 0015. Is the contractor responsible for removing replaced batteries from the site and recycling them?
A: Yes.
Q: CLIN 0016; Section D.1. Amendment 0003 to 36C26227Q0002 stated 24/7 offsite monitoring is “Separate billing,” and no CLIN in 36C26227Q0010 is designated for monitoring. Should offerors price 24/7 offsite monitoring in CLIN 0016?
A: Yes.
Q: CLINs 0004 and 0005. CLIN 0004 lists 6 EA and CLIN 0005 lists 2 EA (8 total), while
Amendment 0003 to 36C26227Q0002 answered “6 total” and identified the 2 CORE systems as the water washdown hoods. Should CLIN 0004 be 4 EA?
A: Yes.
Q: CLIN 0012; Section D.1. CLIN 0012 lists 140 EA in every period, while the SOW states
“120 units during OY4” and Amendment 0003 to 36C26227Q0002 answered “120.” Which quantity should be priced in each period and can the price/cost schedule be updated to reflect the correct quantity?
A: No.
Q: Section E.1, Item 5; Section D.1. Section E.1 requires an Emergency Service Plan for a two-hour response, and Amendment 0003 to 36C26227Q0002 stated “Emergency labor is not part of this bid.” How will emergency response labor be ordered and compensated, given that no CLIN covers it?
A: Separate PO.
NOTE: Any questions not answered is due to it not having any relevancy to the current solicitation and or is public information in which a contractor may request a FOIA.
File details come from the government source that posted it. Updated .