S02. 36C26226Q1038 0001 Life Safety Drawings Blg 26.pdf

PDF 154 KB Posted

Attached to
LIFE SAFETY DRAWINGS BLDG 26
Solicitation number
36C26226Q1038
Issued by

About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the Department of Veterans Affairs, NCO 22 - Gilbert Network Contracting office in Gilbert, Arizona.

The amendment (0001) modifies solicitation 36C26226Q1038 and applies to all offerors and bidders. Offerors must submit responses via email to Jasmon Cornick, Contract Specialist, at jasmon.cornick@va.gov. The amendment is not extended, meaning the original deadline for receipt of offers remains in effect. Offerors are required to acknowledge receipt of this amendment prior to the specified hour and date by completing items 8 and 15 and returning copies of the amendment, acknowledging receipt on each copy of their offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in rejection of the offer. The amendment requires the contractor to sign clause 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) on page 27 of the solicitation. The continuation page contains questions and answers regarding Building 26 life safety documentation and AutoCAD requirements, confirming that asbuilt drawings exist, the VA has existing floor plan CAD files, and AutoCAD is the preferred platform over REVIT.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

VA-26-00063102

36C262

NCO 22

Department of Veterans Affairs

NCO 22 - Gilbert Network Contracting

335 East Germann Road

Gilbert AZ 85297

36C262

NCO 22

Department of Veterans Affairs

NCO 22 - Gilbert Network Contracting

335 East Germann Road

Gilbert AZ 85297

To all Offerors/Bidders

36C26226Q1038

X

X X

Offerors shall be submitted via email to: Jasmon Cornick Contract Specialist at jasmon.cornick@va.gov.

Contractor shall sign clause 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE

FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) pg. 27 of the solicitation.

CONTINUATION PAGE

1. Does Building 26 currently have an existing Life Safety Drawing set that contains some or all of the required life safety information?Yes. Asbuilt drawings

2. Are the referenced 2026 CAD files existing Life Safety Drawings, or are they architectural/base-building floor plans that will need to be developed into Life Safety

Drawings? As builts, issued for construction CAD files.

3. Does the VA currently have an existing Statement of Conditions (SOC) and Basic

Building Information (BBI) documentation for Building 26 that will be provided to the contractor for review/update, or is the contractor expected to develop the SOC/BBI documentation as a new document? Create from asbuilts.

4. Do you have existing AutoCAD drawings of Building 26 - floor plans? Yes

5. I have AutoCAD 2025 and REVIT 2025, which platform do you prefer? AutoCad

File details come from the government source that posted it. Updated .